Letter Sequence Draft RAI |
---|
|
|
MONTHYEARML1108003792011-03-18018 March 2011 NRR E-mail Capture - Draft Request for Additional Information - Palo Verde Nuclear Generating Station, Unit 1, Steam Generator Tube Inspection Report Project stage: Draft RAI ML1108000282011-03-18018 March 2011 Request for Additional Information, Report Summarizing Results of the 2010 Steam Generator Tube Inspections Project stage: RAI ML1108000252011-03-18018 March 2011 Email, Request for Additional Information Report Summarizing Results of the 2010 Steam Generator Tube Inspections Project stage: RAI ML1116800422011-06-20020 June 2011 Review of the 2010 Steam Generator Tube Inspections During Refueling Outage 15 Project stage: Approval 2011-03-18
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24297A6212024-10-22022 October 2024 Request for Additional Information Relief Request (RR) No. 72: Re-Submittal of RR-39/ASME Code X1 IWC-3420, IWA-3300 ML24267A2172024-09-23023 September 2024 (E-Mail) Palo Verde Nuclear Generating Station Units 1, 2, and 3 License Amendment Request to Revise the Technical Specifications 3.5.1 and 3.5.2 Safety Injection Tank Pressure Bands, and to Use GOTHIC Code ML24257A1012024-09-11011 September 2024 Request for Additional Information License Renewal Commitment for AMP of Alloy 600 Components ML24248A2632024-09-0404 September 2024 Acceptance Review of Palo Verde Nuclear Generating Station, Units 1, 2, and 3, Relief Request (RR) No. 71: Re?Submittal of RR?30 ML24242A2812024-08-26026 August 2024 RR72 Acceptance 08/27/24 - La Jr ML24221A2382024-08-0606 August 2024 Change in Estimated Review Schedule and Level of Effort for Palo Verde Units 1, 2, and 3 ML24143A1112024-05-20020 May 2024 Draft 2nd Round Request for RAIs Concerning LAR to Modify LCO for TS 3.5.2, LCO for TS 3.6.5, and Surveillance Requirements 3.5.1.2 and 3.5.2.2 for TS 3.5.1 and TS 3.5.2 ML24138A1112024-05-16016 May 2024 Draft 2nd Round Request for Additional Information (Rais) Concerning License Amendment Request (LAR) to Modify Limiting Condition for Operation (LCO) for Technical Specification (TS) 3.5.2 ML24123A2002024-05-0101 May 2024 (E-Mail) Draft 2nd Round Request for Additional Information Concerning License Amendment Request to Modify Limiting Condition for Operation (LCO) for Technical Specification (TS) 3.5.2, LCO for TS 3.6.5, 3.5.1.2 and 3.5.2.2 for TS 3.5.1, a ML24120A2612024-05-0101 May 2024 Email Acceptance Review of Requested Licensing Action License Renewal Commitment 23A, Alloy 600 Management Program Plan ML24114A2812024-04-19019 April 2024 Request for Additional Information (RAI-10150-R1) ML24103A1222024-04-11011 April 2024 – Acceptance of Requested Licensing Action Re_ License Amendment Request to Revise Technical Specifications 3 ML24011A1002024-01-10010 January 2024 March 2024 Emergency Preparedness Program Inspection - Request for Information ML23334A1612023-11-30030 November 2023 NRR E-mail Capture - Palo Verde 1, 2, and 3 - RAIs Associated with License Renewal Commitment for Pressurizer Surge Line Welds Inspection Program to Manage Environmentally Assisted Fatigue ML23334A0072023-11-29029 November 2023 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Official RAIs for LAR That Revises TSs 3.5.1, SITs - Operating; 3.5.2, SIT Shutdown; 3.6.5, Containment Air Temperature; and SRs for TS 3.5.1, SITs Operating ML23298A1232023-10-25025 October 2023 NRR E-mail Capture - Palo Verde, Unit 1 - RAIs for Relief Request 70, Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle ML23243B0082023-08-31031 August 2023 NRR E-mail Capture - Action: Opportunity to Review and Comment on a New NRC Information Collection, 10 CFR Part 50.55a, Codes and Standards (3150-XXXX) ML23233A0132023-08-18018 August 2023 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Acceptance Review of License Renewal Commitment for Pressurizer Surge Line Welds Inspection Program to Manage Environmentally Assisted Fatigue ML23220A0512023-08-0303 August 2023 NRR E-mail Capture - Re Palo Verde 1, 2, and 3 - SUNSI Review of UFSAR, Rev. 22 ML23202A0162023-07-20020 July 2023 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Acceptance Review of LAR to Revise TSs 3.5.1, SITs - Operating; 3.5.2, SIT Shutdown; 3.6.5, Containment Air Temperature; and SRs for TS 3.5.1, SITs Operating ML23143A1332023-05-23023 May 2023 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Acceptance Review of LAR Revising TS 3.3.11 to Adopt TSTF-266-A, Rev. 3, Eliminate the Remote Shutdown System Table of Instrumentation and Controls ML23130A0132023-05-10010 May 2023 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Acceptance Review for Authorized Use of Mururoa Supplied Air Suits (Models V4F1 and MTH2) Pursuant to 10 CFR 20.1703 and 10 CFR 20.1705 ML23017A0932023-01-17017 January 2023 NRR E-mail Capture - Palo Verde - Acceptance of License Amendment Request Regarding Adoption of TSTF-107, Separate Control Rods That Are Untrippable Versus Inoperable (L-2022-LLA-0181) ML23013A0632023-01-13013 January 2023 NRR E-mail Capture - Palo Verde Unit 1 -Request for Additional Information - U1R23 Inspection Summary Report for Steam Generator Tubing ML22348A1672022-12-14014 December 2022 March 2023 Emergency Preparedness Exercise Inspection - Request for Information ML22339A2372022-12-0505 December 2022 NRR E-mail Capture - Palo Verde Unit 1 – Request for Additional Information - U1R23 Inspection Summary Report for Steam Generator Tubing ML22173A0682022-06-17017 June 2022 Email Concurrence on SE Input for Columbia Pltr LAR ML22167A1872022-06-16016 June 2022 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Revised Acceptance Review of LAR to Adopt TSTF-567, Add Containment Sump TS to Address GSI-191 Issues ML22136A0922022-05-16016 May 2022 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Acceptance Review of LAR to Adopt TSTF-487-A, Revision 1, Relocate DNB Parameters to the COLR ML22075A1902022-03-16016 March 2022 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Acceptance Review of LAR to Adopt TSTF-567, Add Containment Sump TS to Address GSI-191 Issues ML22055A5842022-02-24024 February 2022 NRR E-mail Capture - Palo Verde, Unit 3 - Final RAIs for 22nd Refueling Outage (Spring 2021) Steam Generator Tube Inservice Inspection Report ML22034A0132022-02-0202 February 2022 NRR E-mail Capture - Palo Verde, Unit 2 - Verbal Approval of RR-69 to Extend Containment Tendon Inspection from 2/8/22 to 6/8/22 ML22032A0312022-01-31031 January 2022 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Acceptance Review for an Exemption Regarding Elimination of Dafas Using RIPE Process ML22025A4012022-01-0303 January 2022 March 2022 Emergency Preparedness Program Inspection - Request for Information ML21333A1982021-11-19019 November 2021 NRC Review of PVNGS Training Needs Analysis and Training Required by Condition I of the Confirmatory Order EA-20-054 ML21306A1882021-10-18018 October 2021 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Second Pre-submittal Meeting for the Proposed Exemption to Eliminate Dafas Using RIPE Process ML21272A0592021-09-28028 September 2021 NRR E-mail Capture - Palo Verde 1, 2, and 3 - SUNSI Review of UFSAR, Rev. 21 ML21264A1352021-09-17017 September 2021 NRR E-mail Capture - Palo Verde 1, 2 and 3 - Acceptance Review of LAR Associated with Permanent Extension of Containment ILRT Frequency to 15 Years (Type a) and CIV Leak Rate Test Frequency to 75 Months (Type C) ML21237A0762021-08-25025 August 2021 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Acceptance Review of RR-67, Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection ML21228A0082021-08-16016 August 2021 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Acceptance Review of an LAR for Administrative Changes to Technical Specifications ML21228A1042021-08-12012 August 2021 RR-67, Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (EPID L-2021-LLR-0050) (Email) ML21237A5172021-08-10010 August 2021 Email to PV Licensee and Palo Verde Nuclear Generating Station, Units 1, 2 and 3 - Notification of Inspection of the Licensees Implementation Industry Initiative Associated with the Open Phase Condition (NRC Bulletin 2012-01) and Request Fo ML21160A1442021-06-0909 June 2021 NRR E-mail Capture - Palo Verde 1 and, 2 - Acceptance Review for Order Approving Transfers of Control of Licenses for Minority Interests Subject to Expiring Leases ML21154A0082021-05-26026 May 2021 NRR E-mail Capture - Palo Verde 1, 2 and 3 - Official RAIs for LAR Associated with Permanent Extension of Containment ILRT Frequency to 15 Years (Type a) and CIV Leak Rate Test Frequency to 75 Months (Type C) ML21146A3342021-05-14014 May 2021 ISFSI - Final Package for an Order Associated with Indirect Transfers of Control of Licenses from Pnm to Avangrid ML21132A2372021-05-12012 May 2021 NRR E-mail Capture - Palo Verde 1, 2, and 3, and ISFSI - Final Package for an Order Associated with Indirect Transfers of Control of Licenses from Pnm to Avangrid ML21103A3632021-04-13013 April 2021 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Acceptance Review for Indirect Transfer of Control of Licenses Pursuant to 10 CFR 50.80 and 10 CFR 72.50 ML21064A2372021-03-0303 March 2021 ISI Request for Information Rls ML21053A0262021-02-22022 February 2021 NRR E-mail Capture - Palo Verde 1, 2 and 3 - Acceptance Review of LAR Associated with Permanent Extension of Containment ILRT Frequency to 15 Years (Type a) and CIV Leak Rate Test Frequency to 75 Months (Type C) ML21043A1462021-02-11011 February 2021 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Official RAI for an Order Associated with Indirect License Transfer from Public Service Company of New Mexico to Avangrid, Inc 2024-09-04
[Table view] |
Text
NRR-PMDAPEm Resource From: Gibson, Lauren Sent: Friday, March 18, 2011 1:28 PM To: Russell.Stroud@aps.com Cc: Hall, Randy; Lent, Susan; Burkhardt, Janet
Subject:
Draft Request for Additional Information - Palo Verde Nuclear Generating Station, Unit 1, Steam Generator Tube Inspection Report (TAC No. ME5009)
Attachments: DRAFT REQUEST FOR ADDITIONAL INFORMATION ME50009.pdf March 18, 2011 Mr. Russell A. (Rusty) Stroud Licensing Section Leader Regulatory Affairs Palo Verde Nuclear Generating Station Arizona Public Service Company
- Rusty, By letter dated November 08, 2010 (Agencywide Documents Access and Management Systems (ADAMS)
Accession No. ML103210208), Arizona Public Service Company (APS, the licensee), submitted information summarizing the results of the 2010 steam generator (SG) tube inspections at Palo Verde Nuclear Generating Plant Unit 1.
The NRC staff has reviewed the information provided by APS and determined that the additional information requested in the attachment to this e-mail message is needed to complete its review of the SG tube inspections. In order to complete our review of the LAR in a timely manner, please submit your response to the attached RAI by April 19, 2011. Please contact me if APS would like to have a conference call to discuss this request for additional information.
Sincerely, Lauren Gibson, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation USNRC (301) 415-1056 Randy.Hall@nrc.gov 1
Hearing Identifier: NRR_PMDA Email Number: 3 Mail Envelope Properties (Lauren.Gibson@nrc.gov20110318132800)
Subject:
Draft Request for Additional Information - Palo Verde Nuclear Generating Station, Unit 1, Steam Generator Tube Inspection Report (TAC No. ME5009)
Sent Date: 3/18/2011 1:28:21 PM Received Date: 3/18/2011 1:28:00 PM From: Gibson, Lauren Created By: Lauren.Gibson@nrc.gov Recipients:
"Hall, Randy" <Randy.Hall@nrc.gov>
Tracking Status: None "Lent, Susan" <Susan.Lent@nrc.gov>
Tracking Status: None "Burkhardt, Janet" <Janet.Burkhardt@nrc.gov>
Tracking Status: None "Russell.Stroud@aps.com" <Russell.Stroud@aps.com>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 1217 3/18/2011 1:28:00 PM DRAFT REQUEST FOR ADDITIONAL INFORMATION ME50009.pdf 46382 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received:
DRAFT REQUEST FOR ADDITIONAL INFORMATION 2010 STEAM GENERATOR TUBE INSPECTIONS PALO VERDE NUCLEAR GENERATING STATION UNIT 1 DOCKET NUMBER 50-528 By letter dated November 08, 2010 (Agencywide Documents Access and Management Systems (ADAMS) Accession No. ML103210208), Arizona Public Service Company (APS, the licensee),
submitted information summarizing the results of the 2010 steam generator (SG) tube inspections at Palo Verde Nuclear Generating Plant Unit 1.
In order to complete the review, the staff requests the following information:
- 1. APS indicated that the scope of the foreign objects search and retrieval (FOSAR) effort included an inspection of the blowdown patch plate welds and that the inspections confirmed that all four patch plates (two per SG) were cracked similar to what was found in the Unit 2 SGs. Additionally, APS stated that the patch plate to lug weld was completely compromised and the patch plate to divider plate welds were completely intact. Please provide a description of the blowdown plate assembly, as well as a more complete description of the cracking found in the blowdown patch plate welds. Please summarize the basis of the conclusion that the cracking will not affect the functionality of the blowdown patch plates and that the probability of loose parts being formed is remote.
Please describe any long term follow up actions planned to confirm the conclusions.
- 2. FOSAR identified two small indications on tubes above the hot leg top of tubesheet.
Rotating probe examination identified a third tube with an indication. Please discuss the cause of these three indications (presumably the three tubes identified in Table 2 as volumetric indications). If attributed to a loose part, discuss whether the part was identified and removed. If not identified, please discuss the extent of the rotating probe examinations near these tubes.
- 3. You indicated that this examination was considered a 100% full length tubing inspection. In reviewing Table 1, it does not appear that the bend region (or horizontal run region) of approximately 900 tubes in each steam generator were inspected.
Please clarify.
- 4. Besides the FOSAR, please discuss whether any other secondary side inspections were performed. If inspections were performed, please discuss the scope and results.
- 5. In reviewing the list of tubes that were plugged, the most severe indications do not always appear to have been plugged. Please briefly describe the basis for choosing the tubes that were plugged (e.g., high growth rates, etc.).