Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML11084A00431 March 2011Safety Evaluation to Use Subsequent Edition of American Society of Mechanical Engineers (ASME) Code for Operation and MaintenanceIncorporated by reference
NL-11-0451, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors29 March 2011Financial Assurance Requirements for Decommissioning Nuclear Power ReactorsDecommissioning Funding Plan
NL-11-0481, Response to Requests for Additional Information28 March 2011Response to Requests for Additional InformationSafe Shutdown
Cyber Security
Fire Protection Program
ML11087184928 March 2011Summary of Public Meeting with Southern Nuclear Operating Co. to to Discuss Fleet Improvement Initiatives for the Southern Nuclear Plants
ML11087125024 March 2011BWR Vessel and Internals Inspection Summaries for Spring 2010 OutagesWeld Overlay
VT-2
Earthquake
EVT-1
Dissimilar Metal Weld
DM weld
NL-11-0482, Request for Additional Information (RAI) Re Fourth 10-Year Interval Lnservice Inspection Program22 March 2011Request for Additional Information (RAI) Re Fourth 10-Year Interval Lnservice Inspection ProgramWeld Overlay
Dissimilar Metal Weld
ML11293048222 March 2011FEMA Edwin I. Hatch Nuclear Plant, Final Exercise Report, Exercise Date - September 21, 2010Safe Shutdown
ML11081063621 March 2011Notice of Meeting with Southern Nuclear Operating Company, Inc., to Discuss Annual Assessment of Licensee Performance at Edwin I. Hatch Nuclear Plant with the PublicOpen House
IR 05000321/201000915 March 2011IR 05000321-10-009 and 05000366-10-009; Southern Nuclear Operating; on 11/15-19/2010 - 11/29-12/29/2010; Edwin I. Hatch Nuclear Plant, NRC Triennial Fire Protection ReportSafe Shutdown
Fire Barrier
Enforcement Discretion
Operator Manual Action
Emergency Lighting
B.5.b
Significance Determination Process
Job Performance Measure
Exemption Request
Fire Protection Program
IR 05000321/20105039 March 2011Edwin Hatch Nuclear Plant - NRC Emergency Preparedness Annual Inspection Report 05000321/2010503 and 05000366/2010503
ML1106302184 March 2011Annual Assessment Letter - Edwin I. Hatch, (IR 05000321-11-001 & 05000366-11-001)
ML1106302394 March 2011Inspection/Activity Plan, 01/01/2011 - 06/30/2012, Report 22
ML1103802063 March 20111 & 2, Edwin I. Hatch Nuclear Plant 1 & 2, and Vogtle Electric Generating Plant, 1 & 2 - Request for Additional Information on Cyber Security PlanCyber Security
ML1106106662 March 2011Notice of Public Meeting to Discuss Fleet Improvement Initiatives - Southern Nuclear Plants, Docket Nos. 50-348, 50-364, 50-424, 50-425, 50-321, and 50-366
NL-11-0317, Request for Earlier Date for IP 71003 Phase 1 Inspection1 March 2011Request for Earlier Date for IP 71003 Phase 1 Inspection
ML11258007528 February 2011E. I. Hatch, Units 1 & 2, Annual Reporting Form for Drug and Alcohol Tests for Period Ending 2010
ML11059091728 February 2011Notification of Inspection and Request for InformationNondestructive Examination
VT-2
NL-11-0323, Withdrawal of Relief Request RR-V-4, Version 2, Proposed Alternative in Accordance with 10CFR50.55a(a)(3)(ii)28 February 2011Withdrawal of Relief Request RR-V-4, Version 2, Proposed Alternative in Accordance with 10CFR50.55a(a)(3)(ii)
ML11060030728 February 2011E. I. Hatch, Units 1 & 2, Annual Reporting Form for Drug & Alcohol Tests, for Period Ending 2010
ML11060030628 February 2011E. I. Hatch, Units 1 & 2, 10 CFR Part 26, Subpart I - Managing Fatigue, for Period Ending 2010
TAC:ME435625 February 2011
ML11054046125 February 2011Request for Additional Information on Cyber Security ProgramCyber Security
ML11046047623 February 2011Request for Additional Information, Fourth 10-Year Interval Inservice Inspection Program (TAC Nos. ME4218 and ME4219)Weld Overlay
ML11053018421 February 2011Joseph M. Farley Nuclear Plant and Edwin I. Hatch Nuclear Plant - Supplement to Licensing Amendment Request for the Implement Technical Specification Task Force 425 - A. Revision 3Shutdown Margin
Hydrostatic
Squib
Surveillance Frequency Control Program
NL-11-0298, Comment (4) of M. J. Ajuni on Behalf of Southern Nuclear Operating Co. Draft NRC Regulatory Issue Summary (RIS) 2011-XX, Adequacy of Station Electric Distribution System Voltages17 February 2011Comment (4) of M. J. Ajuni on Behalf of Southern Nuclear Operating Co. Draft NRC Regulatory Issue Summary (RIS) 2011-XX, Adequacy of Station Electric Distribution System VoltagesBackfit
ML11048088117 February 2011Radiation Protection InspectionProcess Control Program
ML11048040317 February 2011Edwin I. Hatch, Units 1 and 2, and Vogtle, Units 1 and 2, Comments on Draft NRC Regulatory Issue Summary 2011-xx, Adequacy of Station Electric Distribution System Voltages.Backfit
NL-11-0298, Joseph M. Farley, Units 1 and 2, Edwin I. Hatch, Units 1 and 2, and Vogtle, Units 1 and 2, Comments on Draft NRC Regulatory Issue Summary 2011-xx, Adequacy of Station Electric Distribution System Voltages.17 February 2011Joseph M. Farley, Units 1 and 2, Edwin I. Hatch, Units 1 and 2, and Vogtle, Units 1 and 2, Comments on Draft NRC Regulatory Issue Summary 2011-xx, Adequacy of Station Electric Distribution System Voltages.Backfit
ML11048005415 February 2011Notification of Potential Part 21 Reportable Condition: Crack Indications in Marathon Control Rod Blades
ML11046048715 February 2011Notification of Potential Part 21 Reportable Condition Re Design Life of D and s Lattice Marathon Control Blades
ML11041037310 February 2011Sholly Report for Fr Publication on February 22, 2011Past operability
Pressure and Temperature Limits Report
Exemption Request
Fuel cladding
NRC-2011-0040, Sholly Report for Fr Publication on February 22, 201110 February 2011Sholly Report for Fr Publication on February 22, 2011Past operability
Pressure and Temperature Limits Report
Exemption Request
Fuel cladding
ML1103304982 February 2011Edwin Hatch - Notification of Licensed Operator Initial Examination 05000321-11-301 and 05000366-11-301
IR 05000321/201000527 January 2011IR 5000321-10-005, 05000366-10-005, 05000321-10-501 & 05000366-10-501, on 10/01/2010 - 12/31/2010, Edwin I. Hatch, Integrated Inspection ReportHigh Radiation Area
Temporary Modification
Significance Determination Process
Operability Determination
Deep Dose Equivalent
Incremental Core Damage Probability Deficit
NL-11-0162, Submittal of Revision to Relief Request RR-V-4 Fourth 10-Year Interval Inservice Testing Program26 January 2011Submittal of Revision to Relief Request RR-V-4 Fourth 10-Year Interval Inservice Testing ProgramStroke time
ML11026037926 January 2011NRC Generic Fundamentals Examination ResultsGeneric Fundamentals Examination
ML11005049414 January 2011Safety Evaluation of Relief Request HNP-ISI-ALT-10, Version 1, for the Fourth 10-Year Inservice Inspection Interval Temporary Non-Code Repair of Service Water Piping, TAC ME4253Nondestructive Examination
VT-2
Functionality Assessment
Liquid penetrant
Through-Wall Leak
ML11010060710 January 2011E-mail Acceptance Review for License Application NL-10-0794 TSTF - 5-A Delete Safety Limit Violation Notification Requirements
ML1101303907 January 2011Annual Letter - Generic Fundamentals Examination (GFE) SectionGeneric Fundamentals Examination