ML110330498
| ML110330498 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 02/02/2011 |
| From: | Widmann M NRC/RGN-II/DRS/OLB |
| To: | Madison D Southern Nuclear Operating Co |
| References | |
| Download: ML110330498 (6) | |
See also: IR 05000321/2011301
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
245 PEACHTREE CENTER AVENUE NE, SUITE 1200
ATLANTA, GEORGIA 30303-1257
February 2, 2011
Mr. Dennis R. Madison
Vice President
Southern Nuclear Operating Company, Inc.
Edwin I. Hatch Nuclear Plant
11028 Hatch Parkway North
Baxley, GA 31513
SUBJECT: EDWIN I. HATCH - NOTIFICATION OF LICENSED OPERATOR INITIAL
EXAMINATION 05000321/2011301 AND 05000366/2011301
Dear Mr. Madison:
In a telephone conversation on January 31, 2011, between Mr. J. Derwood Tootle - Operations
Training Supervisor, Anthony Ball - Exam Developer, Charlie Edmunds - Exam Developer, and
Mr. Phillip Capehart - Senior Operations Engineer, arrangements were made for the
administration of licensing examinations at the Edwin I. Hatch Nuclear Plant. The operating test
is scheduled to be administered during the two weeks of June 6 and June 13, 2011. The written
examination is scheduled to be administered the week of June 20, 2011. The on-site
preparatory week is scheduled for the week of May 16, 2011.
As agreed during the telephone conversation, your staff will prepare both the operating test, and
written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021,
"Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory
Commission (NRC) regional office will discuss with your staff any changes that might be
necessary before the examinations are administered. Your staff has also agreed to make
copies of all examination materials that are necessary for administering the examination.
To meet the above schedule, it will be necessary for your staff to furnish the operating test
outline by March 28, 2011. Mr. Phillip Capehart provided the written examination outline to your
staff on November 29, 2010. The operating test, written examination, and the supporting
reference materials identified in Attachment 3 to ES-201, will be due by April 20, 2011.
Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations
(10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the
outline, examination, and test before they are submitted to the NRC for review and approval. All
materials shall be complete and ready-to-use.
We request that any personal, proprietary, sensitive unclassified, or safeguards information in
your response be contained in a separate enclosure and appropriately marked. Any delay in
receiving the required examination and reference materials, or the submittal of inadequate or
incomplete materials, may cause the examinations to be rescheduled.
2
In order to conduct the requested written examinations and operating tests, it will be necessary
for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above. In accordance with ES-302,
your staff should retain the original simulator performance data (e.g., system pressures,
temperatures, and levels) generated during the dynamic operating tests until the examination
results are final.
Appendix E, of NUREG-1021, contains a number of NRC policies and guidelines that will be in
effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
operator and senior reactor operator license applications (Office of Management and Budget
(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),
and waiver requests, (if any)(OMB approval number 3150-0090), at least 30 days before the
first examination date. If the applications are not received at least 30 days before the
examination date, a postponement may be necessary. Signed applications certifying that all
training has been completed should be submitted at least 14 days before the first examination
date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of
Management and Budget (OMB) under approval number 3150-0018, which expires on February
28, 2013. The public reporting burden for this collection of information is estimated to average
500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining
the data needed, writing the examinations, and completing and reviewing the collection of
information. Send comments on any aspect of this collection of information, including
suggestions for reducing the burden, to the Information and Records Management Branch (T-6
F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet
electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information
and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget,
Washington, DC 20503.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be
available electronically for public inspection in the NRC Public Document Room or from the
Publicly Available Records (PARS) component of the NRCs document system (ADAMS).
ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the
Public Electronic Reading Room).
3
Thank you for your cooperation in this matter. Mr. Derwood Tootle - Operations Training
Supervisor, Anthony Ball - Exam Developer and Charlie Edmunds - Exam Developer have
been advised of the policies and guidelines referenced in this letter. If you have any questions
regarding the NRC's examination procedures and guidelines, please contact Mr. Phillip
Capehart at (404) 997-4483, (Internet E-mail: Phillip.Capehart@nrc.gov), or me at (404) 997-
4550, (Internet E-mail: Malcolm.Widmann@nrc.gov).
Sincerely,
/RA/
Malcolm T. Widmann, Chief
Operations Branch
Division of Reactor Safety
Docket Nos.: 50-321, 50-366
cc w/encl: (See page 4)
4
cc: w/encl
B. D. McKinney, Jr.
Regulatory Response Manager
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
Jeffrey T. Gasser
Chief Nuclear Officer
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
M. J. Ajluni
Nuclear Licensing Director
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
T. D. Honeycutt
Regulatory Response Supervisor
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
L. Mike Stinson
Vice President
Fleet Operations Support
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
R. D. Baker
Licensing Supervisor
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
E. G. Anners
Licensing Engineer
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
Paula Marino
Vice President
Engineering
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
R. E. Varnadore
Site Support Manager
Edwin I. Hatch Nuclear Plant
Electronic Mail Distribution
Moanica Caston
Vice President and General Counsel
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
Steven B. Tipps
Hatch Principal Engineer - Licensing
Edwin I. Hatch Nuclear Plant
Electronic Mail Distribution
Mr. Ken Rosanski
Resident Manager
Edwin I. Hatch Nuclear Plant
Oglethorpe Power Corporation
Electronic Mail Distribution
Chris Clark
Commissioner
Georgia Department of Natural Resources
Electronic Mail Distribution
Lee Foley
Manager of Contracts Generation
Oglethorpe Power Corporation
Electronic Mail Distribution
Senior Resident Inspector
U.S. Nuclear Regulatory Commission
Edwin I. Hatch Nuclear Plant
U.S. NRC
11030 Hatch Parkway N
Baxley, GA 30334
Arthur H. Domby, Esq.
Troutman Sanders
Electronic Mail Distribution
James C. Hardeman
Environmental Radiation Program Manager
Environmental Protection Division
Georgia Department of Natural Resources
Electronic Mail Distribution
Ted V. Jackson
Emergency Response and Radiation
Program Manager
Environmental Protection Division
Georgia Department of Natural Resources
Electronic Mail Distribution
F. Allen Barnes
Director
Environmental Protection Division
Georgia Department of Natural Resources
Electronic Mail Distribution
(cc w/encl: continued on page 5)
5
Cynthia A. Sanders
Radioactive Materials Program Manager
Environmental Protection Division
Georgia Department of Natural Resources
Electronic Mail Distribution
James A. Sommerville
Program Coordination Branch Chief
Environmental Protection Division
Georgia Department of Natural Resources
Electronic Mail Distribution
Mr. Steven M. Jackson
Senior Engineer - Power Supply
Municipal Electric Authority of Georgia
Electronic Mail Distribution
Mr. Reece McAlister
Executive Secretary
Georgia Public Service Commission
Electronic Mail Distribution
Chairman
Appling County Commissioners
County Courthouse
69 Tippins Street, Suite 201
Baxley, GA 31513
Southern Nuclear Operating Company, Inc
ATTN: Mr. Steve Grantham
Training Manager
Hatch Nuclear Plant
11028 Hatch Parkway North
Baxley, GA 31513
3
Thank you for your cooperation in this matter. Mr. Derwood Tootle - Operations Training
Supervisor, Anthony Ball - Exam Developer and Charlie Edmunds - Exam Developer have
been advised of the policies and guidelines referenced in this letter. If you have any questions
regarding the NRC's examination procedures and guidelines, please contact Mr. Phillip
Capehart at (404) 997-4483, (Internet E-mail: Phillip.Capehart@nrc.gov), or me at (404) 997-
4550, (Internet E-mail: Malcolm.Widmann@nrc.gov).
Sincerely,
/RA/
Malcolm T. Widmann, Chief
Operations Branch
Division of Reactor Safety
Docket Nos.: 50-321, 50-366
cc w/encl: (See page 4)
Distribution w/encl:
C. Evans, RII EICS (Part 72 Only)
L. Douglas, RII EICS (Linda Douglas)
OE Mail (email address if applicable)
RIDSNRRDIRS
PUBLIC
RidsNrrPMHatch Resource
X PUBLICLY AVAILABLE
G NON-PUBLICLY AVAILABLE
G SENSITIVE
X NON-SENSITIVE
ADAMS: X Yes
ACCESSION NUMBER: ML 110330498
X SUNSI REVIEW COMPLETE
OFFICE
RII: DRS/OL
RII:DRS/OL
RII: DRP/BR2
SIGNATURE
NAME
CAPEHART
WIDMANN
SCHAEFFER
DATE
02/02/2011
02/02/2011
02/02/2011
E-MAIL COPY?
YES
NO YES
NO YES
NO YES
NO YES
NO YES
NO YES
NO
OFFICIAL
RECORD
COPY DOCUMENT
NAME:
O:\\HATCH
EXAMINATIONS\\INITIAL
EXAM
2011-
301\\CORRESPONDENCE\\HATCH 2011-301 CORPORATE NOTIFICATION LETTER REV1.DOC