Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
RA-11-016, Response to Request for Additional Information Regarding Exelon Cyber Security Plan; Braidwood, Byron, Clinton, Dresden, LaSalle, Limerick, Oyster Creek, Peach Bottom, Quad Cities and Three Mile Island | 31 March 2011 | Response to Request for Additional Information Regarding Exelon Cyber Security Plan; Braidwood, Byron, Clinton, Dresden, LaSalle, Limerick, Oyster Creek, Peach Bottom, Quad Cities and Three Mile Island | Cyber Security |
RS-11-044, 2011 Report on Status of Decommissioning Funding for Reactors | 31 March 2011 | 2011 Report on Status of Decommissioning Funding for Reactors | |
TAC:ME3652 | 31 March 2011 | ||
ML11192A223 | 31 March 2011 | G20110504/LTR-11-0400/EDATS: SECY-2011-0400 - Ltr. Senator Mark Kirk Nuclear Accident Notifications for Braidwood, Dresden, and LaSalle Stations | |
IR 05000237/2011403 | 29 March 2011 | IR 05000237-11-403, 05000249-11-403, on 01/18/2011 01/20/2011 & 02/14/2011 - 02/18/2011, Dresden Station, Units 2 and 3; Routine Security Baseline Inspection - Cover Letter | Significance Determination Process Affidavit |
ML11363A124 | 29 March 2011 | 2011 Dresden Nuclear Power Station Initial License Examination Outline Form Es 401-1 Rev 1 and Form Es 401-3 Rev 1 | |
ML11364A002 | 29 March 2011 | 2011 Dresden Nuclear Power Station Initial License Examination Proposed Written Exam and Handouts | Safe Shutdown High Radiation Area Half scram Squib Power change |
ML11364A008 | 29 March 2011 | 2011 Dresden Nuclear Power Station Initial License Examination Proposed Job Performance Measures | Squib Job Performance Measure |
ML12021A020 | 29 March 2011 | 2011 Dresden Nuclear Power Station Initial License Examination Proposed Scenarios | Half scram Post Accident Monitoring Earthquake Power change |
ML12021A021 | 29 March 2011 | 2011 Dresden Nuclear Power Station Initial License Examination Proposed Revised Outline | |
ML12021A022 | 29 March 2011 | 2011 Dresden Nuclear Power Station Initial License Examination Administered Written Exam Handouts | |
ML12030A136 | 29 March 2011 | 2011 Dresden Nuclear Power Station Initial License Examination Administered Scenarios | Half scram Post Accident Monitoring Earthquake Power change |
ML12030A147 | 29 March 2011 | 2011 Dresden Nuclear Power Station Initial License Examination Administrative Form ES-401-4 | |
ML12030A168 | 29 March 2011 | 2011 Dresden Nuclear Power Station Initial License Examination Administrative Outline and Operating Test Comments | Earthquake |
ML12021A023 | 29 March 2011 | 2011 Dresden Nuclear Power Station Initial License Examination Administered Job Performance Measures | Squib Job Performance Measure |
ML111940507 | 23 March 2011 | FEMA Dresden Nuclear Power Station Final Exercise Report, Exercise Date - March 23, 2011 | Safe Shutdown Nuclear Accident Reporting System Fire Watch |
SVPLTR 11-0013, Submittal of Core Operating Limits Report Cycle 22, Revision 2 | 22 March 2011 | Submittal of Core Operating Limits Report Cycle 22, Revision 2 | Minimum Critical Power Ratio MELLLA |
ML11103A132 | 18 March 2011 | 2011 Dresden Nuclear Power Station Written Exam and Answer Key | Safe Shutdown High Radiation Area Half scram Squib Power change |
ML11104A069 | 18 March 2011 | 2011 Dresden Nuclear Power Station Initial License Examination Form ES-401-9 | |
ML111510628 | 18 March 2011 | 2011 Dresden Nuclear Power Station Initial Examination Administrative Files | Job Performance Measure |
ML110740770 | 14 March 2011 | Triennial Fire Protection Baseline Inspection Dates | |
RS-11-032, Extension of Response to RAI for License Amendment Request to Eliminate Main Steam Isolation Valve Closure and Low Condenser Vacuum Scram Functions During Startup Mode | 7 March 2011 | Extension of Response to RAI for License Amendment Request to Eliminate Main Steam Isolation Valve Closure and Low Condenser Vacuum Scram Functions During Startup Mode | |
ML110700326 | 7 March 2011 | Single Positive Test Form, for Pre-Access, Collected on 05/24/2010 | |
ML110700327 | 7 March 2011 | Single Positive Test Form, for Pre-Access, Collected on 10/11/2010 | |
ML110550875 | 4 March 2011 | Fleet - Request for Additional Information Regarding Approval of Cyber Security Plan | Cyber Security |
IR 05000237/2011001 | 4 March 2011 | Annual Assessment Letter for Dresden Nuclear Power Station (Report 05000237-11-001 and 05000249-11-001) | |
ML110630545 | 2 March 2011 | Ltr. 03/02/2011 Dresden Re Operator Licensing Examination Approval | |
ML110700321 | 1 March 2011 | Single Positive Test Form, for Pre-Access, Collected on 06/14/2010 | |
RS-11-024, Submittal of Fitness for Duty Performance Data Reports - Annual 2010 | 25 February 2011 | Submittal of Fitness for Duty Performance Data Reports - Annual 2010 | Fitness for Duty |
ML110700320 | 25 February 2011 | Single Positive Test Form, for Pre-Access, Collected on 10/18/2010 | |
ML110700318 | 24 February 2011 | Single Positive Test Form, for Pre-Access, Collected on 10/25/2010 | |
ML110540724 | 23 February 2011 | 2/23/11 Ltr to F. Schiffley Re Participation in Commission Meeting on 50.46a Risk-informed Emergency Core Cooling System Rule on 3/24/11 | |
SVPLTR 11-0010, Owner'S Activity Report Submittal Fourth 10-Year Interval 2010 Refueling Outage Activities | 18 February 2011 | Owner'S Activity Report Submittal Fourth 10-Year Interval 2010 Refueling Outage Activities | |
ML110480054 | 15 February 2011 | Notification of Potential Part 21 Reportable Condition: Crack Indications in Marathon Control Rod Blades | |
ML110460487 | 15 February 2011 | Notification of Potential Part 21 Reportable Condition Re Design Life of D and s Lattice Marathon Control Blades | |
NRC-2011-0040, Sholly Report for Fr Publication on February 22, 2011 | 10 February 2011 | Sholly Report for Fr Publication on February 22, 2011 | Past operability Pressure and Temperature Limits Report Exemption Request Fuel cladding |
ML110410373 | 10 February 2011 | Sholly Report for Fr Publication on February 22, 2011 | Past operability Pressure and Temperature Limits Report Exemption Request Fuel cladding |
ML110260320 | 4 February 2011 | Request for Additional Information Related to Elimination of Main Steam Isolation Valve Closure and Low Condenser Scram (TAC Nos. ME4844 & ME4845) (RS-10-021) | MELLLA |
IR 05000237/2010005 | 1 February 2011 | IR 05000237-10-005, 05000249-10-005; on 10/01/2010 - 12/31/2010; Dresden Nuclear Power Station, Units 2 & 3; Equipment Alignment, Inservice Inspection | High winds High Radiation Area Non-Destructive Examination Water Inventory Control Coatings Temporary Modification Tornado-Generated Missile Significance Determination Process Fire Protection Program |
SVPLTR 11-0001, 2011 Dresden Nuclear Power Station Initial Examination Proposed Exam Files | 18 January 2011 | 2011 Dresden Nuclear Power Station Initial Examination Proposed Exam Files | Job Performance Measure |
ML110190439 | 14 January 2011 | Ltr. 01/14/2011 Dresden Re NRC Emergency Preparedness Annual Inspection Report No. 2010501 | |
IR 05000237/2010501 | 14 January 2011 | ||
ML103420021 | 6 January 2011 | Withdrawal of License Amendment Request Concerning the Extension of the Technical Specification Completion Time for Standby Liquid Control | Probabilistic Risk Assessment |
ML103630553 | 6 January 2011 | Summary of Meeting (Teleconference) with Exelon to Discuss RAI Regarding the Implementation of an Emergency Action Level Scheme Based on NEI 99-01, Rev. 5 |