ML110740770

From kanterella
Jump to navigation Jump to search
Triennial Fire Protection Baseline Inspection Dates
ML110740770
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 03/14/2011
From: Robert Daley
Engineering Branch 3
To: Pacilio J
Exelon Generation Co, Exelon Nuclear
References
Download: ML110740770 (1)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 March 14, 2011 Mr. Michael J. Pacilio Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville IL 60555

SUBJECT:

DRESDEN NUCLEAR POWER STATION - TRIENNIAL FIRE PROTECTION BASELINE INSPECTION DATES

Dear Mr. Pacilio:

On March 4, 2011, the U.S. Nuclear Regulatory Commission (NRC) notified you of the results of its end-of-cycle performance review of the Dresden Nuclear Power Station, Units 2 and 3. In addition, the NRC provided an inspection plan for inspections scheduled through June 30, 2012.

As a result of discussions with Mr. B. Rybak and Mr. G. Ice of your staff and the staff of the Monticello Nuclear Generating Plant, we have determined that the dates listed for Inspection Procedure (IP) 71111.05T, Fire Protection (Triennial), were incorrect. The correct dates for this inspection are:

On-site weeks: July 25 - 29, 2011 August 8 - 12, 2011 August 29 - September 2, 2011 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact Ronald A. Langstaff at (630) 829-9747 with any questions you may have regarding this letter.

Sincerely,

/RA/

Robert C. Daley, Chief Engineering Branch 3 Division of Reactor Safety Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 cc: Distribution via ListServ

Mr. Michael J. Pacilio Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville IL 60555

SUBJECT:

DRESDEN NUCLEAR POWER STATION - TRIENNIAL FIRE PROTECTION BASELINE INSPECTION DATES

Dear Mr. Pacilio:

On March 4, 2011, the U.S. Nuclear Regulatory Commission (NRC) notified you of the results of its end-of-cycle performance review of the Dresden Nuclear Power Station, Units 2 and 3. In addition, the NRC provided an inspection plan for inspections scheduled through June 30, 2012. As a result of discussions with Mr. B. Rybak and Mr. G. Ice of your staff and the staff of the Monticello Nuclear Generating Plant, we have determined that the dates listed for Inspection Procedure (IP) 71111.05T, Fire Protection (Triennial), were incorrect. The correct dates for this inspection are:

On-site weeks: July 25 - 29, 2011 August 8 - 12, 2011 August 29 - September 2, 2011 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact Ronald A. Langstaff at (630) 829-9747 with any questions you may have regarding this letter.

Sincerely,

/RA/

Robert C. Daley, Chief Engineering Branch 3 Division of Reactor Safety Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 cc: Distribution via ListServ DISTRIBUTION LIST:

See next page DOCUMENT NAME: G:\DRSIII\DRS\Work in Progress\-Ltr 03__11 Dresden Fire Protection Inspection Dates RAL.docx 9 Publicly Available 9 Non-Publicly Available 9 Sensitive 9 Non-Sensitive To receive a copy of this document, indicate in the concurrence box C = Copy without attach/encl; E = Copy with attach/encl N = No copy OFFICE RIII RIII NAME RLangstaff:ls MRing RDaley DATE 03/10/11 03/10/11 03/14/11 OFFICIAL RECORD COPY

Letter to Mr. Michael Pacilio from Mr. Robert C. Daley dated March 14, 2011.

SUBJECT:

DRESDEN NUCLEAR POWER STATION - TRIENNIAL FIRE PROTECTION BASELINE INSPECTION DATES DISTRIBUTION:

Daniel Merzke RidsNrrDorlLpl3-2 RidsNrrPMDresden Resource RidsNrrDirsIrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource