Exelon Nuclear Job Performance Measure PERFORM LOGS TO CALCULATE DRYWELL LEAK RATE JPM Number: A-N-1-R Revision Number: 00 Date: 09/10 Developed By:
Instructor Date Approved By:
Facility Representative Date
A-N-1-R Page 2 of 9 Revision Record (Summary)
Revision 00 Modified for 2010 NRC exam.
A-N-1-R Page 3 of 9 SIMULATOR SETUP INSTRUCTIONS
- 1.
This is a tabletop JPM utilizing simulator procedures.
- 2.
No Simulator setup needed.
- 3.
Ensure a calculator is available and the memory/display has been cleared.
DOCUMENT PREPARATION
- 1. Clean copy of APPENDIX A, attachment A, Drywell Floor/Equipment Drain Sump Pumps Flowrate Worksheet.
A-N-1-R Page 4 of 9 INITIAL CONDITIONS
- 1. You are the Unit 2 NSO.
- 2. The Unit 2 Floor Drain and Equipment Drain Sumps were pumped by the Aux NSO, with the following data:
PUMP START PUMP STOP STOPWATCH Integrator Integrator Elapsed TIme 2A DWFDS 00382 00682 4 min 00 sec 2B DWFDS 00250 00556 4 min 15 sec 2A DWEDS 01007 01277 3 min 45 sec 2B DWEDS 00970 01236 3 min 30 sec INITIATING CUE
- 1. The Unit Supervisor has directed you to perform Appendix A, Drywell Floor/Equipment Drain Sump Pumps Flowrate Worksheet, using the data provided above.
- 2. Another Operator will verify your calculations.
- 3. Provide the worksheet to the Unit Supervisor when the task is complete.
A-N-1-R Page 5 of 9 Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-1-R Page 6 of 9 JPM Start Time:
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment Provide the examinee with the provided copy of Appendix A, DRYWELL FLOOR/EQUIPMENT DRAIN SUMP PUMPS FLOW RATE WORKSHEET.
NOTE:
Steps one (1) through four (4) may be performed in any order.
- 1.
For 2A DWFDS calculates total gallons pumped of 300 (682 - 382) divided by pumping time of 240 seconds (4 min 00 sec) equals a pump flow rate of 75 gpm.
(300 gal) x (60 sec) = __75 See Key.
___ gpm (240 sec) ( 1 min)
- 2.
For 2B DWFDS calculates total gallons pumped of 306 (556 - 250) divided by pumping time of 255 seconds (4 min 15 sec) equals a pump flow rate of 72 gpm.
(306 gal) x (60 sec) = __72 See Key.
___ gpm (255 sec) ( 1 min)
- 3.
For 2A DWEDS calculates total gallons pumped of 270 (1277 - 1007) divided by pumping time of 225 seconds (3 min 45 sec) equals a pump flow rate of 72 gpm.
(270 gal) x (60 sec) = __72 See Key.
___ gpm (225 sec) ( 1 min)
A-N-1-R Page 7 of 9 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
- 4.
For 2B DWEDS calculates total gallons pumped of 266 (1236 - 970) divided by pumping time of 210 seconds (3 min 30 sec) equals a pump flow rate of 76 gpm.
(266 gal) x (60 sec) = __76 See Key.
___ gpm (210 sec) ( 1 min)
- 5.
Notify Unit Supervisor task complete and/or the need for calculations verification.
Notifies Unit Supervisor.
Acknowledge report of task completion.
CUE:
END JPM Stop Time:_________
A-N-1-R Page 8 of 9 Operators Name:
Job
Title:
Title:
PERFORM LOGS TO CALCULATE DRYWELL LEAK RATE Revision Number: 00 JPM Number: A-N-1-R Task Number and
Title:
29800LP013, Perform the duties of a Unit NSO including monitoring the unit, answering the phones and radio, completing logs, surveillances, and daily sheets, and filling out and conducting a shift turnover.
K/A Number and Importance: Generic.2.1.18 3.6 / 3.8 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 12 minutes Actual Time Used:
minutes
References:
APPENDIX A, rev 124 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:
Date:
A-N-1-R Page 9 of 9 INITIAL CONDITIONS
- 1. You are the Unit 2 NSO.
- 2. The Unit 2 Floor Drain and Equipment Drain Sumps were pumped by the Aux NSO, with the following data:
PUMP START PUMP STOP STOPWATCH Integrator Integrator Elapsed TIme 2A DWFDS 00382 00682 4 min 00 sec 2B DWFDS 00250 00556 4 min 15 sec 2A DWEDS 01007 01277 3 min 45 sec 2B DWEDS 00970 01236 3 min 30 sec INITIATING CUE
- 1. The Unit Supervisor has directed you to perform Appendix A, Drywell Floor/Equipment Drain Sump Pumps Flowrate Worksheet, using the data provided above.
- 2. Another Operator will verify your calculations.
- 3. Provide the worksheet to the Unit Supervisor when the task is complete.
Exelon Nuclear Job Performance Measure PERFORM OFF-SITE SOURCES AVAILABLE JPM Number: A-N-2-R Revision Number: 05 Date: 09/10 Developed By:
Instructor Date Approved By:
Facility Representative Date
A-N-2-R Page 2 of 8 Revision Record (Summary)
Revision 04 Bank JPM.
Revision 05 Revised for 2010 NRC exam.
A-N-2-R Page 3 of 8 SIMULATOR SETUP INSTRUCTIONS
- 1.
Reset the simulator to IC 12, or any similar IC that has a normal full power electrical lineup.
DOCUMENT PREPARATION
- 1. Copy of Appendix X, with data filled out for Unit 3 on attachment 3.
A-N-2-R Page 4 of 8 INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. Unit 2 and Unit 3 are operating at near rated power.
- 3. The Unit 2 EDG was declared inoperable 10 minutes ago, following a failed surveillance.
INITIATING CUE
- 1. The Unit Supervisor has just directed you to verify off-site power availability with the Unit 2 EDG inoperable, in accordance with Appendix X Attachment 3 ONLY, as required by T.S 3.8.1 action condition B.1.
- 2. The Unit 3 assist NSO has already collected the data for Unit 3.
- 3. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-2-R Page 5 of 8 JPM Start Time:
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment Provide the examinee with the provided copy of Appendix X.
NOTE:
- 1.
Record & initial Bus 24-1 &
Bus 34-1 Tie ACB (902-8) position.
Examinee records OPEN position.
- 2.
Record & initial Bus 24 & Bus 24-1 Tie GCB (902-8) position.
Examinee records CLOSED position.
- 3.
Record & initial TR 22 to Bus 24 GCB (902-8) position.
Examinee records CLOSED position.
- 4.
Record & initial Bus 24 & Bus 24-1 Tie GCB (902-8) position.
Examinee records CLOSED position.
- 5.
Record & initial Bus 24-1 &
Bus 34-1 Tie ACB (902-8) position.
Examinee records OPEN position.
- 6.
Record & initial Bus 23-1 &
Bus 24-1 Volts, by selecting Bus 23-1.
Examinee records actual voltage (~4160 Volts).
- 7.
Record & initial Bus 23-1 &
Bus 24-1 Volts, by selecting Bus 24-1.
Examinee records actual voltage (~4160 Volts).
- 8.
Record & initial Bus 23 & Bus 24 Volts, by selecting Bus 23.
Examinee records actual voltage (~4160 Volts).
- 9.
Record & initial Bus 23 & Bus 24 Volts, by selecting Bus 24.
Examinee records actual voltage (~4160 Volts).
- 10. Indicate acceptance criteria met.
Examinee circles YES for acceptance criteria.
A-N-2-R Page 6 of 8 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
- 11. Enter signature, date, and time, for Performed By.
Examinee enters signature, current date, and current time, for Performed By.
- 12. Informs Unit Supervisor task is complete.
Examinee notifies the Unit Supervisor.
Acknowledge report of task completion.
CUE:
END JPM Stop Time:_________
A-N-2-R Page 7 of 8 Operators Name:
Job
Title:
Title:
PERFORM OFF-SITE SOURCES AVAILABLE Revision Number: 05 JPM Number: A-N-2-R Task Number and
Title:
299L044 Perform administrative duties for a malfunction of a piece of safety related equipment.
K/A Number and Importance: Generic.2.1.31 4.6 / 4.3 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 20 minutes Actual Time Used:
minutes
References:
Appendix X, rev 30 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:
Date:
A-N-2-R Page 8 of 8 INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. Unit 2 and Unit 3 are operating at near rated power.
- 3. The Unit 2 EDG was declared inoperable 10 minutes ago, following a failed surveillance.
INITIATING CUE
- 1. The Unit Supervisor has just directed you to verify off-site power availability with the Unit 2 EDG inoperable, in accordance with Appendix X, ONLY, as required by T.S 3.8.1 action condition B.1.
- 2. The Unit 3 assist NSO has already collected the data for Unit 3.
- 3. Inform the Unit Supervisor when the task is complete.
Exelon Nuclear Job Performance Measure VERIFY REVERSAL OF EDG COOLING WATER FLOW SURVEILLANCE JPM Number: A-N-3-R Revision Number: 02 Date: 09/10 Developed By:
Instructor Date Approved By:
Facility Representative Date
A-N-3-R Page 2 of 7 Revision Record (Summary)
Revision 01 Bank JPM.
Revision 02 Revised for 2010 NRC exam.
A-N-3-R Page 3 of 7 SIMULATOR SETUP INSTRUCTIONS
- 1.
This is a tabletop JPM utilizing simulator procedures.
- 2.
No Simulator setup needed.
DOCUMENT PREPARATION
- 1. Provide a marked up copy of DOS 6600-02.
A-N-3-R Page 4 of 7 INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. DOS 6600-02 was performed last shift, for the U2 Diesel Generator Cooling Water Flow Reversal.
- 3. The off-going Field Supervisor was unable to verify the paperwork, and has turned it over to you.
- 4. The NLO reported all surveillance requirements were within specifications.
INITIATING CUE
- 1. Verify all requirements are within specifications, and paperwork is correct.
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-3-R Page 5 of 7 JPM Start Time:
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment Provide the examinee with the provided copy of DOS 6600-02.
NOTE:
- 1.
Candidate should identify step I.5 has a mathematical error.
Identifies differential pressure should read 4.
- 2.
Candidate should identify step I.15 OR step I.16 is signed off as verified dP of <6 (actual is 7).
Identifies incorrect verification of dP <6.
- 3.
Candidate should identify that steps I.21.a & b have been initialed by the same person performing the surveillance and were NOT independently verified.
Identifies step NOT independently verified.
- 4.
Notify Unit Supervisor of discrepancies.
Notifies Unit Supervisor, may dispatch Operators to verify/correct issues, also may initiate IR.
Acknowledge report of task completion.
CUE:
END JPM Stop Time:_________
A-N-3-R Page 6 of 7 Operators Name:
Job
Title:
Title:
VERIFY REVERSAL OF EDG COOLING WATER FLOW SURVEILLANCE Revision Number: 02 JPM Number: A-N-3-R Task Number and
Title:
299L080 Perform the administrative duties for conduct of surveillance, special, or complex procedures K/A Number and Importance: Generic.2.2.12 3.7 / 4.1 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 10 minutes Actual Time Used:
minutes
References:
DOS 6600-02, rev 19 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:
Date:
A-N-3-R Page 7 of 7 INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. DOS 6600-02 was performed last shift, for the U2 Diesel Generator Cooling Water Flow Reversal.
- 3. The off-going Field Supervisor was unable to verify the paperwork, and has turned it over to you.
- 4. The NLO reported all surveillance requirements were within specifications.
INITIATING CUE
- 1. Verify all requirements are within specifications, and paperwork is correct.
- 2. Inform the Unit Supervisor when the task is complete.
Exelon Nuclear Job Performance Measure PERFORM CCSW ACTIVITY CALCULATION JPM Number: A-N-4-R Revision Number: 01 Date: 09/10 Developed By:
Instructor Date Approved By:
Facility Representative Date
A-N-4-R Page 2 of 7 Revision Record (Summary)
Revision 00 New JPM.
Revision 01 Revised for 2010 NRC exam.
A-N-4-R Page 3 of 7 SIMULATOR SETUP INSTRUCTIONS
- 1.
This is a tabletop JPM utilizing simulator procedures.
- 2.
No Simulator setup needed.
- 3.
Ensure a calculator is available and the memory/display has been cleared.
DOCUMENT PREPARATION
- 1. Provide a marked up copy of DOS 1500-08.
A-N-4-R Page 4 of 7 INITIAL CONDITIONS
- 1. You are an on-shift Operator.
- 2. The Unit 2 NSO started DOS 1500-08, then had to leave shift for medical reasons.
INITIATING CUE
- 1. Complete DOS 1500-08, data sheet 1 step A, for the A CCSW heat exchanger calculated CCSW Sample Activity Limit.
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-4-R Page 5 of 7 JPM Start Time:
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment Provide the examinee with the provided copy of DOS 1500-08.
NOTE:
The following steps can be performed in any order.
- 1.
Examinee fills out running pumps for dilution flow (3 Circ pump per unit and 5 Service Water pumps).
See attached key.
- 2.
Examinee calculates Dilution flow (1,017,000 gpm).
See attached key.
- 3.
Examinee enters dilution flow (from above) to calculate CCSW Activity Limit.
See attached key.
- 4.
Examinee calculates CCSW Activity Limit (2.91 x 10-5).
See attached key.
- 5.
Informs Unit Supervisor task is complete.
Examinee notifies the Unit Supervisor.
Acknowledge report of task completion.
CUE:
END JPM Stop Time:_________
A-N-4-R Page 6 of 7 Operators Name:
Job
Title:
Title:
PERFORM CCSW ACTIVITY CALCULATION Revision Number: 01 JPM Number: A-N-4-R Task Number and
Title:
277L003, Perform discharge of CCSW from contaminated LPCI heat exchanger during CCSW pump operation surveillance.
K/A Number and Importance: Generic.2.3.11 3.8 / 4.3 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 15 minutes Actual Time Used:
minutes
References:
DOS 1500-08, rev 17 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:
Date:
A-N-4-R Page 7 of 7 INITIAL CONDITIONS
- 1. You are an on-shift Operator.
- 2. The Unit 2 NSO started DOS 1500-08, then had to leave shift for medical reasons.
INITIATING CUE
- 1. Complete DOS 1500-08, data sheet 1 step A, for the A CCSW heat exchanger calculated CCSW Sample Activity Limit.
- 2. Inform the Unit Supervisor when the task is complete.
Exelon Nuclear Job Performance Measure REPORTABILITY DETERMINATION JPM Number: A-N-1-S Revision Number: 00 Date: 09/10 Developed By:
Instructor Date Approved By:
Facility Representative Date
A-N-1-S Page 2 of 7 Revision Record (Summary)
Revision 00 New JPM developed for2010 NRC exam.
A-N-1-S Page 3 of 7 SIMULATOR SETUP INSTRUCTIONS
- 1.
This is a tabletop JPM utilizing simulator procedures.
- 2.
No Simulator setup needed.
DOCUMENT PREPARATION
- 1. None.
A-N-1-S Page 4 of 7 INITIAL CONDITIONS
- 1. You are the Unit 3 Unit Supervisor.
- 2. The following timeline occurred:
- 1500 - a rented backhoe was released by Dresden station to the vendors off-site facility.
- 1600 - at the vendors off-site facility, it was discovered that the released backhoe had a LOW LEVEL contamination.
- 1700 - corporate issues a press release to notify the public of the released contaminated backhoe.
- 3. The time is now 1715 hours0.0198 days <br />0.476 hours <br />0.00284 weeks <br />6.525575e-4 months <br />.
INITIATING CUE
- 1. Utilizing the Reportability Manual, determine the reportability requirements, including the Time Limit of any Notifications or Reports, if any.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-1-S Page 5 of 7 JPM Start Time:
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment Candidate locates a copy of Reportability Manual LS-AA-1110.
NOTE:
- 1.
Determines the event is reportable per SAF 1.9.
Determines the event is reportable per SAF 1.9, News Release or Notification of Other Government Agency.
- 2.
Determines the time limit to Notify the NRC Operations Center via the ENS within four hours of the occurrence.
Determines the time limit to Notify the NRC Operations Center via the ENS within four hours of the occurrence of any event or situation related to the health and safety of the public or onsite personnel, or protection of the environment, for which a news release is planned or notification to other government agencies has been or will be made.
END JPM Stop Time:_________
A-N-1-S Page 6 of 7 Operators Name:
Job
Title:
Title:
REPORTABILITY DETERMINATION Revision Number: 00 JPM Number: A-N-1-S Task Number and
Title:
299L001, Determine Reportability requirements as outlined in station Reportability manual.
K/A Number and Importance: Generic.2.1.2 4.1 / 4.4 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 10 minutes Actual Time Used:
minutes
References:
Reportability Manual LS-AA-1110, rev 15 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:
Date:
A-N-1-S Page 7 of 7 INITIAL CONDITIONS
- 1. You are the Unit 3 Unit Supervisor.
- 2. The following timeline occurred:
- 1500 - a rented backhoe was released by Dresden station to the vendors off-site facility.
- 1600 - at the vendors off-site facility, it was discovered that the released backhoe had a LOW LEVEL contamination.
- 1700 - corporate issues a press release to notify the public of the released contaminated backhoe.
- 3. The time is now 1715 hours0.0198 days <br />0.476 hours <br />0.00284 weeks <br />6.525575e-4 months <br />.
INITIATING CUE
- 1. Utilizing the Reportability Manual, determine the reportability requirements, including the Time Limit of any Notifications or Reports, if any.
Exelon Nuclear Job Performance Measure REVIEW OFF-SITE POWER SOURCES AVAILABLE PAPERWORK JPM Number: A-N-2-S Revision Number: 04 Date: 09/10 Developed By:
Instructor Date Approved By:
Facility Representative Date
A-N-2-S Page 2 of 7 Revision Record (Summary)
Revision 03 Bank JPM.
Revision 04 Revised for 2010 NRC exam.
A-N-2-S Page 3 of 7 SIMULATOR SETUP INSTRUCTIONS
- 1.
Reset the simulator to IC 12, or any similar IC that has a normal full power electrical lineup.
DOCUMENT PREPARATION
- 1. Provide a marked up copy of Appendix X, with pages 9 and 10 filled in.
A-N-2-S Page 4 of 7 INITIAL CONDITIONS
- 1. You are the Unit 2 Supervisor.
- 2. Unit 2 and Unit 3 are at near rated power.
- 3. The Unit 2 EDG was declared inoperable 10 minutes ago, following a failed surveillance.
- 4. An NSO collected data for verifying off-site power availability with the Unit 2 EDG inoperable, in accordance with Appendix X Attachment 3 INITIATING CUE
- 1. Review the data and complete the paperwork.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-2-S Page 5 of 7 JPM Start Time:
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment Provide the examinee with the provided copy of Appendix X with a completed Attachment 3.
NOTE:
- 1.
Verifies data all entered.
Notes Bus 23-1 & Bus 24-1 Volts, (Bus 24-1) is NOT
> 3851 Volts.
- 2.
Verifies data all entered.
Notes Bus 23 & Bus 24 Volts, (Bus 24) is NOT >
3851 Volts.
- 3.
Verify data is accurate, by reading Voltmeter.
Verifies Voltmeter Bus 23-1 & Bus 24-1 Volts (Bus 24-1) and Voltmeter Bus 23 & Bus 24 Volts (Bus 24), for correct voltage and corrects paperwork, by lining out and initial/dating incorrect value (~4160) and replacing with correct
- value, If Candidate states the he/she would return surveillance to the NSO for corrections, inform the Examinee to make any corrections.
CUE:
END JPM Stop Time:_________
A-N-2-S Page 6 of 7 Operators Name:
Job
Title:
Title:
REVIEW OFF-SITE POWER SOURCES AVAILABLE PAPERWORK Revision Number: 04 JPM Number: A-N-2-S Task Number and
Title:
299L044, Perform administrative duties for a malfunction of a piece of safety related equipment.
K/A Number and Importance: Generic.2.1.31 4.2 / 3.9 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 15 minutes Actual Time Used:
minutes
References:
Appendix X, rev 30 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:
Date:
A-N-2-S Page 7 of 7 INITIAL CONDITIONS
- 1. You are the Unit 2 Supervisor.
- 2. Unit 2 and Unit 3 are at near rated power.
- 3. The Unit 2 EDG was declared inoperable 10 minutes ago, following a failed surveillance.
- 4. An NSO collected data for verifying off-site power availability with the Unit 2 EDG inoperable, in accordance with Appendix X Attachment 3 INITIATING CUE
- 1. Review the data and complete the paperwork.
Exelon Nuclear Job Performance Measure REVIEW CALCULATED DRYWELL LEAKRATE AND IDENTIFY TECH SPECS JPM Number: A-N-3-S Revision Number: 00 Date: 09/10 Developed By:
Instructor Date Approved By:
Facility Representative Date
A-N-3-S Page 2 of 7 Revision Record (Summary)
Revision 00 Modified for 2010 NRC exam.
A-N-3-S Page 3 of 7 SIMULATOR SETUP INSTRUCTIONS
- 1.
This is a tabletop JPM utilizing simulator procedures.
- 2.
No Simulator setup needed.
DOCUMENT PREPARATION
- 1. Provide a marked up copy of Appendix A.
A-N-3-S Page 4 of 7 INITIAL CONDITIONS
- 1. You are the Unit 2 Unit Supervisor.
- 2. Unit 2 is operating at rated conditions.
- 3. The Aux NSO has completed the Saturday 1200 Appendix A MODE 1, 2, AND 3 REACTOR COOLANT LEAKAGE LOG.
INITIATING CUE
- 1. The Shift Manager has directed you to complete a record review of the past three days Appendix A MODE 1, 2, AND 3 REACTOR COOLANT LEAKAGE LOG and identify any Tech Spec requirements.
- 2. Correct any discrepancies noted (if any).
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-3-S Page 5 of 7 JPM Start Time:
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment Provide the examinee with the provided copy of Appendix A.
NOTE:
If asked, leak check is in progress and/or Drywell samples and CAM results are trending up.
- 1.
Verifies Calculated Floor Drain Leakage is correct.
Determines Floor Drain leakage for THU 1200 hours0.0139 days <br />0.333 hours <br />0.00198 weeks <br />4.566e-4 months <br /> should be 4.50 gpm.
- 2.
Verifies Calculated Floor Drain Leakage is correct.
Determines TOTAL leakage for FRI 2000 hours0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br /> should be 12.13 gpm.
If asked to correct Floor Drain leakage numbers and Total leakage, instruct the examinee to make corrections and perform calculation based on numbers given.
NOTE:
- 3.
Verifies Calculated Floor Drain Leakage is correct.
Determines Floor Drain leakage for FRI 1200 hours0.0139 days <br />0.333 hours <br />0.00198 weeks <br />4.566e-4 months <br /> should be 5.15 gpm (TS).
- 4.
References Tech Specs.
References Tech Spec 3.4.4 and recognizes
>5 gpm unidentified leakage for FRI 1600 hours0.0185 days <br />0.444 hours <br />0.00265 weeks <br />6.088e-4 months <br />.
Recognizes in Cond A & B.
- 5.
Reports discrepancies.
Examinee reports discrepancies noted.
Acknowledge report of task completion.
CUE:
END JPM Stop Time:_________
A-N-3-S Page 6 of 7 Operators Name:
Job
Title:
Title:
REVIEW CALCULATED DRYWELL LEAKRATE AND IDENTIFY TECH SPECS Revision Number: 01 JPM Number: A-N-3-S Task Number and
Title:
29900LK108, Discuss the Unit Supervisors responsibilities for plant operation.
K/A Number and Importance: Generic.2.2.40 3.4 / 4.7 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 15 minutes Actual Time Used:
minutes
References:
Appendix A, rev 124 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:
Date:
A-N-3-S Page 7 of 7 INITIAL CONDITIONS
- 1. You are the Unit 2 Unit Supervisor.
- 2. Unit 2 is operating at rated conditions.
- 3. The Aux NSO has completed the Saturday 1200 Appendix A MODE 1, 2,
AND 3 REACTOR COOLANT LEAKAGE LOG.
INITIATING CUE
- 1. The Shift Manager has directed you to complete a record review of the past three days Appendix A MODE 1, 2, AND 3 REACTOR COOLANT LEAKAGE LOG and identify any Tech Spec requirements.
- 2. Correct any discrepancies noted (if any).
Exelon Nuclear Job Performance Measure PERFORM CCSW ACTIVITY CALCULATION JPM Number: A-N-4-S Revision Number: 01 Date: 09/10 Developed By:
Instructor Date Approved By:
Facility Representative Date
A-N-4-S Page 2 of 7 Revision Record (Summary)
Revision 00 New JPM.
Revision 01 Revised for 2010 NRC exam.
A-N-4-S Page 3 of 7 SIMULATOR SETUP INSTRUCTIONS
- 1.
This is a tabletop JPM utilizing simulator procedures.
- 2.
No Simulator setup needed.
- 3.
Ensure a calculator is available and the memory/display has been cleared.
DOCUMENT PREPARATION
- 1. Provide a marked up copy of DOS 1500-08.
A-N-4-S Page 4 of 7 INITIAL CONDITIONS
- 1. You are an on-shift Operator.
- 2. The Unit 2 NSO started DOS 1500-08, then had to leave shift for medical reasons.
INITIATING CUE
- 1. Complete DOS 1500-08, data sheet 1 step A, for the A CCSW heat exchanger calculated CCSW Sample Activity Limit.
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-4-S Page 5 of 7 JPM Start Time:
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment Provide the examinee with the provided copy of DOS 1500-08.
NOTE:
The following steps can be performed in any order.
- 1.
Examinee fills out running pumps for dilution flow (3 Circ pump per unit and 5 Service Water pumps).
See attached key.
- 2.
Examinee calculates Dilution flow (1,017,000 gpm).
See attached key.
- 3.
Examinee enters dilution flow (from above) to calculate CCSW Activity Limit.
See attached key.
- 4.
Examinee calculates CCSW Activity Limit (2.91 x 10-5).
See attached key.
- 5.
Informs Unit Supervisor task is complete.
Examinee notifies the Unit Supervisor.
Acknowledge report of task completion.
CUE:
END JPM Stop Time:_________
A-N-4-S Page 6 of 7 Operators Name:
Job
Title:
Title:
PERFORM CCSW ACTIVITY CALCULATION Revision Number: 01 JPM Number: A-N-4-S Task Number and
Title:
277L003, Perform discharge of CCSW from contaminated LPCI heat exchanger during CCSW pump operation surveillance.
K/A Number and Importance: Generic.2.3.11 3.8 / 4.3 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 15 minutes Actual Time Used:
minutes
References:
DOS 1500-08, rev 16 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:
Date:
A-N-4-S Page 7 of 7 INITIAL CONDITIONS
- 1. You are an on-shift Operator.
- 2. The Unit 2 NSO started DOS 1500-08, then had to leave shift for medical reasons.
INITIATING CUE
- 1. Complete DOS 1500-08, data sheet 1 step A, for the A CCSW heat exchanger calculated CCSW Sample Activity Limit.
- 2. Inform the Unit Supervisor when the task is complete.
Exelon Nuclear Job Performance Measure AUTHORIZE USE OF KI JPM Number: A-N-5-S Revision Number: 01 Date: 09/10 Developed By:
Instructor Date Approved By:
Facility Representative Date
A-N-5-S Page 2 of 9 Revision Record (Summary)
Revision 00 Bank JPM.
Revision 01 Revised for 2010 NRC exam.
A-N-5-S Page 3 of 9 SIMULATOR SETUP INSTRUCTIONS
- 1.
This is a tabletop JPM utilizing simulator procedures.
- 2.
No Simulator setup needed.
DOCUMENT PREPARATION
- 1. Two (2) marked up copies of EP-AA-113-F-02.
- 2. Blank copy of EP-AA-113.
- 3. Blank copy of EP-AA-113-F-03.
A-N-5-S Page 4 of 9 INITIAL CONDITIONS
- 1. You are the Station Emergency Director.
- 2. A General Emergency has been declared.
- 3. There is an offsite release in progress.
- 4. A Loss of the Fuel Clad Barrier has occurred, together with a failure of the RCS.
- 5. Containment is currently being challenged.
- 7. An Emergency life saving operation MUST be performed.
- 8. The operation will take between 15 and 20 minutes in a 200 R/hr field (CDE) with unknown fission product gas concentration in the room.
- 9. The operation requires two people to enter the field.
- 10. Clay Morrow, Employee ID# 123456 and Jax Teller Employee ID# 891011 have volunteered.
- 11. Clay and Jax have NEVER received an emergency exposure before.
- 12. Authorization for Emergency Exposure (EP-AA-113-F-02 forms) have been filled out for Clay and Jax.
INITIATING CUES
- 1. Execute section 4.4 of EP-AA-113.
A-N-5-S Page 5 of 9 Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-5-S Page 6 of 9 JPM Start Time:
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment Provide the Examinee the provided copies of:
NOTE:
EP-AA-113-F-02, EP-AA-113, and EP-AA-113-F-03
- 1.
Applicant determines need for emergency action.
Emergency action is needed per initiating cue.
If asked, Clay and Jax do NOT have any adverse reactions to KI.
CUE:
- 2.
Applicant recognizes per the initiating cue that authorization to take KI must also be completed prior to the emergency workers entering the space.
Recognizes that authorization to take KI must also be completed.
- 3.
Determines there is or has been a Loss of Fuel Clad Barrier (based on initiating cues). Determines from step 4.4.1.B, condition 1, that workers will be entering an unknown radiological atmosphere that is suspected to have a high iodine concentration. Determines KI must be issued.
Determines KI must be issued.
- 4.
Documents the decision to issue KI using THYROID BLOCKING AGENT AUTHORIZATION Form (EP-AA-113-F-03).
BOTH individuals being authorized for KI and entering the space must be listed with their correct names and employee ID numbers:
- Clay Morrow 123456
- Jax Teller 891011
A-N-5-S Page 7 of 9 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment If asked for Radiation Protection Manager to sign and date EP-AA-113-F-03, enter name as TIG TRAGER and todays date in the appropriate blanks.
NOTE:
- 5.
Notifies Occupational Health (Medical) Services Department promptly that KI is to be issued to Exelon Nuclear personnel or contractors.
Examinee states that he/she would notify OHS.
JPM is complete when applicant notifies OHS of KI use.
NOTE:
END JPM Stop Time:_________
A-N-5-S Page 8 of 9 Operators Name:
Job
Title:
Title:
AUTHORIZE USE OF KI Revision Number: 01 JPM Number: A-N-5-S Task Number and
Title:
29900LK150, Discuss the responsibilities of the Shift Manager regarding Reportability determination and event notifications.
K/A Number and Importance: Generic.2.4.40 2.7 / 4.5 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 20 minutes Actual Time Used:
minutes
References:
EP-AA-113, rev B; EP-AA-113-F-03, rev D; EP-AA-113, rev 10 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:
Date:
A-N-5-S Page 9 of 9 INITIAL CONDITIONS
- 1. You are the Station Emergency Director.
- 2. A General Emergency has been declared.
- 3. There is an offsite release in progress.
- 4. A Loss of the Fuel Clad Barrier has occurred, together with a failure of the RCS.
- 5. Containment is currently being challenged.
- 7. An Emergency life saving operation MUST be performed.
- 8. The operation will take between 15 and 20 minutes in a 200 R/hr field (CDE) with unknown fission product gas concentration in the room.
- 9. The operation requires two people to enter the field.
- 10. Clay Morrow, Employee ID# 123456 and Jax Teller Employee ID# 891011 have volunteered.
- 11. Clay and Jax have NEVER received an emergency exposure before.
- 12. Authorization for Emergency Exposure (EP-AA-113-F-02 forms) have been filled out for Clay and Jax.
INITIATING CUES
- 1. Execute section 4.4 of EP-AA-113.
Exelon Nuclear Job Performance Measure SBLC - INJECTION WITH RWCU ISOLATION FAILURE JPM Number: S-N-a Revision Number: 00 Date: 09/10 Developed By:
Instructor Date Approved By:
Facility Representative Date
S-N-a Page 2 of 8 Revision Record (Summary)
Revision 00 Modified for 2010 NRC exam.
S-N-a Page 3 of 8 SIMULATOR SETUP INSTRUCTIONS
- 1. Reset the simulator to IC 12.
NOTE:
It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
- 2. Insert following Malfunctions and/or Remotes:
- IMF CIRWCUAP (2-1201-1 valve failure to close - and allows manual closure).
- IMF CIRWCUBP (2-1201-2 valve failure to close - and allows manual closure).
- 3. Setup the following Triggers:
- None.
DOCUMENT PREPARATION DOP 1100-02 hardcard.
S-N-a Page 4 of 8 INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 3. The Unit Supervisor has authorized the use of Hard Cards.
INITIATING CUE
- 1. The Unit Supervisor has ordered you to inject SBLC, for an ATWS, per the Hard Card.
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-a Page 5 of 8 JPM Start Time:
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment Examinee should locate the hard card, then provide the included copy.
NOTE:
- 1.
Place the SBLC INJECTION CONTROL keylock switch to the SYS 1 OR Turns the SBLC INJECTION CONTROL keylock switch to SYS 2 position.
either the intermediate right OR intermediate left position.
- 2.
Verifies applicable SQUIB pilot light NOT lit.
SQUIB A or B light off.
- 3.
Verifies applicable PUMP pilot light lit.
PUMP 1 or PUMP 2 light on.
- 4.
Verifies FLOW pilot light lit.
WHITE light illuminated.
- 5.
SBLC SQUIB VLV CKT FAILURE annunciator alarms (902-5 H-6).
Annunciator 902-5 H-6 illuminated.
BEGIN ALTERNATE PATH
- 6.
Verifies RWCU valve 2-1201-1 closed.
Examinee recognizes that valve 2-1201-1 valve did NOT close.
- 7.
Verifies RWCU valve 2-1201-1 closed.
Takes manual action for a failed automatic action and closes 2-1201-1 valve, by placing c/s in the CLOSED position.
- 8.
Verifies RWCU valve 2-1201-1A closed.
GREEN light illuminated.
- 9.
Verifies RWCU valve 2-1201-2 closed.
Examinee recognizes that valve 2-1201-2 valve did NOT close.
S-N-a Page 6 of 8 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
- 10. Closes RWCU valve 2-1201-2 closed.
Takes manual action for a failed automatic action and closes 2-1201-2 valve, by placing c/s in the CLOSED position.
- 11. Verifies RWCU valve 2-1201-3 closed.
GREEN light illuminated.
- 12. Verifies RWCU valve 2-1201-7 closed.
RED light illuminated.
- 13. Informs Unit Supervisor task is complete.
Reports SBLC is injecting and valves 2-1201-2 and 2-1201-3 failed to close automatically.
Acknowledge report of task completion.
CUE:
END JPM Stop Time:_________
S-N-a Page 7 of 8 Operators Name:
Job
Title:
Title:
SBLC - INJECTION WITH RWCU ISOLATION FAILURE Revision Number: 00 JPM Number: S-N-a Task Number and
Title:
211L002, Injection of Standby Liquid Control System K/A Number and Importance: 211000.A4.08 4.2 / 4.2 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 9 minutes Actual Time Used:
minutes
References:
DOP 1100-02, rev 18 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:
Date:
S-N-a Page 8 of 8 INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 3. The Unit Supervisor has authorized the use of Hard Cards.
INITIATING CUE
- 1. The Unit Supervisor has ordered you to inject SBLC, for an ATWS, per the Hard Card.
- 2. Inform the Unit Supervisor when the task is complete.
Exelon Nuclear Job Performance Measure CORE SPRAY - PERFORM PUMP TEST WITH PUMP TRIP JPM Number: S-N-b Revision Number: 05 Date: 09/10 Developed By:
Instructor Date Approved By:
Facility Representative Date
S-N-b Page 2 of 10 Revision Record (Summary)
Revision 04 Bank JPM.
Revision 05 Revised for 2010 NRC exam.
S-N-b Page 3 of 10 SIMULATOR SETUP INSTRUCTIONS
- 1. Reset the simulator to IC 12.
NOTE:
It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
- 2. Start the LPCI/CS room cooler fans.
- 3. Enter the following Expert commands to set up an automatic trigger to trip the Core Spray pump after the test valve is opened:
NOTE:The trigger assignment can be changed to any other available trigger to accommodate running this JPM concurrently with other JPMs.
trgset 1 "cssbkppb.and. cslop4b" (Trigger 1 Activates when 2B Core Spray pump is running AND when MO 1402-4B OPEN light turns ON) ior csdtpppb (1 10) trip (After 10 sec, inserts a 2B Core Spray pump trip) ior csdclppb (1 10) off (After 10 sec, inserts a 2B Core Spray pump trip) trgset 2 "(et_array(1).and. (.not. cssbkppb))"l2 (Trigger 2 Activates when Trigger 1 is active AND when 2B Core Spray pump is NOT running) trg 2 "dor csdtpppb"l2 (Deletes 2B Core Spray pump trip)
DOCUMENT PREPARATION
- 1. Markup a copy of DOS 1400-05 as complete up through Step I.7. (Ready to start 2B Core Spray Pump per step I.8).
S-N-b Page 4 of 10 INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. The Unit 2 Core Spray B Pump operability surveillance is required due to maintenance.
- 3. The operability surveillance for the 2A Core Spray pump is NOT needed.
- 4. The system is filled and vented.
- 5. The required valve operability surveillance has been completed.
- 6. Vibration data is NOT required.
- 7. The Unit 2 NLO is standing by in the corner room.
- 8. The LPCI/Core Spray Room Coolers are running.
INITIATING CUE
- 1. The Unit Supervisor directs you to perform DOS 1400-05 step I.8 for the 2B Core Spray pump.
- 2. All applicable Prerequisites have been met.
- 3. Inform the Unit Supervisor upon completion of step I.8.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
S-N-b Page 5 of 10 Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-b Page 6 of 10 JPM Start Time:
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment Provide Examinee a copy of DOS 1400-05.
NOTE:
- 1.
Verify the following valve line up:
MO 2-1402-4B Closed MO 2-1402-38B Open 2-1402-6B Open MO 2-1402-25B Closed MO 2-1402-3B Open 2-1402-40B-SV Closed Verifies the following:
Green light illuminated.
Green light illuminated.
Green light illuminated.
Green light illuminated.
Green light illuminated.
Directs NLO to Verify 2-1402-40B-SV Closed 2-1402-40B-SV, INST SV is closed.
CUE:
The next three (3) actions may be requested to be performed at the same time.
NOTE:
- 2.
Verify 2B CORE SPRAY MOTOR has adequate lubrication.
Contacts NLO to verify 2B CORE SPRAY MOTOR has adequate lubrication per step I.8.b.(1).
2B Core Spray motor oil level is normal (within +0 to -1/8 inch band).
CUE:
- 3.
Verify 2B LPCI/CS Room Cooler is operating properly.
Contacts NLO to verify proper room cooler operation per step I.8.c.
2B LPCI/CS room cooler is operating normally.
CUE:
S-N-b Page 7 of 10 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
- 4.
Direct NLO to open 2-1402-40B-SV and report pressure.
Directs 2-1402-40B-SV Open.
When asked, report: 2-1402-40B-SV Inst SV is Open.
CUE:
- 5.
Record suction pressure provided by NLO.
Pressure of 7 psig recorded on Data Sheet 1.
When asked, report: suction pressure is 7 psig.
CUE:
- 6.
Calculate 2-1402-8B initial closed DP.
DP Calculated:
2-1450-1B ________ psig Minus 2-1402-40B ___7____psig Records 2-1450-1B pressure as 75 psig (+ 5 psig)
If examinee requests the above calculation to be verified, CUE:
sign the verified by line If the student informs the SRO that the Core Spray System should be declared inoperable, acknowledge the report.
Candidate will N/A step I.8.g.
NOTE:
- 7.
Start 2B CORE SPRAY Pump.
Red light illuminated and annunciators H-13 and A-5 alarm.
2B Core Spray Pump overcurrent trip malfunction is automatically inserted 10 seconds after the 2-1402-4B valve has dual indication.
NOTE:
S-N-b Page 8 of 10 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
- 8.
Open FLOW TEST VLV MO 2-1402-4B.
Rotates and holds MO 2-1402-4B Control switch CW to Open.
BEGIN ALTERNATE PATH
- 9.
Acknowledge and report alarm for 2B CS pump trip.
Acknowledges annunciator H-5 and makes report.
Acknowledge report.
CUE:
- 10. Immediately Close 2-1402-4B.
Green light illuminated.
Red light illuminated.
If examinee enters DOA 6500-10, respond that the assist NSO will execute that procedure.
CUE:
If examinee terminates, or requests permission to terminate the surveillance CUE:
OR If examinee references the DAN for pump trip and has at least considered the actions to take, then provide the cue:
Terminate the surveillance. Leave the system in the current lineup. Someone else will be assigned to verify the system is restored to normal.
- 11. Informs Unit Supervisor task is complete.
Examinee notifies the Unit Supervisor.
Acknowledge report of task completion.
CUE:
END JPM Stop Time:_________
S-N-b Page 9 of 10 Operators Name:
Job
Title:
Title:
CORE SPRAY - PERFORM PUMP TEST WITH PUMP TRIP Revision Number: 05 JPM Number: S-N-b Task Number and
Title:
209L004, Perform a CS pump operability test and determine if the results meet the acceptance criteria as stated in DOS 1400-05 K/A Number and Importance: 209001.A4.01 3.8 / 3.6 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 22 minutes Actual Time Used:
minutes
References:
DOS 1400-05, rev 41 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:
Date:
S-N-b Page 10 of 10 INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. The Unit 2 Core Spray B Pump operability surveillance is required due to maintenance.
- 3. The operability surveillance for the 2A Core Spray pump is NOT needed.
- 4. The system is filled and vented.
- 5. The required valve operability surveillance has been completed.
- 6. Vibration data is NOT required.
- 7. The Unit 2 NLO is standing by in the corner room.
- 8. The LPCI/Core Spray Room Coolers are running.
INITIATING CUE
- 1. The Unit Supervisor directs you to perform DOS 1400-05 step I.8 for the 2B Core Spray pump.
- 2. All applicable Prerequisites have been met.
- 3. Notify the Unit Supervisor upon completion of step I.8.
Exelon Nuclear Job Performance Measure DEHC - ESTABLISH RPV COOLDOWN WITH BYPASS VALVES JPM Number: S-N-c Revision Number: 01 Date: 09/10 Developed By:
Instructor Date Approved By:
Facility Representative Date
S-N-c Page 2 of 8 Revision Record (Summary)
Revision 00 New JPM.
Revision 01 Revised for 2010 NRC exam
S-N-c Page 3 of 8 SIMULATOR SETUP INSTRUCTIONS
- 1. Reset the simulator to any IC with the Reactor shutdown, but at full pressure.
NOTE:
It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
- 2. Ensure that Both DEHC monitors are displaying the STATUS screen.
- 3. Insert following Malfunctions and/or Remotes:
- None.
- 4. Setup the following Triggers:
- None.
- 5. Be prepared to acknowledge various alarms on other panels during this JPM (candidate to acknowledge 902-7 panel only).
DOCUMENT PREPARATION Markup a copy of DGP 02-03.
S-N-c Page 4 of 8 INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. A transient has occurred and the Unit Supervisor has determined a reactor cooldown is required.
- 3. Another NSO will acknowledge annunciators not associated with this task.
INITIATING CUE
- 1. The Unit Supervisor has directed you to begin a 75.0 Deg. F. / hr reactor cooldown to 400 Deg. F. utilizing the Turbine Bypass valves by performing DGP 02-03 steps E.29.
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-c Page 5 of 8 JPM Start Time:
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment Provide the Examinee with the provided copy of DGP 02-03.
NOTE:
All the below actions can be performed on either of the Digital EHC control stations.
- 1.
Select <CONTROL>.
Utilizing the trackball controller, clicks on
<CONTROL>.
- 2.
Select <RX COOLDOWN>.
Utilizing the trackball controller, clicks on
<RX COOLDOWN>.
- 3.
Verify REACTOR COOLDOWN is OFF.
Observes the REACTOR COOLDOWN OFF select button is orange.
- 4.
Select STPT/RAMP.
Utilizing the trackball controller, clicks on the
<STPT/RAMP>.
- 5.
Enter desired target temperature setpoint.
Clicks in the Set Point box.
Utilizing the keyboard, enters 400.0.
- 6.
Enter desired cooldown rate in the Ramp box.
Clicks in the Ramp Rate box. Utilizing the keyboard, enters 75.0.
- 7.
Select <OK>.
Utilizing the trackball controller, clicks on <OK>.
Clicks <OK> on the Confirm Setpoint pop up window.
- 8.
Initiate Reactor cooldown by selecting ON for REACTOR COOLDOWN.
Utilizing the trackball controller, clicks on <ON>.
Clicks <OK> on the Begin Reactor Cooldown pop up window.
S-N-c Page 6 of 8 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
- 9.
On <CONTROL>
<PRESSURE CONTROL>
screen, adjust pressure setpoint as necessary to maintain at least 50 psig above Reactor pressure.
If uses other DEHC screen, utilizing the trackball controller, clicks on <CONTROL>.
Utilizing the trackball controller, clicks on
<PRESSURE CONTROL>.
The Examinee may wait to proceed until RPV pressure has decreased ~ 50 psig.
NOTE:
- 10. On <CONTROL> <BPV JACK> screen, verify BPV Jack position setpoint is
-5.0%.
If uses other DEHC screen, utilizing the trackball controller, clicks on <CONTROL>.
Utilizing the trackball controller, clicks on < BPV JACK >.
Observes BPV Jack position setpoint is -5.0%.
- 11. Informs Unit Supervisor task is complete.
Examinee notifies the Unit Supervisor.
Acknowledge report of task completion.
CUE:
END JPM Stop Time:_________
S-N-c Page 7 of 8 Operators Name:
Job
Title:
Title:
DEHC - ESTABLISH RPV COOLDOWN WITH BYPASS VALVES Revision Number: 01 JPM Number: S-N-c Task Number and
Title:
29501LP040, Respond to a Reactor Scram IAW DGP 02-03.
K/A Number and Importance: 241000.A4.06 3.9 / 3.9 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 12 minutes Actual Time Used:
minutes
References:
DGP 02-03, rev 89 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:
Date:
S-N-c Page 8 of 8 INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. A transient has occurred and the Unit Supervisor has determined a reactor cooldown is required.
- 3. Another NSO will acknowledge annunciators not associated with this task.
INITIATING CUE
- 1. The Unit Supervisor has directed you to begin a 75.0 Deg. F. / hr reactor cooldown to 400 Deg. F. utilizing the Turbine Bypass valves by performing DGP 02-03 steps E.29.
- 2. Inform the Unit Supervisor when the task is complete.
Exelon Nuclear Job Performance Measure LPCI - MITIGATE HIGH SUCTION PRESSURE WHILE LINING UP TO CST SUCTION FOR INJECTION JPM Number: S-N-d Revision Number: 07 Date: 09/10 Developed By:
Instructor Date Approved By:
Facility Representative Date
S-N-d Page 2 of 9 Revision Record (Summary)
Revision 06 Bank JPM.
Revision 07 Revised for 2010 NRC exam.
S-N-d Page 3 of 9 SIMULATOR SETUP INSTRUCTIONS
- 1. Reset the simulator to IC 12.
NOTE:
It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
- 2. Verify NO LPCI pumps operating.
- 3. Insert following Malfunctions and/or Remotes:
- None.
- 4. Setup the following Triggers:
- None.
DOCUMENT PREPARATION Markup a copy of DEOP 0500-03.
S-N-d Page 4 of 9 INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. A transient has occurred requiring Alternate Water Injection.
- 3. RPV level is -65 inches and slowly dropping.
- 4. RPV pressure is 375 psig and slowly dropping.
- 5. An EO has been briefed and is in the field.
INITIATING CUE
- 1. The Unit Supervisor has directed you to line up the 2A LPCI pump suction to the CST to prepare to raise RPV water level per DEOP 500-03, step G.12.
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-d Page 5 of 9 JPM Start Time:
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment Provide the Examinee with the provided copy of DEOP 0500-03.
NOTE:
- 1.
Place 2A LPCI PP control switch in Pull-to-Lock.
ALL lights extinguished.
- 2.
Place PP SUCT VLV MO 2-1501-5A control switch in Manual Bypass and verify closed.
RED light illuminated.
- 3.
Verify MIN FLOW VLV 2-1501-13A closed if not needed.
RED light illuminated.
2-1501-13A is not required for 2B LPCI pump.
CUE:
The following valves may be verified in any order NOTE:
- 4.
Verify TORUS CLG/TEST valves 2-1501-20A and 2-1501-38A closed.
GREEN lights illuminated.
- 5.
Verify TORUS SPRAY VLVs 2-1501-19A and 2-1501-18A closed.
GREEN lights illuminated.
- 6.
Verify DW SPRAY VLVs 2-1501-28A and 2-1501-27A closed.
GREEN lights illuminated.
- 7.
Verify TORUS CLG/TEST valves 2-1501-20B and 2-1501-38B closed.
GREEN lights illuminated.
- 8.
Verify TORUS SPRAY VLVs 2-1501-19B and 2-1501-18B closed.
GREEN lights illuminated.
S-N-d Page 6 of 9 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
- 9.
Verify DW SPRAY VLVs 2-1501-28B and 2-1501-27B closed.
GREEN lights illuminated.
For bleeding off the pressure in the suction piping, the examinee may communicate each of the following steps individually OR instruct the NLO to complete actions of DEOP 0500-03 step G.12.c.(5 thru 8).
NOTE:
When directed, as the NLO in the field, communicate that the steps (either individually of as a whole) have been completed.
CUE:
Instructs NLO to complete step G.12.c.(5).(a).
Instructs NLO to complete step G.12.c.(5).(b).
Instructs NLO to complete step G.12.c.(5).(c).
Instructs NLO to complete step G.12.c.(5).(d).
- 14. Open 2-1501-47A-R, U2 LPCI A PUMP SUCT PI 2-1501-47A ROOT VLV (at pump) and verify PI 2-1501-47A indicates less than 15 psig.
Instructs NLO to obtain PI 2-1501-47A reading per step G.12.c.(6).
PI 2-1501-47A indicates 15.5 psig.
CUE:
- 15. Recognizes reading is NOT less than 15 psig.
Determines reading is greater than 15 psig.
S-N-d Page 7 of 9 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
Instructs NLO to close 2-1501-47A per step G.12.c.(8).
2-1501-47A-R is Closed.
CUE:
BEGIN ALTERNATE PATH
- 17. Open PP SUCT VLV MO 2-1501-5A.
GREEN light illuminated.
- 18. Place 2A LPCI PP control switch in AUTO.
Depresses and places 2A LPCI PP c/s to center (AUTO) position.
Examinee notifies Unit Supervisor of 2A LPCI pump suction pressure problem when aligned to CST. May recommend using another LPCI pump.
Before examinee proceeds, inform him/her injection is no longer needed and another LPCI pump does NOT need to be selected CUE:
Acknowledge report of task completion.
END JPM Stop Time:
S-N-d Page 8 of 9 Operators Name:
Job
Title:
Title:
LPCI - MITIGATE HIGH SUCTION PRESSURE WHILE LINING UP TO CST SUCTION FOR INJECTION Revision Number: 07 JPM Number: S-N-d Task Number and
Title:
29502LK061, Lineup LPCI to the CST K/A Number and Importance: 203000.A4.02 4.1 / 4.1 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 12 minutes Actual Time Used:
minutes
References:
DEOP 0500-03, rev 20 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:
Date:
S-N-d Page 9 of 9 INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. A transient has occurred requiring Alternate Water Injection.
- 3. RPV level is -65 inches and slowly dropping.
- 4. RPV pressure is 375 psig and slowly dropping.
- 5. An EO has been briefed and is in the field.
INITIATING CUE
- 1. The Unit Supervisor has directed you to line up the 2A LPCI pump suction to the CST to prepare to raise RPV water level per DEOP 500-03, step G.12.
- 2. Inform the Unit Supervisor when the task is complete.
Exelon Nuclear Job Performance Measure CONTAINMENT - VENT THE TORUS WITH LEVEL LESS THAN 30 FEET JPM Number: S-N-e Revision Number: 05 Date: 09/10 Developed By:
Instructor Date Approved By:
Facility Representative Date
S-N-e Page 2 of 8 Revision Record (Summary)
Revision 04 Bank JPM.
Revision 05 Revised for 2010 NRC exam.
S-N-e Page 3 of 8 SIMULATOR SETUP INSTRUCTIONS
- 1. 1.Reset the simulator to an IC with the mode switch NOT in run, so that the proper alarms and interlocks will work.
- 2. Ensure Torus water level is 20 feet.
- 3. Insert following Malfunctions and/or Remotes.
IMF CIGP2I (Spurious Group II Isolation)
IOR PCDOOP61 OFF (prevents the 1601-61 valve from opening)
Adjusts Torus Level indications to ~20 feet.
ior atl10 25.0 ior pcltr10a 20 ior pcltr10b 20 ior pcptr103 58.0 (Adjusts Torus Bottom Pressure to 58.0 psig)
Pulls ECCS Initiation Logic fuses so when Drywell pressure is forced high, NO ECCS starts.
irf lp1aaf1f pulled irf lp701af pulled irf lp1aaf2f pulled irf lp701bf pulled irf csalgoff pulled irf csblgoff pulled irf hp2a1f1 pulled irf hp2b1f1 pulled Adjusts Drywell & Torus pressures to 50.0 psig.
ior pcp8524 50.0 ior pcpdw102 50.0 ior pcp85401 5.0l ior pcptr1 5.0
- 5. Start ALL available U2 EAST T.B., Radwaste, and U3 T.B. exhaust fans.
- 6. Place CRM ISOL switch to ISOLATE - wait 10 seconds then verify a C/R Booster Fan is running.
DOCUMENT PREPARATION Markup a copy of DEOP 500-04.
S-N-e Page 4 of 8 INITIAL CONDITIONS
- 1. You are the Aux NSO.
- 2. A break inside the Primary Containment has occurred.
- 3. Torus bottom pressure is about to exceed the PCP limit in DEOP 200-01.
- 4. Torus water level is 20'
- 5. Control Room ventilation has been isolated.
- 6. Reactor Building and Turbine Building have been evacuated.
- 7. The Instrument Bus and ESS Bus are energized.
- 8. The Instrument Air System is available.
INITIATING CUE
- 1. The Unit Supervisor has directed you to vent the Primary Containment in accordance with DEOP 500-04, attachment 1 to control Primary Containment pressure.
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-e Page 5 of 8 JPM Start Time:
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment Provide examinee the marked up copy of DEOP 0500-04.
NOTE:
Annunciator 902-3 A-15 may be received during this JPM.
- 1.
Verify SBGT is operating and flow is ~ 4000 scfm.
Verifies 2/3A SBGT train FI 7540-13 is reading
~4000 scfm.
- 2.
Verify Reactor Mode switch NOT Verifies Reactor Mode switch in RUN.
NOT in RUN.
- 3.
Place VENT ISOL SIGNAL BYPASS switch on 902-5 panel to TORUS.
Momentarily places Bypass switch to Torus Position.
The AO 2-1601-61, TORUS 2-INCH VENT VLV, will NOTE:
NOT open.
- 4.
Open AO 2-1601-61, TORUS 2-INCH VENT VLV.
Places AO 2-1601-61 control switch to OPEN position and determines that the valve will not open.
IF candidate states that the 2-1601-61 valve will not open, direct him/her to complete the task.
NOTE:
BEGIN ALTERNATE PATH
- 5.
Place VENT ISOL SIGNAL BYPASS switch on 902-5 panel to DRYWELL.
Momentarily places Vent Isol Signal Bypass switch to Drywell position.
If examinee reads TORUS BOTTOM PRESS PI 2-1640-103, inform him/her that the meter displays 58 psig and is trending UP slowly.
CUE:
- 6.
Open AO 2-1601-62, DW 2-INCH Vent.
Red Open light illuminated.
S-N-e Page 6 of 8 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
- 7.
Open AO 2-1601-63, VENT TO SBGT.
Red Open light illuminated.
- 8.
Start as many Turbine Building and Radwaste Exhaust fans as possible.
Initiates action to start All available Turbine Building and Radwaste Exhaust fans.
- 9.
Determine if SBGT flow is adequate to control and maintain DW pressure below the Primary Containment Pressure Limit.
Containment pressure stable or decreasing.
DW pressure is being controlled and maintained below the Primary Containment Pressure Limit.
CUE:
If examinee asks reading on TORUS BOTTOM PRESS PI 2-1640-103, inform him/her that the meter has decreased to 53 psig (5 psig less than original report).
- 10. Informs Unit Supervisor task is complete.
Examinee notifies the Unit Supervisor.
Acknowledge report of task completion.
CUE:
END JPM Stop Time:_________
S-N-e Page 7 of 8 Operators Name:
Job
Title:
Title:
CONTAINMENT - VENT THE TORUS WITH LEVEL LESS THAN 30 FEET Revision Number: 05 JPM Number: S-N-e Task Number and
Title:
295L099, Vent the primary containment to SBGT to stay below the Primary Containment Pressure Limit.
K/A Number and Importance: 295024.A1.14 3.4 / 3.5 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 17 minutes Actual Time Used:
minutes
References:
DEOP 0500-04, rev 12 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:
Date:
S-N-e Page 8 of 8 INITIAL CONDITIONS
- 1. You are the Aux NSO.
- 2. A break inside the Primary Containment has occurred.
- 3. Torus bottom pressure is about to exceed the PCP limit in DEOP 200-01.
- 4. Torus water level is 20'
- 5. Control Room ventilation has been isolated.
- 6. Reactor Building and Turbine Building have been evacuated.
- 7. The Instrument Bus and ESS Bus are energized.
- 8. The Instrument Air System is available.
INITIATING CUE
- 1. The Unit Supervisor has directed you to vent the Primary Containment in accordance with DEOP 500-04, attachment 1 to control Primary Containment pressure.
- 2. Inform the Unit Supervisor when the task is complete.
Exelon Nuclear Job Performance Measure AUX POWER - TRANSFER POWER TO TR-22 FROM TR-21 WITH BREAKER FAILURE JPM Number: S-N-f Revision Number: 01 Date: 09/10 Developed By:
Instructor Date Approved By:
Facility Representative Date
S-N-f Page 2 of 9 Revision Record (Summary)
Revision 00 New JPM.
Revision 01 Revised for 2010 NRC exam.
S-N-f Page 3 of 9 SIMULATOR SETUP INSTRUCTIONS
NOTE:
It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
- 2. Insert following Malfunctions and/or Remotes:
- M63 (to prevent TR-22 to Bus 23 breaker from closing).
- 3. Setup the following Triggers:
- None.
- 4. Ensure ONLY 2 RFPs operating.
- 5. Ensure ONLY 3 Cond/Cond Booster Pumps operating.
DOCUMENT PREPARATION
- 1.
Marked up copy of DOP 6500-01.
S-N-f Page 4 of 9 INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. Unit 2 was operating at rated power when the TR-21 trouble alarm is received.
- 3. The NLO, dispatched to TR-21, reported that the TR-21 cooling fans are not all operating and the transformer temperature is rising.
- 4. The Unit Supervisor has decided to unload TR-21 by transferring auxiliary power to TR-22.
- 5. Another operator will verify TR-86 Load Tap Changer positions and loading remains below the restrictions of the procedure.
INITIATING CUE
- 1. The Unit Supervisor has directed you to transfer Bus 21 and Bus 23 to TR-22 from TR-21 in accordance with DOP 6500-01.
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-f Page 5 of 9 JPM Start Time:
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment Provide the examinee with the provided copy of DOP 6500-01.
NOTE:
This task has two parts, which can be performed in any order.
IF the incoming and running voltages are NOT approximately equal, inform examinee that they ARE approximately equal.
CUE:
TRANSFER BUS 21 TO TR-22
- 1.
Position TR-22 to Bus 21 SYNCHROSCOPE selector switch to ON.
Switch in ON position.
- 2.
Verify:
INCOMING VOLTS and RUNNING VOLTS meters approximately equal.
SYNCHRONIZING meter at 12 oclock position and NOT SYNCHRONIZING meter lights rotating.
NOT glowing.
Voltages approximately equal.
Meter NOT White lights extinguished.
rotating.
- 3.
Position TR-22 to Bus 21 breaker control switch to CLOSE.
RED light illuminated.
- 4.
Verify:
SYNCHRONIZING meter at 12 oclock position.
TR-22 to Bus 21 breaker indicates CLOSED.
Annunciator 902-8 D-1 in alarm.
Meter NOT rotating.
RED light illuminated.
Annunciator 902-8 D-1 illuminated.
S-N-f Page 6 of 9 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
- 5.
Position TR-21 to Bus 21 breaker control switch to TRIP.
GREEN light illuminated.
- 6.
Verify:
TR-21 to Bus 21 breaker indicates OPEN.
Annunciator 902-8 D-1 clears.
GREEN light illuminated.
Annunciator 902-8 D-1 extinguished.
- 7.
Position TR-22 to Bus 21 synchroscope selector switch to OFF.
Switch in OFF position.
- 8.
Verify Bus 21 AMMETER and VOLTMETER indications are normal.
Verifies Bus 21 amps and volts are normal.
Amps may vary depending on conditions, and volts are normally ~ 4160.
NOTE:
TRANSFER BUS 23 TO TR-22
- 9.
Position TR-22 to Bus 23 SYNCHROSCOPE selector switch to ON.
Switch in ON position.
- 10. Verify:
INCOMING VOLTS and RUNNING VOLTS meters approximately equal.
SYNCHRONIZING meter at 12 oclock position and NOT SYNCHRONIZING meter lights rotating.
NOT glowing.
Voltages approximately equal.
Meter NOT White lights extinguished.
rotating.
BEGIN ALTERNATE PATH
- 11. Position TR-22 to Bus 23 breaker control switch to CLOSE.
Breaker does NOT close.
S-N-f Page 7 of 9 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
- 12. IMMEDIATELY positions TR-22 to Bus 23 breaker control switch to OPEN (trip) AND notifies Unit Supervisor.
GREEN light illuminated.
IF an Operator is dispatched to check the tripped breaker, report:
the breaker is open, with NO flags up.
CUE:
Candidate should NOT proceed and trip TR-21 to Bus 23 breaker, as this will de-energize Bus 23.
NOTE:
- 13. Informs Unit Supervisor task is complete.
Examinee notifies the Unit Supervisor.
Acknowledge report of task completion.
CUE:
END JPM Stop Time:
S-N-f Page 8 of 9 Operators Name:
Job
Title:
Title:
AUX POWER - TRANSFER POWER TO TR-22 FROM TR-21 WITH BREAKER FAILURE Revision Number: 01 JPM Number: S-N-f Task Number and
Title:
262L024, Transfer a 4160 volt bus between power supplies.
K/A Number and Importance: 262001.A4.04 3.6 / 3.7 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 14 minutes Actual Time Used:
minutes
References:
DOP 6500-01, rev 10 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:
Date:
S-N-f Page 9 of 9 INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. Unit 2 was operating at rated power when the TR-21 trouble alarm is received.
- 3. The NLO, dispatched to TR-21, reported that the TR-21 cooling fans are not all operating and the transformer temperature is rising.
- 4. The Unit Supervisor has decided to unload TR-21 by transferring auxiliary power to TR-22.
- 5. Another operator will verify TR-86 Load Tap Changer positions and loading remains below the restrictions of the procedure.
INITIATING CUE
- 1. The Unit Supervisor has directed you to transfer Bus 21 and Bus 23 to TR-22 from TR-21 in accordance with DOP 6500-01.
- 2. Inform the Unit Supervisor when the task is complete.
Exelon Nuclear Job Performance Measure RWM - ENTER SUBSTITUTE ROD POSITION JPM Number: S-N-g Revision Number: 05 Date: 09/10 Developed By:
Instructor Date Approved By:
Facility Representative Date
S-N-g Page 2 of 7 Revision Record (Summary)
Revision 04 Bank JPM.
Revision 05 Revised for 2010 NRC exam.
S-N-g Page 3 of 7 SIMULATOR SETUP INSTRUCTIONS
- 1. Reset the simulator to IC 12.
NOTE:
It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
- 2. Desired substitute position for control rod N-07 is 48. (Check prior to inserting the malfunction below).
- 3. Enter the following Expert Command prior to starting this JPM.
- IMF RDFAILN7 (RPIS failure for control rod N-07)
- 4. Acknowledge alarms and reset alarms.
- 5. Verify RWM operational and on Main Screen.
DOCUMENT PREPARATION Markup a copy of DOP 0400-02.
S-N-g Page 4 of 7 INITIAL CONDITIONS
- 1. You are the Unit 2 NSO.
- 2. Control Rod N-07 rod position has failed.
- 3. Control Rod N-07 was verified to be at position 48 prior to failure, and has NOT been moved.
- 4. The Control Rod has been currently verified to be at position 48.
- 5. The Rod Worth Minimizer is operational.
- 6. No other rods have had a substitute position assigned.
INITIATING CUE
- 1. Unit Supervisor has directed you to enter a substitute position of 48 for Control Rod N-07 in accordance with DOP 0400-02, step G.3.c.
- 2. Notify Unit Supervisor when the substitute position has been entered.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-g Page 5 of 7 JPM Start Time:
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #
Provide examinee a copy of DOP 0400-02.
NOTE:
- 1. Proceed to Step G.3.c.(1) of DOP 0400-
- 02.
Proceeds to Step G.3.c.(1) of DOP 0400-02.
- 2. Selects Secondary Functions, then Substitute Position screen Substitute Position screen SELECTED.
- 3. Selects control rod N-07 on the touch screen.
Control Rod N-07 outlined with blue box and shown on screen as SELECTED.
- 4. Sets the desired Control Rod position on the bar graph on the left side of the screen.
POSITION SHOWN on top of position bar graph, reads 48.
- 5. Touches the ENTER REQUEST box.
RWM accepts the request, rod N-07 position indication changes from ?? to substituted 48 position.
- 6. Touches the EXIT FUNCTION box to return to the Main Display RWM returns to the Main Display Respond as US when examinee informs you they have completed the task CUE:
END JPM Stop Time:
S-N-g Page 6 of 7 Operators Name:
Job
Title:
Title:
RWM - ENTER SUBSTITUTE ROD POSITION Revision Number: 05 JPM Number: S-N-g Task Number and
Title:
201L027, Enter Substitute Rod Position.
K/A Number and Importance: 201006.A4.06 3.2 / 3.2 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 12 minutes Actual Time Used:
minutes
References:
DOP 0400-02, rev 23 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:
Date:
S-N-g Page 7 of 7 INITIAL CONDITIONS
- 1. You are the Unit 2 NSO.
- 2. Control Rod N-07 rod position has failed.
- 3. Control Rod N-07 was verified to be at position 48 prior to failure, and has NOT been moved.
- 4. The Control Rod has been currently verified to be at position 48.
- 5. The Rod Worth Minimizer is operational.
- 6. No other rods have had a substitute position assigned.
INITIATING CUE
- 1. Unit Supervisor has directed you to enter a substitute position of 48 for Control Rod N-07 in accordance with DOP 0400-02, step G.3.c.
- 2. Notify Unit Supervisor when the substitute position has been entered.
Exelon Nuclear Job Performance Measure OFF GAS - ALIGN CHARCOAL ADSORBER FILTERS IN SERIES MODE JPM Number: S-N-h Revision Number: 00 Date: 09/10 Developed By:
Instructor Date Approved By:
Facility Representative Date
S-N-h Page 2 of 7 Revision Record (Summary)
Revision 00 New JPM developed for 2010 NRC exam.
S-N-h Page 3 of 7 SIMULATOR SETUP INSTRUCTIONS
- 1. Reset the simulator to IC 12.
NOTE:
It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
- 2. Verify the Charcoal Adsorbers are in PARALLEL mode of operation.
- 3. Setup the following Triggers:
None.
DOCUMENT PREPARATION Markup a copy of DOP 5400-05.
S-N-h Page 4 of 7 INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. The system engineer has completed data collection for the offgas system and requests returning the charcoal adsorbers to the series mode of operation from the parallel mode of operation.
INITIATING CUE
- 1. Unit Supervisor has directed you to align the charcoal adsorbers to the SERIES mode of operation in accordance with DOP 5400-05, step G.4.
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-h Page 5 of 7 JPM Start Time:
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #
Provide the Examinee with the provided copy of DOP 5400-05.
NOTE:
- 1. Proceeds to step G.4 of DOP 5400-05.
Locates step G.4 of the procedure (which then directs next step).
- 2. Determines the correct step to utilize is step G.21 of DOP 5400-05.
Proceeds to step G.21 of the procedure.
GREEN light illuminated.
GREEN light illuminated.
GREEN light illuminated.
GREEN light illuminated.
GREEN light illuminated.
GREEN light illuminated.
- 9. Notify Unit Supervisor of task completion.
Unit Supervisor notified of task completion.
Acknowledge report of task completion.
CUE:
END JPM Stop Time:_________
S-N-h Page 6 of 7 Operators Name:
Job
Title:
Title:
OFF GAS - ALIGN CHARCOAL ADSORBER FILTERS IN SERIES MODE Revision Number: 00 JPM Number: S-N-h Task Number and
Title:
271L005, Startup the Offgas Charcoal Adsorber system K/A Number and Importance: 271000.A4.09 3.3 / 3.2 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 12 minutes Actual Time Used:
minutes
References:
DOP 5400-05, rev 32 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:
Date:
S-N-h Page 7 of 7 INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. The system engineer has completed data collection for the offgas system and requests returning the charcoal adsorbers to the series mode of operation from the parallel mode of operation.
INITIATING CUE
- 1. Unit Supervisor has directed you to align the charcoal adsorbers to the SERIES mode of operation in accordance with DOP 5400-05, step G.4.
- 2. Inform the Unit Supervisor when the task is complete.
Exelon Nuclear Job Performance Measure LINEUP SBLC TEST TANK FOR ALTERNATE WATER INJECTION JPM Number: S-N-i Revision Number: 10 Date: 09/10 Developed By:
Instructor Date Approved By:
Facility Representative Date
S-N-i Page 2 of 8 Revision Record (Summary)
Revision 09 Bank JPM.
Revision 10 Revised for 2010 NRC Exam.
S-N-i Page 3 of 8 SIMULATOR SETUP INSTRUCTIONS
- 1. None, this JPM is performed in the plant.
DOCUMENT PREPARATION Markup a copy of DEOP 0500-03.
S-N-i Page 4 of 8 INITIAL CONDITIONS
- 1. You are an extra NSO.
- 2. Unit 2 has just scrammed.
- 4. The Clean Demin Water system is operating normally.
INITIATING CUE
- 1. The Unit Supervisor has directed you to line up and inject using the Standby Liquid Control Test Tank with Clean Demin water per DEOP 0500-03, step G.4.
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-i Page 5 of 8 JPM Start Time:
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment Provide the Examinee with the supplied copy of DEOP 0500-03.
NOTE:
The examinee is NOT required to obtain a key to open or close locked valves.
The examinee is required only to identify which type of key is required to open the valve.
- 1.
Proceeds to the Unit 2 Standby Liquid Control (SBLC) area.
Proceeds to the U2 SBLC area.
- 2.
Unlock and close 2-1101-4, SBLC STORAGE TK OUTLET SV.
Unlock lock and removes chain, then rotates valve hand wheel full clockwise.
The component is in the condition you have described.
CUE:
- 3.
Unlock and close 2-1199-37 SBLC STORAGE TK OUTLET SV.
Unlock lock and removes chain, then rotates valve handle 1/4 turn clockwise.
The component is in the condition you have described.
CUE:
- 4.
Open 2-4315-500, CLEAN DEMIN WTR SUPPLY TO SBLC SV.
Rotates valve hand wheel full counter-clockwise.
The component is in the condition you have described.
CUE:
- 5.
Open 2-1101-7, CLEAN DEMIN WTR TO SBLC TEST TK SV.
Rotates valve hand wheel full counter-clockwise.
The component is in the condition you have described.
CUE:
S-N-i Page 6 of 8 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
- 6.
Unlock and open 2-1101-8, SBLC TEST TK OUTLET SV.
Unlock lock and removes chain, then rotates valve hand wheel full counter-clockwise.
The component is in the condition you have described.
CUE:
NOTE:
- 7.
Start both SBLC pumps from the main Control Room.
Contacts the Unit 2 Control Room Operator to start the SBLC pumps.
I have started both Unit 2 Standby Liquid Control pumps.
CUE:
- 8.
Throttle 2-1101-7, CLEAN DEMIN WTR TO SBLC TEST TK SV, to stabilize level in tank.
Opens / closes valve to maintain test tank level.
The test tank level is now stabilized (as much going in as is going out).
CUE:
- 9.
Informs Unit Supervisor task is complete.
Examinee notifies the Unit Supervisor.
Acknowledge report of task completion.
CUE:
END JPM Stop Time:_________
S-N-i Page 7 of 8 Operators Name:
Job
Title:
Title:
LINEUP SBLC TEST TANK FOR ALTERNATE WATER INJECTION Revision Number: 10 JPM Number: S-N-i Task Number and
Title:
295L088, Line Up SBLC Test Tank for Alternate Water Injection.
K/A Number and Importance: 295031.A1.08 3.8 / 3.9 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 17 minutes Actual Time Used:
minutes
References:
DEOP 0500-03, rev 19 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:
Date:
S-N-i Page 8 of 8 INITIAL CONDITIONS
- 1. You are an extra NSO.
- 2. Unit 2 has just scrammed.
- 4. The Clean Demin Water system is operating normally.
INITIATING CUE
- 1. The Unit Supervisor has directed you to line up and inject using the Standby Liquid Control Test Tank with Clean Demin water per DEOP 0500-03, step G.4.
- 2. Inform the Unit Supervisor when the task is complete.
Exelon Nuclear Job Performance Measure EDG - MANUALLY FILL UNIT 2/3 EDG DAY TANK JPM Number: S-N-j Revision Number: 02 Date: 09/10 Developed By:
Instructor Date Approved By:
Facility Representative Date
S-N-j Page 2 of 8 Revision Record (Summary)
Revision 01 Bank JPM.
Revision 02 Revised for 2010 NRC exam.
S-N-j Page 3 of 8 SIMULATOR SETUP INSTRUCTIONS
- 1. None, this JPM is performed in the plant.
DOCUMENT PREPARATION Markup a copy of DOA 6600-01.
S-N-j Page 4 of 8 INITIAL CONDITIONS
- 1. You are an extra NSO.
- 2. Annunciator 902-8 G-4, Unit 2/3 Diesel Generator Day Tank Level HI / LO, has just annunciated.
INITIATING CUE
- 1. The Unit Supervisor has directed you to check the Unit 2/3 Diesel Generator Fuel Oil Day Tank level AND refill if necessary utilizing DOA 6600-01, attachment A.
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-j Page 5 of 8 JPM Start Time:
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment Provide the Examinee with the supplied copy of DOA 6600-01.
NOTE:
- 1.
Proceeds to the 2/3 Diesel Generator Room.
Proceeds to the 2/3 Diesel Generator Room.
- 2.
Examinee checks the level in the D/G Fuel Oil Day Tank.
Observes day tank sightglass and determines day tank needs filling.
Point to the lower third area on the local sightglass measuring stick and state: the level is here.
CUE:
Normal level is 30 - 38".
NOTE:
- 3.
Verify that power is available to the DIESEL FUEL OIL TRANSFER PUMP 2/3.
Verifies power available, by local indicating lights illuminated.
The GREEN LIGHT is illuminated.
CUE:
- 4.
Start the Fuel Oil Transfer Pump by holding local Test Switch in the ON position.
Holds 2/3-5203 U2 Diesel Oil Transfer Pp c/s in ON position.
The pump is running.
CUE:
You have held the switch for approximately 5 minutes.
S-N-j Page 6 of 8 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
- 5.
Checks the level in the fuel oil day tank.
OBSERVES sight glass and/or REQUESTS annunciator 902-8 G-4 status.
Point to the 35 inch mark on the local sightglass measuring stick and state: the level is here.
AND/OR the NSO says Control Room alarm 902-8 G-4 has reset.
CUE:
- 6.
Informs Unit Supervisor task is complete.
Examinee notifies the Unit Supervisor.
Acknowledge report of task completion.
CUE:
END JPM Stop Time:_________
S-N-j Page 7 of 8 Operators Name:
Job
Title:
Title:
Title:
264LN00414, Discuss the steps involved in filling of Diesel Generator Day Tanks with Diesel Fuel Oil Storage Tank Transfer Pumps.
K/A Number and Importance: 264000.G.1.30 4.4 / 4.0 Suggested Testing Environment: In-Plant Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 12 minutes Actual Time Used:
minutes
References:
DOA 6600-01, rev 15 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:
Date:
S-N-j Page 8 of 8 INITIAL CONDITIONS
- 1. You are an extra NSO.
- 2. Annunciator 902-8 G-4, Unit 2/3 Diesel Generator Day Tank Level HI / LO, has just annunciated.
INITIATING CUE
- 1. The Unit Supervisor has directed you to check the Unit 2/3 Diesel Generator Fuel Oil Day Tank level AND refill if necessary utilizing DOA 6600-01, attachment A.
- 2. Inform the Unit Supervisor when the task is complete.
Exelon Nuclear Job Performance Measure HVAC - VALVE IN CONTROL ROOM EMERGENCY BREATHING AIR JPM Number: S-N-k Revision Number: 11 Date: 09/10 Developed By:
Instructor Date Approved By:
Facility Representative Date
S-N-k Page 2 of 8 Revision Record (Summary)
Revision 10 Bank JPM.
Revision 11 Revised for 2010 NRC Exam.
S-N-k Page 3 of 8 SIMULATOR SETUP INSTRUCTIONS
- 1. None, this JPM is performed in the plant.
DOCUMENT PREPARATION Markup a copy of DOP 4650-01.
S-N-k Page 4 of 8 INITIAL CONDITIONS
- 1. You are an extra NSO.
- 2. Control Room personnel have noticed a pungent odor in the Control Room.
- 3. The Control Room Ventilation is NOT operating properly and the smell is getting worse.
- 4. The Unit 3 Supervisor has evacuated ALL non-essential personnel from the Control Room and has directed all NSOs to don SCBAs.
INITIATING CUE
- 1. The Unit 3 Unit Supervisor has directed you to place the Control Room Emergency Breathing Air System Main Bank in operation in accordance with DOP 4650-01, step G.3.
- 2. Inform the Unit 3 Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-k Page 5 of 8 JPM Start Time:
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment Provide the Examinee with the supplied copy of DOP 4650-01.
NOTE:
- 1.
Proceeds to Emergency Breathing Air manifold in Unit 2 Battery Room.
Proceeds to Emergency Breathing Air manifold in Unit 2 Battery Room.
- 2.
Verify the following:
- LP-1 CLOSED
- LP-2 CLOSED
- LP-3 CLOSED
- LP-4 CLOSED Verifies valve handle perpendicular to valve body for:
- 3.
OPEN all Main Bank Cylinder shutoff valves (Cylinders 7 through 13).
Turns hand wheels on cylinders 7-13 full counter clockwise.
The component is in the condition you have described.
CUE:
Count cylinders from left to right to find cylinders 7-13.
NOTE:
- 4.
Check Main Bank pressure.
Reads pressure on PRV 3, CR EMER AIR BREATHING CYL OUTLET PRV. (right side gauge).
Have examinee read actual pressure.
NOTE:
If pressure is < 2000 psig, point to 2000 psig, on the gauge, and inform that pressure is here.
CUE:
S-N-k Page 6 of 8 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
- 5.
Pressurize the supply manifold from the Main Bank by opening LP-3, CR EMERG AIR BREATHING CYL SV.
OPENS valve LP-3 by turning valve handle counter clockwise 1/4 turn so handle is in-line with valve body The component is in the condition you have described.
CUE:
- 6.
Verify pressure regulator PRV-3 is maintaining manifold pressure >65 psig and <80 psig.
VERIFIES manifold pressure between 65 and 80 psig as read on CR EMER AIR BREATHING CYL OUTLET PRV. (left side gauge).
If pressure is out of spec, point to 70 psig, on the gauge, and inform that pressure is here.
CUE:
Have examinee read actual pressure.
NOTE:
- 7.
Informs Unit Supervisor task is complete.
Examinee notifies the Unit Supervisor.
Acknowledge report of task completion.
CUE:
END JPM Stop Time:_________
S-N-k Page 7 of 8 Operators Name:
Job
Title:
Title:
VALVE IN CONTROL ROOM EMERGENCY BREATHING AIR Revision Number: 11 JPM Number: S-N-k Task Number and
Title:
279M001, Valve in Control Room Breathing Air Supply.
K/A Number and Importance: 600000.A2.10 2.9 / 3.1 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 15 minutes Actual Time Used:
minutes
References:
DOP 4650-01, rev 09 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:
Date:
S-N-k Page 8 of 8 INITIAL CONDITIONS
- 1. You are an extra NSO.
- 2. Control Room personnel have noticed a pungent odor in the Control Room.
- 3. The Control Room Ventilation is NOT operating properly and the smell is getting worse.
- 4. The Unit 3 Supervisor has evacuated ALL non-essential personnel from the Control Room and has directed all NSOs to don SCBAs.
INITIATING CUE
- 1. The Unit 3 Unit Supervisor has directed you to place the Control Room Emergency Breathing Air System Main Bank in operation in accordance with DOP 4650-01, step G.3.
- 2. Inform the Unit 3 Supervisor when the task is complete.