Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML07108026230 March 2007Biennial Report: Status of Decommissioning Funding Per 10 CFR 50.75(f)(1)
ML07065053528 March 2007R. E. Ginna - License Amendment 101 Technical Specification 3.5.1 Regarding Emergency Core Cooling System AccumulatorsBoric Acid
Probabilistic Risk Assessment
Significance Determination Process
Large early release frequency
ML07089037128 March 2007R. E. Ginna - Tech Spec Pages for Amendment 101 Technical Specification 3.5.1 Regarding Emergency Core Cooling System Accumulators
ML0713703097 March 2007Velan, Inc., Piston Check Cv Information
ML22195A1592 March 2007NSAL-06-6 LOCA Mass and Energy Release Analysis
ML0706106172 March 2007Annual Assessment Letter EOC 2006 - Ginna Station (05-244/2007001)
ML0703706231 March 2007R. E. Ginna Nuclear Power Plant - Issuance of Amendment Steam Generator Tube Integrity Technical Specifications
ML0706701591 March 2007R. E. Ginna - Fitness for Duty Program Performance Data Report for the Period July 1, 2006 Through December 31, 2006Fitness for Duty
ML0706702081 March 2007R. E. Ginna, Tech Spec Pages for Amendment 100 Regarding Steam Generator Tube Integrity Technical SpecificationsShutdown Margin
Offsite Dose Calculation Manual
Hydrostatic
Nondestructive Examination
Pressure and Temperature Limits Report
Annual Radiological Environmental Operating Report
Pressure Boundary Leakage
TAC:MD16661 March 2007
ML07047064412 February 2007R. E. Ginna - Response to Request for Additional Information and Revised Mark-Up Regarding Service Water Pump Operability RequirementsUltimate heat sink
Probabilistic Risk Assessment
Seismically rugged
Large early release frequency
ML07031009412 February 2007RAI, R.E. Ginna Response to Generic Letter (GL) 2003-01, Control Room Habitability
TAC:MB980712 February 2007
IR 05000244/20074026 February 2007IR 05000244-07-402, 01/22/2007 - 01/26/2007, R. E. Ginna Nuclear Power Plant, Physical ProtectionAffidavit
IR 05000244/200600531 January 2007IR 05000244-06-005; 10/01/2006 - 12/31/2006; R. E. Ginna Nuclear Power Plant; Refueling and Other Outage Activities, Other ActivitiesBoric Acid
Fire Barrier
Hydrostatic
Past operability
Nondestructive Examination
Locked High Radiation Area
Significance Determination Process
Process Control Program
Operability Determination
Hemyc
Fuel cladding
Liquid penetrant
Pressure Boundary Leakage
Recently irradiated fuel
Fire Protection Program
Power Uprate
ML07038010131 January 2007Calvert Cliffs, Nine Mile Point, and R.E. Ginna Nuclear Power Plants, Generic Letter 2006-02, Response to Request for Additional InformationSafe Shutdown
Probabilistic Risk Assessment
ML07038009730 January 2007Inspection and Mitigation of Alloy 82/182 Pressurizer Butt Welds
TAC:MD415430 January 2007
ML07038026130 January 2007R. E. Ginna Nuclear - Transmittal of Inservice Inspection Report for the Fourth Interval (2000-2009), Second Period, Third Outage (2006) - ISI and First Interval (1997-2008), Third Period, First Outage (2006) - Iwe/IwlBoric Acid
VT-2
Moisture barrier
Liquid penetrant
ML0700401964 January 2007Requalification Program Inspection - Ginna Nuclear Power Plant