 Issue dateTitleTopic
RIS 2003-08, Protection of Safeguards Information from Unauthorized Disclosure30 April 2003
7 November 2005
3 April 2008
Protection of Safeguards Information from Unauthorized Disclosure
2005/04/30-NRC Regulatory Issue Summary 2003-08 Protection of Safeguards Information from Unauthorized Disclosure
Enclosure 1 - NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure
Summary of Safeguards Information Requirements, Attachment 1 to NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure
Backfit
RIS 2003-08, Enclosure 1 - NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure30 April 2003
7 November 2005
3 April 2008
Enclosure 1 - NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure
Summary of Safeguards Information Requirements, Attachment 1 to NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure
Backfit
ML07317032614 December 2007(Public Letter) - Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-solved TablesSignificance Determination Process
ML07348042414 December 2007ASME Boiler & Pressure Vessel Code, Section XI-Reactor Pressure Vessel Head Penetration Tube Remote Inner-Diameter Temper Bead Repair - Generic Request for Relief G-RR-2 - Response to Request For..Hydrostatic
ML07351027313 December 2007Discharge Monitoring Report for November 2007
ML07338074010 December 2007Corrected Pages to Safety Evaluation for Amendments Regarding Increased Temperature and Level Limits of Ultimate Heat Sink (TAC Nos. MD2621 and MD2622)Ultimate heat sink
Fuel cladding
ML0734505554 December 2007Unit 2 Cycle 14 (U2C14) - 12-Month Steam Generator (SG) Inspection Report
ML0734400414 December 2007Transmittal of Update to TVA Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Rev. 18 for Browns Ferry, Sequoyah, and Watts BarFitness for Duty
Offsite Dose Calculation Manual
Safe Shutdown Earthquake
Coatings
Nondestructive Examination
B.5.b
Process Control Program
Fire Protection Program
ML0734004544 December 2007Air Permit Approved Changes
ML07340009230 November 2007Rev. 2 to SG-CDME-07-7, Condition Monitoring and Operational Assessment: GL-95-05 Alternate Repair Criterion End of Cycle 14, 90 Day Report for Sequoyah Unit 2.B.5.b Mitigating Strategies
TAC:MD625930 November 2007
ML07332002030 November 2007Request for Additional Information Regarding Realistic Large Break LOCA Analysis MethodsFuel cladding
ML07338126329 November 2007Plants - Changes to Distribution Lists for TVA Dockets
ML07333111128 November 2007Discharge Monitoring Report - Quality Assurance (DMR-QA) Study 27 Provider-Graded Test Results - Final Report
ML07337031728 November 2007Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors (PWR) - Notice of Completion
ML07313038520 November 2007Request for Additional Information Regarding Revised Probability of Prior Cycle Detection Model
TAC:MD411020 November 2007
ML07324004715 November 2007Unit 2 - Steam Generator Tube Inspection Information, Response to Request for Additional Information (RAI)
ML07320009714 November 2007Discharge Monitoring Report for October 2007
ML07320009214 November 2007Cycle 16 Core Operating Limits Report (COLR) Revision
ML07320008914 November 200710 CFR 50.46 Annual Report of Non-Significant ChangesFuel cladding
ML0731305487 November 2007Annual Environmental Operating ReportUltimate heat sink
Met Tower
ML0729900387 November 2007Audit of the Licensee'S Management of Regulatory CommitmentsWeld Overlay
B.5.b
TAC:MD69357 November 2007
ML07304001126 October 2007Pressurizer Weld Overlay Examination Results to Relief Request G-RR-1Weld Overlay
ML07303003326 October 2007Technical Specifications Change 07-02, Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with Technical Specification Task Force.Safe Shutdown
Ultimate heat sink
Incorporated by reference
IR 05000327/200700426 October 2007IR 05000327-07-004, IR 05000328-07-004, on 07/01/2007 - 09/30/2007, Sequoyah Nuclear Plant, Units 1 and 2; Maintenance EffectivenessSafe Shutdown
Fire Barrier
Significance Determination Process
ML07324002425 October 2007Examples of Max Thermal Power License Conditions
ML07305002325 October 2007Letter Submitting Changes to Distribution Lists for TVA Dockets
ML07299054124 October 2007TVA-Sequoyah Nuclear Plant - Permit TNR050015 -Annual Maintenance Fee
TAC:MD675711 October 2007
ML07282030711 October 2007Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists
ML07285017511 October 2007Technical Specifications, Increased Containment Purge Hour LimitHigh Radiation Area
ML07289006111 October 2007Transmittal of Discharge Monitoring Report for September 2007
IR 05000327/200700611 October 2007IR 05000327-07-006 and 05000328-07-006, on June 4-July 13, 2007, Sequoyah Nuclear Plant - Component Design Bases InspectionMission time
Probabilistic Risk Assessment
Significance Determination Process
Job Performance Measure
Time Critical Operator Action
ML07277065811 October 2007License Amendment, Increased Containment Purge Hour Limit
ML0727507805 October 2007Request for Additional Information Regarding 2006 Steam Generator Tube Inspections
ML0728300323 October 2007Technical Specifications (TS) Change 07-04 Revision of Core Operating Limits Report (COLR) References for Realistic Large Break Loss of Coolant Accident Methodology Supplemental Information
ML0727601462 October 2007Region II Management Change in Operator Licensing
ML0727601121 October 2007Changes to Distribution Lists for TVA Dockets
ML07324004830 September 2007Rev. 0 to SG-CDME-07-21-NP, Examination of a Steam Generator Tube Removed from Sequoyah Unit 2.Nondestructive Examination
Weak link
ML07242004328 September 2007License Amendment, Increased Temperature and Level Limits of Ultimate Heat SinkSafe Shutdown
Boric Acid
Ultimate heat sink
Fuel cladding
ML07264000628 September 2007Request for Withholding Information from Public Disclosure
ML07274046728 September 2007Technical Specifications, Increased Temperature and Level Limits of Ultimate Heat SinkUltimate heat sink
ML07270032127 September 2007Memo: Temperature Issue for the Sequoyah Nuclear Plant, Units 1 & 2 - Technical Specification Change Request for Ultimate Heat Sink Temperature Increase and Elevation ChangesUltimate heat sink
Press Release-07-121, - NRC Seeks Public Comment on Draft Environmental Review of Sequoyah Fuels Corp. Remediation Plan24 September 2007Press Release-07-121 - NRC Seeks Public Comment on Draft Environmental Review of Sequoyah Fuels Corp. Remediation PlanOpen House
ML07275047021 September 2007MPR Associates, Inc. - Report of Defect in Accordance with 10 CFR 21Commercial Grade Dedication
ML07255027420 September 2007Issuance of Amendments 316 and 306 Regarding Allowable Value for Turbine Trip on Low Trip System Pressure (TS-07-01)
ML07267014920 September 2007Tech Spec Pages for Amendments 316 and 306 Regarding Allowable Value for Turbine Trip on Low Trip System Pressure (TS-07-01)
ML07264031420 September 2007Highway Route Approval Application (NRC 210) Route: Naval Weapons Station, Charleston, Sc to Doe'S Savannah River Site, Aiken, Sc - Request for Additional Information