Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML07332036431 December 2007NUREG-1437 Supp 33 Dfc, Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Shearon Harris Nuclear Power Plant, Unit 1 (Draft for Comment).Safe Shutdown
Boric Acid
High winds
Ultimate heat sink
Offsite Dose Calculation Manual
Anticipated operational occurrence
Internal Flooding
Hydrostatic
Zebra Mussel
Incorporated by reference
Aging Management
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
License Renewal
Earthquake
Biofouling
Environmental Justice
Fire Watch
Power Uprate
Press Release-II-07-055, NRC Issues Draft Environmental Impact Statement for Harris Nuclear Plant License Renewal; Public Meeting Jan. 30.26 December 2007Press Release-II-07-055: NRC Issues Draft Environmental Impact Statement for Harris Nuclear Plant License Renewal; Public Meeting Jan. 30.License Renewal
ML07355002520 December 2007NFPA 805 Transition Pilot Plant FAQ 07-0036, Revision 1Safe Shutdown
Fire Barrier
Fire Protection Program
ML07355002120 December 2007NFPA 805 Transition Pilot Plant FAQ 06-0025, Revision 4Safe Shutdown
Fire Barrier
Fire Protection Program
TAC:MC563020 December 2007
ML07354026220 December 2007Afpb Staff Response to NFPA 805 Transition Pilot Plant FAQ 07-0035, Revision 0
ML07352051319 December 200701/07-08/2008 Pilot Observation Visit with Duke Energy and Progress Energy Regarding Oconee and Harris Transition to National Fire Protection Association Standard 805
ML07330044013 December 2007License Renewal Application Review (Shpo No. ER-052747)License Renewal
ML07324110812 December 2007Review of the Spring 2006 Refueling Outage 13 Steam Generator Tube Inspection Reports
ML07330049410 December 2007Notice of Availability of the Draft Plant-Specific Supplement 33 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Shearon Harris Nuclear Power Plant, Unit 1License Renewal
ML07320070110 December 2007FRN - Notice of Availability of the Draft Supplement 33 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants and Public Meeting for the License Renewal of Shearon Harris Nuclear Power Plant, Unit 1License Renewal
ML07320066510 December 2007NOA of the Draft Plant-Specific Supplement 33 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants (Geis) Regarding Sheron Harris Nuclear Power Plant, Unit 1 (MD3611) - LetterLicense Renewal
ML0734402117 December 2007Deficiency Report Part 21 Potential Insufficient Thread Engagement for Certain Pressure Transmitters
ML0734001476 December 2007NFPA 805 Transition Pilot Plant FAQ 06-0025, Revision 3Safe Shutdown
Fire Barrier
Fire Protection Program
ML0733711663 December 2007Notice of Meeting with Progress Energy & Duke Energy Regarding Fire Probabilistic Risk Assessment for the Pilot Plants Transitioning to the National Fire Protection Association Standard NFPA 805Probabilistic Risk Assessment
ML0733700253 December 2007NFPA 805 Transition Pilot Plant FAQ 06-0008, Revision 8, Alternative Method for Fire Protection Engineering AnalysesSafe Shutdown
Fire Barrier
Fire Protection Program
ML07332002826 November 2007NFPA 805 Transition Pilot Plant FAQ 06-0012, Revision 5, Determining Manual Actions That Require a Change Evaluation During Transition.Safe Shutdown
Fire Barrier
Operator Manual Action
Exemption Request
Fire Protection Program
Manual Operator Action
ML07325043321 November 2007Management Changes for Progress Energy
ML07320088219 November 2007Public - Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables (Tac No. MD6415)Significance Determination Process
ML07324104415 November 2007Summary of Conference Call Held on 10/25/2007, Between the U.S. Nuclear Regulatory Commission and Carolina Power & Light Company, Concerning Responses to Request for Additional Information Regarding Tube Inspection
ML07351008212 November 2007NFPA 805 Transition Pilot Plant FAQ 06-0025, Revision 3 (Corrected Version)Safe Shutdown
Fire Barrier
Fire Protection Program
ML07355002312 November 2007NFPA 805 Transition Pilot Plant FAQ 07-0033, Revision 1Safe Shutdown
Fire Barrier
Fire Protection Program
ML0732000869 November 2007Notification of Potential Part 21 Report Conval Valves Weld Qualifications
HNP-07-144, License Renewal Application, Amendment 4, 10 CFR Part 54.21 (B) Annual Update5 November 2007License Renewal Application, Amendment 4, 10 CFR Part 54.21 (B) Annual UpdateLicense Renewal
ML0731701652 November 2007LTR-07-0755 - Ltr. John D. Runkle, Shearon Harris NPP-Fire ProtectionSafe Shutdown
Operator Manual Action
IR 05000400/200700429 October 2007IR 05000400-07-004, on 07/1/2007 - 09/30/2007; Shearon Harris Nuclear Power Plant, Unit 1; Radiation Monitoring Instrumentation and Protective Equipment, Event Follow-upHigh Radiation Area
Grab sample
Offsite Dose Calculation Manual
Fire Barrier
Hydrostatic
Locked High Radiation Area
Significance Determination Process
Annual Radiological Environmental Operating Report
Operability Determination
ML07324002425 October 2007Examples of Max Thermal Power License Conditions
HNP-07-155, NRC Correspondence Distribution List Update25 October 2007NRC Correspondence Distribution List Update
ML07297069024 October 2007Notice of Meeting with Duke Energy and Progress Energy Regarding Pilot Plant Transition to the National Fire Protection Association Standard, National Fire Protection Association 805Multiple Spurious Operation
Manual Operator Action
HNP-07-145, Inservice Inspection Relief Request 1, Summary of Ultrasonic Examinations of Preemptive Weld Overlays for Pressurizer Nozzle Locations Containing Alloy 600 Materials22 October 2007Inservice Inspection Relief Request 1, Summary of Ultrasonic Examinations of Preemptive Weld Overlays for Pressurizer Nozzle Locations Containing Alloy 600 MaterialsWeld Overlay
Dissimilar Metal Weld
ML07292008219 October 2007Index of References - Shearon Harris SEIS License RenewalLicense Renewal
Chernobyl
HNP-07-143, Inservice Inspection Relief Request 1 Re Weld Overlay Repair Stress Analysis Summary19 October 2007Inservice Inspection Relief Request 1 Re Weld Overlay Repair Stress Analysis SummaryWeld Overlay
Nondestructive Examination
Stress corrosion cracking
Dissimilar Metal Weld
DM weld
ML07282030711 October 2007Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists
HNP-07-142, Cycle 15 Core Operating Limits Report10 October 2007Cycle 15 Core Operating Limits ReportShutdown Margin
ML07276073710 October 2007Relief Request No. 1 Regarding Proposed Alternative to the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Requirements for Pressurizer Nozzle Weld Overlay RepairsWeld Overlay
Nondestructive Examination
Incorporated by reference
Stress corrosion cracking
Liquid penetrant
Dissimilar Metal Weld
Thermal fatigue
ML0728200169 October 2007NFPA-805 Transition Pilot Plant FAQ 06-0008, Revision 7Safe Shutdown
Fire Barrier
Fire Protection Program
ML0728200158 October 2007NFPA-805 Transition Pilot Plant FAQ 06-0005, Revision 2 - Definition of a Fire Protection Program (FPP) Change for HarrisFire Protection Program
IR 05000400/20073015 October 2007IR 05000400-07-301; Carolina Power & Light Company; 08/13-16/2007 08/23/2007; Shearon Harris Nuclear Power Plant - NRC Examination Report
HNP-07-139, Impact of Errors in the SECPOP2000 Computer Code on the Severe Accident Mitigation Alternatives Analysis for Shearon Harris Nuclear Power Plant License Renewal5 October 2007Impact of Errors in the SECPOP2000 Computer Code on the Severe Accident Mitigation Alternatives Analysis for Shearon Harris Nuclear Power Plant License RenewalProbabilistic Risk Assessment
License Renewal
L-80-030, Request for Technical Assistance, Resolution of the Impact of Air Handler Unavailability on Technical Specification Equipment Based on Interpretation of GL 80-30 Dated April 10, 1980 and NRC Letter to Perry, Dated April 05, 20024 October 2007Request for Technical Assistance, Resolution of the Impact of Air Handler Unavailability on Technical Specification Equipment Based on Interpretation of GL 80-30 Dated April 10, 1980 and NRC Letter to Perry, Dated April 05, 2002Probabilistic Risk Assessment
ML0727601462 October 2007Region II Management Change in Operator Licensing
ML07274025528 September 2007NFPA-805 Transition Pilot Plant FAQ 06-0019, Revision 3Fire Protection Program
ML07306054528 September 2007NFPA 805 Transition Pilot Plant FAQ 06-0019, Revision 4Fire Protection Program
HNP-07-128, Response to Request for Additional Information (RAI) Regarding the Spring 2006 Refueling Outage 13 Steam Generator Tube Inspections27 September 2007Response to Request for Additional Information (RAI) Regarding the Spring 2006 Refueling Outage 13 Steam Generator Tube Inspections
ML07269045226 September 2007Discrimination: OI Case 2-2006-033
ML07269010425 September 2007Secy Memorandum to Board and Parties Re LBP-07-11
HNP-07-124, License Renewal Application Amendment 3 and Responses to Requests for Additional Information - Questions Related to Scoping and Aging Management Review Methodology24 September 2007License Renewal Application Amendment 3 and Responses to Requests for Additional Information - Questions Related to Scoping and Aging Management Review MethodologySafe Shutdown
Aging Management
Stress corrosion cracking
License Renewal
ML07274026220 September 2007NFPA-805 Transition Pilot Plant FAQ 07-0038Hot Short
Safe Shutdown
Operator Manual Action
Multiple Spurious Operation
ML07274026820 September 2007NFPA-805 Transition Pilot Plant FAQ 07-0039Safe Shutdown
Fire Barrier
Enforcement Discretion
Operator Manual Action
Multiple Spurious Operation
Exemption Request
Fire Protection Program
HNP-07-129, NRC Regulatory Issue Summary 2007-17, Preparation and Scheduling of Operator Licensing Examinations19 September 2007NRC Regulatory Issue Summary 2007-17, Preparation and Scheduling of Operator Licensing ExaminationsGeneric Fundamentals Examination