MONTHYEARML22314A0752022-11-10010 November 2022 2B - Exam Administrative Items - Normal Release ML22034A3992022-02-16016 February 2022 Enclosure 1 - IP 71130.03 Cy 2021 - IR 8 Baseline Inspection Completion ML22034A3952022-02-16016 February 2022 Enclosure 3 - IP 96001 CY2021 - IR 8 Baseline Inspection Completion ML22034A3972022-02-16016 February 2022 Enclosure 2 - IP 92707 CY2021 - IR 8 Baseline Inspection Completion ML18338A0882018-12-0404 December 2018 Attachment FormerFAQResponses_11302018 ML18180A2602018-06-29029 June 2018 NFPA 805 FAQ 10-0059 - NFPA 805 Monitoring ML18073A3582018-03-15015 March 2018 NRC Staff Comments FAQ 18-0015 ML17235B1482017-08-23023 August 2017 U.S. Nuclear Regulatory Commission - Tornado Missile Risk Evaluator (TMRE) Methodology Topics and Methodology Feedback ML16315A2892016-11-10010 November 2016 Attachment 5 EPRI RETRAN-3D Computer Code Manuals, NP-7450(A) RA-16-003, Attachment 5 EPRI RETRAN-3D Computer Code Manuals, NP-7450(A)2016-11-10010 November 2016 Attachment 5 EPRI RETRAN-3D Computer Code Manuals, NP-7450(A) ML18039A8562016-06-0202 June 2016 Fpra FAQ 16-0011 - Cable Tray Ignition - Draft ML14191B2622014-07-10010 July 2014 NFPA 805 Transition FAQ 14-0070, Revision 0 ML13170A3282013-06-13013 June 2013 Special Inspection Question & Answers ML1214300352012-05-21021 May 2012 NFPA 805 Transition FAQ 12-0062, Revision 1 ML12056A0522012-03-12012 March 2012 Enclosure 6 - List of Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status ML1204105892012-02-10010 February 2012 NFPA 805 Transition FAQ 10-0059, Revision 5 ML1204105852012-02-10010 February 2012 NRC Staff Response to NFPA 805 Transition FAQ 10-0059, Revision 4 ML1203201932012-02-0101 February 2012 NFPA 805 Transition FAQ 10-0059, Revision 4 ML1202603842012-01-13013 January 2012 FAQ Revision NFPA 805 Monitoring ML1201903132012-01-13013 January 2012 NFPA 805 Transition FAQ 10-0059, Rev 3 ML1202603722012-01-13013 January 2012 NFPA 805 Monitoring ML1202604252012-01-13013 January 2012 FAQ-1 - NFPA 805 Monitoring ML1202604402012-01-13013 January 2012 FAQ - NFPA 805 Monitoring ML1128600532011-09-30030 September 2011 NRC Staff Comments on FAQ 59R2 ML1127304102011-09-30030 September 2011 NRC Staff Response to NFPA 805 Transition FAQ 10-0059, Revision 2 RA-11-025, Enclosure 1, Attachment 2 - Duke Energy Corporation and Progress Energy, Inc. Organization Charts Post Merger2011-09-0202 September 2011 Enclosure 1, Attachment 2 - Duke Energy Corporation and Progress Energy, Inc. Organization Charts Post Merger ML1123401522011-08-19019 August 2011 NFPA 805 Transition FAQ 10-0059, Rev 2 ML1111804812011-04-21021 April 2011 NFPA 805 Transition FAQ 10-0059, Rev 1 ML1109105082011-03-31031 March 2011 NRC Staff Response to NFPA 805 Transition FAQ 10-0059, Revision 0 (Part 2) ML0933507512010-01-14014 January 2010 Temporary Instruction 2515/180, Managing Fatigue ML0916101892009-06-0303 June 2009 NFPA 805 Transition Pilot Plant FAQ 07-0035, Revision 2, Bus Duct Counting Guidance for High Energy Arcing Faults ML0909905112009-04-29029 April 2009 Enclosure 1: Shearon Harris Regulatory Audit Participants ML1020301612009-04-12012 April 2009 Tritium Concern Talking Points ML1019402162009-04-12012 April 2009 Offsite Notification to State/Local Agencies Regarding Tritium Release Onsite - EN 44951 ML0909305002009-04-0303 April 2009 Afpb Staff Response to NFPA 805 Transition Pilot Plant FAQ 07-0035, Revision 1 ML1020301722009-04-0101 April 2009 Tritium Questions and Answers ML0908500122009-03-26026 March 2009 NFPA 805 Transition Pilot Plant FAQ 07-0035, Revision 1, Bus Duct Counting Guidance for High Energy Arching Faults ML0902902182009-01-22022 January 2009 NFPA 805 Transition Pilot Plant FAQ 07-0030 ML1019402762008-12-0202 December 2008 Nuclear Condition Report for Tritium in Groundwater NEI 04-02, NFPA 805 Transition Pilot Plant FAQ 07-0039, Revision 2, Lessons Learned - NEI 04-02 B-2 Table2008-09-12012 September 2008 NFPA 805 Transition Pilot Plant FAQ 07-0039, Revision 2, Lessons Learned - NEI 04-02 B-2 Table ML0825904662008-09-12012 September 2008 NFPA 805 Transition Pilot Plant FAQ 07-0039, Revision 2, Lessons Learned - NEI 04-02 B-2 Table ML0914201382008-09-0909 September 2008 NFPA 805 Transition Pilot Plant FAQ 07-0039, Revision 2 - Clean Version ML0821000342008-07-24024 July 2008 NFPA 805 Transition Pilot Plant FAQ 07-0038, Revision 1 ML0813006972008-05-0909 May 2008 NFPA 805 Transition Pilot Plant FAQ 07-0032, Revision 2 ML0809101362008-03-28028 March 2008 NFPA 805 Transition Pilot Plant FAQ 07-0039, Revision 1, Lessons Learned - NEI 04-02 B-2 and B-3 Tables ML0807004112008-03-10010 March 2008 NFPA 805 Transition Pilot Plant FAQ 07-0032, Revision 1, Clarification of 10 CFR 50.48(c), 50.48(a), and GDC 3. ML0807001572008-03-10010 March 2008 NFPA 805 Transition Pilot Plant FAQ 06-0025, Revision 5 ML0806704192008-03-0707 March 2008 CDBI Findings ML0735500252007-12-20020 December 2007 NFPA 805 Transition Pilot Plant FAQ 07-0036, Revision 1 ML0735500212007-12-20020 December 2007 NFPA 805 Transition Pilot Plant FAQ 06-0025, Revision 4 2022-02-16
[Table view] |
Text
FAQ Number 06-0019 FAQ Revision 4 FAQ Title Definition of Power Block and Plant Plant: Harris Nuclear Plan (HNP) Date: 09-28-07
Contact:
Alan Holder Phone: 919-546-3372 Email: alan.holder@pgnmail.com Distribution: (NEI Internal Use) 805 TF FPWG FPRATF Purpose of FAQ:
Provide specific clarification within NEI 04-02 as to the definition of power block and plant used in NFPA 805, such that the terms are applied to Structures, Systems and Components associated with Nuclear Safety Performance Criteria.
Is this Interpretation of guidance? Yes / No Proposed new guidance not in NEI 04-02? Yes / No Details:
NEI 04-02 guidance needing interpretation (include section, paragraph, and line numbers as applicable):
NEI 04-02, Section 4.3.1, Fundamental Fire Protection Program and Design Elements Transition Review, Table B-1 uses NFPA 805 chapter 3 as part of the transition review. Specific clarification is requested for certain terms and phrases found in NFPA 805.
Circumstances requiring guidance interpretation or new guidance:
Interpretive guidance is needed to clarify the meaning and application of the term power block as found in, NFPA-805, Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition), Chapter 3, Section 3.3.1.2 Control of Combustibles, Section 3.5 Water Supply, Section 3.6 Standpipes and Hose Stations and Section 3.11.1 Building Separation.
Specifically, the definition of Power Block and Plant and how these will be applied when reviewing Chapter 3 transition.
Page 1 of 2
FAQ Number 06-0019 FAQ Revision 4 FAQ Title Definition of Power Block and Plant Detail contentious points if licensee and NRC have not reached consensus on the facts and circumstances:
NA Potentially relevant existing FAQ numbers:
FAQ #06-0007 Response Section:
Proposed resolution of FAQ and the basis for the proposal:
This FAQ provides interpretive guidance to clarify the term Power Block where used in NFPA 805, Chapter 3. NFPA 805, Section 1.6.46 defines Power Block as Structures that have equipment required for nuclear plant operations. Although not endorsed by Regulatory Guide 1.205, NFPA 805, Section A.1.6.46 further describes the term Power Block as, Containment, auxiliary building, service building, control building, fuel building, rad waste, water treatment, turbine building and intake structure are examples of power block structures.
If appropriate, provide proposed rewording of guidance for inclusion in the next Revision:
As follows; Clarification of NFPA 805 specific sections as applied under NEI 04-02, to be included in (New) Appendix K, to NEI 04-02 upon approval of specific clarification (final formatting to be provided by NEI).
Power Block or Plant Where used in Chapter 3, power block and plant refers to structures that have equipment required for nuclear plant operations, such as Containment, auxiliary building, service building, control building, fuel building, rad waste, water treatment, turbine building, and intake structure, or structures that are identified in the facilitys current license basis (CLB). Applicable structures will be identified in the 10CFR50.48(c) License Amendment Request.