Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
RIS 2003-08, Enclosure 1 - NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure | 30 April 2003 7 November 2005 3 April 2008 | Enclosure 1 - NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure Summary of Safeguards Information Requirements, Attachment 1 to NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure | Backfit |
RIS 2003-08, Protection of Safeguards Information from Unauthorized Disclosure | 30 April 2003 7 November 2005 3 April 2008 | Protection of Safeguards Information from Unauthorized Disclosure 2005/04/30-NRC Regulatory Issue Summary 2003-08 Protection of Safeguards Information from Unauthorized Disclosure Enclosure 1 - NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure Summary of Safeguards Information Requirements, Attachment 1 to NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure | Backfit |
IR 05000321/2006014 | 29 December 2006 | ||
ML070090039 | 29 December 2006 | EA-06-013, Edwin I. Hatch, Notice of Violation and Proposed Imposition of Civil Penalty | |
Press Release-II-06-046, NRC Proposes $104,000 Fine Against Southern Nuclear for Violation at Hatch Nuclear Plant | 29 December 2006 | Press Release-II-06-046: NRC Proposes $104,000 Fine Against Southern Nuclear for Violation at Hatch Nuclear Plant | |
NL-06-2513, E. I. Hatch, J. M. Farley, Vogtle, 10 CFR 50.46 ECCS Evaluation Model Annual Reports for 2005 | 14 December 2006 | E. I. Hatch, J. M. Farley, Vogtle, 10 CFR 50.46 ECCS Evaluation Model Annual Reports for 2005 | |
ML063460440 | 13 December 2006 | Response Date for Request for Additional Information Regarding Resolution of Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power (TAC Nos. MD0947 Through MD1050) | |
NL-06-2611, Request for Use of Radium Hurricane Hood Category-2 and Category-3 | 11 December 2006 | Request for Use of Radium Hurricane Hood Category-2 and Category-3 | Coatings Locked High Radiation Area |
ML063240197 | 11 December 2006 | Summary of November 14, 2006, Meeting with Southern Nuclear Operating Co., on Alternative Source Term Submittal | |
ML063380317 | 5 December 2006 | Enclosure 1 - Addressee List | |
TAC:MD0987 | 5 December 2006 | ||
NL-06-2726, LER 06-S01-00 for Edwin I. Hatch Nuclear Plant, Re Contract Employee Failure to Self-Disclose Material Information for Unescorted Access | 5 December 2006 | LER 06-S01-00 for Edwin I. Hatch Nuclear Plant, Re Contract Employee Failure to Self-Disclose Material Information for Unescorted Access | |
ML071220472 | 30 November 2006 | Offsite Dose Calculation Manual, Version 19 | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Power change |
TAC:MD1586 | 28 November 2006 | ||
NL-06-2550, Request to Implement an Alternative Source Term Radtrad Input Files | 27 November 2006 | Request to Implement an Alternative Source Term Radtrad Input Files | |
NL-06-2618, Notification of Deviation from BWRVIP-130 | 27 November 2006 | Notification of Deviation from BWRVIP-130 | |
ML063330244 | 21 November 2006 | Notification of Inspection and Request for Information | |
ML070430092 | 20 November 2006 | E. I. Hatch, Unit 2, Volume 1, Revision 2, Introduction Fourth Ten-Year Examination Plan. | Safe Shutdown High Radiation Area Weld Overlay Hydrostatic Coatings Nondestructive Examination VT-2 Incorporated by reference Exemption Request Dissimilar Metal Weld Scaffolding |
ML070430094 | 20 November 2006 | E. I. Hatch, Unit 2, Volume 2, Revision 1, Class 1, 2 and 3 Components Fourth Ten-Year Examination Plan. | Weld Overlay Hydrostatic VT-2 Scram Discharge Volume Dissimilar Metal Weld DM weld |
ML063250191 | 20 November 2006 | IR 05000321-06-401, and IR 05000366-06-401, on 08/18/2006, Southern Nuclear Operating Company, Inc | |
IR 05000321/2006401 | 20 November 2006 | IR 05000321-06-401, 05000366-06-401; 08/08/2006 - 08/18/2006; Edwin I. Hatch Nuclear Plant Unit 1 and Unit 2; Team Inspection of the Licensee'S Material Control and Accounting (Mc&A) Program | Significance Determination Process |
IR 05000321/2006402 | 20 November 2006 | IR 05000321-06-402, 05000366-06-402, Safeguards Information Removed | Affidavit |
ML070430100 | 20 November 2006 | E. I. Hatch, Unit 2, Volume 3, Revision 1.0, Class 1, 2 and 3 Figures Fourth Ten-Year Inservice Inspection Plan. | |
ML063070037 | 14 November 2006 | Edwin I Hatch, Nuclear Plant Unit No. 1 & 2, Request for Additional Information for Alternate Source Term Review (TAC Nos. MD2934 & MD2935) | |
ML063280065 | 14 November 2006 | Meeting Summary Handouts, Enclosure 2 (Tac Nos. MD2934 and MD2935) | Seismically rugged Earthquake Maintenance Rule Program |
TAC:MD2934 | 14 November 2006 | ||
NL-06-2496, Request to Implement an Alternative Source Term Atmospheric Dispersion Factor Information | 6 November 2006 | Request to Implement an Alternative Source Term Atmospheric Dispersion Factor Information | |
ML070100197 | 2 November 2006 | Usfws Comments for Vogtle Alternative Sites in Alabama | |
NL-06-2046, Technical Specifications Revision Request Section 5.3.1 - Unit Staff Qualifications | 30 October 2006 | Technical Specifications Revision Request Section 5.3.1 - Unit Staff Qualifications | |
ML062840680 | 24 October 2006 | Letter, Project Reassignment | |
ML063100361 | 24 October 2006 | Audit of Southern Nuclear Operating Company | |
TAC:MD0499 | 24 October 2006 | ||
ML062900515 | 24 October 2006 | Forthcoming Meeting with Southern Nuclear Operating Company, Regarding Alternate Source Term Application for the Edwin I. Hatch, Units 1 and 2 | |
IR 05000321/2006009 | 20 October 2006 | IR 05000321-06-009, 05000366-06-009, Safeguards Information Removed | Fitness for Duty Affidavit |
ML063010017 | 20 October 2006 | IR 05000321-06-009, 05000366-06-009 for Hatch Nuclear Plant & Security Inspection Report | Fitness for Duty |
ML062850366 | 10 October 2006 | Part 21 Notification - BWR Core Shroud Tie Rod Upper Support Cracking | Safe Shutdown Earthquake Operating Basis Earthquake Finite Element Analysis Design basis earthquake Earthquake |
IR 05000321/2006004 | 3 October 2006 | IR 05000321-06-004, 05000366-06-004, and 072000036-06-002, on 07/01/2006 - 09/30/2006, for Edwin I. Hatch, Units 1 and 2, Identification and Resolution of Problems | Boric Acid High winds High Radiation Area Offsite Dose Calculation Manual Temporary Modification Locked High Radiation Area Significance Determination Process Annual Radiological Environmental Operating Report Operability Determination Annual Radiological Effluent Release Report Power change |
ML062580134 | 3 October 2006 | Evaluation of Edwin I. Hatch Nuclear Plant, Unit Nos. 1 and 2, Response to Generic Letter 2003-01 Control Room Habitability (Tac No. MB9810 and MB9811) | Safe Shutdown |
NL-06-2037, Response to Regulatory Issue Summary 2006-15 on Preparation and Scheduling of Operator Licensing Examinations | 18 September 2006 | Response to Regulatory Issue Summary 2006-15 on Preparation and Scheduling of Operator Licensing Examinations | Generic Fundamentals Examination |
ML062650312 | 1 September 2006 | Liquid Radiation Release Lessons Learned Task Force Final Report (Enclosure) | Boric Acid Offsite Dose Calculation Manual Coatings Condition Adverse to Quality Significance Determination Process Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Chernobyl Accidental discharge |
NL-06-1930, Response to Generic Letter 2003-01, Control Room Habitability | 1 September 2006 | Response to Generic Letter 2003-01, Control Room Habitability | Safe Shutdown Fire Barrier Tornado Missile Incorporated by reference Biofouling Fire Protection Program |
ML062430408 | 31 August 2006 | Report 22 - Inspection/Activity Plan 09/01/06 - 03/31/08 | |
ML062430398 | 31 August 2006 | Mid Cycle Letter | |
ML062490255 | 29 August 2006 | Enclosure 6, E. I. Hatch, Request to Implement an Alternative Source Term - Clean Typed TS and Bases Pages | Shutdown Margin Reactor Vessel Water Level Loop seal High Radiation Area Ultimate heat sink Stroke time Anticipated operational occurrence Hydrostatic Squib Scram Discharge Volume Power Operated Valves Hardened vent Fuel cladding |
ML062490253 | 29 August 2006 | Enclosure 5, E. I. Hatch Request to Implement an Alternative Source Term - Marked-Up TS and Bases Pages | Shutdown Margin Reactor Vessel Water Level Loop seal Ultimate heat sink Anticipated operational occurrence Hydrostatic Squib Scram Discharge Volume Fuel cladding |
NL-06-1637, Request to Implement an Alternative Source Term | 29 August 2006 | Request to Implement an Alternative Source Term | Design basis earthquake Earthquake |
ML062490242 | 29 August 2006 | Enclosure 1, E. I. Hatch Request to Implement an Alternative Source Term - AST Safety Assessment | Safe Shutdown High winds Mission time Safe Shutdown Earthquake Seismically rugged Design basis earthquake Earthquake Deep Dose Equivalent Power Uprate |
ML062500095 | 28 August 2006 | Requalification Program Inspection - Hatch | |
ML062300304 | 28 August 2006 | Order Requiring Compliance with Key Radiological Protection Mitigation Strategies | |
NL-06-1844, Fitness for Duty Performance Data | 28 August 2006 | Fitness for Duty Performance Data | Fitness for Duty |