Hatch Inspection / Activity Plan 09/01/2006 - 03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/30/2006 13:34:33 Report 22 2
PB2TI169
- MSPI VERIFICATION Safety Issues 10/01/2006 12/31/2006 1, 2 2515/169 IP Mitigating Systems Performance Index Verification 3
- REQUALIFICATION INSPECTION Baseline Inspections 10/02/2006 10/06/2006 1, 2 7111111B IP Licensed Operator Requalification Program 1
PSB1-RP
- RP OCCUPATIONAL PRE-INSP VISIT/ ISFSI Baseline Inspections 01/08/2007 01/12/2007 1, 2 7112101 IP Access Control to Radiologically Significant Areas 3
EB1-MODS
- MODIFICATIONS-10CFR50.59 Baseline Inspections 02/05/2007 02/09/2007 1, 2 7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 02/05/2007 02/09/2007 1, 2 7111117B IP Permanent Plant Modifications 2
PSB1-RP
- RP OCCUPATIONAL BASELINE INSP-WEEK 1 Baseline Inspections 02/12/2007 02/16/2007 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 02/12/2007 02/16/2007 1, 2 7112102 IP ALARA Planning and Controls Baseline Inspections 02/12/2007 02/16/2007 1, 2 7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 02/12/2007 02/16/2007 1, 2 71151 IP Performance Indicator Verification 1
EB3-ISI
- UNIT 2 INSERVICE INSPECTION Baseline Inspections 02/19/2007 02/23/2007 2
7111108G IP Inservice Inspection Activities - BWR 2
PSB1-RP
- RP OCCUPATIONAL BASELINE INSP-WEEK 2 Baseline Inspections 02/26/2007 03/02/2007 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 02/26/2007 03/02/2007 1, 2 7112102 IP ALARA Planning and Controls Baseline Inspections 02/26/2007 03/02/2007 1, 2 7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 02/26/2007 03/02/2007 1, 2 71151 IP Performance Indicator Verification 2
60855.1
- OPERATIONAL ISFSI INSPECTION BY RESIDENT Other Routine 07/09/2007 07/13/2007 1
60855.1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 4
PB2-PI&R
- BIENNIAL PI&R PROGRAM INSPECTION Baseline Inspections 07/30/2007 08/03/2007 1, 2 71152B IP Identification and Resolution of Problems Baseline Inspections 08/13/2007 08/17/2007 1, 2 71152B IP Identification and Resolution of Problems 2
PS2-EP
- EMERGENCY PREPAREDNESS EXERCISE Baseline Inspections 08/20/2007 08/24/2007 1, 2 7111401 IP Exercise Evaluation Baseline Inspections 08/20/2007 08/24/2007 1, 2 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 08/20/2007 08/24/2007 1, 2 71151 IP Performance Indicator Verification 3
OL PREP
- INITIAL EXAM PREPARATION Not Applicable 11/05/2007 11/09/2007 1
V23274 HATCH/NOVEMBER 2007 EXAM AT POWER FACILITIES 3
OL EXAM
- INITIAL EXAM Not Applicable 11/26/2007 12/07/2007 1
V23274 HATCH/NOVEMBER 2007 EXAM AT POWER FACILITIES This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Hatch Inspection / Activity Plan 09/01/2006 - 03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/30/2006 13:34:33 Report 22 1
EB3-HS
- HEAT SINK INSPECTION Baseline Inspections 12/10/2007 12/14/2007 1, 2 7111107B IP Heat Sink Performance 1
PSB1-RP
- RP PUBLIC PRE-INSP VISIT Baseline Inspections 01/07/2008 01/09/2008 1, 2 7112101 IP Access Control to Radiologically Significant Areas 4
PSB1-RP
- RP PUBLIC BASELINE INSPECTION Baseline Inspections 01/28/2008 02/01/2008 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 01/28/2008 02/01/2008 1, 2 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 01/28/2008 02/01/2008 1, 2 7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 01/28/2008 02/01/2008 1, 2 7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P Baseline Inspections 01/28/2008 02/01/2008 1, 2 71151 IP Performance Indicator Verification 1
EB3-ISI
- UNIT 1 - INSERVICE INSPECTION Baseline Inspections 02/18/2008 02/22/2008 1
7111108G IP Inservice Inspection Activities - BWR This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.