MONTHYEARML0531903342005-11-14014 November 2005 Notice of Meeting with Southern Nuclear Operating Co, Inc., Regarding Control Room In-leakage Testing at Hatch, Units 1 and 2 Project stage: Request ML0534700922005-11-29029 November 2005 Hatch, Units 1 & 2, Enclosure, Meeting Summary, Generic Letter 2003-01 Project stage: Meeting ML0534603052005-12-23023 December 2005 Hatch, Units 1 and 2, Meeting Summary, Generic Letter 2003-01 Control Room Habitability Project stage: Meeting NL-06-1930, Response to Generic Letter 2003-01, Control Room Habitability2006-09-0101 September 2006 Response to Generic Letter 2003-01, Control Room Habitability Project stage: Request ML0625801342006-10-0303 October 2006 Evaluation of Edwin I. Hatch Nuclear Plant, Unit Nos. 1 and 2, Response to Generic Letter 2003-01 Control Room Habitability (Tac No. MB9810 and MB9811) Project stage: Other 2005-12-23
[Table View] |
Similar Documents at Hatch |
---|
Category:Letter
MONTHYEARIR 05000321/20240102024-11-0606 November 2024 NRC Inspection Report 05000321/2024010 and 05000366/2024010 ML24299A2222024-10-31031 October 2024 Audit Summary for License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components IR 05000321/20240032024-10-30030 October 2024 Edwin I Hatch, Units 1 and 2 - Integrated Inspection Report 05000321/2024003 and 05000366/2024003 NL-24-0357, Notification of Deviation from the Inspection Frequency Requirements of the Boiling Water Reactor Vessel and Internals Project (BWRVIP) BWR Jet Pump Assembly Inspection and Flaw Evaluation Guidelines2024-10-30030 October 2024 Notification of Deviation from the Inspection Frequency Requirements of the Boiling Water Reactor Vessel and Internals Project (BWRVIP) BWR Jet Pump Assembly Inspection and Flaw Evaluation Guidelines ML24292A1602024-10-22022 October 2024 Request for Withholding Information from Public Disclosure License Amendment Request to Revise Technical Specification Surveillance Requirements to Increase Safety/Relief Valve Setpoints ML24290A0792024-10-18018 October 2024 SLR Environmental Preapplication Meeting Summary ML24303A4102024-10-17017 October 2024 Dir Results Letter to NRC - Hatch - Hurricane Helene IR 05000321/20244012024-10-10010 October 2024 Security Baseline Inspection Report 05000321-2024401 and 05000366-2024401 ML24256A0282024-09-12012 September 2024 2024 Hatch Requal Inspection Corporate Notification Letter NL-23-0930, Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program2024-09-11011 September 2024 Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program NL-24-0337, Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program2024-09-0909 September 2024 Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 NL-24-0334, 0 to the Updated Final Safety Analysis Report, Technical Specifications Bases Changes, Technical Requirements Manual Changes, License Renewal 10 CFR 54 .37(b) Changes, 10 CFR 50.59 Summary Report & Revised Nrc2024-09-0303 September 2024 0 to the Updated Final Safety Analysis Report, Technical Specifications Bases Changes, Technical Requirements Manual Changes, License Renewal 10 CFR 54 .37(b) Changes, 10 CFR 50.59 Summary Report & Revised Nrc IR 05000321/20240912024-08-27027 August 2024 NRC Investigation Report 2-2023-003 and NOV - NRC Inspection Report 05000321/2024091 and 05000366/2024091 IR 05000321/20240052024-08-26026 August 2024 Updated Inspection Plan for Edwin I. Hatch Nuclear Plant, Units 1 and 2 - Report 05000321/2024005 and 05000366/2024005 NL-24-0313, Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint Response to Request for Additional Information2024-08-23023 August 2024 Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint Response to Request for Additional Information IR 05000321/20240022024-08-0808 August 2024 Edwin I Hatch Nuclear Plants, Units 1 and 2 – Integrated Inspection Report 05000321-2024002 and 05000366-2024002 NL-24-0290, Response to Request for Additional Information Related to Request for Specific Exemption2024-07-26026 July 2024 Response to Request for Additional Information Related to Request for Specific Exemption NL-24-0276, Post-Audit Supplement to License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components2024-07-26026 July 2024 Post-Audit Supplement to License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components NL-24-0261, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20232024-07-19019 July 2024 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2023 ML24198A1252024-07-16016 July 2024 Edwin I Hatch Nuclear Plant Units 1 - 2 Notification of Conduct of Title 10 of the Code of Federal Regulations 50 NL-24-0260, Inservice Inspection Program Owner’S Activity Report (OAR-1) for Refueling Outage 1R312024-07-0909 July 2024 Inservice Inspection Program Owner’S Activity Report (OAR-1) for Refueling Outage 1R31 05000321/LER-2024-003, Reactor Core Isolation Cooling (RCIC) System Inoperable Due to Mispositioned Link2024-07-0303 July 2024 Reactor Core Isolation Cooling (RCIC) System Inoperable Due to Mispositioned Link 05000321/LER-2024-002-01, Incorrectly Installed Temporary Modification Results in Multiple Conditions Prohibited by Plant Technical Specifications2024-07-0303 July 2024 Incorrectly Installed Temporary Modification Results in Multiple Conditions Prohibited by Plant Technical Specifications NL-24-0143, Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in2024-06-27027 June 2024 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in NL-24-0239, Response to Apparent Violation in NRC Inspection Report 05000321, 366/2024090: EA-23-1392024-06-17017 June 2024 Response to Apparent Violation in NRC Inspection Report 05000321, 366/2024090: EA-23-139 ML24163A0532024-06-14014 June 2024 Audit Plan - Alternative Seismic Method LAR ML24149A0492024-06-0404 June 2024 SNC Fleet - Regulatory Audit in Support of Review of the License Amendment Request to Revise TS 1.1, Use and Application Definitions, and Add New Technical Specification 5.5.21 and 5.5.17, Online Monitoring Program, NL-24-0148, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-06-0404 June 2024 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-24-0202, SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations2024-05-24024 May 2024 SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations IR 05000321/20240902024-05-15015 May 2024 NRC Inspection Report 05000321-2024090 and 05000366-2024090, Investigation Report 2-2023-003; and Apparent Violation NL-24-0191, Annual Radiological Environmental Operating Reports for 20232024-05-10010 May 2024 Annual Radiological Environmental Operating Reports for 2023 05000321/LER-2024-002, Manual Reactor Trip Due to Loss of Feedwater2024-05-0909 May 2024 Manual Reactor Trip Due to Loss of Feedwater NL-24-0195, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water.2024-05-0707 May 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water. NL-24-0064, Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.52024-05-0303 May 2024 Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.5 IR 05000032/20240112024-04-25025 April 2024 Notification of Edwin I. Hatch Nuclear Plant - Comprehensive Engineering Team Inspection (CETI) Baseline Inspection Report 0500032/2024011 and 05000366/2024011 NL-24-0165, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20232024-04-25025 April 2024 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2023 05000366/LER-2024-002, Incorrectly Installed Temporary Modification Results in a Condition Prohibited by Plant Technical Specifications2024-04-24024 April 2024 Incorrectly Installed Temporary Modification Results in a Condition Prohibited by Plant Technical Specifications IR 05000321/20240012024-04-22022 April 2024 Integrated Inspection Report 05000321/2024001 and 05000366/2024001 NL-24-0026, Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint2024-04-19019 April 2024 Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint 05000321/LER-2024-001, Primary Containment Penetration Exceeded Maximum Allowable Primary Containment Leakage Rate (La)2024-04-0909 April 2024 Primary Containment Penetration Exceeded Maximum Allowable Primary Containment Leakage Rate (La) NL-24-0115, Response to Request for Additional Information Exemption Requests for Physical.2024-04-0404 April 2024 Response to Request for Additional Information Exemption Requests for Physical. NL-24-0116, Nuclear Property Insurance Coverage as of April 1, 2024 and Licensee Guarantees of Payment of Deferred.2024-03-29029 March 2024 Nuclear Property Insurance Coverage as of April 1, 2024 and Licensee Guarantees of Payment of Deferred. ML23275A2402024-03-22022 March 2024 SNC Fleet - Issuance of Environmental Assessment and Finding of No Significant Impact Regarding Exemption from the Requirements of 10 CFR Part 73, Section 73.2, Definitions (EPID Nos. L-2023-LLE-0018 & L-2023-LLE-0021) - Letter NL-24-0062, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-03-12012 March 2024 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-24-0089, Correction of Technical Specification Omission2024-03-0909 March 2024 Correction of Technical Specification Omission ML24069A0012024-03-0909 March 2024 – Correction of Amendment No. 266 Regarding License Amendment Request Regarding Relocation of Specific Surveillance Frequencies to a Licensee-Controlled Program (TSTF-425, Revision 3) ML24047A0362024-03-0404 March 2024 Response to Hatch and Vogtle FOF Dates Change Request (2025) NL-24-0061, Cycle 32 Core Operating Limits Report Version 12024-03-0101 March 2024 Cycle 32 Core Operating Limits Report Version 1 IR 05000321/20230062024-02-28028 February 2024 Annual Assessment Letter Edwin I. Hatch Nuclear Plant Units 1 and 2 - Nrc Inspection Report 05000321/2023006 and 05000366/2023006 2024-09-09
[Table view] |
Text
October 3, 2006 Mr. L. M. Stinson Vice President - Nuclear Hatch Project Southern Nuclear Operating Company, Inc.
Post Office Box 1295 Birmingham, AL 35201-1295
SUBJECT:
EVALUATION OF EDWIN I. HATCH NUCLEAR PLANT, UNIT NOS. 1 AND 2, RESPONSE TO GENERIC LETTER 2003-01, CONTROL ROOM HABITABILITY (TAC NOS. MB9810 AND MB9811)
The Nuclear Regulatory Commission (NRC) acknowledges the receipt of your responses for Edwin I. Hatch Nuclear Plant, Unit Nos. 1 and 2 (Hatch), to Generic Letter (GL) 2003-01, Control Room Habitability, dated August 4, 2003 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML032190245); March 29, 2004 (ADAMS Accession No. ML040910289); October 27, 2004 (ADAMS Accession No. ML043030315);
November 10, 2005 (ADAMS Accession No. ML053180074); and September 1, 2006 (ADAMS Accession No. ML062480132). This letter provides a status of your response and describes any actions that may be required to consider your response to GL 2003-01 complete.
GL 2003-01 requested that you confirm that your control room meets its design bases (e.g.,
General Design Criteria (GDC) 1, 3, 4, 5, & 19, draft GDC, or principal design criteria), paying special attention to the: (1) determination of the most-limiting unfiltered and/or filtered inleakage into the control room and comparison to values used in your design bases for meeting control room operator dose limits from accidents (GL 2003-01, Item 1a); (2) determination that the most-limiting unfiltered inleakage is incorporated into your hazardous chemical assessments (GL 2003-01, Item 1b); and, (3) determination that reactor control capability is maintained in the control room or at the alternate shutdown location in the event of smoke (GL 2003-01, Item 1b). The GL further requested information on any compensatory measures in use to demonstrate control room habitability, and the plans to retire them (GL 2003-01, Item 2).
In your letter dated September 1, 2006, you reported the results of tracer gas tests of the Hatch control room that were conducted in accordance with American Society for Testing and Materials E741, Standard Test Method for Determining Air Change in a Single Zone by Means of a Tracer Gas Dilution. The control room uses a positive pressure design. You determined that the maximum tested value for inleakage into the control room envelope (CRE) was 5 standard cubic feet per minute (scfm), which is less than the value of 110 scfm assumed in your design-basis radiological dose analysis.
You also reported that the maximum tested unfiltered inleakage for toxic chemical release operation mode is 16 scfm, but did not report what you assumed in your chemical assessment evaluations. However, you indicated that all industrial facilities located within 5 miles of the plant and all hazardous chemicals currently manufactured, stored, or transported in the vicinity
L. Stinson of the plant have been assessed for control room habitability (CRH) and determined to pose no threat to the plant. You also indicated that reactor control capability is maintained from either the control room or the remote safe shutdown panel in the event of smoke.
The GL further requested that you assess your technical specifications (TSs) to determine if they verify the integrity of the CRE, including ongoing verification of the inleakage assumed in the design-basis analysis for CRH, in light of the demonstrated inadequacy of a differential pressure measurement to alone provide such verification (GL 2003-01, Item 1c). As permitted by the GL, you provided a schedule for revising the surveillance requirement in the TSs to reference an acceptable surveillance methodology. In your September 1, 2006, response you stated that you will implement Technical Specification Task Force (TSTF) 448, Control Room Habitability, once it has been approved by the NRC staff.
The information you provided supported the fact that there are no compensatory measures needed to be in place to demonstrate CRH. The information you provided also supported the fact that you meet the intent of the GDCs for CRH. Your commitment to implement TS changes based on TSTF-448, following our formal review and approval of TSTF-448, is acceptable for the purpose of closing out your response to GL 2003-01.
The NRC staff has completed its review of your response to GL 2003-01 and finds it acceptable. The NRC staff looks forward to working with the Southern Nuclear Operating Company, Inc., staff to implement the provisions of TSTF-448.
Please contact me if you have any questions regarding this correspondence.
Sincerely,
/RA/
Christopher Gratton, Sr. Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-321 and 50-366 cc: See next page
L. Stinson of the plant have been assessed for control room habitability (CRH) and determined to pose no threat to the plant. You also indicated that reactor control capability is maintained from either the control room or the remote safe shutdown panel in the event of smoke.
The GL further requested that you assess your technical specifications (TSs) to determine if they verify the integrity of the CRE, including ongoing verification of the inleakage assumed in the design-basis analysis for CRH, in light of the demonstrated inadequacy of a differential pressure measurement to alone provide such verification (GL 2003-01, Item 1c). As permitted by the GL, you provided a schedule for revising the surveillance requirement in the TSs to reference an acceptable surveillance methodology. In your September 1, 2006, response you stated that you will implement Technical Specification Task Force (TSTF) 448, Control Room Habitability, once it has been approved by the NRC staff.
The information you provided supported the fact that there are no compensatory measures needed to be in place to demonstrate CRH. The information you provided also supported the fact that you meet the intent of the GDCs for CRH. Your commitment to implement TS changes based on TSTF-448, following our formal review and approval of TSTF-448, is acceptable for the purpose of closing out your response to GL 2003-01.
The NRC staff has completed its review of your response to GL 2003-01 and finds it acceptable. The NRC staff looks forward to working with the Southern Nuclear Operating Company, Inc., staff to implement the provisions of TSTF-448.
Please contact me if you have any questions regarding this correspondence.
Sincerely,
/RA/
Christopher Gratton, Sr. Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-321 and 50-366 cc: See next page Distribution:
Public PD2-1 R/F RidsNrrDorlLpl2-1(EMarinos)
RidsNrrLAOBrien RidsNrrPMCGratton RidsOgcRp RidsAcrsMailCenter RidsRgn2MailCenter(SShaeffer) RidsNrrDssScvb(RDennig)
RidsNrrDprPgcb (CJackson) RidsNrrDorlDpr SLee, EDO, Rgn1 DOCUMENT NAME: E:\Filenet\ML062580134.wpd ML062580134 NRR-106 OFFICE NRR/LPL2-1/PM NRR/LPL2-1/LA NRR/PGCB/BC NRR/SCVB/BC NRR/LPL2-1/BC NAME CGratton MOBrien CJackson RDennig EMarinos DATE / /06 / /06 / /06 / /06 / /06 OFFICIAL RECORD COPY
Edwin I. Hatch Nuclear Plant, Unit Nos. 1 & 2 cc:
Laurence Bergen Mr. Jeffrey T. Gasser Oglethorpe Power Corporation Executive Vice President 2100 E. Exchange Place Southern Nuclear Operating Company, Inc.
P.O. Box 1349 P.O. Box 1295 Tucker, GA 30085-1349 Birmingham, AL 35201-1295 Mr. R. D. Baker Mr. Dennis R. Madison, General Manager Manager - Licensing Edwin I. Hatch Nuclear Plant Southern Nuclear Operating Company, Inc. Southern Nuclear Operating Company, Inc.
P.O. Box 1295 U.S. Highway 1 North Birmingham, AL 35201-1295 P.O. Box 2010 Baxley, GA 31515 Resident Inspector Plant Hatch Mr. K. Rosanski 11030 Hatch Parkway N. Resident Manager Baxley, GA 31531 Oglethorpe Power Corporation Edwin I. Hatch Nuclear Plant Harold Reheis, Director P.O. Box 2010 Department of Natural Resources Baxley, GA 31515 205 Butler Street, SE., Suite 1252 Atlanta, GA 30334 Mr. L. M. Stinson Vice President - Nuclear Hatch Project Steven M. Jackson Southern Nuclear Operating Company, Inc.
Senior Engineer - Power Supply P.O. Box 1295 Municipal Electric Authority of Georgia Birmingham, AL 35201-1295 1470 Riveredge Parkway, NW Atlanta, GA 30328-4684 Mr. Reece McAlister Executive Secretary Georgia Public Service Commission 244 Washington St., SW Atlanta, GA 30334 Arthur H. Domby, Esq.
Troutman Sanders Nations Bank Plaza 600 Peachtree St, NE, Suite 5200 Atlanta, GA 30308-2216 Chairman Appling County Commissioners County Courthouse Baxley, GA 31513