Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML21181A220 | 29 June 2021 | Part 21 Written Notification - P21-03302021 Rev. 2 - Failures of Size 1 and 2 Freedom Series Full Voltage Reversing Starters | |
L-PI-21-027, 2020 10 CFR 50.46 LOCA Annual Report | 28 June 2021 | 2020 10 CFR 50.46 LOCA Annual Report | |
IR 05000282/2021010 | 22 June 2021 | Design Basis Assurance Inspection (Teams) Inspection Report 05000282/2021010 and 05000306/2021010 | Safe Shutdown Internal Flooding Probabilistic Risk Assessment Significance Determination Process Surveillance Frequency Control Program Large early release frequency Earthquake Coronavirus COVID-19 Fire Protection Program |
ML21167A184 | 16 June 2021 | Summary of the June 9, 2021, Public Outreach to Discuss the NRC 2020 End-Of-Cycle Plant Performance Assessment of Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant, Units 1 and 2 | Open House |
ML21166A379 | 15 June 2021 | Units 1 and 2 2020 End-of-Cycle Meeting Presentation | Coronavirus |
IR 05000282/2021011 | 3 June 2021 | Biennial Problem Identification and Resolution Inspection Report 05000282/2021011 and 05000306/2021011 | Ultimate heat sink Stroke time Cyber Security Condition Adverse to Quality License Renewal Coronavirus COVID-19 COVID19 |
ML21147A523 | 3 June 2021 | Prarie Island Nuclear Generating Plant, Units 1 and 2 - Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection | |
Press Release-III-21-008, NRC to Hold Virtual Meeting to Discuss 2020 Performance of Monticello and Prairie Island Nuclear Power Plants | 2 June 2021 | Press Release-III-21-008: NRC to Hold Virtual Meeting to Discuss 2020 Performance of Monticello and Prairie Island Nuclear Power Plants | |
ML21145A346 | 25 May 2021 | 6/9/21 Notice of Significant Public Meeting to Discuss NRC End-of-Cycle Performance Assessment of Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant for Performance for 2020 Calendar Year | |
ML21146A206 | 25 May 2021 | Information Meeting with a Question and Answer Session to Discuss NRC 2020 End-of-Cycle Plant Performance Assessment of Prairie Island Nuclear Plant, Units 1 and 2 | |
ML21137A104 | 20 May 2021 | Summary of May 6, 2021, Meeting with Northern States Power Company, Doing Business as Xcel Energy, Related to a Planned License Amendment to Transition to a 24 Month Operating Cycle | Surveillance Frequency Control Program |
ML21139A311 | 19 May 2021 | Independent Spent Fuel Storage Installation (ISFSI) - Revised Emergency Plan (E-Plan), Emergency Plan Implementing Procedures (EPIP) and Rec/Rpss Handbook | Boric Acid Health Physics Network High winds Reactor Vessel Water Level High Radiation Area Grab sample Design basis earthquake Earthquake Fuel cladding Pressure Boundary Leakage Minimum staff Power change |
ML21139A312 | 19 May 2021 | Independent Spent Fuel Storage Installation (ISFSI) - Summary of Changes - 10 CFR 50.54(q)(5) | Fuel cladding |
ML21139A310 | 19 May 2021 | Independent Spent Fuel Storage Installation (ISFSI) - Submittal of Revised Emergency Plan (E-Plan), Emergency Plan Implementing Procedures (EPIP) and Rec/Rpss Handbook | |
L-PI-21-023, Independent Spent Fuel Storage Installation - 2020 Annual Radiological Environmental Monitoring Program Report | 14 May 2021 | Independent Spent Fuel Storage Installation - 2020 Annual Radiological Environmental Monitoring Program Report | Grab sample Offsite Dose Calculation Manual FLEX |
ML21134A005 | 14 May 2021 | 2020 Annual Radioactive Effluent Report and Offsite Dose Calculation Manual | Offsite Dose Calculation Manual Process Control Program |
ML21133A250 | 13 May 2021 | NRR E-mail Capture - Prairie Island - Acceptance Review of TSTF-471 and TSTF-571-T | |
ML21133A357 | 13 May 2021 | Control Point Hazard | |
ML21131A075 | 10 May 2021 | Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000282/2021004; 05000306/2021004 | Boric Acid Non-Destructive Examination Aging Management Foreign Material Exclusion Dissimilar Metal Weld Scaffolding |
IR 05000282/2021001 | 6 May 2021 | Integrated Inspection Report 05000282/2021001 and 05000306/2021001 | Past operability Enforcement Discretion Functionality Assessment Operability Determination Coronavirus COVID-19 Fire Protection Program Power change |
ML21124A065 | 6 May 2021 | Xcel Energy Presentation for May 6, 2021 Public Meeting to Discuss 24-Month Cycles at Prairie Island Nuclear Generating Plant, Units 1 and 2 | Surveillance Frequency Control Program |
PMNS20210528, Meeting with Northern States Power Company Regarding Prairie Island Nuclear Generating Plant, Units 1 and 2, Proposed License Amendment Request | 5 May 2021 | Meeting with Northern States Power Company Regarding Prairie Island Nuclear Generating Plant, Units 1 and 2, Proposed License Amendment Request | |
ML21161A092 | 3 May 2021 | Paragon Energy Solutions, LLC, Failures of Size 1 and 2 Freedom Series Full Voltage Reversing Starters | |
ML21126A172 | 29 April 2021 | Paragon Energy Solutions Failures of Size 1 and 2 Freedom Series Full Voltage Reversing Starters | |
ML21121A000 | 27 April 2021 | Preparation and Scheduling of Operator Licensing Examinations | |
ML21113A314 | 23 April 2021 | Independent Spent Fuel Storage Installation - Notification of Submittal of Annual Report of Individual Monitoring | |
IR 05000282/2021401 | 21 April 2021 | Security Baseline Inspection Report 05000282/2021401 and 05000306/2021401; Independent Spent Storage Security Inspection Report 07200010/2021401 | Safeguards Contingency Plan Coronavirus COVID-19 |
L-PI-21-007, Application to Revise Technical Specifications to Adopt TSTF-471, Eliminate Use of the Term Core Alterations in Actions and Notes | 19 April 2021 | Application to Revise Technical Specifications to Adopt TSTF-471, Eliminate Use of the Term Core Alterations in Actions and Notes | Boric Acid Shutdown Margin High Radiation Area Offsite Dose Calculation Manual Hydrostatic Nondestructive Examination Pressure and Temperature Limits Report Surveillance Frequency Control Program Deep Dose Equivalent Power Uprate |
ML21110A592 | 19 April 2021 | GFE Results, March 2021 | Generic Fundamentals Examination |
ML21099A097 | 9 April 2021 | Information Request to Support Upcoming Temporary Instruction 2515/194 Inspection; Inspection Report 05000282/2021012 and 05000306/2021012 | Operator Manual Action Open Phase Condition |
ML21067A038 | 7 April 2021 | U.S. NRC Analysis of Northern States Power Company'S Initial and Updated Decommissioning Funding Plans for the Prairie Island Nuclear Generating Plant, Units 1 and 2, and Monticello Nuclear Generating Plant Independent Spent Fuel Storage in | Decommissioning Funding Plan Authorized possession limits |