Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML21181A22029 June 2021Part 21 Written Notification - P21-03302021 Rev. 2 - Failures of Size 1 and 2 Freedom Series Full Voltage Reversing Starters
L-PI-21-027, 2020 10 CFR 50.46 LOCA Annual Report28 June 20212020 10 CFR 50.46 LOCA Annual Report
IR 05000282/202101022 June 2021Design Basis Assurance Inspection (Teams) Inspection Report 05000282/2021010 and 05000306/2021010Safe Shutdown
Internal Flooding
Probabilistic Risk Assessment
Significance Determination Process
Surveillance Frequency Control Program
Large early release frequency
Earthquake
Coronavirus
COVID-19
Fire Protection Program
ML21167A18416 June 2021Summary of the June 9, 2021, Public Outreach to Discuss the NRC 2020 End-Of-Cycle Plant Performance Assessment of Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant, Units 1 and 2Open House
ML21166A37915 June 2021Units 1 and 2 2020 End-of-Cycle Meeting PresentationCoronavirus
IR 05000282/20210113 June 2021Biennial Problem Identification and Resolution Inspection Report 05000282/2021011 and 05000306/2021011Ultimate heat sink
Stroke time
Cyber Security
Condition Adverse to Quality
License Renewal
Coronavirus
COVID-19
COVID19
ML21147A5233 June 2021Prarie Island Nuclear Generating Plant, Units 1 and 2 - Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection
Press Release-III-21-008, NRC to Hold Virtual Meeting to Discuss 2020 Performance of Monticello and Prairie Island Nuclear Power Plants2 June 2021Press Release-III-21-008: NRC to Hold Virtual Meeting to Discuss 2020 Performance of Monticello and Prairie Island Nuclear Power Plants
ML21145A34625 May 20216/9/21 Notice of Significant Public Meeting to Discuss NRC End-of-Cycle Performance Assessment of Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant for Performance for 2020 Calendar Year
ML21146A20625 May 2021Information Meeting with a Question and Answer Session to Discuss NRC 2020 End-of-Cycle Plant Performance Assessment of Prairie Island Nuclear Plant, Units 1 and 2
ML21137A10420 May 2021Summary of May 6, 2021, Meeting with Northern States Power Company, Doing Business as Xcel Energy, Related to a Planned License Amendment to Transition to a 24 Month Operating CycleSurveillance Frequency Control Program
ML21139A31119 May 2021Independent Spent Fuel Storage Installation (ISFSI) - Revised Emergency Plan (E-Plan), Emergency Plan Implementing Procedures (EPIP) and Rec/Rpss HandbookBoric Acid
Health Physics Network
High winds
Reactor Vessel Water Level
High Radiation Area
Grab sample
Design basis earthquake
Earthquake
Fuel cladding
Pressure Boundary Leakage
Minimum staff
Power change
ML21139A31219 May 2021Independent Spent Fuel Storage Installation (ISFSI) - Summary of Changes - 10 CFR 50.54(q)(5)Fuel cladding
ML21139A31019 May 2021Independent Spent Fuel Storage Installation (ISFSI) - Submittal of Revised Emergency Plan (E-Plan), Emergency Plan Implementing Procedures (EPIP) and Rec/Rpss Handbook
L-PI-21-023, Independent Spent Fuel Storage Installation - 2020 Annual Radiological Environmental Monitoring Program Report14 May 2021Independent Spent Fuel Storage Installation - 2020 Annual Radiological Environmental Monitoring Program ReportGrab sample
Offsite Dose Calculation Manual
FLEX
ML21134A00514 May 20212020 Annual Radioactive Effluent Report and Offsite Dose Calculation ManualOffsite Dose Calculation Manual
Process Control Program
ML21133A25013 May 2021NRR E-mail Capture - Prairie Island - Acceptance Review of TSTF-471 and TSTF-571-T
ML21133A35713 May 2021Control Point Hazard
ML21131A07510 May 2021Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000282/2021004; 05000306/2021004Boric Acid
Non-Destructive Examination
Aging Management
Foreign Material Exclusion
Dissimilar Metal Weld
Scaffolding
IR 05000282/20210016 May 2021Integrated Inspection Report 05000282/2021001 and 05000306/2021001Past operability
Enforcement Discretion
Functionality Assessment
Operability Determination
Coronavirus
COVID-19
Fire Protection Program
Power change
ML21124A0656 May 2021Xcel Energy Presentation for May 6, 2021 Public Meeting to Discuss 24-Month Cycles at Prairie Island Nuclear Generating Plant, Units 1 and 2Surveillance Frequency Control Program
PMNS20210528, Meeting with Northern States Power Company Regarding Prairie Island Nuclear Generating Plant, Units 1 and 2, Proposed License Amendment Request5 May 2021Meeting with Northern States Power Company Regarding Prairie Island Nuclear Generating Plant, Units 1 and 2, Proposed License Amendment Request
ML21161A0923 May 2021Paragon Energy Solutions, LLC, Failures of Size 1 and 2 Freedom Series Full Voltage Reversing Starters
ML21126A17229 April 2021Paragon Energy Solutions Failures of Size 1 and 2 Freedom Series Full Voltage Reversing Starters
ML21121A00027 April 2021Preparation and Scheduling of Operator Licensing Examinations
ML21113A31423 April 2021Independent Spent Fuel Storage Installation - Notification of Submittal of Annual Report of Individual Monitoring
IR 05000282/202140121 April 2021Security Baseline Inspection Report 05000282/2021401 and 05000306/2021401; Independent Spent Storage Security Inspection Report 07200010/2021401Safeguards Contingency Plan
Coronavirus
COVID-19
L-PI-21-007, Application to Revise Technical Specifications to Adopt TSTF-471, Eliminate Use of the Term Core Alterations in Actions and Notes19 April 2021Application to Revise Technical Specifications to Adopt TSTF-471, Eliminate Use of the Term Core Alterations in Actions and NotesBoric Acid
Shutdown Margin
High Radiation Area
Offsite Dose Calculation Manual
Hydrostatic
Nondestructive Examination
Pressure and Temperature Limits Report
Surveillance Frequency Control Program
Deep Dose Equivalent
Power Uprate
ML21110A59219 April 2021GFE Results, March 2021Generic Fundamentals Examination
ML21099A0979 April 2021Information Request to Support Upcoming Temporary Instruction 2515/194 Inspection; Inspection Report 05000282/2021012 and 05000306/2021012Operator Manual Action
Open Phase Condition
ML21067A0387 April 2021U.S. NRC Analysis of Northern States Power Company'S Initial and Updated Decommissioning Funding Plans for the Prairie Island Nuclear Generating Plant, Units 1 and 2, and Monticello Nuclear Generating Plant Independent Spent Fuel Storage inDecommissioning Funding Plan
Authorized possession limits