Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML21230A35230 June 2021CN-2021-06-DRAFT Outline Comments Rev 0
ML21230A34625 June 2021CN 2021-06 Draft Written Comments kdc-rev1 Final
ML21230A34925 June 2021CN-2021-06 Draft Written ExamSafe Shutdown
High winds
Shutdown Margin
Reactor Vessel Water Level
Loop seal
Half scram
Temporary Modification
Squib
FLEX
Earthquake
Fuel cladding
Power change
Coast down
ML21230A35025 June 2021CN-2021-06 Final OutlinesShutdown Margin
Failure to Scram
ML21230A34725 June 2021Initial Licensing Retake Examination Material Cover LetterWater Inventory Control
Job Performance Measure
Operability Determination
Overtravel
Failure to Scram
ML21208A41925 June 2021CN-2021-06 Post Exam Analysis
ML21230A32525 June 2021CN-2021-06 Public Forms
ML21208A42125 June 2021CN-2021-06 Final Op TestWater Inventory Control
Job Performance Measure
Operability Determination
Overtravel
Failure to Scram
ML21208A42225 June 2021CN-2021-06 Final Written ExamSafe Shutdown
High winds
Shutdown Margin
Reactor Vessel Water Level
Loop seal
Half scram
Temporary Modification
Squib
FLEX
Earthquake
Fuel cladding
Power change
Coast down
ML21230A35125 June 2021CN-2021-06-DRAFT Op Test Comments kdc-rev1-final
NLS2021032, 10 CFR 50.55a Relief Request RI5-02, Revision 3, and RRS-01, Revision 121 June 202110 CFR 50.55a Relief Request RI5-02, Revision 3, and RRS-01, Revision 1
NLS2021039, 10 CFR 50.55a Relief Request RS-01, Revision 016 June 202110 CFR 50.55a Relief Request RS-01, Revision 0Grace period
ML21166A22216 June 2021NRC Initial Operator Licensing Retake Examination Approval 05000298/2021301, CNS2021301-Exam Approval Ltr-kdc
NLS2021040, Submittal of Emergency Plan, Revision 77 and Summary of 50.54( Q) Analysis14 June 2021Submittal of Emergency Plan, Revision 77 and Summary of 50.54( Q) AnalysisSafe Shutdown
Time of Discovery
Health Physics Network
High winds
Fire Barrier
Earthquake
Deep Dose Equivalent
Pressure Boundary Leakage
Minimum staff
Inadvertent Siren Activation
Siren
ML21165A00611 June 2021NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-582Water Inventory Control
IR 05000298/20210107 June 2021Design Basis Assurance Inspection (Teams) Inspection Report 05000298/2021010Stroke time
Past operability
Aging Management
Significance Determination Process
Large early release frequency
Operability Determination
Maintenance Rule Program
ML21140A38924 May 2021Riv Column 1 EOC 2020 Public Meeting SummaryCoronavirus
COVID-19
ML21089A07620 May 2021the Nuclear Regulatory Commission'S Analysis of Nebraska Public Power District'S Initial and Updated Decommissioning Funding Plans for the Cooper Nuclear Station Independent Spent Fuel Storage InstallationDecommissioning Funding Plan
Authorized possession limits
License Renewal
ML21055A40214 May 2021Memorandum: Final Environmental Assessment and Finding of No Significant Impact of Initial and Updated Decommissioning Funding Plans for the Cooper, Fort Calhoun and Virgil C. Summer Independent Spent Fuel Storage InstallationsDecommissioning Funding Plan
ML21055A40014 May 2021Enclosure 1: Environmental Assessments and Findings of No Significant Impact of Independent Spent Fuel Storage Facilities Decommissioning Funding Plans Federal Register NoticeDecommissioning Funding Plan
ML21054A02814 May 2021Enclosure 2: Final Environmental Assessment and Finding of No Significant Impact of Nebraska Public Power District'S Initial and Updated Decommissioning Funding Plans for Cooper Nuclear Station ISFSIDecommissioning Funding Plan
Authorized possession limits
ML21133A32613 May 2021Control Point Hazard
NLS2021029, Annual Radiological Environmental Report13 May 2021Annual Radiological Environmental ReportChernobyl
NLS2021018, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements11 May 2021Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) EnhancementsReactor Vessel Water Level
Water Inventory Control
Operating Basis Earthquake
Qualified Offsite Circuit
Surveillance Frequency Control Program
Control of Heavy Loads
Power Operated Valves
Fuel cladding
Offsite Circuit
ML21130A60010 May 2021On-Shift Staffing Analysis, Revision 3
NLS2021035, Attachment/Enclosureport of Change and Summary of 50.54(q) Analysis - On-Shift Staffing Analysis, Rev. 310 May 2021Attachment/Enclosureport of Change and Summary of 50.54(q) Analysis - On-Shift Staffing Analysis, Rev. 3Safe Shutdown
Reactor Vessel Water Level
High Radiation Area
Fire impairment
Severe Accident Management Guideline
Minimum staff
Fire Protection Program
ML21125A0376 May 2021May 6, 2021 Public Meeting (Observation) Slides for RAP Back Program Presentation to Industry(003)Fitness for Duty
Cyber Security
IR 05000298/20210015 May 2021CNS2021001-IR-AS, Cooper Nuclear Station - Integrated Inspection Report 05000298/2021001Internal Flooding
Enforcement Discretion
Functionality Assessment
Significance Determination Process
Large early release frequency
Operability Determination
Coronavirus
COVID-19
Fire Protection Program
Power change
Downpower
Siren
IR 05000298/20214014 May 2021Security Baseline Inspection Report 05000298/2021401Fitness for Duty
Press Release-IV-21-005, NRC to Hold Virtual Meeting to Discuss 2020 Performance of 10 Region IV Nuclear Power Plants30 April 2021Press Release-IV-21-005: NRC to Hold Virtual Meeting to Discuss 2020 Performance of 10 Region IV Nuclear Power Plants
NLS2021028, Annual Radioactive Effluent Release Report30 April 2021Annual Radioactive Effluent Release ReportTime of Discovery
Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Process Control Program
Annual Radiological Effluent Release Report
Power change
NLS2021026, Preparation and Scheduling of Operator Licensing Examinations29 April 2021Preparation and Scheduling of Operator Licensing Examinations
PMNS20210563, Public Webinar to Discuss the NRCs 2020 Annual Assessment of Safety Performance at Arkansas Nuclear One, Columbia, Comanche Peak, Cooper, Diablo Canyon, Palo Verde, River Bend Station, South Texas Project, Waterford, and Wolf Creek29 April 2021Public Webinar to Discuss the NRCs 2020 Annual Assessment of Safety Performance at Arkansas Nuclear One, Columbia, Comanche Peak, Cooper, Diablo Canyon, Palo Verde, River Bend Station, South Texas Project, Waterford, and Wolf Creek
ML21130A27721 April 20210 to Updated Final Safety Analysis Report, Drawing 729E471BB, Sheet 7, Functional Control Diagram Control Rod Drive Hydraulic System
ML21130A27621 April 20210 to Updated Final Safety Analysis Report, Drawing 730E148BB, Sheet 1, Process Diagram Reactor Water Clean-Up System
ML21130A27821 April 20210 to Updated Final Safety Analysis Report, Drawing CNSNBI10, Sheet 1, Reactor Water Level Indication Correlation
ML21130A27921 April 20210 to Updated Final Safety Analysis Report, Drawing 3005, Sheet 4, Auxiliary One Line Diagram Motor Control Centers M, N, P, U, V, & W
ML21130A28021 April 20210 to Updated Final Safety Analysis Report, Drawing 729E471BB, Sheet 6, Functional Control Diagram Control Rod Drive Hydraulic System
ML21130A28121 April 20210 to Updated Final Safety Analysis Report, Drawing 730E140BB, Sheet 1, Fcd Residual Heat Removal System
ML21130A28221 April 20210 to Updated Final Safety Analysis Report, Drawing 729E471BB, Revision 3, Sheet 2, Functional Control Diagram Control Rod Drive Hydraulic System
ML21130A28321 April 20210 to Updated Final Safety Analysis Report, Drawing 919D690BC, Sheet 3, Reactor Vessel
ML21130A28421 April 20210 to Updated Final Safety Analysis Report, Drawing 729E471BB, Sheet 5, Functional Control Diagram Control Rod Drive Hydraulic System
ML21130A28621 April 20210 to Updated Final Safety Analysis Report, Drawing 4259, Sheet 1, Containment Vessel Penetration Location
ML21130A28721 April 20210 to Updated Final Safety Analysis Report, Drawing 730E100, Sheet 2, Neutron Monitoring System Arrangement
ML21130A28821 April 20210 to Updated Final Safety Analysis Report, Drawing 4215, Reactor Building Structural Shielding Blocks (HPCI Hatch)
ML21130A28921 April 20210 to Updated Final Safety Analysis Report, Drawing 729E589BB, Sheet 3, High Pressure Coolant Injection System Functional Control Diagram
ML21130A29021 April 20210 to Updated Final Safety Analysis Report, Drawing 730E140BB, Sheet 2, Fcd Residual Heat Removal System
ML21130A29121 April 20210 to Updated Final Safety Analysis Report, Drawing 729E402BB, Sheet 1, Functional Control Diagram Core Spray System
ML21130A29221 April 20210 to Updated Final Safety Analysis Report, Drawing 729E223BB, Sheet 1, Neutron Monitoring System
NLS2021013, 0 to Updated Final Safety Analysis Report, Drawing ILE70-3, Sheet 107F, Installation Details - Temperature Detectors for Nuclear Boiler Systems Leak Detection21 April 20210 to Updated Final Safety Analysis Report, Drawing ILE70-3, Sheet 107F, Installation Details - Temperature Detectors for Nuclear Boiler Systems Leak Detection