ML21230A352 | 30 June 2021 | CN-2021-06-DRAFT Outline Comments Rev 0 | |
ML21230A346 | 25 June 2021 | CN 2021-06 Draft Written Comments kdc-rev1 Final | |
ML21230A349 | 25 June 2021 | CN-2021-06 Draft Written Exam | Safe Shutdown High winds Shutdown Margin Reactor Vessel Water Level Loop seal Half scram Temporary Modification Squib FLEX Earthquake Fuel cladding Power change Coast down |
ML21230A350 | 25 June 2021 | CN-2021-06 Final Outlines | Shutdown Margin Failure to Scram |
ML21230A347 | 25 June 2021 | Initial Licensing Retake Examination Material Cover Letter | Water Inventory Control Job Performance Measure Operability Determination Overtravel Failure to Scram |
ML21208A419 | 25 June 2021 | CN-2021-06 Post Exam Analysis | |
ML21230A325 | 25 June 2021 | CN-2021-06 Public Forms | |
ML21208A421 | 25 June 2021 | CN-2021-06 Final Op Test | Water Inventory Control Job Performance Measure Operability Determination Overtravel Failure to Scram |
ML21208A422 | 25 June 2021 | CN-2021-06 Final Written Exam | Safe Shutdown High winds Shutdown Margin Reactor Vessel Water Level Loop seal Half scram Temporary Modification Squib FLEX Earthquake Fuel cladding Power change Coast down |
ML21230A351 | 25 June 2021 | CN-2021-06-DRAFT Op Test Comments kdc-rev1-final | |
NLS2021032, 10 CFR 50.55a Relief Request RI5-02, Revision 3, and RRS-01, Revision 1 | 21 June 2021 | 10 CFR 50.55a Relief Request RI5-02, Revision 3, and RRS-01, Revision 1 | |
NLS2021039, 10 CFR 50.55a Relief Request RS-01, Revision 0 | 16 June 2021 | 10 CFR 50.55a Relief Request RS-01, Revision 0 | Grace period |
ML21166A222 | 16 June 2021 | NRC Initial Operator Licensing Retake Examination Approval 05000298/2021301, CNS2021301-Exam Approval Ltr-kdc | |
NLS2021040, Submittal of Emergency Plan, Revision 77 and Summary of 50.54( Q) Analysis | 14 June 2021 | Submittal of Emergency Plan, Revision 77 and Summary of 50.54( Q) Analysis | Safe Shutdown Time of Discovery Health Physics Network High winds Fire Barrier Earthquake Deep Dose Equivalent Pressure Boundary Leakage Minimum staff Inadvertent Siren Activation Siren |
ML21165A006 | 11 June 2021 | NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-582 | Water Inventory Control |
IR 05000298/2021010 | 7 June 2021 | Design Basis Assurance Inspection (Teams) Inspection Report 05000298/2021010 | Stroke time Past operability Aging Management Significance Determination Process Large early release frequency Operability Determination Maintenance Rule Program |
ML21140A389 | 24 May 2021 | Riv Column 1 EOC 2020 Public Meeting Summary | Coronavirus COVID-19 |
ML21089A076 | 20 May 2021 | the Nuclear Regulatory Commission'S Analysis of Nebraska Public Power District'S Initial and Updated Decommissioning Funding Plans for the Cooper Nuclear Station Independent Spent Fuel Storage Installation | Decommissioning Funding Plan Authorized possession limits License Renewal |
ML21055A402 | 14 May 2021 | Memorandum: Final Environmental Assessment and Finding of No Significant Impact of Initial and Updated Decommissioning Funding Plans for the Cooper, Fort Calhoun and Virgil C. Summer Independent Spent Fuel Storage Installations | Decommissioning Funding Plan |
ML21055A400 | 14 May 2021 | Enclosure 1: Environmental Assessments and Findings of No Significant Impact of Independent Spent Fuel Storage Facilities Decommissioning Funding Plans Federal Register Notice | Decommissioning Funding Plan |
ML21054A028 | 14 May 2021 | Enclosure 2: Final Environmental Assessment and Finding of No Significant Impact of Nebraska Public Power District'S Initial and Updated Decommissioning Funding Plans for Cooper Nuclear Station ISFSI | Decommissioning Funding Plan Authorized possession limits |
ML21133A326 | 13 May 2021 | Control Point Hazard | |
NLS2021029, Annual Radiological Environmental Report | 13 May 2021 | Annual Radiological Environmental Report | Chernobyl |
NLS2021018, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements | 11 May 2021 | Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements | Reactor Vessel Water Level Water Inventory Control Operating Basis Earthquake Qualified Offsite Circuit Surveillance Frequency Control Program Control of Heavy Loads Power Operated Valves Fuel cladding Offsite Circuit |
ML21130A600 | 10 May 2021 | On-Shift Staffing Analysis, Revision 3 | |
NLS2021035, Attachment/Enclosureport of Change and Summary of 50.54(q) Analysis - On-Shift Staffing Analysis, Rev. 3 | 10 May 2021 | Attachment/Enclosureport of Change and Summary of 50.54(q) Analysis - On-Shift Staffing Analysis, Rev. 3 | Safe Shutdown Reactor Vessel Water Level High Radiation Area Fire impairment Severe Accident Management Guideline Minimum staff Fire Protection Program |
ML21125A037 | 6 May 2021 | May 6, 2021 Public Meeting (Observation) Slides for RAP Back Program Presentation to Industry(003) | Fitness for Duty Cyber Security |
IR 05000298/2021001 | 5 May 2021 | CNS2021001-IR-AS, Cooper Nuclear Station - Integrated Inspection Report 05000298/2021001 | Internal Flooding Enforcement Discretion Functionality Assessment Significance Determination Process Large early release frequency Operability Determination Coronavirus COVID-19 Fire Protection Program Power change Downpower Siren |
IR 05000298/2021401 | 4 May 2021 | Security Baseline Inspection Report 05000298/2021401 | Fitness for Duty |
Press Release-IV-21-005, NRC to Hold Virtual Meeting to Discuss 2020 Performance of 10 Region IV Nuclear Power Plants | 30 April 2021 | Press Release-IV-21-005: NRC to Hold Virtual Meeting to Discuss 2020 Performance of 10 Region IV Nuclear Power Plants | |
NLS2021028, Annual Radioactive Effluent Release Report | 30 April 2021 | Annual Radioactive Effluent Release Report | Time of Discovery Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Process Control Program Annual Radiological Effluent Release Report Power change |
NLS2021026, Preparation and Scheduling of Operator Licensing Examinations | 29 April 2021 | Preparation and Scheduling of Operator Licensing Examinations | |
PMNS20210563, Public Webinar to Discuss the NRCs 2020 Annual Assessment of Safety Performance at Arkansas Nuclear One, Columbia, Comanche Peak, Cooper, Diablo Canyon, Palo Verde, River Bend Station, South Texas Project, Waterford, and Wolf Creek | 29 April 2021 | Public Webinar to Discuss the NRCs 2020 Annual Assessment of Safety Performance at Arkansas Nuclear One, Columbia, Comanche Peak, Cooper, Diablo Canyon, Palo Verde, River Bend Station, South Texas Project, Waterford, and Wolf Creek | |
ML21130A277 | 21 April 2021 | 0 to Updated Final Safety Analysis Report, Drawing 729E471BB, Sheet 7, Functional Control Diagram Control Rod Drive Hydraulic System | |
ML21130A276 | 21 April 2021 | 0 to Updated Final Safety Analysis Report, Drawing 730E148BB, Sheet 1, Process Diagram Reactor Water Clean-Up System | |
ML21130A278 | 21 April 2021 | 0 to Updated Final Safety Analysis Report, Drawing CNSNBI10, Sheet 1, Reactor Water Level Indication Correlation | |
ML21130A279 | 21 April 2021 | 0 to Updated Final Safety Analysis Report, Drawing 3005, Sheet 4, Auxiliary One Line Diagram Motor Control Centers M, N, P, U, V, & W | |
ML21130A280 | 21 April 2021 | 0 to Updated Final Safety Analysis Report, Drawing 729E471BB, Sheet 6, Functional Control Diagram Control Rod Drive Hydraulic System | |
ML21130A281 | 21 April 2021 | 0 to Updated Final Safety Analysis Report, Drawing 730E140BB, Sheet 1, Fcd Residual Heat Removal System | |
ML21130A282 | 21 April 2021 | 0 to Updated Final Safety Analysis Report, Drawing 729E471BB, Revision 3, Sheet 2, Functional Control Diagram Control Rod Drive Hydraulic System | |
ML21130A283 | 21 April 2021 | 0 to Updated Final Safety Analysis Report, Drawing 919D690BC, Sheet 3, Reactor Vessel | |
ML21130A284 | 21 April 2021 | 0 to Updated Final Safety Analysis Report, Drawing 729E471BB, Sheet 5, Functional Control Diagram Control Rod Drive Hydraulic System | |
ML21130A286 | 21 April 2021 | 0 to Updated Final Safety Analysis Report, Drawing 4259, Sheet 1, Containment Vessel Penetration Location | |
ML21130A287 | 21 April 2021 | 0 to Updated Final Safety Analysis Report, Drawing 730E100, Sheet 2, Neutron Monitoring System Arrangement | |
ML21130A288 | 21 April 2021 | 0 to Updated Final Safety Analysis Report, Drawing 4215, Reactor Building Structural Shielding Blocks (HPCI Hatch) | |
ML21130A289 | 21 April 2021 | 0 to Updated Final Safety Analysis Report, Drawing 729E589BB, Sheet 3, High Pressure Coolant Injection System Functional Control Diagram | |
ML21130A290 | 21 April 2021 | 0 to Updated Final Safety Analysis Report, Drawing 730E140BB, Sheet 2, Fcd Residual Heat Removal System | |
ML21130A291 | 21 April 2021 | 0 to Updated Final Safety Analysis Report, Drawing 729E402BB, Sheet 1, Functional Control Diagram Core Spray System | |
ML21130A292 | 21 April 2021 | 0 to Updated Final Safety Analysis Report, Drawing 729E223BB, Sheet 1, Neutron Monitoring System | |
NLS2021013, 0 to Updated Final Safety Analysis Report, Drawing ILE70-3, Sheet 107F, Installation Details - Temperature Detectors for Nuclear Boiler Systems Leak Detection | 21 April 2021 | 0 to Updated Final Safety Analysis Report, Drawing ILE70-3, Sheet 107F, Installation Details - Temperature Detectors for Nuclear Boiler Systems Leak Detection |