Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML19190A04328 June 2019Discusses Proprietary Information for Curtiss-Wright SAS - 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 - Cw SAS Initial Report No. 10CFR21-48
NL-19-0771, Risk Informed Technical Specification Information Only Bases Changes27 June 2019Risk Informed Technical Specification Information Only Bases ChangesSafe Shutdown
High Radiation Area
Surveillance Frequency Control Program
Offsite Circuit
NL-19-0710, Quality Assurance Topical Report Submittal24 June 2019Quality Assurance Topical Report SubmittalFitness for Duty
Shutdown Margin
Offsite Dose Calculation Manual
Commercial Grade Dedication
Nondestructive Examination
Temporary Modification
Cyber Security
Condition Adverse to Quality
Process Control Program
Fire Protection Program
ML19165A27014 June 2019Annual Report Form for Drug and Alcohol Tests for 2018
NL-19-0676, Proposed Alternative FNP-ISI-ALT-05-04, Response to NRC Request for Additional Information11 June 2019Proposed Alternative FNP-ISI-ALT-05-04, Response to NRC Request for Additional InformationIncorporated by reference
Grace period
ML19190A0447 June 201910 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 - Cw SAS Initial Report No. 10CFR21-48
ML19157A2126 June 2019Operator Licensing Written Examination Approval Letter 05000348/2019301 and 05000364/2019301
NL-19-0650, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20185 June 201910 CFR 50.46 ECCS Evaluation Model Annual Report for 2018
ML19158A13131 May 2019Paragon Energy Systems LLC -10 CFR Part 21 Report of Defect GS2 Terry Turbine Introl Positioners
NL-19-0795, Cameron Non-Proprietary Engineering Reports; ER-1180NP, Rev. 1, ER-1181NP, Rev. 1; ER-1182NP, Rev. 1; and ER-1183NP, Rev. 1.31 May 2019Cameron Non-Proprietary Engineering Reports; ER-1180NP, Rev. 1, ER-1181NP, Rev. 1; ER-1182NP, Rev. 1; and ER-1183NP, Rev. 1.
NL-19-0565, Submittal of Cycle 27 Core Operating Limits Report31 May 2019Submittal of Cycle 27 Core Operating Limits ReportShutdown Margin
ML19150A10229 May 2019Request for Additional Information Regarding Relief Request FNP-ISI-05-04, Version 1.0 (L-2019-LLR-0020)Incorporated by reference
Grace period
ML19149A42229 May 2019Summary of Public Meeting Concerning Annual Assessment of the Farley Nuclear Plant, Units 1 and 2, Docket Nos. 05000348 and 05000361Open House
ML19140A45628 May 2019Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 06/04/2019Coatings
Surveillance Frequency Control Program
Exemption Request
NL-19-0623, Significant Hazards Evaluation and Environmental Considerations for Farley Risk Informed Technical Specifications Response to Request for Additional Information17 May 2019Significant Hazards Evaluation and Environmental Considerations for Farley Risk Informed Technical Specifications Response to Request for Additional Information
NL-19-0618, Response to Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations17 May 2019Response to Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations
ML19135A25815 May 2019Single Positive Test Form Collected on 03/28/2019
ML19135A25715 May 2019Single Positive Test Form Collected on 01/15/2019
Press Release-II-19-029, NRC Selects George Wilson as Director of the Office of Enforcement10 May 2019Press Release-II-19-029: NRC Selects George Wilson as Director of the Office of EnforcementOpen House
IR 05000348/201900110 May 2019Nuclear Regulatory Commission Integrated Inspection Report 05000348/2019001 and 05000364/2019001Internal Flooding
Temporary Modification
Functionality Assessment
Operability Determination
Fire Protection Program
Power change
ML14224A3563 May 2019Letter to All Holders of Licenses for Operating Power Reactors - Rescission of Certain Power Reactor Security Orders Applicable to Nuclear Power Plants
NL-19-0221, Risk-Informed Technical Specifications Initiative 4b, Risk-Managed Technical Specifications, SNC Response to NRC Request for Additional Information (RAI)3 May 2019Risk-Informed Technical Specifications Initiative 4b, Risk-Managed Technical Specifications, SNC Response to NRC Request for Additional Information (RAI)Hot Short
Safe Shutdown
High winds
Mission time
Fire Barrier
Tornado Missile
Internal Flooding
Probabilistic Risk Assessment
FLEX
Tornado Missile Protection
Thermoset
Surveillance Frequency Control Program
Large early release frequency
TORMIS
Offsite Circuit
Fire Protection Program
Very Early Warning Fire Detection
ML19064A77426 April 2019Issuance of Amendments Regarding License Amendment Request to Revise Technical Specification 5.2.2.g and Update Emergency Plan Minimum on Shift Staff TablesFire Protection Program
NL-19-0343, Relief Request FNP-ISI-RR-03: SNC Response to NRC Request for Additional Information23 April 2019Relief Request FNP-ISI-RR-03: SNC Response to NRC Request for Additional InformationBoric Acid
NL-19-0347, Snubber Program Plan for the Fifth Ten Year Inservice Testing Interval10 April 2019Snubber Program Plan for the Fifth Ten Year Inservice Testing IntervalSafe Shutdown
ML19100A00710 April 2019Information Request for the Cyber-Security Baseline Security Inspection, Notification to Perform Inspection 05000348/2019013; 05000364/201901Cyber Security
IR 05000348/201901310 April 2019Information Request for the Cyber-Security Baseline Security Inspection, Notification to Perform Inspection 05000348/2019013; 05000364/201901Cyber Security
ML19100A35710 April 2019March 6, 2019, NRC Generic Fundamentals Examination Results for Joseph M. Farley Nuclear PlantGeneric Fundamentals Examination
ML19098A1908 April 2019NRR E-mail Capture - for Your Comments - State of Alabama - Farley, Hatch, and Vogtle License Amendment Request for TS 5.2.2.g
IR 05000348/20190113 April 2019NRC Problem Identification and Resolution Inspection Report 05000348/2019011 and 05000364/2019011Mission time
Functionality Assessment
Operability Determination
Maintenance Rule Program
NL-19-0283, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors1 April 2019Financial Assurance Requirements for Decommissioning Nuclear Power Reactors