MONTHYEARNL-24-0014, Revised Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical.2024-01-30030 January 2024 Revised Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical. NL-24-0031, Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 2R232024-01-29029 January 2024 Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 2R23 NL-24-0020, Plan, Unit 1 Responses to NRC Request for Additional Information for Refueling Outage 1R24 Steam Generator Tube Inspection Report2024-01-22022 January 2024 Plan, Unit 1 Responses to NRC Request for Additional Information for Refueling Outage 1R24 Steam Generator Tube Inspection Report NL-23-0926, Correction of Technical Specification Typographical Error2024-01-12012 January 2024 Correction of Technical Specification Typographical Error NL-24-0011, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-01-11011 January 2024 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-23-0901, 30-Day 10 CFR 21 Notification - Framatome Supplied Siemens Medium Voltage (Mv) Circuit Breakers2023-12-15015 December 2023 30-Day 10 CFR 21 Notification - Framatome Supplied Siemens Medium Voltage (Mv) Circuit Breakers NL-23-0908, Cycle 30 Core Operating Limits Report2023-12-13013 December 2023 Cycle 30 Core Operating Limits Report NL-23-0889, Units 1 and 2 - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water (RHRSW) and Plant Service Water (Psw) Systems2023-12-0606 December 2023 Units 1 and 2 - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water (RHRSW) and Plant Service Water (Psw) Systems NL-23-0879, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation NL-23-0877, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation NL-23-0878, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation NL-23-0841, Update to Notice of Intent to Pursue Subsequent License Renewal2023-11-20020 November 2023 Update to Notice of Intent to Pursue Subsequent License Renewal NL-23-0827, Response to Requests for Additional Information for a License Amendment Request and a Proposed Alternative Related to TS 3.4.142023-11-17017 November 2023 Response to Requests for Additional Information for a License Amendment Request and a Proposed Alternative Related to TS 3.4.14 NL-23-0825, Reply to Notice of Violation EA-23-080 and Readiness for 95001 Inspection2023-11-14014 November 2023 Reply to Notice of Violation EA-23-080 and Readiness for 95001 Inspection NL-23-0750, Response to Second Request for Additional Information Regarding License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the Colr2023-10-0404 October 2023 Response to Second Request for Additional Information Regarding License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the Colr NL-23-0745, Refueling Outage 1R24 Steam Generator Tube Inspection Report2023-09-22022 September 2023 Refueling Outage 1R24 Steam Generator Tube Inspection Report NL-23-0739, Response to NRC Inspection Report and Preliminary White Finding2023-09-0808 September 2023 Response to NRC Inspection Report and Preliminary White Finding NL-23-0695, Response to Round 2 Request for Additional Information Regarding License Amendment Request for Technical Specification 3.8.3, Inverters Operating, Completion Time Extension (LAR-22-002S2)2023-08-31031 August 2023 Response to Round 2 Request for Additional Information Regarding License Amendment Request for Technical Specification 3.8.3, Inverters Operating, Completion Time Extension (LAR-22-002S2) NL-23-0666, License Amendment Request: Remove Combined License Appendix C (LAR 23-008)2023-08-28028 August 2023 License Amendment Request: Remove Combined License Appendix C (LAR 23-008) NL-23-0713, Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit2023-08-23023 August 2023 Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit NL-23-0716, Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit2023-08-23023 August 2023 Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit NL-23-0704, Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit2023-08-22022 August 2023 Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit NL-23-0658, Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal2023-08-11011 August 2023 Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal NL-23-0670, Response to Request for Additional Information Regarding License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-144832023-08-11011 August 2023 Response to Request for Additional Information Regarding License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-14483 NL-23-0672, Licensee Guarantees of Payment of Deferred Premiums2023-08-10010 August 2023 Licensee Guarantees of Payment of Deferred Premiums NL-23-0542, CFR 50.46 ECCS Evaluation Model Annual Report for 20222023-08-0909 August 2023 CFR 50.46 ECCS Evaluation Model Annual Report for 2022 NL-23-0624, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2023-08-0404 August 2023 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-23-0628, Readiness for Supplemental Inspection EA-22-1012023-07-26026 July 2023 Readiness for Supplemental Inspection EA-22-101 NL-23-0611, Core Operating Limits Report, Cycle 11 Version 12023-07-19019 July 2023 Core Operating Limits Report, Cycle 11 Version 1 NL-23-0566, ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use2023-07-13013 July 2023 ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use NL-23-0584, Preservice Inspection Program Owner'S Activity Report2023-07-10010 July 2023 Preservice Inspection Program Owner'S Activity Report NL-23-0555, Request for Exemption from Physical Barrier Requirement2023-07-0707 July 2023 Request for Exemption from Physical Barrier Requirement NL-23-0506, to Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC and CAOC Fq Surveillance Technical Specifications2023-07-0505 July 2023 to Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC and CAOC Fq Surveillance Technical Specifications NL-23-0541, Inservice Inspection Program Owners Activity Report for Outage 1R242023-06-28028 June 2023 Inservice Inspection Program Owners Activity Report for Outage 1R24 NL-23-0444, Quality Assurance Topical Report Submittal2023-06-15015 June 2023 Quality Assurance Topical Report Submittal NL-23-0339, Response to Request for Additional Information Regarding License Amendment Request for Technical Specification 3.8.3, Inverters - Operating, Completion Time Extension (LAR-22-002S1)2023-06-13013 June 2023 Response to Request for Additional Information Regarding License Amendment Request for Technical Specification 3.8.3, Inverters - Operating, Completion Time Extension (LAR-22-002S1) NL-23-0455, Report of 10 CFR 50.59 Changes, Tests, and Experiments and 10 CFR 52 Appendix D Departure Report2023-06-12012 June 2023 Report of 10 CFR 50.59 Changes, Tests, and Experiments and 10 CFR 52 Appendix D Departure Report NL-23-0457, ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use2023-06-12012 June 2023 ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use NL-23-0467, Response to Request for Additional Information Regarding License Amendment Request: Timing of Unit 4 Technical Specifications Effectiveness Prior to Initial Criticality (LAR-23-005S1)2023-06-0909 June 2023 Response to Request for Additional Information Regarding License Amendment Request: Timing of Unit 4 Technical Specifications Effectiveness Prior to Initial Criticality (LAR-23-005S1) NL-23-0449, National Pollutant Discharge Elimination System (NPDES) Permit Renewal Application2023-06-0202 June 2023 National Pollutant Discharge Elimination System (NPDES) Permit Renewal Application NL-23-0422, Inservice Inspection Program Owner'S Activity Report for Refueling Outage 2R272023-05-30030 May 2023 Inservice Inspection Program Owner'S Activity Report for Refueling Outage 2R27 NL-23-0346, License Amendment Request for Exception to Regulatory Guide 1.163 (LAR 23-007)2023-05-25025 May 2023 License Amendment Request for Exception to Regulatory Guide 1.163 (LAR 23-007) NL-23-0383, SNC Response to Regulatory Issue Summary 2023-01:Preparation And.2023-05-19019 May 2023 SNC Response to Regulatory Issue Summary 2023-01:Preparation And. NL-23-0385, License Amendment Request: More Restrictive Action for Technical Specification 3.1.9 (LAR-23-006R1)2023-05-17017 May 2023 License Amendment Request: More Restrictive Action for Technical Specification 3.1.9 (LAR-23-006R1) NL-23-0398, Withdrawal of Request of License Amendment Request Regarding More Restrictive Action for Technical Specification 3.1.9 (LAR-23-006)2023-05-16016 May 2023 Withdrawal of Request of License Amendment Request Regarding More Restrictive Action for Technical Specification 3.1.9 (LAR-23-006) NL-23-0372, Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 20222023-05-10010 May 2023 Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 2022 NL-23-0337, Response to Request for Additional Information Related to License Amendment Request to Revise the Frequency of Surveillance Requirement 3.6.3.52023-05-0505 May 2023 Response to Request for Additional Information Related to License Amendment Request to Revise the Frequency of Surveillance Requirement 3.6.3.5 NL-23-0360, Supplement to License Amendment Request and Exemptions to Allow Use of Lead Test Assemblies for Accident-Tolerant Fuel2023-05-0505 May 2023 Supplement to License Amendment Request and Exemptions to Allow Use of Lead Test Assemblies for Accident-Tolerant Fuel NL-23-0326, Response to Apparent Violation in NRC Inspection Report 05000424, 425/2023090; EA-22-1082023-05-0101 May 2023 Response to Apparent Violation in NRC Inspection Report 05000424, 425/2023090; EA-22-108 NL-23-0217, License Amendment Request to Revise Technical Specification Surveillance Requirement 3.4.14.1 and Proposed Inservice Testing Alternative ALT-VR-022023-05-0101 May 2023 License Amendment Request to Revise Technical Specification Surveillance Requirement 3.4.14.1 and Proposed Inservice Testing Alternative ALT-VR-02 2024-01-30
[Table view] |
Text
~ Southern Nuclear Regulatory Affairs 3535 Colonnade Parkway Birmingham, AL 35243 205 992 5000 tel 205 992 7795 fax May 17,2019 Docket Nos.: 50-321 50-348 50-424 52-025 NL-19-0618 50-366 50-364 50-425 52-026 U.S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant- Units 1 and 2 Edwin I. Hatch Nuclear Plant- Units 1 and 2 Vogtle Electric Generating Plant- Units 1 and 2 Vogtle Electric Generating Plant- Units 3 and 4 Response to Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations Ladies and Gentlemen:
On April 17, 2019, the Nuclear Regulatory Commission (NRC) issued Regulatory Issue Summary (RIS) 2019-02, "Preparation and Scheduling of Operator Licensing Examinations."
RIS 2019-02 requests that licensees voluntarily submit projections of their site-specific operator licensing examination schedules as well as the estimated number of applicants planning to take operator licensing and generic fundamental examinations for years 2021-2024.
Southern Nuclear Operating Company (SNC) hereby provides as enclosures to this letter the requested information on NRC form 536 for Joseph M. Farley Nuclear Plant- Units 1 and 2, Edwin I. Hatch Nuclear Plant- Units 1 and 2, Vogtle Electric Generating Plant- Units 1 and 2, and Vogtle Electric Generating Plant- Units 3 and 4. The estimates provided represent SNC's current understanding, but are subject to possible change in the future. These enclosures supersede previous, similar RIS responses.
This letter contains no NRC commitments. If you have any questions, please contact Justin Wheat at 205.992.5998.
Respectfully submitted, Cheryl /1\ heart Regulatory Affairs Director CAG/kmo
U. S. Nuclear Regulatory Commission NL-19-0618 Page2
Enclosure:
- 1. NRC Form 536, Operator Licensing Examination Data for Joseph M. Farley Nuclear Plant- Units 1 and 2
- 2. NRC Form 536, Operator Licensing Examination Data for Edwin I. Hatch Nuclear Plant- Units 1 and 2
- 3. NRC Form 536, Operator Licensing Examination Data for Vogtle Electric Generating Plant- Units 1 and 2
- 4. NRC Form 536, Operator Licensing Examination Data for Vogtle Electric Generating Plant - Units 3 and 4 cc: Regional Administrator, Region II NRR Project Manager- Farley, Hatch, Vogtle 1 & 2 NRO Project Manager -Vogtle 3 & 4 Senior Resident Inspector- Farley, Hatch, Vogtle 1 & 2, Vogtle 3 & 4 RType: CGA02.001 Vogtle 3 & 4 RType: VND.LI.LOO File AR.01.02.06
Joseph M. Farley Nuclear Plant- Units 1 and 2 Edwin I. Hatch Nuclear Plant- Units 1 and 2 Vogtle Electric Generating Plant- Units 1 and 2 Vogtle Electric Generating Plant- Units 3 and 4 Response to Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations Enclosure 1 NRC Form 536, Operator Licensing Examination Data for Joseph M. Farley Nuclear Plant- Units 1 and 2
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB : NO. 3150*0131 EXPIRES: 11/30/2020 (11-2017)
'!)J"" R£cc,l
~(j *~ Estimated burden per response to comply with this volunla!y infonnation collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> This
/~0~n0 OPERATOR LICENSING information collection is used to plan budgets and resources for operator examinations Send
~
c comments regarding burden estimate to the Information SeNices Branch (T-2 F43), U S Nuclear
~ EXAMINATION DATA Regulatory Commission, Washington, DC20555-0001 . or by e-mail to tnfocollects.Resource@nrc.gov,
~......, +0l' and to the Desk Officer, OffiCe of Information and Regulatory Affairs, NEOB-10202, (3150-0131). Office of Management and Budge~ Washington, DC 20503. If a means used to impose an information coHection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION Joseph M. Farley Nuclear Plant- Units 1 & 2 A. PROPOSED EXAMINATION PREPARATION SCHEDULE I~ I CY2021 CY 2022 CY 2023 cv2o24 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS CY2022 CY2021 CY2023 CY2024 PROPOSED NUMBER NUMBER OF REACTOR OPERATORS 8 8 0 8 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 8 8 0 8 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 2 2 0 2 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 6114/21 12/5/22 N/A 611 0/24 ALTERNATE DATE 6/21121 12/12/22 N/A 611 7/24 NRC FORM 536 (11-2017)
Joseph M. Farley Nuclear Plant- Units 1 and 2 Edwin I. Hatch Nuclear Plant- Units 1 and 2 Vogtle Electric Generating Plant- Units 1 and 2 Vogtle Electric Generating Plant- Units 3 and 4 Response to Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations Enclosure 2 NRC Form 536, Operator Licensing Examination Data for Edwin I. Hatch Nuclear Plant- Units 1 and 2
NRCFORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 11/30/2020 (11-2017)
.,.. . *a~<.,
Estimallld bunlen per response Ill comply with this volun!aiy information colection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This
\*~¥%
OPERATOR LICENSING infmnalion cdleclion is used m plan budgets and res01.rces for operator I!J(aminations. Send
- ! "0 COfll11ellls regading burden estinaiB lo the lnfmnation Services Branch (T-2 F43), U.S. Nuclear
- EXAMINATION DATA RegulatDry Corrrnlsslon, Washingtln, DC20555-0001, or by e-mail Ill lnlocollects.Resoun
- e@rrc.gov, and ID the Desk Ofbr, Office of lnloonation and RegulatDry Aftairs, NE00-10202, (31S0.0131), Office
.,.,., ***** ol Management and Budget, Washington, DC 20503. If a means used to Impose an lnfonnalion colection does not display a currently valid OMB conrot m.rnber, the NRC may not conduct or sponsor, and a person is not required mrespond Ill, the information colection.
FACILITY NRC REGION
'Edwin I. Hatch Nuclear Plant 1 & 2 II II I A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY2021 CY 2022 CY 2023 cv2024 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED 2 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS CY2021 CY2021 CY2023 CY2024 PROPOSED NUMBER NUMBER OF REACTOR OPERATORS 8 8 8 0 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 10 8 8 0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 2 2 0 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 03/01/21 12/16/21 05/08/23 NIA ALTERNATE DATE 03/15/21 11115/21 05/22/23 NIA NRC FORM 538 (11-2017)
Joseph M. Farley Nuclear Plant- Units 1 and 2 Edwin I. Hatch Nuclear Plant- Units 1 and 2 Vogtle Electric Generating Plant- Units 1 and 2 Vogtle Electric Generating Plant- Units 3 and 4 Response to Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations Enclosure 3 NRC Form 536, Operator Licensing Examination Data for Vogtle Electric Generating Plant- Units 1 and 2
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150*0131 EXPIRES: 11/30/2020 (11-2017)
'~¥\.
Estimated burden per response to comply with this voluntary lnf()(mation collecbon request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> This OPERATOR LICENSING 111formation collection is used to plan budgets and re~urces for operator examinations Send c 0 comments regarding burden estimate to the Information Services Branch (T*2 F43), U.S Nuclear
" EXAMINATION DATA
~
~ ~
Regulatory Commission, Washington, DC2055S.0001, or by If-mali to Infocorects Resource@nrc gov,
,.,of.: 0.:- and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office
~ of Management and Budget, Washington, DC 20503 If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information coMection.
FACILITY NRC REGION VOGTLE ELECTRIC GENERATING PLANT- UNITS 1 & 2 A. PROPOSED EXAMINATION PREPARATION SCHEDULE I~ I CY 2023 CY2021 CY 2022 cv2o24 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED I 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS CY2021 CY2022 CY2023 CY2024 PROPOSED NUMBER NUMBER OF REACTOR OPERATORS 8 0 6 6 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 4 0 6 6 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 0 0 0 NUMBER OF SENIOR REACTOR OPERATORS* LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 10/04/2021 N/A 10/02/2023 N/A ALTERNATE DATE 11/15/2021 N/A 11/13/2023 N/A NRC FORM 536 (11-2017)
Joseph M. Farley Nuclear Plant- Units 1 and 2 Edwin I. Hatch Nuclear Plant- Units 1 and 2 Vogtle Electric Generating Plant- Units 1 and 2 Vogtle Electric Generating Plant- Units 3 and 4 Response to Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations Enclosure 4 NRC Form 536, Operator Licensing Examination Data for Vogtle Electric Generating Plant- Units 3 and 4
NRCFORM536 U. S. NUCLEAR REGULA TORY COMMISSION APPROVED BY OMB: NO. 3150..0131 EXPIRES: 11/30/2020 l¥ ..\;
(11-2017)
..,.,.,. .. lafl(
.::P *I! Estimated burden per response lo comply with this vofunlaly information coBection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This OPERATOR LICENSING lnformabon collection is used 1D plan budgets and resoll"tes lor operator examinations. Send
- corrvnents regarding burden estimate to the Information SeMces Branch (T-2 F~J), U.S. Nuclear c 0 EXAMINATION DATA Regulaloly Commission, WashingiDn, DC20555-0001, or bye-maR to lnfocollects.Resource@m
- .gov,
"'+ ~ 0~ and 1D the Desk Officer, Office of Information and Regulatay Affairs, NEOB-10202, (315G-0131), Office of Management and Budget Washington, DC 20503. If a means used to Impose an Information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required lo respond ID, the information coDection.
FACILITY NRC REGION VOGTLE ELECTRIC GENERATING PLANT- UNITS 3 & 4 A. PROPOSED EXAMINATION PREPARATION SCHEDULE I~ I CY 2023 cy2024 CY2021 CY 2022 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2021 CY2022 CY2023 CY2024 NUMBER OF REACTOR OPERATORS 0 9 0 6 NUMBER OF SENIOR REACTOR OPERATORS- INSTANT 0 4 0 4 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 0 0 0 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE N/A 03/2112022 N/A 03/18/2024 ALTERNATE DATE N/A 03/14/2022 N/A 03/1112024 NRC FORM 538 (11-2017)