Response to Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations
ML19137A342
Person / Time
Site: Hatch, Vogtle, Farley  Southern Nuclear icon.png
Issue date: 05/17/2019
From: Gayheart C
Southern Nuclear Operating Co
To:
Document Control Desk, Office of New Reactors, Office of Nuclear Reactor Regulation
References
NL-19-0618
Download: ML19137A342 (10)


Text

~ Southern Nuclear Regulatory Affairs 3535 Colonnade Parkway Birmingham, AL 35243 205 992 5000 tel 205 992 7795 fax May 17,2019 Docket Nos.: 50-321 50-348 50-424 52-025 NL-19-0618 50-366 50-364 50-425 52-026 U.S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant- Units 1 and 2 Edwin I. Hatch Nuclear Plant- Units 1 and 2 Vogtle Electric Generating Plant- Units 1 and 2 Vogtle Electric Generating Plant- Units 3 and 4 Response to Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations Ladies and Gentlemen:

On April 17, 2019, the Nuclear Regulatory Commission (NRC) issued Regulatory Issue Summary (RIS) 2019-02, "Preparation and Scheduling of Operator Licensing Examinations."

RIS 2019-02 requests that licensees voluntarily submit projections of their site-specific operator licensing examination schedules as well as the estimated number of applicants planning to take operator licensing and generic fundamental examinations for years 2021-2024.

Southern Nuclear Operating Company (SNC) hereby provides as enclosures to this letter the requested information on NRC form 536 for Joseph M. Farley Nuclear Plant- Units 1 and 2, Edwin I. Hatch Nuclear Plant- Units 1 and 2, Vogtle Electric Generating Plant- Units 1 and 2, and Vogtle Electric Generating Plant- Units 3 and 4. The estimates provided represent SNC's current understanding, but are subject to possible change in the future. These enclosures supersede previous, similar RIS responses.

This letter contains no NRC commitments. If you have any questions, please contact Justin Wheat at 205.992.5998.

Respectfully submitted, Cheryl /1\ heart Regulatory Affairs Director CAG/kmo

U. S. Nuclear Regulatory Commission NL-19-0618 Page2

Enclosure:

1. NRC Form 536, Operator Licensing Examination Data for Joseph M. Farley Nuclear Plant- Units 1 and 2
2. NRC Form 536, Operator Licensing Examination Data for Edwin I. Hatch Nuclear Plant- Units 1 and 2
3. NRC Form 536, Operator Licensing Examination Data for Vogtle Electric Generating Plant- Units 1 and 2
4. NRC Form 536, Operator Licensing Examination Data for Vogtle Electric Generating Plant - Units 3 and 4 cc: Regional Administrator, Region II NRR Project Manager- Farley, Hatch, Vogtle 1 & 2 NRO Project Manager -Vogtle 3 & 4 Senior Resident Inspector- Farley, Hatch, Vogtle 1 & 2, Vogtle 3 & 4 RType: CGA02.001 Vogtle 3 & 4 RType: VND.LI.LOO File AR.01.02.06

Joseph M. Farley Nuclear Plant- Units 1 and 2 Edwin I. Hatch Nuclear Plant- Units 1 and 2 Vogtle Electric Generating Plant- Units 1 and 2 Vogtle Electric Generating Plant- Units 3 and 4 Response to Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations Enclosure 1 NRC Form 536, Operator Licensing Examination Data for Joseph M. Farley Nuclear Plant- Units 1 and 2

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB : NO. 3150*0131 EXPIRES: 11/30/2020 (11-2017)

'!)J"" R£cc,l

~(j *~ Estimated burden per response to comply with this volunla!y infonnation collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> This

/~0~n0 OPERATOR LICENSING information collection is used to plan budgets and resources for operator examinations Send

~

c comments regarding burden estimate to the Information SeNices Branch (T-2 F43), U S Nuclear

~ EXAMINATION DATA Regulatory Commission, Washington, DC20555-0001 . or by e-mail to tnfocollects.Resource@nrc.gov,

~......, +0l' and to the Desk Officer, OffiCe of Information and Regulatory Affairs, NEOB-10202, (3150-0131). Office of Management and Budge~ Washington, DC 20503. If a means used to impose an information coHection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Joseph M. Farley Nuclear Plant- Units 1 & 2 A. PROPOSED EXAMINATION PREPARATION SCHEDULE I~ I CY2021 CY 2022 CY 2023 cv2o24 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS CY2022 CY2021 CY2023 CY2024 PROPOSED NUMBER NUMBER OF REACTOR OPERATORS 8 8 0 8 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 8 8 0 8 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 2 2 0 2 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 6114/21 12/5/22 N/A 611 0/24 ALTERNATE DATE 6/21121 12/12/22 N/A 611 7/24 NRC FORM 536 (11-2017)

Joseph M. Farley Nuclear Plant- Units 1 and 2 Edwin I. Hatch Nuclear Plant- Units 1 and 2 Vogtle Electric Generating Plant- Units 1 and 2 Vogtle Electric Generating Plant- Units 3 and 4 Response to Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations Enclosure 2 NRC Form 536, Operator Licensing Examination Data for Edwin I. Hatch Nuclear Plant- Units 1 and 2

NRCFORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 11/30/2020 (11-2017)

.,.. . *a~<.,

Estimallld bunlen per response Ill comply with this volun!aiy information colection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This

\*~¥%

OPERATOR LICENSING infmnalion cdleclion is used m plan budgets and res01.rces for operator I!J(aminations. Send

  • ! "0 COfll11ellls regading burden estinaiB lo the lnfmnation Services Branch (T-2 F43), U.S. Nuclear
    • EXAMINATION DATA RegulatDry Corrrnlsslon, Washingtln, DC20555-0001, or by e-mail Ill lnlocollects.Resoun
      e@rrc.gov, and ID the Desk Ofbr, Office of lnloonation and RegulatDry Aftairs, NE00-10202, (31S0.0131), Office

.,.,., ***** ol Management and Budget, Washington, DC 20503. If a means used to Impose an lnfonnalion colection does not display a currently valid OMB conrot m.rnber, the NRC may not conduct or sponsor, and a person is not required mrespond Ill, the information colection.

FACILITY NRC REGION

'Edwin I. Hatch Nuclear Plant 1 & 2 II II I A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY2021 CY 2022 CY 2023 cv2024 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED 2 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS CY2021 CY2021 CY2023 CY2024 PROPOSED NUMBER NUMBER OF REACTOR OPERATORS 8 8 8 0 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 10 8 8 0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 2 2 0 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 03/01/21 12/16/21 05/08/23 NIA ALTERNATE DATE 03/15/21 11115/21 05/22/23 NIA NRC FORM 538 (11-2017)

Joseph M. Farley Nuclear Plant- Units 1 and 2 Edwin I. Hatch Nuclear Plant- Units 1 and 2 Vogtle Electric Generating Plant- Units 1 and 2 Vogtle Electric Generating Plant- Units 3 and 4 Response to Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations Enclosure 3 NRC Form 536, Operator Licensing Examination Data for Vogtle Electric Generating Plant- Units 1 and 2

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150*0131 EXPIRES: 11/30/2020 (11-2017)

'~¥\.

Estimated burden per response to comply with this voluntary lnf()(mation collecbon request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> This OPERATOR LICENSING 111formation collection is used to plan budgets and re~urces for operator examinations Send c 0 comments regarding burden estimate to the Information Services Branch (T*2 F43), U.S Nuclear

" EXAMINATION DATA

~

~ ~

Regulatory Commission, Washington, DC2055S.0001, or by If-mali to Infocorects Resource@nrc gov,

,.,of.: 0.:- and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office

~ of Management and Budget, Washington, DC 20503 If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information coMection.

FACILITY NRC REGION VOGTLE ELECTRIC GENERATING PLANT- UNITS 1 & 2 A. PROPOSED EXAMINATION PREPARATION SCHEDULE I~ I CY 2023 CY2021 CY 2022 cv2o24 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED I 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS CY2021 CY2022 CY2023 CY2024 PROPOSED NUMBER NUMBER OF REACTOR OPERATORS 8 0 6 6 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 4 0 6 6 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 0 0 0 NUMBER OF SENIOR REACTOR OPERATORS* LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 10/04/2021 N/A 10/02/2023 N/A ALTERNATE DATE 11/15/2021 N/A 11/13/2023 N/A NRC FORM 536 (11-2017)

Joseph M. Farley Nuclear Plant- Units 1 and 2 Edwin I. Hatch Nuclear Plant- Units 1 and 2 Vogtle Electric Generating Plant- Units 1 and 2 Vogtle Electric Generating Plant- Units 3 and 4 Response to Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations Enclosure 4 NRC Form 536, Operator Licensing Examination Data for Vogtle Electric Generating Plant- Units 3 and 4

NRCFORM536 U. S. NUCLEAR REGULA TORY COMMISSION APPROVED BY OMB: NO. 3150..0131 EXPIRES: 11/30/2020 l¥ ..\;

(11-2017)

..,.,.,. .. lafl(

.::P *I! Estimated burden per response lo comply with this vofunlaly information coBection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This OPERATOR LICENSING lnformabon collection is used 1D plan budgets and resoll"tes lor operator examinations. Send

corrvnents regarding burden estimate to the Information SeMces Branch (T-2 F~J), U.S. Nuclear c 0 EXAMINATION DATA Regulaloly Commission, WashingiDn, DC20555-0001, or bye-maR to lnfocollects.Resource@m
.gov,

"'+ ~ 0~ and 1D the Desk Officer, Office of Information and Regulatay Affairs, NEOB-10202, (315G-0131), Office of Management and Budget Washington, DC 20503. If a means used to Impose an Information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required lo respond ID, the information coDection.

FACILITY NRC REGION VOGTLE ELECTRIC GENERATING PLANT- UNITS 3 & 4 A. PROPOSED EXAMINATION PREPARATION SCHEDULE I~ I CY 2023 cy2024 CY2021 CY 2022 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2021 CY2022 CY2023 CY2024 NUMBER OF REACTOR OPERATORS 0 9 0 6 NUMBER OF SENIOR REACTOR OPERATORS- INSTANT 0 4 0 4 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 0 0 0 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE N/A 03/2112022 N/A 03/18/2024 ALTERNATE DATE N/A 03/14/2022 N/A 03/1112024 NRC FORM 538 (11-2017)