Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
NLS2015080, Response to Request for Additional Information for Relief Requests RP-08, Comprehensive Pump Test Upper Limit, and RP-09, Variance Around the Reference Values, for Fifth Ten-Year Interval Pump and Valve Inservice Testing Program30 June 2015Response to Request for Additional Information for Relief Requests RP-08, Comprehensive Pump Test Upper Limit, and RP-09, Variance Around the Reference Values, for Fifth Ten-Year Interval Pump and Valve Inservice Testing Program
NLS2015079, Nebraska Public Power District'S Second Six-Month Status Report in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (EA-30 June 2015Nebraska Public Power District'S Second Six-Month Status Report in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (EA-13FLEX
Containment Hardened Vent
CAC:MF591130 June 2015
ML15180A38729 June 2015NRR E-mail Capture - Cooper - Additional RAIs Resulting from NPPD RAI Responses for LAR Associated with Deleting Condensate Storage Tank as an Alternate Source of Makeup Water
IR 05000298/201500722 June 2015IR 05000298/2015007; on 04/06/2015 - 05/08/2015; Cooper Nuclear Station; Component Design Basis Inspection and Notice of ViolationSafe Shutdown
Stroke time
Tornado Missile
Internal Flooding
Probabilistic Risk Assessment
Condition Adverse to Quality
Aging Management
Tornado Generated Missile
Significance Determination Process
Job Performance Measure
Tornado Missile Protection
Large early release frequency
Operability Determination
Time Critical Operator Action
Earthquake
Failure to Scram
NLS2015068, Response to Request for Additional Information Associated with Near-Term Task Force Recommendation 2. 1, Seismic Hazard and Screening Report22 June 2015Response to Request for Additional Information Associated with Near-Term Task Force Recommendation 2. 1, Seismic Hazard and Screening ReportSafe Shutdown
Fukushima Dai-Ichi
Seismically rugged
Earthquake
ML15173A45022 June 2015IR 05000298/2015007; on 04/06/2015 - 05/08/2015; Cooper Nuclear Station; Component Design Basis Inspection and Notice of ViolationSafe Shutdown
Stroke time
Tornado Missile
Internal Flooding
Probabilistic Risk Assessment
Condition Adverse to Quality
Aging Management
Tornado Generated Missile
Significance Determination Process
Job Performance Measure
Tornado Missile Protection
Time Critical Operator Action
Earthquake
NLS2015075, Deviation from BWRVIP-18 and BWRVIP-41 Inspection Requirements Cooper Nuclear Station17 June 2015Deviation from BWRVIP-18 and BWRVIP-41 Inspection Requirements Cooper Nuclear StationEVT-1
CAC:MF63329 June 2015
NLS2015064, Response to NRC Requests for Additional Information for License Amendment Request to Add Residual Heat Removal System Containment Spray Function and a Supplement to the License Amendment Request9 June 2015Response to NRC Requests for Additional Information for License Amendment Request to Add Residual Heat Removal System Containment Spray Function and a Supplement to the License Amendment Request
NLS2105025, 10 CFR 50.55a Requests for Fifth Ten-Year Inservice Inspection Interval9 June 201510 CFR 50.55a Requests for Fifth Ten-Year Inservice Inspection IntervalWeld Overlay
Hydrostatic
Nondestructive Examination
VT-2
Stress corrosion cracking
License Renewal
EVT-1
Dissimilar Metal Weld
Measurement Uncertainty Recapture
NLS2015063, Retraction of Licensee Event Report 2014-005-00, Lube Oil Leak Results in a Potential Condition Prohibited by Technical Specifications and a Potential Loss of Safety Function.9 June 2015Retraction of Licensee Event Report 2014-005-00, Lube Oil Leak Results in a Potential Condition Prohibited by Technical Specifications and a Potential Loss of Safety Function.Mission time
NLS2015066, Response to NRC Request for Additional Information for High Pressure Coolant Injection (HPCI) Solenoid Operated Drain Valve Testing for Fifth Ten-Year Interval Valve IST Program Relief Request RV-019 June 2015Response to NRC Request for Additional Information for High Pressure Coolant Injection (HPCI) Solenoid Operated Drain Valve Testing for Fifth Ten-Year Interval Valve IST Program Relief Request RV-01
ML15128A1413 June 2015G20110506/LTR-11-0402/G20110492/LTR-11-0382 - 2.206 Final Director'S Decision, Petitioner Thomas Saporito Related to Cooper Nuclear Station and Fort Calhoun StationUltimate heat sink
FLEX
Fukushima Dai-Ichi
Backfit
ML15128A1343 June 2015G20110506/LTR-11-0402/G20110492/LTR-11-0382 - Letter to Petitioner, 2.206 Final Director'S Decision, Petitioner Thomas Saporito Related to Cooper Nuclear Station and Fort Calhoun StationUltimate heat sink
FLEX
Fukushima Dai-Ichi
Backfit
ML14290A4863 June 2015Y020140127 - Withdrawal of Order EA-05-007, Order Imposing Additional Security Measures
ML15153A8282 June 2015NRR E-mail Capture - Cooper - Relief Request (RR) RP-08 Associated with Comprehensive Pump Test Upper Limit and RR RP-09 Regarding Variance Around the Reference Values for Fifth Ten-Year Interval Pump IST Program
ML15153A2072 June 2015Notification of NRC Initial Operator Licensing Examination 05000298/2015303
ML15135A00529 May 2015Issuance of Amendment No. 250, Adopt Technical Specification Task Force (TSTF) Traveler TSTF-413, Elimination of Requirements for a Post Accident Sampling System (PASS)Grab sample
Cyber Security
Safeguards Contingency Plan
Fire Protection Program
TAC:MF445229 May 2015
ML15112A05126 May 2015Second Integrated Assessment Extension Letter
ML15134A24220 May 2015Relief Request RI-08, Revision 0, Relief from Reactor Vessel Nozzle-to-Vessel Shell Welds and Nozzle Inner Radius Sections, for the Fourth 10-Year Inservice Inspection IntervalIncorporated by reference
ML15140A63920 May 2015NRR E-mail Capture - Cooper Nuclear Station - RAIs for the License Amendment Application to Revise Technical Specifications to Add Residual Heat Removal System Containment Spray Function
IR 05000298/201530215 May 2015Er 05000298/2015302; January 27 - May 6, 2015; Cooper Nuclear Station; Initial Operator Licensing Retake Examination Report
NLS2015065, Annual Radiological Environmental Report for 201414 May 2015Annual Radiological Environmental Report for 2014Chernobyl
NLS2015060, Revision to Safeguards Plan13 May 2015Revision to Safeguards Plan
ML15132A30812 May 2015NRR E-mail Capture - Cooper - HPCI Solenoid Operated Drain Valve Testing for Fifth Ten-Year Interval Valve IST Program Relief Request RV-01
TAC:MF47126 May 2015
ML15125A0606 May 2015Nuclear Regulatory Commission Plan for the Audit of Nebraska Public Power District'S Flood Hazard Reevaluation Report Submittal Relating to the NEAR-TERM Task Force Recommendation 2.1-FLOODING for Cooper Nuclear StationFukushima Dai-Ichi
IR 05000298/20154065 May 2015IR 05000298/2015406; 04/17/2015; Cooper Nuclear Station - NRC Inspection ReportAffidavit
ML15107A2544 May 2015Request for Additional Information Associated with Near-Term Task Force Recommendation 2.1, Seismic Hazard and Screening ReportSafe Shutdown
Safe Shutdown Earthquake
Fukushima Dai-Ichi
Earthquake
NLS2015055, Correction to License Amendment Request to Revise Technical Specifications to Add Residual Heat Removal System Containment Spray Function4 May 2015Correction to License Amendment Request to Revise Technical Specifications to Add Residual Heat Removal System Containment Spray FunctionReactor Vessel Water Level
CAC:MF55844 May 2015
IR 05000298/20150011 May 2015IR 05000298/2015001; 01/01/2015 - 03/31/2015; Cooper Nuclear Station; Surveillance TestingStroke time
Internal Flooding
Temporary Modification
Functionality Assessment
Significance Determination Process
Scram Discharge Volume
Operability Determination
Maintenance Rule Program
Fire Protection Program
Power change
Downpower
NLS2015058, Annual Radioactive Effluent Release Report, January 1, 2014 Through December 31, 201430 April 2015Annual Radioactive Effluent Release Report, January 1, 2014 Through December 31, 2014Annual Radioactive Effluent Release Report
ML15126A43030 April 2015Offsite Dose Assessment Manual, January 1, 2014 Through December 31, 2014 and Process Control ProgramTime of Discovery
Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Process Control Program
Annual Radiological Effluent Release Report
Power change
ML15126A42930 April 2015Submittal of Annual Radioactive Effluent Release Report, Offsite Dose Assessment Manual Submittal, and the Process Control ProgramAnnual Radioactive Effluent Release Report
Process Control Program
ML15126A17529 April 2015Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi AccidentFukushima Dai-Ichi
NLS2015043, Expedited Seismic Evaluation Process Report29 April 2015Expedited Seismic Evaluation Process ReportHigh Radiation Area
Ultimate heat sink
Probabilistic Risk Assessment
FLEX
Fukushima Dai-Ichi
Earthquake
Power-Operated Valves
Power Operated Valves
NLS2015042, Submittal of Updated Safety Analysis Report, Revision 27, Revisions to Fire Hazards Analysis and Inservice Inspection Program24 April 2015Submittal of Updated Safety Analysis Report, Revision 27, Revisions to Fire Hazards Analysis and Inservice Inspection ProgramIncorporated by reference
NLS2015053, Submittal of 2014 Financial Report for the Calendar Year 201424 April 2015Submittal of 2014 Financial Report for the Calendar Year 2014Decommissioning Funding Plan
Fukushima Dai-Ichi
Earthquake
Uranium Hexafluoride
NLS2015041, Quality Assurance Program Changes23 April 2015Quality Assurance Program ChangesSafe Shutdown
Non-Destructive Examination
Coatings
Temporary Modification
Process Control Program
Fire Protection Program
Grace period
TAC:MF591121 April 2015
ML15159A18921 April 20152015-04-Public Forms
ML15127A16321 April 20152015-04-DRAFT-OUTLINES
ML15127A27521 April 20152015-04-DRAFT-OUTLINE Comments
ML15111A31621 April 2015NRR E-mail Capture - Cooper Nuclear Station - Relief Requests (Rrs) for Pumps RP-01 Through RP-09, RRs for Valves RV-01 Through RV-05, and General RR RG-01 (TAC Nos. MF5911, MF5913 Through MF5920, MF5921 and MF5922 Through MF5926)
ML15127A49021 April 20152015-04-FINAL Outlines
ML15127A50121 April 20152015-04-DRAFT Written ExamSafe Shutdown
Boric Acid
Shutdown Margin
High Radiation Area
Half scram
Time to boil
Post Accident Monitoring
Hydrostatic
Temporary Modification
Squib
Locked High Radiation Area
Time Critical Operator Action
Deep Dose Equivalent
Fuel cladding
Recently irradiated fuel
Offsite Circuit
Power change
Coast down
ML15127A50221 April 20152015-04-DRAFT Written Exam CommentsTime Critical Operator Action