Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
BSEP 14-0075, Reply to a Notice of Violation, EA-14-04830 June 2014Reply to a Notice of Violation, EA-14-048High winds
Internal Flooding
Condition Adverse to Quality
Significance Determination Process
BSEP 14-0076, Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805 (NRC TAC Nos. ME9623 and ME9624)26 June 2014Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805 (NRC TAC Nos. ME9623 and ME9624)Safe Shutdown
Probabilistic Risk Assessment
Large early release frequency
Fire Protection Program
BSEP 14-0066, Phase 1 Overall Integrated Plan in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109)26 June 2014Phase 1 Overall Integrated Plan in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109)FLEX
Design basis earthquake
Earthquake
Hardened vent
Scaffolding
GOTHIC
Power Uprate
TAC:MF446726 June 2014
ML14177A45525 June 2014Investigation Synopsis, Office of Investigation Case Number 2-2013-013Fatigue Rule
ML14175B29024 June 2014Requalification Program Inspection - Brunswick Steam Electric PlantJob Performance Measure
ML14176A96124 June 2014Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014Fire Barrier
Coatings
Foreign Material Exclusion
ML14177A76019 June 2014FOIA 2014-0264 - Billed Inspection Hours Disaggregated by Both Plant and Year FY1994-2014
BSEP 14-0061, Updated Information on Date Change for 2014 and 2015 Licensed Operator Exams19 June 2014Updated Information on Date Change for 2014 and 2015 Licensed Operator Exams
ML14147A2284 June 20144/17/2014 Summary of Closed Meeting with Duke Energy Progress, Inc. Regarding Areva Methods Applicability of Mella+ for Brunswick Steam Electric Plant. Units 1 and 2
ML14155A2094 June 2014E-mail Re. Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805Probabilistic Risk Assessment
Large early release frequency
Fire Protection Program
RA-14-0012, Response to NRC Regulatory Issue Summary 2014-05, Preparation and Scheduling of Operator Licensing Examinations3 June 2014Response to NRC Regulatory Issue Summary 2014-05, Preparation and Scheduling of Operator Licensing Examinations
ML14156A4252 June 2014(Unit 1 and Unit 2) - Notification of a Triennial Fire Protection Baseline Inspection (NRC Inspection Report Nos. 05000325/2014008 and 05000324/2014008)Safe Shutdown
Fitness for Duty
Hydrostatic
Operator Manual Action
Temporary Modification
Multiple Spurious Operation
Emergency Lighting
B.5.b
Job Performance Measure
Thermoset
Severe Accident Management Guideline
Exemption Request
Maintenance Rule Program
Fire Protection Program
Manual Operator Action
IR 05000324/201401129 May 2014NRC Inspection Report Nos. 05000325/2014011 and 05000324/2014011; Final Significance Determination and Notice of ViolationHigh winds
Ultimate heat sink
Condition Adverse to Quality
Significance Determination Process
Preliminary White Finding
ML14148A15527 May 2014Notification of Licensed Operator Initial Examination 05000325/14-301 and 05000324/14-301
ML14126A54527 May 2014Nuclear Regulatory Commission Audits of Licensee Responses to Phase 1 of the Order to Modify Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions, EA-13-109
BSEP 14-0057, Response to Follow-up Request for Additional Information Regarding NRC Bulletin 2012-01: Design Vulnerability in Electric Power System22 May 2014Response to Follow-up Request for Additional Information Regarding NRC Bulletin 2012-01: Design Vulnerability in Electric Power SystemOpen Phase Condition
Thermography
BSEP 14-0056, Response to Request for Additional Information Regarding License Renewal Commitment Completion, Evaluation of Operating Experience at Extended Power Uprate Conditions21 May 2014Response to Request for Additional Information Regarding License Renewal Commitment Completion, Evaluation of Operating Experience at Extended Power Uprate ConditionsAging Management
License Renewal
Flow Induced Vibration
Power Uprate
ML14140A29120 May 2014EA-14-048 Public Meeting Summary - Regulatory Conference and Predecision Enforcement Conference for Brunswick Steam Electric PlantCondition Adverse to Quality
Preliminary White Finding
ML14140A18819 May 2014Summary of Public Meeting - 2013 Annual Assessment Regrading Brunswick Steam Electric PlantOpen House
BSEP 14-0046, Radiological Environmental Operating Report for 20139 May 2014Radiological Environmental Operating Report for 2013Grab sample
Offsite Dose Calculation Manual
Missed surveillance
Fukushima Dai-Ichi
Annual Radiological Environmental Operating Report
Earthquake
Chernobyl
ML14111A1479 May 2014Seismic Screening and Prioritization Results Regarding Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review of InsightsSafe Shutdown
Ultimate heat sink
Safe Shutdown Earthquake
Probabilistic Risk Assessment
FLEX
Fukushima Dai-Ichi
Earthquake
Backfit
BSEP 14-0048, Submittal of April 17, 2014, Presentation Regarding Methods Applicability for Maximum Extended Load Line Limit Analysis Plus (Mellla+)7 May 2014Submittal of April 17, 2014, Presentation Regarding Methods Applicability for Maximum Extended Load Line Limit Analysis Plus (Mellla+)Affidavit
IR 05000325/20144046 May 2014IR 05000324-14-404 & 05000325-14-404, 04/17/2014, BrunswickAffidavit
Press Release-II-14-026, NRC Schedules Conference with Duke Energy to Discuss Brunswick Plant Flooding Issue1 May 2014Press Release-II-14-026: NRC Schedules Conference with Duke Energy to Discuss Brunswick Plant Flooding Issue
ML14079A23430 April 2014BNP-PSA-086, Bnp Fire PRA - Fire Scenario Data, Enclosure 2, Attachment 25
Press Release-II-14-024, NRC Schedules Open House to Discuss Brunswick Nuclear Plant Performance29 April 2014Press Release-II-14-024: NRC Schedules Open House to Discuss Brunswick Nuclear Plant PerformanceOpen House
IR 05000324/201400229 April 2014IR 05000325-14-002, 05000324-14-002; on 01/01/14 - 03/31/14; Brunswick Steam Electric Plant, Units 1 and 2; Integrated ReportSafe Shutdown
High Radiation Area
Offsite Dose Calculation Manual
Internal Flooding
Functionality Assessment
Locked High Radiation Area
Significance Determination Process
Annual Radiological Environmental Operating Report
Process Control Program
Operability Determination
Biofouling
Fire Protection Program
Power change
ML14099A21728 April 2014FRN on Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing SUNSI and Order Imposing Procedures for Access to SUNSIHydrostatic
Cyber Security
Preemption Authority
Exemption Request
Fuel cladding
BSEP 14-0044, Date Change for 2014 and 2015 Licensed Operator Exams28 April 2014Date Change for 2014 and 2015 Licensed Operator Exams
ML14115A44325 April 2014Request for Additional Information (RAI) Regarding License Renewal Commitment Completion of Evaluation of Operating Experience at Extended Power Uprate Conditions (TAC Nos. MF3268 and MF3269)Aging Management
License Renewal
Power Uprate
TAC:MF326825 April 2014
TAC:ME930925 April 2014
ML14115A44425 April 2014NRR E-mail Capture - Brunswick 1 and 2 - Bulletin (Bl) 2012-01 Request for Additional Information (RAI) Response Follow-up RAIOpen Phase Condition
Thermography
BSEP 14-0038, Radioactive Effluent Release Report for 201323 April 2014Radioactive Effluent Release Report for 2013Time of Discovery
Loop seal
Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Power change
ML14070A20421 April 2014Staff Assessment Regarding Flooding Walkdowns to Support Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-ichi Nuclear Power Plant AccidentUnanalyzed Condition
Internal Flooding
Fukushima Dai-Ichi
Earthquake
IR 05000325/201401018 April 2014Brunswick Steam Electric Plant - NRC Inspection Report Nos. 05000325-14-010 and 05000324-14-010; Preliminary White FindingHigh winds
Ultimate heat sink
Condition Adverse to Quality
Significance Determination Process
Preliminary White Finding
ML14108A30618 April 2014Brunswick Steam Electric Plant - NRC Inspection Report Nos. 05000325-14-010 and 05000324-14-010; Preliminary White FindingHigh winds
Ultimate heat sink
Condition Adverse to Quality
Significance Determination Process
Preliminary White Finding
ML14135A51117 April 2014Enclosure 4 to BSEP 14-0048 - Areva Mellla+ Methods Applicability Presentation (Non-Proprietary Version)MELLLA
Water rod
ML14135A50917 April 2014Enclosure 1 to BSEP 14-0048, Duke Energy Presentation - Brunswick Mellla+ Methods Applicability, Pre-Application MeetingExclusive Use
Affidavit
ML14106A26216 April 2014Notice of Category 3 Public Meeting Regarding Brunswick Steam Electric Plant to Discuss NRC Reactor Oversight Process Annual AssessmentOpen House
IR 05000325/201400915 April 2014IR 05000325-14-009, March 10-13, 2014, Brunswick, NRC Post Approval Site Inspection for License RenewalAging Management
Flow Accelerated Corrosion
License Renewal
EVT-1
BSEP 14-0035, Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 80510 April 2014Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805Hot Short
Safe Shutdown
High winds
Mission time
Probabilistic Risk Assessment
Incorporated by reference
Large early release frequency
Fire Protection Program
BSEP 14-0031, Simulator Compliance with ANSI/ANS-3.5-2009, Nuclear Power Plant Simulators for Use in Operator Training and Examination9 April 2014Simulator Compliance with ANSI/ANS-3.5-2009, Nuclear Power Plant Simulators for Use in Operator Training and Examination
BSEP 14-0033, Cycle 20 Core Operating Limits Report (COLR)4 April 2014Cycle 20 Core Operating Limits Report (COLR)Safety Limit Minimum Critical Power Ratio