ML14148A155
| ML14148A155 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 05/27/2014 |
| From: | Eugene Guthrie Division of Reactor Safety II |
| To: | Hamrick G Carolina Power & Light Co |
| References | |
| 50-324/14-301, 50-325/14-301 | |
| Download: ML14148A155 (5) | |
See also: IR 05000324/2014301
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
245 PEACHTREE CENTER AVENUE NE, SUITE 1200
ATLANTA, GEORGIA 30303-1257
May 27, 2014
ATTN: Mr. George T. Hamrick
Vice President
Carolina Power and Light Company
Brunswick Steam Electric Plant
P.O. Box 10429
Southport, NC 28461
SUBJECT:
BRUNSWICK STEAM ELECTRIC PLANT - NOTIFICATION OF LICENSED
OPERATOR INITIAL EXAMINATION 05000325/2014301 AND
Dear Mr. Hamrick:
In a telephone conversation on May 12, 2014, between with Mr. Lou Sosler, Exam Writer,
Mr. Bob Bolin Exam Author/Exam Development Coordinator, and Mr. Phillip Capehart, Senior
Operations Engineer, arrangements were made for the administration of licensing examinations
at the Brunswick Steam Electric Plant. The operating test is scheduled to be administered
during the weeks of October 6 and October 13, 2014. The written examination is scheduled to
be administered the week of October 20, 2014. The on-site preparatory week is scheduled for
the week of September 8, 2014.
As agreed during the telephone conversation, your staff will prepare both the operating test and
written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021,
"Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory
Commission (NRC) regional office will discuss with your staff any changes that might be
necessary before the examinations are administered. Your staff has also agreed to make
copies of all examination materials that are necessary for administering the examination.
To meet the above schedule, it will be necessary for your staff to furnish the operating test
outline by July 23, 2014. Mr. Capehart provided the written examination outline to your staff in
February, 2014. The written exam and the supporting reference materials identified in
Attachment 3 to ES-201 will be due by September 1, 2014. The operating test will be due by
August 18, 2014. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations
(10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the
outline, examination, and test before they are submitted to the NRC for review and approval. All
materials shall be complete and ready-to-use.
We request that any personal, proprietary, sensitive unclassified, or safeguards information in
your response be contained in a separate enclosure and appropriately marked. Any delay in
receiving the required examination and reference materials, or the submittal of inadequate or
incomplete materials, may cause the examinations to be rescheduled.
G. Hamrick
2
In order to conduct the requested written examinations and operating tests, it will be necessary
for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above. In accordance with ES-302,
your staff should retain the original simulator performance data (e.g., system pressures,
temperatures, and levels) generated during the dynamic operating tests until the examination
results are final.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
operator and senior reactor operator license applications, medical certifications, and waiver
requests (if any) at least 30 days before the first examination date. If the applications are not
received at least 30 days before the examination date, a postponement may be necessary.
Signed applications certifying that all training has been completed should be submitted at least
14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of
Management and Budget (OMB) under approval number 3150-0018, which expires on April 30,
2016. The public reporting burden for this collection of information is estimated to average 500
hours per response, including the time for reviewing instructions, gathering and maintaining the
data needed, writing the examinations, and completing and reviewing the collection of
information. Send comments on any aspect of this collection of information, including
suggestions for reducing the burden, to the Information and Records Management Branch (T-6
F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet
electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information
and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget,
Washington, DC 20503.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be
available electronically for public inspection in the NRC Public Document Room or from the
Publicly Available Records (PARS) component of the NRCs document system (ADAMS).
ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the
Public Electronic Reading Room).
Thank you for your cooperation in this matter. Mr. Bob Bolin has been advised of the policies
and guidelines referenced in this letter. If you have any questions regarding the NRC's
examination procedures and guidelines, please contact Mr. Phillip Capehart at (404) 997-4483.
G. Hamrick
3
(Internet E-mail: Phillip.Capehart@nrc.gov), or me at (404) 997-4662, (Internet E-mail:
Malcolm.Widmann@nrc.gov).
Sincerely,
/RA/
Eugene F. Guthrie, Chief
Operations Branch 2
Division of Reactor Safety
Docket Nos. 50-325, 50-324
cc: Distribution via Listserv
_ML14148A155______
xG SUNSI REVIEW COMPLETE G FORM 665 ATTACHED
OFFICE
RII:DRS
RII:DRS
SIGNATURE
PGC1
EFG
NAME
CAPEHART
GUTHRIE
DATE
5/27/2014
5/ 27/2014
5/ /2014
5/ /2014
5/ /2014
5/ /2014
5/ /2014
E-MAIL COPY?
YES
NO
YES
NO YES
NO
YES
NO
YES
NO YES
NO
YES
NO
Letter to George T. Hamrick from Malcolm Widmann dated May 27, 2014.
SUBJECT:
BRUNSWICK STEAM ELECTRIC PLANT - NOTIFICATION OF LICENSED
OPERATOR INITIAL EXAMINATION 05000325/2014301 AND
Distribution w/encl:
RIDSNRRDIRS
PUBLIC
RidsNrrPMBrunswick Resource