Notification of Licensed Operator Initial Examination 05000325/14-301 and 05000324/14-301
ML14148A155
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 05/27/2014
From: Eugene Guthrie
Division of Reactor Safety II
To: Hamrick G
Carolina Power & Light Co
References
50-324/14-301, 50-325/14-301
Download: ML14148A155 (5)


See also: IR 05000324/2014301

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

May 27, 2014

ATTN: Mr. George T. Hamrick

Vice President

Carolina Power and Light Company

Brunswick Steam Electric Plant

P.O. Box 10429

Southport, NC 28461

SUBJECT: BRUNSWICK STEAM ELECTRIC PLANT - NOTIFICATION OF LICENSED

OPERATOR INITIAL EXAMINATION 05000325/2014301 AND

05000324/2014301

Dear Mr. Hamrick:

In a telephone conversation on May 12, 2014, between with Mr. Lou Sosler, Exam Writer,

Mr. Bob Bolin Exam Author/Exam Development Coordinator, and Mr. Phillip Capehart, Senior

Operations Engineer, arrangements were made for the administration of licensing examinations

at the Brunswick Steam Electric Plant. The operating test is scheduled to be administered

during the weeks of October 6 and October 13, 2014. The written examination is scheduled to

be administered the week of October 20, 2014. The on-site preparatory week is scheduled for

the week of September 8, 2014.

As agreed during the telephone conversation, your staff will prepare both the operating test and

written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021,

"Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory

Commission (NRC) regional office will discuss with your staff any changes that might be

necessary before the examinations are administered. Your staff has also agreed to make

copies of all examination materials that are necessary for administering the examination.

To meet the above schedule, it will be necessary for your staff to furnish the operating test

outline by July 23, 2014. Mr. Capehart provided the written examination outline to your staff in

February, 2014. The written exam and the supporting reference materials identified in

Attachment 3 to ES-201 will be due by September 1, 2014. The operating test will be due by

August 18, 2014. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations

(10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the

outline, examination, and test before they are submitted to the NRC for review and approval. All

materials shall be complete and ready-to-use.

We request that any personal, proprietary, sensitive unclassified, or safeguards information in

your response be contained in a separate enclosure and appropriately marked. Any delay in

receiving the required examination and reference materials, or the submittal of inadequate or

incomplete materials, may cause the examinations to be rescheduled.

G. Hamrick 2

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor

operator and senior reactor operator license applications, medical certifications, and waiver

requests (if any) at least 30 days before the first examination date. If the applications are not

received at least 30 days before the examination date, a postponement may be necessary.

Signed applications certifying that all training has been completed should be submitted at least

14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of

Management and Budget (OMB) under approval number 3150-0018, which expires on April 30,

2016. The public reporting burden for this collection of information is estimated to average 500

hours per response, including the time for reviewing instructions, gathering and maintaining the

data needed, writing the examinations, and completing and reviewing the collection of

information. Send comments on any aspect of this collection of information, including

suggestions for reducing the burden, to the Information and Records Management Branch (T-6

F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet

electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information

and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget,

Washington, DC 20503.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an

information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be

available electronically for public inspection in the NRC Public Document Room or from the

Publicly Available Records (PARS) component of the NRCs document system (ADAMS).

ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the

Public Electronic Reading Room).

Thank you for your cooperation in this matter. Mr. Bob Bolin has been advised of the policies

and guidelines referenced in this letter. If you have any questions regarding the NRC's

examination procedures and guidelines, please contact Mr. Phillip Capehart at (404) 997-4483.

G. Hamrick 3

(Internet E-mail: Phillip.Capehart@nrc.gov), or me at (404) 997-4662, (Internet E-mail:

Malcolm.Widmann@nrc.gov).

Sincerely,

/RA/

Eugene F. Guthrie, Chief

Operations Branch 2

Division of Reactor Safety

Docket Nos. 50-325, 50-324

License Nos. DPR-71, DPR-62

cc: Distribution via Listserv

_ML14148A155______ xG SUNSI REVIEW COMPLETE G FORM 665 ATTACHED

OFFICE RII:DRS RII:DRS

SIGNATURE PGC1 EFG

NAME CAPEHART GUTHRIE

DATE 5/27/2014 5/ 27/2014 5/ /2014 5/ /2014 5/ /2014 5/ /2014 5/ /2014

E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO

Letter to George T. Hamrick from Malcolm Widmann dated May 27, 2014.

SUBJECT: BRUNSWICK STEAM ELECTRIC PLANT - NOTIFICATION OF LICENSED

OPERATOR INITIAL EXAMINATION 05000325/2014301 AND

05000324/2014301

Distribution w/encl:

RIDSNRRDIRS

PUBLIC

RidsNrrPMBrunswick Resource