Simulator Compliance with ANSI/ANS-3.5-2009, Nuclear Power Plant Simulators for Use in Operator Training and Examination
ML14107A342
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 04/09/2014
From: Pope A
Duke Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ANSI/ANS-3.5-2009, BSEP 14-0031
Download: ML14107A342 (2)


Text

Brunswick Nuclear Plant DUKE ENERGY. P.O. Box 10429 Southport, NC 28461 APR 0 9 2014 Serial: BSEP 14-0031 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324 Simulator Compliance With ANSI/ANS-3.5-2009, Nuclear Power Plant Simulators for Use in OperatorTraining and Examination

Reference:

Letter from David C. DiCello (Carolina Power & Light Company) to U.S. Nuclear Regulatory Commisssion (Serial: BSEP 01-0037), Plant Simulator Certification, dated June 7, 2001, ADAMS Accession Number ML011630294 Ladies and Gentlemen:

The purpose of this letter is to document that, effective March 7, 2014, the Brunswick Steam Electric Plant (BSEP) Simulator complies with ANSI/ANS-3.5-2009, as endorsed by NRC Regulatory Guide 1.149, Nuclear Power Plant Simulator Facilitiesfor Use in OperatorTraining, License Examinations, and Applicant Experience Requirements, Revision 4, April 2011.

From 2001 until March 7, 2014, the BSEP Simulator complied with the ANSI/ANS-3.5-1998 version of the standard, as endorsed by NRC Regulatory Guide 1.149, Revision 3, October 2001.

The Brunswick Updated Final Safety Analysis Report (UFSAR) will be reviewed and revised as necessary. Necessary UFSAR revisions will be made in accordance with 10 CFR 50.71(e).

This document contains no regulatory commitments.

Please refer any questions regarding this submittal to Mr. Lee Grzeck, Manager - Regulatory Affairs, at (910) 457-2487.

Sincerely, qAn ette H. Pope Manager - Organizational Effectiveness Brunswick Steam Electric Plant

U.S. Nuclear Regulatory Commission Page 2 of 2 cc: U. S. Nuclear Regulatory Commission, Region II ATTN: Mr. Victor M. McCree, Regional Administrator 245 Peachtree Center Ave, NE, Suite 1200 Atlanta, GA 30303-1257 U. S. Nuclear Regulatory Commission ATTN: Mr. Siva P. Lingam(Mail Stop OWFN 8G9A) (Electronic Copy Only) 11555 Rockville Pike Rockville, MD 20852-2738 U. S. Nuclear Regulatory Commission ATTN: Ms. Michelle P. Catts, NRC Senior Resident Inspector 8470 River Road Southport, NC 28461-8869 Chair - North Carolina Utilities Commission P.O. Box 29510 Raleigh, NC 27626-0510