Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
TAC:ME5689 | 30 June 2011 | ||
ML11144A252 | 30 June 2011 | 2009 Refueling Outage Steam Generator Tube Inspections Summary for End of Cycle 22 | |
TAC:ME6803 | 30 June 2011 | ||
ML11215A059 | 30 June 2011 | WCAP-17345-NP, Rev 2, H*: Resolution of NRC Technical Issue Regarding Tubesheet Bore Eccentricity (3-Loop Model 44F/ Model 51F), Attachment 5 to 11-403 | Finite Element Analysis |
ML111810163 | 29 June 2011 | Comments on the Safety Evaluation Associated with Amendment No. --/273 - Temporary Alternate Repair Criteria | Finite Element Analysis |
TAC:ME6648 | 28 June 2011 | ||
ML111800730 | 28 June 2011 | Connecticut, Inc., Virginia Electric and Power Company, Submission of Revision 11 of the Quality Assurance Topical Report | Fitness for Duty Shutdown Margin Non-Destructive Examination Commercial Grade Dedication Probabilistic Risk Assessment Coatings Nondestructive Examination Temporary Modification Condition Adverse to Quality Process Control Program License Renewal Fire Protection Program |
ML111800499 | 27 June 2011 | 2010 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46, Kewaunee, Millstone, North Anna, Surry | |
ML111740004 | 23 June 2011 | Response to NRC Notice of Violation EA-10-255 | |
ML111730227 | 22 June 2011 | Confirmation of Payment of Listed Part 170 Invoices | |
ML111810155 | 14 June 2011 | Submittal of Decommissioning Funding Status Report: Response to Request for Addition Information | |
ML111640434 | 10 June 2011 | Notification of Inspection and Request for Information | |
ML11171A552 | 7 June 2011 | Vpdes Permit No. VA0004049 Application for Permit Reissuance | Boric Acid Grab sample Coatings Biofouling |
ML111530328 | 2 June 2011 | Completion of Temporary Instruction (Ti) 184, Availability and Readiness Inspection of Severe Accident Mitigation Guidelines (Samgs) at Region II Facilities - Revision | Severe Accident Management Guideline B.5.b Mitigating Strategies |
ML111540388 | 2 June 2011 | 08/02-03/2011 Meeting Announcement - 2011 U.S. Nuclear Regulatory Commission (NRC) Initial Examination Writers Workshop | |
ML11110A111 | 31 May 2011 | Issuance of Amendments Regarding Reactor Vessel Heatup and Cooldown Curves for 48 Effective Full-Power Years | Anticipated operational occurrence Hydrostatic Exemption Request |
TAC:ME3920 | 31 May 2011 | ||
ML111470265 | 26 May 2011 | Stations, Units 1 and 2 - Request for Exemption from Certain Requirements of the Fitness for Duty Rule for Managing Fatigue | Fitness for Duty |
ML11154A101 | 24 May 2011 | Steam Generator Tube Inservice Inspection Report for the 2010 Refueling Outage | Nondestructive Examination |
TAC:ME6375 | 24 May 2011 | ||
IR 05000280/2011009 | 24 May 2011 | IR 05000280-11-009 & 05000281-11-009, on 04/25/11 - 04/29/11, Surry Power Station, Units 1 and 2; Post Approval Site Inspection for License Renewal | Non-Destructive Examination Coatings Aging Management Moisture barrier License Renewal Biofouling |
ML11090A000 | 20 May 2011 | Issuance of Amendments Regarding Technical Specification Change to Sections 6.4.Q, Steam Generator (SG) Program and 6.6.A.3 Steam Generator Tube Inspection Report | Probabilistic Risk Assessment Finite Element Analysis |
ML111400367 | 19 May 2011 | Notification of Surry Power Station - Component Design Bases Inspection - NRC Inspection Report 05000280, 281/2011011 | Probabilistic Risk Assessment Time Critical Operator Action |
ML11143A063 | 17 May 2011 | Submittal of Consolidated Cyber Security Plan and RAI Response | Cyber Security |
ML111380415 | 17 May 2011 | Connecticut, Inc. and Virginia Electric and Power Company - Fitness-For-Duty Program; Annual Performance Data Report Revision of Fatigue Management Information | Fitness for Duty |
ML11136A185 | 16 May 2011 | NRR E-mail Capture - ME5494; ME5501 and 02; ME5506 and 07; ME5540 and 42 - 2011 Decommissioning Funding Status (DFS) Report - Request for Additional Information (RAI) - Final Version | |
ML111360206 | 13 May 2011 | Units 1 and 2 - Confirmation of Payment | |
IR 05000280/2011013 | 13 May 2011 | NRC Temporary Instruction 2515/183 Inspection Report 050000280/2011013 and 050000281/2011013 | B.5.b Design basis earthquake Severe Accident Management Guideline |
ML110980538 | 9 May 2011 | Cyber Security Plan Implementation Schedule | Cyber Security |
ML11123A285 | 6 May 2011 | Upcoming Steam Generator Tube Inservice Inspection | |
ML11129A007 | 5 May 2011 | NRR E-mail Capture - FW: ME5494; ME5501 and 02; ME5506 and 07; ME5540 and 41 - 2011 Decommissioning Funding Status (DFS) Report - Request for Additional Information (RAI) | |
IR 05000280/2011002 | 5 May 2011 | IR 05000280-11002, 05000281-11-002, on 01/01/2011-03/31/2011, Surry Power Station, Units 1 and 2: Identification and Resolution of Problems, Other Activities | Safe Shutdown High winds High Radiation Area Fire Barrier Internal Flooding Temporary Modification Significance Determination Process Job Performance Measure Thermoset Process Control Program Operability Determination Maintenance Rule Program Fire Protection Program Power change |
ML11159A002 | 2 May 2011 | NRR E-mail Capture - Surry Power Station Units 1 and 2 - Preliminary RAIs for 10 CFR 26.205(c) and (D) Exemption Request | Fitness for Duty Exemption Request |
ML111230053 | 2 May 2011 | Reply to a Notice of Violation EA-10-255, NRC Inspection Report No. 50-280/2011-012 and 50-281/2011-012, NRC Office of Investigations Report 2-2010-029 and Notice of Violation | Safe Shutdown Fitness for Duty Fire Protection Program Fire Watch |
ML11130A023 | 29 April 2011 | Submittal of Annual Radioactive Effluent Release Report | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report |
ML11129A073 | 29 April 2011 | Independent Spent Fuel Storage Installation Annual Radiological Environmental Operating Report | Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Chernobyl |
TAC:ME6146 | 25 April 2011 | ||
ML11124A009 | 25 April 2011 | Response to Request for Additional Information, Unit 2 2009 Steam Generator Tube Inspection Report | |
PNO-II-11-002, B - Preliminary Notification of Event or Unusual Occurrence | 19 April 2011 | PNO-II-11-002B - Preliminary Notification of Event or Unusual Occurrence | |
ML111090635 | 19 April 2011 | Notification of Inspection & Request for Information for NRC PI & R Inspection | Probabilistic Risk Assessment Operator Manual Action Maintenance Rule Program |
ML111150527 | 19 April 2011 | Fleet, Enquiry to, Data in Tables, Via E-mail | |
ML111150531 | 19 April 2011 | FFD Annual Performance Report | |
ML111080763 | 18 April 2011 | PNO-II-11-002A - Surry, Units 1 and 2, Notification of Unusual Event Due to Loss of Offsite Power | |
Press Release-II-11-021, NRC Monitors Events at Surry Nuclear Power Plant After Loss of Offsite Power and Unusual Event Declaration | 17 April 2011 | Press Release-II-11-021: NRC Monitors Events at Surry Nuclear Power Plant After Loss of Offsite Power and Unusual Event Declaration | |
ML111080197 | 17 April 2011 | PNO-II-11-002: Notification of Unusual Event Due to Loss of Offsite Power | |
ML111080541 | 14 April 2011 | Units, 1 & 2 - Nuclear Liability Insurance Endorsements | |
ML111040421 | 14 April 2011 | Cycle 24 Core Operating Limits Report, Revision 0 | Shutdown Margin |
ML111030430 | 13 April 2011 | Public Meeting/Open House - Handouts | Earthquake |
ML111030426 | 13 April 2011 | Public Meeting/Open House Attendees | |
ML111030409 | 13 April 2011 | Annual Assessment Meeting Summary Slides |