UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 June 10, 2011 Mr. David A. Heacock President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
SUBJECT:
SURRY NUCLEAR STATION NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION
Dear Mr. Heacock:
During the period of July 18-22, 2011, the NRC will conduct baseline emergency preparedness inspection activities at the Surry Nuclear Station. The inspection will evaluate activities in the Emergency Preparedness cornerstone using NRC Inspection Procedures (IP) 71114.01 and 71114.04. The inspection will also review the emergency preparedness performance indicators using IP 71151.
To minimize the impact to your on-site resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. It is important that all of these documents are up to date and complete, thereby minimizing the number of additional documents requested during the preparation and/or the onsite portions of the inspection. The inspector has requested that the subject informational material be made available to the NRC staff upon arrival on July 18, 2011.
We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Barry Garber at (757) 365-2725 of your organization. If there are any questions about this inspection or the material requested, please contact the lead inspector, Mark Speck at (404) 997-4759.
VEPCO 2
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/ reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Brian R. Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos.: 50-280, 50-281 License Nos.: DPR-32, DPR-37
Enclosure:
Emergency Preparedness Inspection Document List
VEPCO 3
Gerald T. Bischof Site Vice President Surry Power Station Virginia Electric and Power Company Electronic Mail Distribution B. L. (Sonny) Stanley Director, Nuclear Safety and Licensing Virginia Electric and Power Company Electronic Mail Distribution Lillian M. Cuoco, Esq.
Senior Counsel Dominion Resources Services, Inc.
Electronic Mail Distribution Chris L. Funderburk Director, Nuclear Licensing & Operations Support Virginia Electric and Power Company Electronic Mail Distribution Ginger L. Melton Virginia Electric and Power Company Electronic Mail Distribution Virginia State Corporation Commission Division of Energy Regulation P.O. Box 1197 Richmond, VA 23209 Attorney General Supreme Court Building 900 East Main Street Richmond, VA 23219 Senior Resident Inspector Surry Power Station U.S. Nuclear Regulatory Commission 5850 Hog Island Rd Surry, VA 23883 Michael M. Cline Director Virginia Department of Emergency Services Management Electronic Mail Distribution
ML111640434 X SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII: DRS RII: DRS SIGNATURE RA RA NAME M. SPECK B. BONSER DATE 06/10/2011 06/10/2011 E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO YES NO
Enclosure Document Request List Inspection Dates:
July 18-22, 2011 Inspection Procedures:
IP 71114.01 Exercise Evaluation IP 71114.04 Emergency Action Level and Emergency Plan Changes IP 71151 Performance Indicator Verification Note: This is a list of the documents to be delivered to the NRC Region II Office (Attention:
Mark Speck, 245 Peachtree Center Avenue, NE, Suite 1200, Atlanta, GA 30303-1257) and/or provided to the Team Lead Inspector upon arrival for the respective inspections. The current version of these documents is expected unless specified otherwise. Electronic media is preferred, if readily available (the preferred file format is Word or searchable pdf files on CDROM or thumb drive). Please organize the information as it is arranged below (e.g. a folder labeled Miscellaneous). It is not the intent that large or burdensome data be scanned for this purpose. This data will be inspected using original documentation. If there are questions regarding the documents requested, please do not hesitate to contact the lead inspector.
EP1 Exercise Evaluation Drill and exercise related procedures Core damage assessment procedure Dose assessment procedure Special/emergency exposure procedure Potassium Iodide distribution procedure Assembly/accountability procedure Emergency Facility Activation procedures Previous two exercise packages: scenario timeline drill reports or assessment, and respective Final Federal Emergency Management Agency (FEMA) / Department of Homeland Security (DHS) exercise reports All drill reports within inspection period Current exercise package: scenario timeline, expected Drill and Exercise Performance opportunities, exercise objectives, radiological assumptions and distributions, and scope of play and participation Corrective action program entries related to the exercises and drills for the two year inspection period EP4 Emergency Action Level (EAL) and Emergency Plan Changes Governing document for 10 CFR 50.54(q) evaluation process 10 CFR 50.54(q) evaluator training program and qualification records Changed procedure 10 CFR 50.54(q) evaluation Changed procedure current and previous revisions to last inspection Corrective action program entries related to Emergency Action Level and Emergency Plan changes for the two year inspection period
2 Enclosure EP01/EP02/EP03 Performance Indicators (PI) Verification Governing document for the performance indicator process Drill and Exercise Performance (DEP), Emergency Response Organization (ERO), and Alert and Notification System (ANS) PI data submitted for the two year inspection period DEP documentation and evaluations for the two year inspection period Current ERO roster Corrective action program entries related to performance indicators, that is DEP, ERO training and participation, and ANS for the two year inspection period Miscellaneous Procedures Current Emergency Plan Safety Evaluation Report approved Emergency Plan Current Emergency Action Levels Safety Evaluation Report approved Emergency Action Levels Current Emergency Plan implementing procedures Corrective Action Program procedure Lead Inspector Contact Information:
Mark E. Speck (404) 997-4759 Mark.Speck@nrc.gov Mailing Address US Nuclear Regulatory Commission, Region II ATTN: Mark Speck 245 Peachtree Center Ave., NE Suite 1200 Atlanta, GA 30303-1257