Notification of Surry Power Station - Component Design Bases Inspection - NRC Inspection Report 05000280, 281/2011011
ML111400367
Person / Time
Site: Surry  Dominion icon.png
Issue date: 05/19/2011
From: Binoy Desai
NRC/RGN-II/DRS/EB1
To: Heacock D
Virginia Electric & Power Co (VEPCO)
References
IR-11-011
Download: ML111400367 (6)


See also: IR 05000280/2011011

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

May 19, 2011

Mr. David A. Heacock

President and Chief Nuclear Officer

Virginia Electric and Power Company

Innsbrook Technical Center

5000 Dominion Boulevard

Glen Allen, VA 23060-6711

SUBJECT:

NOTIFICATION OF SURRY POWER STATION - COMPONENT DESIGN

BASES INSPECTION - NRC INSPECTION REPORT 05000280, 281/2011011

Dear Mr. Heacock:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

Region II staff will conduct a component design bases inspection at your Surry Power Station

during the weeks of November 14 - 18, November 28 - December 2, and December 12 - 16,

2011. The inspection team will be led by Shane Sandal, a Senior Reactor Inspector from the

NRC's Region II Office. This inspection will be conducted in accordance with the baseline

inspection procedure, Procedure 71111.21, Component Design Bases Inspection, issued

December 6, 2010.

The inspection will evaluate the capability of risk significant / low margin components to function

as designed and to support proper system operation. The inspection will also include a review

of selected operator actions, operating experience, and modifications.

During a telephone conversation on May 4, 2011, Mr. Sandal confirmed with Mr. Garber of your

staff, arrangements for an information gathering site visit and the three-week onsite inspection.

The schedule is as follows:

Information gathering visit: Week of October 24 - 28, 2011

Onsite weeks: November 14 - 18, November 28 - December 2, and December 12 - 16,

2011

The purpose of the information gathering visit is to meet with members of your staff to identify

risk-significant components and operator actions. Information and documentation needed to

support the inspection will also be identified. Mr. George MacDonald, a Region II Senior

Reactor Analyst, will accompany Mr. Sandal during the information gathering visit to review

probabilistic risk assessment data and identify risk significant components which will be

examined during the inspection.

The enclosure lists documents that will be needed prior to the information gathering visit.

Please provide the referenced information to the Region II office by October 17, 2011. Contact

VEPCO

2

Mr. Sandal with any questions concerning the requested information. The inspectors will try to

minimize your administrative burden by specifically identifying only those documents required

for inspection preparation.

Additional documents will be requested during the information gathering visit. The additional

information will need to be made available to the team in the Region II office prior to the

inspection teams preparation week of November 7. Mr. Sandal, will also discuss the following

inspection support administrative details: availability of knowledgeable plant engineering and

licensing personnel to serve as points of contact during the inspection; method of tracking

inspector requests during the inspection; licensee computer access; working space;

arrangements for site access; and other applicable information.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRC's document system

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding the

information requested or the inspection, please contact Mr. Sandal at (404) 997-4513 or me at

(404) 997-4519.

Sincerely,

/RA.

Binoy B. Desai, Chief

Engineering Branch 1

Division of Reactor Safety

Docket Nos.: 50-280, 50-281

License Nos.: DPR-32, DPR-37

Enclosure: INFORMATION REQUEST FOR SURRY POWER STATION - COMPONENT

DESIGN BASES INSPECTION

cc w/enc/: (See page 3)

VEPCO

3

cc w/encl:

Gerald T. Bischof

Site Vice President

Surry Power Station

Virginia Electric and Power Company

Electronic Mail Distribution

B. L. (Sonny) Stanley

Director, Nuclear Safety and Licensing

Virginia Electric and Power Company

Electronic Mail Distribution

Lillian M. Cuoco, Esq.

Senior Counsel

Dominion Resources Services, Inc.

Electronic Mail Distribution

Chris L. Funderburk

Director, Nuclear Licensing & Operations Support

Virginia Electric and Power Company

Electronic Mail Distribution

Ginger L. Melton

Virginia Electric and Power Company

Electronic Mail Distribution

Virginia State Corporation Commission

Division of Energy Regulation

P.O. Box 1197

Richmond, VA 23209

Attorney General

Supreme Court Building

900 East Main Street

Richmond, VA 23219

Senior Resident Inspector

Surry Power Station

U.S. Nuclear Regulatory Commission

5850 Hog Island Rd

Surry, VA 23883

Michael M. Cline

Director

Virginia Department of Emergency Services Management

Electronic Mail Distribution

ML111400367_ XG SUNSI REVIEW COMPLETE XG FORM 665 ATTACHED

OFFICE

RII:DRS

RII:DRS

SIGNATURE

RA

RA

NAME

SSANDEL

BDESAI

DATE

5/ 18 /2011

5/ 19 /2011

E-MAIL COPY?

YES

NO YES

NO YES

NO YES

NO YES

NO YES

NO YES

Enclosure

INFORMATION REQUEST FOR SURRY POWER STATION

COMPONENT DESIGN BASES INSPECTION

Please provide the information electronically in .pdf files, Excel, or other searchable format on

CDROM (or FTP site, Sharepoint, etc.) The CDROM (or website) should be indexed and

hyperlinked to facilitate ease of use.

1.

From your most-recent probabilistic safety analysis (PSA) excluding external events and

fires:

a.

Two risk rankings of components from your site-specific probabilistic safety analysis

(PSA): one sorted by Risk Achievement Worth (RAW), and the other sorted by

Birnbaum Importance

b.

A list of the top 500 cutsets

2.

From your most-recent probabilistic safety analysis (PSA) including external events and

fires:

a.

Two risk rankings of components from your site-specific probabilistic safety analysis

(PSA): one sorted by Risk Achievement Worth (RAW), and the other sorted by

Birnbaum Importance

b.

A list of the top 500 cutsets

3.

Risk ranking of operator actions from your site specific PSA sorted by RAW. Provide

human reliability worksheets for these items

4.

List of time critical operator actions with a brief description of each action

5.

List of Emergency and Abnormal Operating Procedures revised (significant) since April 1,

2008 with a brief description of each revision

6.

List of components with low design margins (i.e., pumps closest to the design limit for flow

or pressure, diesel generator close to design required output, heat exchangers close to

rated design heat removal, MOV risk-margin rankings, etc.) and associated evaluations or

calculations

7. List of station operating experience evaluations/reviews performed and documented in the

stations corrective action program for industry events and safety related equipment

failures/vulnerabilities [as communicated by NRC generic communications, industry

communications, 10 CFR part 21 notifications, etc.] since April 1, 2008

8.

List and brief description of safety related SSC design modifications implemented since

April 1, 2008

9.

List and brief description of common-cause component failures that have occurred since

April 1, 2008

10. List and brief description of operability evaluations completed since April 1, 2008

11. List of equipment on the sites Station Equipment Reliability Issues List, including a

description of the reason(s) why each component is on that list and summaries (if available)

of your plans to address the issue(s)

2

Enclosure

12. List and brief description of equipment currently in degraded or nonconforming status as

described in RIS 05-020

13. List and reason for equipment classified in maintenance rule (a)(1) status since April 1,

2008 to present

14. Copies of System Descriptions (or the like design basis documents) for Safety-Related

Systems

15. Copy of UFSAR(s)

16. Copy of Technical Specification(s)

17. Copy of Technical Specifications Bases

18. Copy of Technical Requirements Manual(s)

19. List and brief description of Root Cause Evaluations that have been performed since April

1, 2008

20. In-service Testing Program Procedure(s)

21. Corrective Action Program Procedure(s)

22. One line diagram of electrical plant (electronic and full size - hard copy week of October

24)

23. Index and legend for electrical plant one-line diagrams

24. Primary AC calculation(s) for safety-related buses

25. Primary DC calculation(s) for safety-related buses

26. PI&Ds for ECCS systems (electronic and 1/2 size - hard copy week of October 24)

27. Index and Legend for PI&Ds

28. Copy of design bases documents for ECCS systems

29. Copy of Operability determination procedure(s)

30. Copies of condition reports associated with findings from previous CDBI (if applicable)

31. Index (procedure number, titles, and current revision) of station Emergency Operating

Procedures (EOPs), Abnormal Operating Procedures (AOPs), and Annunciator Response

Procedures (ARPs)

32. Contact information for a person to discuss PRA information prior to the information

gathering trip (name, title, phone number, and e-mail address)