Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
L-2008-125, License Amendment Request, Increase in Refueling Water Tank Level30 June 2008License Amendment Request, Increase in Refueling Water Tank LevelBoric Acid
Shutdown Margin
L-2008-137, Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors.30 June 2008Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors.Boric Acid
Ultimate heat sink
Mission time
Safe Shutdown Earthquake
Coatings
Operating Basis Earthquake
Earthquake
Fuel cladding
Scaffolding
L-2008-132, Units 1 & 2, Official Service List Changes30 June 2008Units 1 & 2, Official Service List Changes
TAC:MD920830 June 2008
L-2008-150, Duane Arnold, and Point, Beach, Units 1 and 2, Quality Assurance Topical Report (QATR-FPL-1) Revisions 1 & 227 June 2008Duane Arnold, and Point, Beach, Units 1 and 2, Quality Assurance Topical Report (QATR-FPL-1) Revisions 1 & 2Fitness for Duty
Shutdown Margin
Offsite Dose Calculation Manual
Fire Barrier
Coatings
Nondestructive Examination
Temporary Modification
Cyber Security
Condition Adverse to Quality
Process Control Program
Safeguards Contingency Plan
Maintenance Rule Program
Fire Protection Program
Grace period
Power Uprate
L-2008-149, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.426 June 2008Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4Safe Shutdown
Boric Acid
Shutdown Margin
High Radiation Area
Ultimate heat sink
Non-Destructive Examination
Stroke time
Anticipated operational occurrence
Hydrostatic
Missed surveillance
Fuel cladding
Pressure Boundary Leakage
Recently irradiated fuel
Power change
Unidentified leakage
L-2008-148, Report of 10 CFR 50.59 Plant Changes for June 12, 2006 Through April 4, 200826 June 2008Report of 10 CFR 50.59 Plant Changes for June 12, 2006 Through April 4, 2008Safe Shutdown
Finite Element Analysis
ML08178068223 June 2008Request for Withholding of Commercial Document, Analysis & Evaluation of St. Lucie Unit 1 Natural Circulation Cooldown, Nsac 16.
Press Release-II-08-035, NRC Issues Confirmatory Order to FPL Following Alternative Dispute Resolution16 June 2008Press Release-II-08-035: NRC Issues Confirmatory Order to FPL Following Alternative Dispute Resolution
ML08165026113 June 2008EA-07-321-Confirmatory Order, Effective Immediately, NRC Office of Investigation Report No. 2-2006-034Enforcement Discretion
ML10242011111 June 2008Marine Turtle Removal Monthly Summary for May 2008
ML08162035310 June 2008EN-08-035, St. Lucie Nuclear Plant, Florida Power and Light CompanyEnforcement Discretion
ML0815801686 June 2008Notice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed No Significant Hazards Consideration Determination, & Opportunity for a Hearing Regarding Minor Changes & Corrections to the TSs
L-2008-121, Request for Additional Information Response, Alternative Source Term Amendment2 June 2008Request for Additional Information Response, Alternative Source Term AmendmentSafe Shutdown
Offsite Dose Calculation Manual
Recently irradiated fuel
ML08143048629 May 2008St. Lucie, Unit 2, Closure of Confirmatory of Action Letter NRR-07-028Weld Overlay
Dissimilar Metal Weld
L-2008-116, Official Service List Update for Official Use Only and Safeguards Information Correspondence from Nuclear Regulatory Commission23 May 2008Official Service List Update for Official Use Only and Safeguards Information Correspondence from Nuclear Regulatory Commission
L-2008-110, Request an Official Service List Change20 May 2008Request an Official Service List Change
L-2008-108, Proposed License Amendment, Request for Additional Information Response, Control Room Habitability TSTF-44820 May 2008Proposed License Amendment, Request for Additional Information Response, Control Room Habitability TSTF-448Safe Shutdown
ML08133041112 May 2008Summary of Category One Public Meeting Annual Assessment for St. Lucie Nuclear Plant
L-2008-070, Three Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems.12 May 2008Three Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems.Scaffolding
ML08133041612 May 2008Enclosure - St. Lucie Annual Assessment Meeting, Reactor Oversight Program - Cy 2007
ML0933403226 May 2008Marine Turtle Removal Monthly Summary for April 2008
L-2008-090, Annual Environmental Operating Report30 April 2008Annual Environmental Operating ReportBiofouling
IR 05000335/200800230 April 2008IR 05000335-08-002 and 05000389-08-002; Florida Power & Light Company; 01/01/2008 - 03/31/2008; St. Lucie Nuclear Plant, Units 1 & 2, NRC Integrated Inspection ReportSafe Shutdown
Fire Barrier
Fire impairment
Temporary Modification
Significance Determination Process
Pressure Boundary Leakage
Pressure boundary leak
Unidentified leakage
L-2008-098, In-Service Inspection Plans, Submittal for the Use of Structural Weld Overlays as an Alternative Repair Technique, Fourth Ten-Year Interval Unit 1 Relief Request 229 April 2008In-Service Inspection Plans, Submittal for the Use of Structural Weld Overlays as an Alternative Repair Technique, Fourth Ten-Year Interval Unit 1 Relief Request 2Weld Overlay
Nondestructive Examination
Stress corrosion cracking
Liquid penetrant
Dissimilar Metal Weld
L-2010-033, St. Lucie, Units 1 and 2, Offsite Dose Calculation Manual (Odcm), Chemistry Operating Procedure C-200, Rev 31B, Marked Up Pages28 April 2008St. Lucie, Units 1 and 2, Offsite Dose Calculation Manual (Odcm), Chemistry Operating Procedure C-200, Rev 31B, Marked Up PagesOffsite Dose Calculation Manual
L-2008-091, Annual Radiological Environmental Operating Report for Calendar Year 200728 April 2008Annual Radiological Environmental Operating Report for Calendar Year 2007Offsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
L-2008-093, Independent Spent Fuel Storage Installation (ISFSI) - Cask Registration28 April 2008Independent Spent Fuel Storage Installation (ISFSI) - Cask Registration
L-2008-092, Independent Spent Fuel Storage Installation (ISFSI) - Cask Registration28 April 2008Independent Spent Fuel Storage Installation (ISFSI) - Cask Registration
TAC:MD617423 April 2008
ML08077026523 April 2008Request for Additional Information, Control Room Habitability, TSTF-448
IR 05000335/200800718 April 2008IR 05000335-08-007, IR 05000389-08-007, and IR 07200061-08-001, on 02/25/2008 - 03/14/2008, for St. Lucie, Units 1 and 2, and ISFSI, Inspector NotesSafe Shutdown
High winds
Non-Destructive Examination
Commercial Grade Dedication
Safe Shutdown Earthquake
Operating Basis Earthquake
Nondestructive Examination
Design basis earthquake
Earthquake
Control of Heavy Loads
Fuel cladding
Fire Protection Program
ML11290A08116 April 2008Drawing 2998-G-125, Rev. 22, Main Steam & Safety Valve Vents. Sheet MS-L-2
ML08109024816 April 2008IR 05000335-08-007, 05000389-08-007 and 07200061-08-001 on 02/25 - 03/14/2008 for St. Lucie, Units 1 and 2 and ISFSINon-Destructive Examination
Safe Shutdown Earthquake
Operating Basis Earthquake
Job Performance Measure
Design basis earthquake
L-2008-081, Proposed License Amendment, Request for Additional Information Response, Alternative Source Term Amendment14 April 2008Proposed License Amendment, Request for Additional Information Response, Alternative Source Term Amendment
ML08102066410 April 2008IR 05000335-08-301 and 05000389-08-301, on 04/08/2008, 07/21/2008 and 07/28/2008, St. Lucie Nuclear Plant, Reactor and Senior Reactor Operator Initial Examination
L-2008-077, Independent Spent Fuel Storage Installation - Cask Registration9 April 2008Independent Spent Fuel Storage Installation - Cask Registration
L-2008-080, Independent Spent Fuel Storage Installation - Cask Registration9 April 2008Independent Spent Fuel Storage Installation - Cask Registration
L-2008-078, Independent Spent Fuel Storage Installation - Cask Registration9 April 2008Independent Spent Fuel Storage Installation - Cask Registration
L-2008-079, Inservice Inspection Plan, Fourth Ten-Year Interval Unit 1 Relief Request 39 April 2008Inservice Inspection Plan, Fourth Ten-Year Interval Unit 1 Relief Request 3Safe Shutdown
Boric Acid
Shutdown Margin
Coatings
L-2008-076, Extension Request Regarding the Three Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems9 April 2008Extension Request Regarding the Three Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems
ML1024201077 April 2008Marine Turtle Removal Monthly Summary for March 2008
ML0809906344 April 2008Part 21 Notification Regarding Failure to Comply with the Requirements for Dedication of Commercial Grade Items
RIS 2003-08, Protection of Safeguards Information from Unauthorized Disclosure30 April 2003
7 November 2005
3 April 2008
Protection of Safeguards Information from Unauthorized Disclosure
2005/04/30-NRC Regulatory Issue Summary 2003-08 Protection of Safeguards Information from Unauthorized Disclosure
Enclosure 1 - NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure
Summary of Safeguards Information Requirements, Attachment 1 to NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure
Backfit
RIS 2003-08, Enclosure 1 - NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure30 April 2003
7 November 2005
3 April 2008
Enclosure 1 - NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure
Summary of Safeguards Information Requirements, Attachment 1 to NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure
Backfit
ML0809402413 April 2008Summary of Safeguards Information Requirements, Attachment 1 to NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure
ML0809402383 April 2008Update of Nuclear Regulatory Commission (NRC) Distribution List for Documents Containing Official Use Only (OUO) and Safeguards Information (SGI)
IR 05000335/20084012 April 2008NRC Office of Investigations Report No. 2-2006-034 - St. Lucie Nuclear Plant and NRC Security Inspection Report 05000335/2008401 and 05000389/2008401 (OUO Removed)