May 29, 2008 Mr. J. A. Stall Senior Vice President Nuclear and Chief Nuclear officer St. Lucie Plant Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420
SUBJECT:
ST. LUCIE NUCLEAR PLANT, UNIT 2 - CLOSURE OF CONFIRMATORY ACTION LETTER NRR-07-028 (TAC NO. MD4178)
Dear Mr. Stall:
On March 20, 2007, the U.S. Nuclear Regulatory Commission (NRC) issued Confirmatory Action Letter (CAL) No. NRR-07-028 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML070780319) regarding dissimilar metal welds in the pressurizer at St. Lucie Unit 2. This letter acknowledges receipt of Florida Power and Light Company (FPL) letter dated February 21, 2008 (ADAMS Accession No. ML080660074),
informing the NRC of actions taken in response to this CAL.
In that letter, FPL stated that the St. Lucie Unit 2 pressurizer had six piping nozzle welds that were originally made with alloy 82/182 weld materials. These included the pressurizer surge line, spray line, three safety lines and a relief nozzle.FPL also stated that during the fall 2007 refueling outage, all six piping nozzle welds were mitigated. The pressurizer surge and relief nozzle-to-safe end welds were mitigated by full structural weld overlays. The pressurizer spray and safety nozzle-to-safe end welds were cut out and replaced with stainless steel.
Based on your letter, the NRC has found that all the commitments listed in the CAL and supporting commitment letters (ADAMS Accession Nos. ML070330591 and ML070590514) have been met. No further response is required regarding the CAL. We consider the CAL closed. As such, it is no longer necessary to implement enhanced inspection and leakage monitoring requirements for the reactor coolant system. Technical Assignment Control No. MD4178 has been closed.
Thank you for informing us of the actions documented in your letter. These actions may be examined during a future NRC inspection of your facility.
Current NRC guidance regarding CALs is contained in the NRC Enforcement Policy and the NRC Enforcement Manual, which are available at the NRC web site at http://www.nrc.gov/about-nrc/regulatory/enforcement.html (click on Enforcement Policy or Enforcement Guidance) or by contacting the Government Printing Office (GPO) toll-free at 1-888-293-6498. The GPO is open from 7:00 a.m. to 9:00 p.m. EST, Monday through Friday (except Federal holidays).
J.
In accordance with Title10, Code of Federal Regulations, Section2.390 of the NRC's "Rules of Practice," a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the NRC=s document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm.html.
Sincerely,
/RA/
Timothy J. McGinty, Acting Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No.:50-389 cc: See next page
ML081430486 OFFICE DCI/CPNB DCI/CPNB LPL2-2/PM LPL2-2/LA LPL2-2/BC NAME JCollins TChan BMozafari BClayton for CSola TBoyce DATE 05/22/08 05/22/08 05/22/08 05/22/08 05/28/08 OFFICE DCI/D DRP/D RII DORL/D(A)
NAME MEvans MSykes forLWert (by email)
TMcGinty DATE 05/23/08 05/29/08 05/29/08
Florida Power and Light Company ST. LUCIE PLANT cc:
Mr. Mano Nazar Senior Vice President and Nuclear Chief Operating Officer Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408 Senior Resident Inspector St. Lucie Plant U.S. Nuclear Regulatory Commission P.O. Box 6090 Jensen Beach, Florida 34957 Craig Fugate, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100 M. S. Ross, Managing Attorney Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 Marjan Mashhadi, Senior Attorney Florida Power & Light Company 801 Pennsylvania Avenue, NW.
Suite 220 Washington, DC 20004 Mr. Douglas Anderson County Administrator St. Lucie County 2300 Virginia Avenue Fort Pierce, Florida 34982 Mr. William A. Passetti, Chief Department of Health Bureau of Radiation Control 2020 Capital Circle, SE, Bin #C21 Tallahassee, Florida 32399-1741 Mr. Gordon L. Johnston Site Vice President St. Lucie Nuclear Plant 6351 South Ocean Drive Jensen Beach, Florida 34957-2000Mr. Christopher R. Costanzo Plant General Manager
St. Lucie Nuclear Plant 6351 South Ocean Drive Jensen Beach, Florida 34957 Mr. Terry Patterson Licensing Manager St. Lucie Nuclear Plant 6351 South Ocean Drive Jensen Beach, Florida 34957 Don E. Grissette Vice President, Nuclear Training and Performance Improvement Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 Mr. Rajiv S. Kundalkar Vice President - Nuclear Technical Services Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 Mr. J. Kammel Radiological Emergency Planning Administrator Department of Public Safety 6000 Southeast Tower Drive Stuart, Florida 34997 Mr. Bill Parks Operations Manager St. Lucie Nuclear Plant 6351 South Ocean Drive Jensen Beach, Florida 34957-2000 Mr. Seth B. Duston Training Manager St. Lucie Nuclear Plant 6351 South Ocean Drive Jensen Beach, Florida 34957-2000