L-2010-033, St. Lucie, Units 1 and 2, Offsite Dose Calculation Manual (Odcm), Chemistry Operating Procedure C-200, Rev 31B, Marked Up Pages

From kanterella
Jump to navigation Jump to search
St. Lucie, Units 1 and 2, Offsite Dose Calculation Manual (Odcm), Chemistry Operating Procedure C-200, Rev 31B, Marked Up Pages
ML100610650
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 04/28/2008
From:
Florida Power & Light Co
To:
Office of Nuclear Reactor Regulation
References
L-2010-033 C-200, Rev 31B
Download: ML100610650 (6)


Text

L-2010-033 C-200, OFFSITE DOSE CALCULATION MANUAL REVISIONS 31B MARKED UP PAGES (5 PAGES)

Procedufe No ST. LUCIE PLANT CHEMISTRY OPERATING Curt evis!Or-PROCEDURE o P Effective Date WFP L SAFETY RELATED REFERENCE USE 10/06108 J o Title: 0 DOSE CALCULATION MANUAL P -N (ODCM)4g 8 g Responsible Department:

CHEMISTRY z , REVISION

SUMMARY

e Revision 31B- Incorporated PCR 08-5161 to correct typo on page 227. (Bruce Vogel, LL- u j 10/03/08)>L AND 0 < Incorporated PCR 08-4568 to reflect change of title of COP-05.02. (Bruce Vogel, 09/10/08)M Revision 31A -Incorporated MC 08-2706 for CR 08-18187 for minor correction to Table 4.11-2 for clarification. (Bruce Vogel, 06/04/08)Revision 31 -Incorporated PCR 08-0367 for CR 07-42134 to make changes due to NP-922 cancellation (EV-AA-01 is replacement) and add 6 perimeter wells to program. (Bruce Voge 04/29/08)Revision 30- Incorporated PCR 08-0180 to add surveillance of Cask Handling Facility (CHF exhaust vent. (Glenn Adams, 02/12/08)AND Incorporated PCR 07-4244 to add surveillance of Cask Handling Facility (CHF) exhaust vent (Glenn Adams, 12/13/07)Revision 29 -Incorporated PCR 07-0684 to add changes required to implement the industr)initiative under Nuclear Policy, NP-922. (Edwin Burgos, 03/13/07)[.L Y Ch 0#-4 Revision FRG Review Date Approved By AApproval Da'te S.OPS 0 04/22/82 C. M. Wethy 04127182 DATE Plan n!General Manager DOCT PROCEDURE Revision FRG Review Date Approved By Approval Date DOCN C-200 31B 04/28/08 C. Costanzo 04/29/08 SYS Plant General Manager COM COMPLETED N/A ITM 31B Authorized Approver M an Day 1c0r03t08 Authorized Approver (Minor Correction) 109KL3l 1-794 REVISION NO.: PROCEDURE TITLE:

0..31 B OFFSITE DOSE CALCULATION MANUAL (ODCM)1223 of 230 PROCEDURE NO.: C-200 ST. LUCIE PLANT APPENDIX B-2 RADIOLOGICAL ENVIRONMENTAL SAMPLING IN SUPPORT OF THE INDUSTRY INITIATIVE (Page 1 of 2)ST. LUCIE PLANT Key to Sample Locations STATE PSL ID SAMPLES SAMPLE LOCATION DESCRIPTION ID COLLECTED FREQUENCY H70 GIS-MW-ES Tritium / Gamma Quarterly West of AlA; between the discharge canal and Gate "B" H71 GIS-MW-EI Tritium /Gamma Quarterly West of AlA; between the discharge canal and Gate "B" H72 GIS-MW-SI Tritium / Gamma Quarterly South of Intake canal and the adjacent access road H73 GIS-MW-SWS Tritium / Gamma Quarterly S1W corner of Intake canal and the adjacent access road H74 GIS-MW-SWI Tritium / Gamma Quarterly S/W corner of Intake canal and the adjacent access road H75 GIS-MW-WI Tritium / Gamma Quarterly West of plant site and intake canal; South of switchyard Y It is the policy of Florida Power & Light Company (FPL) that the St. Lucie 1 & 2 Radiological Environmental Monitoring Programs are conducted by the State of Florida Department of Health (DOH) and Bureau of Radiation Control (BRC), pursuant to an Agreement between FPL and DOH and; that coordination of the Radiological Environmental Monitoring Programs with DOH and compliance with the Radiological Environmental Monitoring Program Controls are the responsibility of the Nuclear Plant Support Services Department.

North of Simulator; South of Big Mud Creek East of Barge Slip; By LU bldg South of North Warehouse West of AlA and East of Parking Lot C.')

REVISION NO.: PROCEDURE TITLE: PAGE.*_u'.,_.

ýr, 31B OFFSITE DOSE CALCULATION MANUAL (ODCM) N' .f 2,;;--224of 13,11-;PROCEDURE NO.: C-200 ST LUCIE PLANT M2 APPENDIX B-2 RADIOLOGICAL ENVIRONMENTAL SAMPLING IN SUPPORT OF THE INDUSTRY INITIATIVE (Page 2 of 2)Specific sample locations and sampling periodicity shall be determined at a later date after collection of sufficient data to make a location determination Until further notice, sample collection points, sampling periodicity, and analyses to be performed in support of the INDUSTRY INITIATIVE NEI 07-07 shall be at the discretion of the Reftý ' ) Manager.END OF APPENDIX B-2 NA 06 0 REVISION NO,: PROCEDURE TrTLE: PAGE l. ! , 31B OFFSITE DOSE CALCULATION MANUAL (ODCM) ..... of 230 PROCEDURE NO: -, C-200 ST. LUCIE PLANT , E?FIGURE 1-3 RADIOLOGICAL ENVIRONMENTAL SAMPLING LOCATIONS IN SUPPORT OFTHE INDUSTRY INITIATIVE (Page 1 of 1)V.0"1

... ;: :

.. ." "'+'='++:

+:,,:; +. 0 ..'....... _' ..,...-i3i C' \, amm"%\

IDWATER PROTECTION PROCEDUR O\ /.r~47 o-cpo P T LUCIE PLANT x~-SIITJJ OIJ~ARY'ýELLS/'

, a. I" ..4~ ~.gi/ ..,:i/ -.FT N~AW ( '75)GGW SW .... ..,, ..2v...... ..... .'gap........L -*0~~~ Gi-&7 11 CS..VOW*bft,%

.. ~ ~ ~ ..4.,,~~~g%00~V-6 V 0 ~O 0)