Issue date | Title | Topic | |
---|---|---|---|
ML20055G583 | 11 July 1990 | Requests Further Extension Until 930930 or Earlier as Result of Various Uncertainties Existing Re Nuclear Waste Program Including Govt Plans in Area of Savannah River Plant | |
ML20155F444 | 4 May 1988 | Responds to NRC & Request at 880504 Meeting Describing GE Program to Reconfirm Design Adequacy of Associated Circuits in GE Bwrs.Upon Completion of Phases 1 & 2 of Evaluation of Bwrs,Ge Will Submit Summary by 881104 | |
ML20238C277 | 4 September 1987 | Part 21 Rept Re Incorrectly Crimped Wire Terminations on Switchgear Components.Terminations Being Returned to Factory for Evaluation | |
ML20237L414 | 20 August 1987 | Requests That Further Extension Be Granted to 900930 for Completion of Const | |
ML20215L059 | 22 June 1987 | Responds to Request for Assurance That Facility Neutron Monitoring Sys Design Similar to Design of Other Plants.List of Plants W/Similar Design,Already Reviewed & Approved by Nrc,Encl | Hot Short Exemption Request |
ML20212B555 | 19 February 1987 | Informs of Failure of 1975 Vintage AM-4.16-250-9HB Circuit Breaker to Trip Electrically.Field Representative Sent to Investigate Occurrence & Report Findings.Part 21 Related | |
ML20235F174 | 21 January 1987 | Submits New Mailing Address for All Correspondence Re Facility Due to Author Retirement | |
ML20133C196 | 1 October 1985 | Submits Verification Results for Serial Numbers on Each Irvsp Capsule in Lynchburg Research Ctr Storage Pool,Per Rev 2 to BAW-1543 | |
ML20097G276 | 15 August 1984 | Requests Extension Until 870930 for Const Completion. Extension Requested Based on Chem Nuclear Desire to Purchase Strip of Property | |
ML20198D913 | 11 July 1984 | Offers Info Re Successful Testing of Ae Rev O Pistons in R5-V12 Engines at Loads Higher than in R4 Engines.Rev E Drawings Include beefed-up Structure as Does Piston Used for Failure Analysis Associates Strain Gauge Test Work | |
ML20084R687 | 30 March 1984 | Advises That Effective 840330 Author,Will Be Retiring from Allied General Nuclear Svcs.After 840330,correspondence Should Be Addressed to C Nielsen,Vice President,Allied Chemical Nuclear Products,Inc | |
ML20083H022 | 14 December 1983 | Responds to IE Bulletin 83-07 & 83-07,Suppl 1, Apparently Fraudulent Products Sold by Ray Miller,Inc. No Subj Matl Installed in safety-related Sys at Facility | |
ML20083G729 | 13 December 1983 | Responds to IE Bulletin 83-07 & 83-07 Suppl 1, Apparently Fraudulent Products Sold by Ray Miller,Inc. No Subj Matl Installed at Facility.Matl in Stock Identified,Isolated & Tagged | |
ML20083H141 | 13 December 1983 | Forwards Application to Amend State of Sc Radioactive Matls License 144 & to DOE Summarizing Current Status of Shutdown Activities | |
ML20077S179 | 1 July 1983 | FOIA Request for Structural Integrity Test Rept for Facilities | |
ML20070C763 | 10 December 1982 | Part 21 Rept Re Problem W/Brown Boveri Electric,Inc Low Voltage Circuit Breakers W/Solid State Trip Devices.Units from San Onofre 2 & 3 Failed Due to long-term Degradation of Filter Capacitor C205.Suspect Trip Units Should Be Tested | |
ML20070A960 | 17 November 1982 | Ack Receipt of IE Insp Rept 50-332/82-03.No Proprietary Info | |
ML20027A946 | 30 August 1982 | Ack Receipt of IE Insp Rept 50-332/82-02.No Proprietary Info | |
ML20065C230 | 16 August 1982 | Requests Extension of Const Completion Date Until 830930 | |
ML20039C445 | 11 December 1981 | Discusses Plans for Pursuing Licensing Approval of New BWR Fuel Product Line.Requests NRC Review Commitments Consistent W/Current or Modified Schedule Which Supports Licensing Approval Need Date of Nov 1984.Current Schedule Encl | |
ML20039C840 | 23 November 1981 | Requests Extension Until 820930 of Completion Date for Facility.No Action Was Taken by Commission on 781109 Request for Extension to 811231 | |
ML19353A340 | 10 December 1980 | Ack Receipt of IE Insp Rept 50-332/80-03 on 801015-17.No Proprietary Info | |
ML19338C892 | 8 August 1980 | Ack Receipt of IE Insp Rept 50-332/80-02 on 800708-11.No Proprietary Info | |
ML19330B216 | 15 July 1980 | Responds to IE Bulletin 80-15 Re Emergency Notification Sys Failure W/Loss of Offsite Power.Licensing Proceedings Terminated.Facility Is Presently Utilized in DOE R&D Activities.Bulletin Does Not Apply | |
ML19209A764 | 21 September 1979 | Responds to IE Bulletin 79-19.Current Set of DOT & NRC Regulations Maintained.Made 39 Shipments of Low Level Radwaste in 1978-1979 | |
ML19253A713 | 15 August 1979 | Ack Receipt of IE Insp Rept 50-332/79-02 on 790718-19.No Proprietary Info | |
ML19248D183 | 25 June 1979 | Ack Receipt of IE Insp Rept 50-332/79-01 on 790604-07.No Proprietary Info | |
ML19224D491 | 8 June 1979 | Submits Rept Re Flowline Corp Stainless Steel Elbows Which Failed to Meet Acceptance Criteria & for Which Results of Test for Detecting Susceptibility of Intergranular Attack Were Erroneously Recorded.Elbows Returned to Distributor | |
ML17053A530 | 20 March 1979 | Forwards Proprietary Copies of Alternate Load Spec Info Document Applicable to Wetwell Walls,To Replace Info in NUREG-0487.Encl Withheld (Ref 10CFR2.790).W/affidavit | |
ML17053A406 | 5 February 1979 | Forwards GE Topical Rept NEDO-24010-2,Suppl 2,Bases for Criteria for Combination of Earthquake & Other Transient Responses by the Square-Root-Sum-Of-The-Squares Method. Rept Is Provided on Behalf of Mark 2 Owner'S Group | Earthquake |
ML19270F010 | 3 January 1979 | Ack Receipt of IE Insp Rept 50-332/78-06.No Proprietary Info | |
ML20064H103 | 14 November 1978 | Forwards Addl Copies of 781109 Request for Extension of Completion Date Under Constr Permit CPCSF-4 | |
ML20064H104 | 9 November 1978 | Requests That Constr Permit CPCSF-4 for Separations Facil Be Extended to 811231 |