CNL-24-016, Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) | 10 January 2024 | Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) | |
ML23192A447 | 31 July 2023 | Staff Assessment of Updated Seismic Hazards at TVA Sites Following the NRC Process for the Ongoing Assessment of Natural Hazards Information | Probabilistic Risk Assessment Fukushima Dai-Ichi Earthquake |
WBL-23-018, Revised Pressure and Temperature Limits Report (PTLR) | 10 April 2023 | Revised Pressure and Temperature Limits Report (PTLR) | Hydrostatic Pressure and Temperature Limits Report |
CNL-23-002, Application to Revise Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications to Change the Number of Tritium Producing Burnable Absorber Rods (WBN-TS-21-02) and Proposed Revision to Reactor Vessel Surveillance Capsule Removal Sche | 20 March 2023 | Application to Revise Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications to Change the Number of Tritium Producing Burnable Absorber Rods (WBN-TS-21-02) and Proposed Revision to Reactor Vessel Surveillance Capsule Removal Schedu | |
WBL-21-057, Cycle 4 Mid-Cycle Outage Generic Letter 95-05 Voltage-Based Alternate Repair Criteria Final Report | 16 December 2021 | Cycle 4 Mid-Cycle Outage Generic Letter 95-05 Voltage-Based Alternate Repair Criteria Final Report | Safe Shutdown Earthquake Nondestructive Examination Downpower |
CNL-21-018, Application to Adopt TSTF-205-A, Revision of Channel Calibration, Channel Functional Test, and Related Definitions, and TSTF-563-A, Revise Instrument Testing Definitions to Incorporate the Surveillance . | 9 December 2021 | Application to Adopt TSTF-205-A, Revision of Channel Calibration, Channel Functional Test, and Related Definitions, and TSTF-563-A, Revise Instrument Testing Definitions to Incorporate the Surveillance . | Safe Shutdown Shutdown Margin Surveillance Frequency Control Program Pressure Boundary Leakage |
WBL-21-056, Revised Pressure and Temperature Limits Report (PTLR) | 9 December 2021 | Revised Pressure and Temperature Limits Report (PTLR) | Hydrostatic Pressure and Temperature Limits Report |
CNL-21-055, Revision to Refueling Outage 3 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria Final Report | 20 July 2021 | Revision to Refueling Outage 3 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria Final Report | Safe Shutdown Earthquake Nondestructive Examination Downpower |
CNL-21-040, Supplement to Expedited Application for Approval to Use a Growth Rate Temperature Adjustment When Implementing the Generic Letter 95-05 Analysis for the (WBN TS-391-21-002) | 23 March 2021 | Supplement to Expedited Application for Approval to Use a Growth Rate Temperature Adjustment When Implementing the Generic Letter 95-05 Analysis for the (WBN TS-391-21-002) | Nondestructive Examination Foreign Material Exclusion Coast down |
CNL-21-011, Expedited Application for Approval to Use a Growth Rate Temperature Adjustment When Implementing the Generic Letter 95-05 Analysis for the (WBN TS-391-21-002) | 25 February 2021 | Expedited Application for Approval to Use a Growth Rate Temperature Adjustment When Implementing the Generic Letter 95-05 Analysis for the (WBN TS-391-21-002) | Anticipated operational occurrence |
WBL-21-006, Refueling Outage 3 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria Final Report | 11 February 2021 | Refueling Outage 3 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria Final Report | Safe Shutdown Earthquake Nondestructive Examination Downpower |
CNL-20-102, 10 CFR 71.95 Report for 3-60B Casks User | 16 December 2020 | 10 CFR 71.95 Report for 3-60B Casks User | |
WBL-20-066, Revised Pressure and Temperature Limits Report (PTLR) | 16 December 2020 | Revised Pressure and Temperature Limits Report (PTLR) | Hydrostatic Pressure and Temperature Limits Report |
CNL-20-074, Submittal of Additional Supplement to License Amendment Request for Measurement Uncertainty Recapture Power Uprate (WBN-TS-19-06) | 28 August 2020 | Submittal of Additional Supplement to License Amendment Request for Measurement Uncertainty Recapture Power Uprate (WBN-TS-19-06) | |
WBL-20-004, Analysis of Capsule U from Watts Bar Unit 2 Reactor Vessel Radiation Surveillance Program | 16 April 2020 | Analysis of Capsule U from Watts Bar Unit 2 Reactor Vessel Radiation Surveillance Program | |
CNL-19-082, License Amendment Request for Measurement Uncertainty Recapture Power Uprate (WBN-TS-19-06) | 10 October 2019 | License Amendment Request for Measurement Uncertainty Recapture Power Uprate (WBN-TS-19-06) | Safe Shutdown Boric Acid Shutdown Margin Ultimate heat sink Anticipated operational occurrence Safe Shutdown Earthquake Internal Flooding Hydrostatic Coatings Operating Basis Earthquake Cyber Security Emergency Lighting FLEX Pressure and Temperature Limits Report Annual Radioactive Effluent Release Report Process Control Program Time Critical Operator Action Earthquake Maintenance Rule Program Fuel cladding Fire Protection Program Flow Induced Vibration |
L-19-034, Wafts Bar Nuclear Plant, Unit 1 - Technical Specification (TS) 5.9.8 - Post Accident Monitoring System (Pams) Report | 18 June 2019 | Wafts Bar Nuclear Plant, Unit 1 - Technical Specification (TS) 5.9.8 - Post Accident Monitoring System (Pams) Report | Post Accident Monitoring |
L-19-026, Revised Pressure and Temperature Limits Report (PTLR) | 4 April 2019 | Revised Pressure and Temperature Limits Report (PTLR) | Hydrostatic Pressure and Temperature Limits Report |
ML19039A049 | 8 February 2019 | Amd 1 to USAR Chapter 9 Auxiliary System NRC Additional Redactions | Hot Short Safe Shutdown Boric Acid High winds Loop seal Ultimate heat sink Grab sample Fire Barrier Tornado Missile Time to boil Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Operator Manual Action VT-2 Tornado-Generated Missile Tornado Generated Missile Design basis earthquake Tritium Producing Burnable Absorber Rods Earthquake Fuel cladding |
ML17356A269 | 20 December 2017 | Construction Lessons Learned Report | Significance Determination Process |
CNL-17-134, Transmittal of WCAP-18191-NP, Watts Bar Unit 2 Heatup and Cooldown Limit Curves for Normal Operation and Supplemental Reactor Vessel Integrity Evaluations | 13 October 2017 | Transmittal of WCAP-18191-NP, Watts Bar Unit 2 Heatup and Cooldown Limit Curves for Normal Operation and Supplemental Reactor Vessel Integrity Evaluations | Hydrostatic Aging Management |
CNL-17-050, Submission of Technical Reports to Support a Public Meeting Regarding the Transition to the Reactor Oversight Process for the Mitigating Systems Performance Index | 30 May 2017 | Submission of Technical Reports to Support a Public Meeting Regarding the Transition to the Reactor Oversight Process for the Mitigating Systems Performance Index | |
CNL-15-204, Response to NRC Question Regarding the Revised Containment Analysis, Including Enclosure 3, WCAP-17834-NP, Revision 2, Wcobra/Trac Long Term LOCA M&E and Containment Integrity Analysis and Enclosure 4, Affidavit | 21 September 2015 | Response to NRC Question Regarding the Revised Containment Analysis, Including Enclosure 3, WCAP-17834-NP, Revision 2, Wcobra/Trac Long Term LOCA M&E and Containment Integrity Analysis and Enclosure 4, Affidavit | GOTHIC |
CNL-15-143, the Tennessee Valley Authority (TVA) Nuclear Power Group Commercial Grade Dedication Recovery Project - Closure Report | 31 July 2015 | the Tennessee Valley Authority (TVA) Nuclear Power Group Commercial Grade Dedication Recovery Project - Closure Report | Commercial Grade Dedication |
CNL-15-097, Flood Hazard Reevaluation Report for Watts Bar Plant, Response to NRC Request for Information Per 10CFR50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident | 16 June 2015 | Flood Hazard Reevaluation Report for Watts Bar Plant, Response to NRC Request for Information Per 10CFR50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident | Ultimate heat sink Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Fukushima Dai-Ichi Earthquake |
CNL-15-039, Severe Accident Management Alternatives for Reactor Coolant Pump Seals | 10 April 2015 | Severe Accident Management Alternatives for Reactor Coolant Pump Seals | Internal Flooding Probabilistic Risk Assessment FLEX Large early release frequency Earthquake |
ML15030A508 | 30 January 2015 | Tritium Production Program, Updated Plans for Cycle 13 Operation and Updated Evaluation of the Radiological Impacts of Tritium Permeation Into the Reactor Coolant System | Offsite Dose Calculation Manual |
ML14100A039 | 2 April 2014 | Submittal of Pre-Operational Test Instruction | Stroke time Temporary Modification Scaffolding |
CNL-14-038, Tennessee Valley Authority'S Seismic Hazard & Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Recommendation 2.1 of Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Acc | 31 March 2014 | Tennessee Valley Authority'S Seismic Hazard & Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Recommendation 2.1 of Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accid | Safe Shutdown Boric Acid Mission time Safe Shutdown Earthquake Probabilistic Risk Assessment Fukushima Dai-Ichi Seismically rugged Design basis earthquake Earthquake Seismic Walkdown Report |
ML13338A683 | 26 November 2013 | Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Watts Bar Nuclear Plant, Units 1 and 2, TAC MF0950 and MF1177 | Safe Shutdown Boric Acid High winds Shutdown Margin Ultimate heat sink Safe Shutdown Earthquake Internal Flooding Operating Basis Earthquake Emergency Lighting FLEX Tornado Generated Missile Fukushima Dai-Ichi Frazil ice Earthquake |
ML13196A376 | 9 July 2013 | Submittal of Pre-op Test Instructions | Stroke time Temporary Modification |
ML13206A004 | 24 June 2013 | Methodology for Evaluating the Potential for Multiple Dam Failures Due to Seismic Events | Hydrostatic Probabilistic Risk Assessment Earthquake |
ML13115A036 | 11 April 2013 | Engineering Information Record 51-9198783-000, Watts Bar WBN1C11 SG Inspection 180-Day Report | Nondestructive Examination |
ML13148A014 | 4 April 2013 | Preoperational Test, 2-PTI-068-13, Rev. 1, Shutdown from Outside the Main Control Room. | Temporary Modification |
ML13162A310 | 3 April 2013 | 2-PTI-002-01, Rev 000, Condensate System. | |
ML13081A002 | 13 March 2013 | Revised Watts Bar Nuclear Plant Unit 1/Unit 2 As-Designed Fire Protection Report. Part 1 of 2 | |
ML13081A003 | 13 March 2013 | Revised Watts Bar Nuclear Plant Unit 1/Unit 2 As-Designed Fire Protection Report. Part 2 of 2 | |
ML13162A311 | 25 February 2013 | 2-PTI-026-01, Rev 000, High Pressure Fire Protection. | Stroke time Hydrostatic Fire impairment Temporary Modification Scaffolding |
ML13050A398 | 31 January 2013 | 2-PTI-072-01, Rev 000, Containment Spray Pump Value Logic Test. | Stroke time Arc flash |
ML13044A114 | 31 January 2013 | Multiple Spurious Operation Evaluation Report R1976-20-01, Dated January 2013, Revision 2 | Hot Short Safe Shutdown Boric Acid Fire Barrier Enforcement Discretion Operator Manual Action Multiple Spurious Operation Emergency Lighting Hemyc |
ML13162A312 | 16 November 2012 | 2-PTI-003A-03, Rev 000, Main Feedwater System Functional Test. | Scaffolding |
ML12298A059 | 18 October 2012 | Submittal of 2-PTI-099-05, Rev 0, Overpower Delta-T & Overtemperature Delta-T Turbine Runback. | |
ML13050A397 | 20 August 2012 | 2-PTI-068-04, Rev 000, Pressurizer Relief Tank. | Stroke time |
ML12236A165 | 19 July 2012 | Application to Revise Watts Bar Nuclear Plant (WBN) Unit 1 Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis (WBN-UFSAR-12-01) | Safe Shutdown Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Temporary Modification Finite Element Analysis Earthquake |
ML12215A338 | 29 February 2012 | Enclosure 2, WCAP-17309-NP, Rev. 1, Watts Bar, Unit 2 Evaluation for Tube Vibration Induced Fatigue | Finite Element Analysis |
ML12073A392 | 29 February 2012 | WNA-VR-00283-WBT-NP, Rev. 7, Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I&C Projects Iv&V Summary Report for the Post Accident Monitoring System. Attachment 2 | Commercial Grade Dedication Post Accident Monitoring |
ML12073A225 | 28 February 2012 | Attachment 6, TVA Calculation WBPEVAR8807025, Revision 8, Bypassed and Inoperable Status Indication Logic Input Indications (Letter Item 4) | Safe Shutdown Boric Acid |
ML12073A359 | 28 February 2012 | WBT-D-3769 Np, Common Q Pams Secure Development and Operational Environment Sser 23 Appendix Hh Action Item 98 Requests for Additional Information | Hot Short Safe Shutdown Boric Acid Ultimate heat sink Fire Barrier Commercial Grade Dedication Post Accident Monitoring Coatings Operator Manual Action Cyber Security Siren Power Uprate Affidavit |
ML12034A166 | 31 January 2012 | WBT-D-3753 NP-Enclosure - Clarification of Dielectric Withstand Testing in Response to WNA-CN-00157-WBT | |
ML12069A327 | 19 January 2012 | Attachment 17 - Ametek Report No. TR-1136, Qualification Documentation Review Package for Ametek Aerospace Gulton-Statham Products Nuclear Qualified Pressure Transmitter Series Enveloping --- Gage Pressure Transmitter Series Pg 3200, Differ | Anticipated operational occurrence Safe Shutdown Earthquake Post Accident Monitoring Hydrostatic Operating Basis Earthquake Earthquake Fire Protection Program Reverse polarity Weak link |