 Issue dateTitleTopic
CNL-24-016, Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)10 January 2024Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)
ML23192A44731 July 2023Staff Assessment of Updated Seismic Hazards at TVA Sites Following the NRC Process for the Ongoing Assessment of Natural Hazards InformationProbabilistic Risk Assessment
Fukushima Dai-Ichi
Earthquake
WBL-23-018, Revised Pressure and Temperature Limits Report (PTLR)10 April 2023Revised Pressure and Temperature Limits Report (PTLR)Hydrostatic
Pressure and Temperature Limits Report
CNL-23-002, Application to Revise Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications to Change the Number of Tritium Producing Burnable Absorber Rods (WBN-TS-21-02) and Proposed Revision to Reactor Vessel Surveillance Capsule Removal Sche20 March 2023Application to Revise Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications to Change the Number of Tritium Producing Burnable Absorber Rods (WBN-TS-21-02) and Proposed Revision to Reactor Vessel Surveillance Capsule Removal Schedu
WBL-21-057, Cycle 4 Mid-Cycle Outage Generic Letter 95-05 Voltage-Based Alternate Repair Criteria Final Report16 December 2021Cycle 4 Mid-Cycle Outage Generic Letter 95-05 Voltage-Based Alternate Repair Criteria Final ReportSafe Shutdown Earthquake
Nondestructive Examination
Downpower
CNL-21-018, Application to Adopt TSTF-205-A, Revision of Channel Calibration, Channel Functional Test, and Related Definitions, and TSTF-563-A, Revise Instrument Testing Definitions to Incorporate the Surveillance .9 December 2021Application to Adopt TSTF-205-A, Revision of Channel Calibration, Channel Functional Test, and Related Definitions, and TSTF-563-A, Revise Instrument Testing Definitions to Incorporate the Surveillance .Safe Shutdown
Shutdown Margin
Surveillance Frequency Control Program
Pressure Boundary Leakage
WBL-21-056, Revised Pressure and Temperature Limits Report (PTLR)9 December 2021Revised Pressure and Temperature Limits Report (PTLR)Hydrostatic
Pressure and Temperature Limits Report
CNL-21-055, Revision to Refueling Outage 3 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria Final Report20 July 2021Revision to Refueling Outage 3 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria Final ReportSafe Shutdown Earthquake
Nondestructive Examination
Downpower
CNL-21-040, Supplement to Expedited Application for Approval to Use a Growth Rate Temperature Adjustment When Implementing the Generic Letter 95-05 Analysis for the (WBN TS-391-21-002)23 March 2021Supplement to Expedited Application for Approval to Use a Growth Rate Temperature Adjustment When Implementing the Generic Letter 95-05 Analysis for the (WBN TS-391-21-002)Nondestructive Examination
Foreign Material Exclusion
Coast down
CNL-21-011, Expedited Application for Approval to Use a Growth Rate Temperature Adjustment When Implementing the Generic Letter 95-05 Analysis for the (WBN TS-391-21-002)25 February 2021Expedited Application for Approval to Use a Growth Rate Temperature Adjustment When Implementing the Generic Letter 95-05 Analysis for the (WBN TS-391-21-002)Anticipated operational occurrence
WBL-21-006, Refueling Outage 3 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria Final Report11 February 2021Refueling Outage 3 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria Final ReportSafe Shutdown Earthquake
Nondestructive Examination
Downpower
CNL-20-102, 10 CFR 71.95 Report for 3-60B Casks User16 December 202010 CFR 71.95 Report for 3-60B Casks User
WBL-20-066, Revised Pressure and Temperature Limits Report (PTLR)16 December 2020Revised Pressure and Temperature Limits Report (PTLR)Hydrostatic
Pressure and Temperature Limits Report
CNL-20-074, Submittal of Additional Supplement to License Amendment Request for Measurement Uncertainty Recapture Power Uprate (WBN-TS-19-06)28 August 2020Submittal of Additional Supplement to License Amendment Request for Measurement Uncertainty Recapture Power Uprate (WBN-TS-19-06)
WBL-20-004, Analysis of Capsule U from Watts Bar Unit 2 Reactor Vessel Radiation Surveillance Program16 April 2020Analysis of Capsule U from Watts Bar Unit 2 Reactor Vessel Radiation Surveillance Program
CNL-19-082, License Amendment Request for Measurement Uncertainty Recapture Power Uprate (WBN-TS-19-06)10 October 2019License Amendment Request for Measurement Uncertainty Recapture Power Uprate (WBN-TS-19-06)Safe Shutdown
Boric Acid
Shutdown Margin
Ultimate heat sink
Anticipated operational occurrence
Safe Shutdown Earthquake
Internal Flooding
Hydrostatic
Coatings
Operating Basis Earthquake
Cyber Security
Emergency Lighting
FLEX
Pressure and Temperature Limits Report
Annual Radioactive Effluent Release Report
Process Control Program
Time Critical Operator Action
Earthquake
Maintenance Rule Program
Fuel cladding
Fire Protection Program
Flow Induced Vibration
L-19-034, Wafts Bar Nuclear Plant, Unit 1 - Technical Specification (TS) 5.9.8 - Post Accident Monitoring System (Pams) Report18 June 2019Wafts Bar Nuclear Plant, Unit 1 - Technical Specification (TS) 5.9.8 - Post Accident Monitoring System (Pams) ReportPost Accident Monitoring
L-19-026, Revised Pressure and Temperature Limits Report (PTLR)4 April 2019Revised Pressure and Temperature Limits Report (PTLR)Hydrostatic
Pressure and Temperature Limits Report
ML19039A0498 February 2019Amd 1 to USAR Chapter 9 Auxiliary System NRC Additional RedactionsHot Short
Safe Shutdown
Boric Acid
High winds
Loop seal
Ultimate heat sink
Grab sample
Fire Barrier
Tornado Missile
Time to boil
Safe Shutdown Earthquake
Hydrostatic
Operating Basis Earthquake
Operator Manual Action
VT-2
Tornado-Generated Missile
Tornado Generated Missile
Design basis earthquake
Tritium Producing Burnable Absorber Rods
Earthquake
Fuel cladding
ML17356A26920 December 2017Construction Lessons Learned ReportSignificance Determination Process
CNL-17-134, Transmittal of WCAP-18191-NP, Watts Bar Unit 2 Heatup and Cooldown Limit Curves for Normal Operation and Supplemental Reactor Vessel Integrity Evaluations13 October 2017Transmittal of WCAP-18191-NP, Watts Bar Unit 2 Heatup and Cooldown Limit Curves for Normal Operation and Supplemental Reactor Vessel Integrity EvaluationsHydrostatic
Aging Management
CNL-17-050, Submission of Technical Reports to Support a Public Meeting Regarding the Transition to the Reactor Oversight Process for the Mitigating Systems Performance Index30 May 2017Submission of Technical Reports to Support a Public Meeting Regarding the Transition to the Reactor Oversight Process for the Mitigating Systems Performance Index
CNL-15-204, Response to NRC Question Regarding the Revised Containment Analysis, Including Enclosure 3, WCAP-17834-NP, Revision 2, Wcobra/Trac Long Term LOCA M&E and Containment Integrity Analysis and Enclosure 4, Affidavit21 September 2015Response to NRC Question Regarding the Revised Containment Analysis, Including Enclosure 3, WCAP-17834-NP, Revision 2, Wcobra/Trac Long Term LOCA M&E and Containment Integrity Analysis and Enclosure 4, AffidavitGOTHIC
CNL-15-143, the Tennessee Valley Authority (TVA) Nuclear Power Group Commercial Grade Dedication Recovery Project - Closure Report31 July 2015the Tennessee Valley Authority (TVA) Nuclear Power Group Commercial Grade Dedication Recovery Project - Closure ReportCommercial Grade Dedication
CNL-15-097, Flood Hazard Reevaluation Report for Watts Bar Plant, Response to NRC Request for Information Per 10CFR50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident16 June 2015Flood Hazard Reevaluation Report for Watts Bar Plant, Response to NRC Request for Information Per 10CFR50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi AccidentUltimate heat sink
Safe Shutdown Earthquake
Hydrostatic
Operating Basis Earthquake
Fukushima Dai-Ichi
Earthquake
CNL-15-039, Severe Accident Management Alternatives for Reactor Coolant Pump Seals10 April 2015Severe Accident Management Alternatives for Reactor Coolant Pump SealsInternal Flooding
Probabilistic Risk Assessment
FLEX
Large early release frequency
Earthquake
ML15030A50830 January 2015Tritium Production Program, Updated Plans for Cycle 13 Operation and Updated Evaluation of the Radiological Impacts of Tritium Permeation Into the Reactor Coolant SystemOffsite Dose Calculation Manual
ML14100A0392 April 2014Submittal of Pre-Operational Test InstructionStroke time
Temporary Modification
Scaffolding
CNL-14-038, Tennessee Valley Authority'S Seismic Hazard & Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Recommendation 2.1 of Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Acc31 March 2014Tennessee Valley Authority'S Seismic Hazard & Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Recommendation 2.1 of Near-Term Task Force Review of Insights from the Fukushima Dai-ichi AccidSafe Shutdown
Boric Acid
Mission time
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Fukushima Dai-Ichi
Seismically rugged
Design basis earthquake
Earthquake
Seismic Walkdown Report
ML13338A68326 November 2013Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Watts Bar Nuclear Plant, Units 1 and 2, TAC MF0950 and MF1177Safe Shutdown
Boric Acid
High winds
Shutdown Margin
Ultimate heat sink
Safe Shutdown Earthquake
Internal Flooding
Operating Basis Earthquake
Emergency Lighting
FLEX
Tornado Generated Missile
Fukushima Dai-Ichi
Frazil ice
Earthquake
ML13196A3769 July 2013Submittal of Pre-op Test InstructionsStroke time
Temporary Modification
ML13206A00424 June 2013Methodology for Evaluating the Potential for Multiple Dam Failures Due to Seismic EventsHydrostatic
Probabilistic Risk Assessment
Earthquake
ML13115A03611 April 2013Engineering Information Record 51-9198783-000, Watts Bar WBN1C11 SG Inspection 180-Day ReportNondestructive Examination
ML13148A0144 April 2013Preoperational Test, 2-PTI-068-13, Rev. 1, Shutdown from Outside the Main Control Room.Temporary Modification
ML13162A3103 April 20132-PTI-002-01, Rev 000, Condensate System.
ML13081A00213 March 2013Revised Watts Bar Nuclear Plant Unit 1/Unit 2 As-Designed Fire Protection Report. Part 1 of 2
ML13081A00313 March 2013Revised Watts Bar Nuclear Plant Unit 1/Unit 2 As-Designed Fire Protection Report. Part 2 of 2
ML13162A31125 February 20132-PTI-026-01, Rev 000, High Pressure Fire Protection.Stroke time
Hydrostatic
Fire impairment
Temporary Modification
Scaffolding
ML13050A39831 January 20132-PTI-072-01, Rev 000, Containment Spray Pump Value Logic Test.Stroke time
Arc flash
ML13044A11431 January 2013Multiple Spurious Operation Evaluation Report R1976-20-01, Dated January 2013, Revision 2Hot Short
Safe Shutdown
Boric Acid
Fire Barrier
Enforcement Discretion
Operator Manual Action
Multiple Spurious Operation
Emergency Lighting
Hemyc
ML13162A31216 November 20122-PTI-003A-03, Rev 000, Main Feedwater System Functional Test.Scaffolding
ML12298A05918 October 2012Submittal of 2-PTI-099-05, Rev 0, Overpower Delta-T & Overtemperature Delta-T Turbine Runback.
ML13050A39720 August 20122-PTI-068-04, Rev 000, Pressurizer Relief Tank.Stroke time
ML12236A16519 July 2012Application to Revise Watts Bar Nuclear Plant (WBN) Unit 1 Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis (WBN-UFSAR-12-01)Safe Shutdown
Safe Shutdown Earthquake
Hydrostatic
Operating Basis Earthquake
Temporary Modification
Finite Element Analysis
Earthquake
ML12215A33829 February 2012Enclosure 2, WCAP-17309-NP, Rev. 1, Watts Bar, Unit 2 Evaluation for Tube Vibration Induced FatigueFinite Element Analysis
ML12073A39229 February 2012WNA-VR-00283-WBT-NP, Rev. 7, Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I&C Projects Iv&V Summary Report for the Post Accident Monitoring System. Attachment 2Commercial Grade Dedication
Post Accident Monitoring
ML12073A22528 February 2012Attachment 6, TVA Calculation WBPEVAR8807025, Revision 8, Bypassed and Inoperable Status Indication Logic Input Indications (Letter Item 4)Safe Shutdown
Boric Acid
ML12073A35928 February 2012WBT-D-3769 Np, Common Q Pams Secure Development and Operational Environment Sser 23 Appendix Hh Action Item 98 Requests for Additional InformationHot Short
Safe Shutdown
Boric Acid
Ultimate heat sink
Fire Barrier
Commercial Grade Dedication
Post Accident Monitoring
Coatings
Operator Manual Action
Cyber Security
Siren
Power Uprate
Affidavit
ML12034A16631 January 2012WBT-D-3753 NP-Enclosure - Clarification of Dielectric Withstand Testing in Response to WNA-CN-00157-WBT
ML12069A32719 January 2012Attachment 17 - Ametek Report No. TR-1136, Qualification Documentation Review Package for Ametek Aerospace Gulton-Statham Products Nuclear Qualified Pressure Transmitter Series Enveloping --- Gage Pressure Transmitter Series Pg 3200, DifferAnticipated operational occurrence
Safe Shutdown Earthquake
Post Accident Monitoring
Hydrostatic
Operating Basis Earthquake
Earthquake
Fire Protection Program
Reverse polarity
Weak link