2-PTI-072-01, Rev 000, Containment Spray Pump Value Logic Test.
ML13050A398
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 01/31/2013
From: Boudreaux C
Tennessee Valley Authority
To:
Office of Nuclear Reactor Regulation
References
2-PTI-072-01, Rev 0
Download: ML13050A398 (249)


Text

WATTS BAR NUCLEAR PLANT UNIT 2 PREOPERATIONAL TEST TITLE: CONTAINMENT SPRAY PUMP VALVE LOGIC TEST Instruction No: 2-PTI-072-01 Revision No: 0 PREPARED BY: (ý4\f1$ ý)DU ýVqasi 0113 42 DATE: 1, ~/-30 PRINT NAME / SIGNATURE REVIEWED BY: DATE: 1-31-13 PRINT NAME / SIGNATURE INSTRUCTION APPROVAL JTG MEETING No: Z)

JTG CHAIRMAN: DATE: /- 31-/3 APPROVED BY:A-1 J DATE: 1-/ -L*-3 P7qPRTIONAL TARTUP MNAGER TEST RESULTS APPROVAL JTG MEETING No:

JTG CHAIRMAN: DATE:

APPROVED BY: DATE:

PREOPERATIONAL STARTUP MANAGER SMP-8.0, Administration of Preoperational Test instructions, Appendix B 12107/2010

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 2 of 249 Revision Log Revision Affected or Change Effective Page Number Date Numbers Description of Revision/Change 0000 All Initial revision. Created from microfilm copy of Unit 1 PTI-072-01, Rev 0 and CN-01 through CN-05.

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 3 of 249 Table of Contents

1.0 INTRODUCTION

................................................................................................... 5 1.1 Test Objectives ........................................................................................................ 5 1.2 Sc o p e ............................................................................................................................ 5

2.0 REFERENCES

..................................................................................................... 6 2.1 Performance References ......................................................................................... 6 2.2 Developmental References ...................................................................................... 6 3.0 PRECAUTIONS AND LIMITATIONS ..................................................................... 13 4.0 PREREQUISITE ACTIONS .................................................................................... 16 4.1 Preliminary Actions ................................................................................................ 16 4.2 Special Tools, Measuring and Test Equipment, Parts, and Supplies ...................... 21 4.3 Field Preparations .................................................................................................. 22 4.4 Approvals and Notifications ................................................................................... 34 5.0 ACCEPTANCE CRITERIA ...................................................................................... 35 6.0 PERFORMANCE ........................................................................................................ 42 6.1 2-FCV-72-34 Logic/Stroke Timing ........................................................................... 42 6.2 2-FCV-72-13 Logic/Stroke Timing ........................................................................... 51 6.3 2-FCV-72-22, and 2-FCV-72-44 Logic /Stroke Timing ........................................... 59 6.4 2-FCV-72-21, and 2-FCV-72-45 Logic /Stroke Timing ........................................... 76 6.5 2-FCV-72-40 Logic/Stroke Timing .......................................................................... 93 6.6 2-FCV-72-41 Logic/Stroke Timing ............................................................................. 103 6.7 2-FCV-72-39 Logic/Stroke Timing ............................................................................ 113 6.8 2-FCV-72-2 Logic/Stroke Timing .............................................................................. 126 6.9 Containment Spray Pump 2A-A Logic Test .............................................................. 138 6.10 Containment Spray Pump 2B-B Logic Test .............................................................. 154 6.11 Containment Spray Pump 2A-A Flow Performance Test .......................................... 170 6.12 Containment Spray Pump 2B-B Flow Performance Test .......................................... 177 7.0 POST-PERFORMANCE ACTIVITIES ...................................................................... 184

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 4 of 249 Table of Contents (continued) 8.0 RECORDS ................................................................................................................ 188 Appendix A: Procedures/Instructions Reference Review ......................................... 189 Appendix B: Tem porary Condition Log ...................................................................... 190 Appendix C: Sw itch Lineup ......................................................................................... 191 Appendix D: B reaker Lineup ........................................................................................ 194 Appendix E: Permanent Plant Instrumentation Log .................................................. 199 Appendix F: Computer Point Verification Log ........................................................... 202 Appendix G: Containment Spray Pump 2A-A Computer Point Tem perature Data ................................................................................... 205 Appendix H: Containment Spray Pump 2A-A Performance Data Sheet .................. 208 Appendix 1: Containment Spray Pump 2B-B Computer Point Tem perature Data ................................................................................... 225 Appendix J: Containment Spray Pump 2B-B Performance Data ............................. 228 Appendix K: Containment Spray System Train A Operating Param eters .............................................................................................. 245 Appendix L: Containment Spray System Train B Operating Param eters .............................................................................................. 247 Appendix M: Breaker Response Timer Setup ............................................................. 249

1.0 INTRODUCTION

1.1 Test Objectives This test is being performed to demonstrate the operability of the Containment Spray System (CSS) under conditions as close to design as possible.

The Containment Spray (CS) Headers will not be tested in this PTI and will be verified under 2-PTI-072-02.

1.2 Scope Verify System 72, CSS components function according to design requirements and required safety functions. This includes the following:

A. Pump and valve logic will be tested B. CS pumps will be operated to verify miniflow conditions C. Proper CS pump operation at design flow conditions through the recirculation test flow path, miniflow path, and heat exchangers D. Proper operation of CSS motor operated valves under no-load conditions E. Proper operation of the CS pump breakers F. Proper operation of transfer switch alarms G. Proper operation of the CS system motor operated valves interlocks

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 6 of 249

2.0 REFERENCES

2.1 Performance References A. SMP-9.0, Conduct Of Test B. SMP-15.0, Status And Control Of Isolation Devices C. 2-TOP-072-01, Temporary Operating Plan for Containment Spray D. 2-TOP-074-01, Temporary Operating Plan for Residual Heat Removal E. 2-PTI-999-01, Operation Vibration Testing F. TI-300, Electrical Arc Flash Personal Protective Equipment & Protective Boundary Matrices G. SOI-30.05, Auxiliary Building HVAC Systems H. TVA Safety Manual Procedure 801, Confined Space Entry I. TVA Safety Manual Procedure 1021, Working on / or Near Energized Electrical Equipment J. GOI-7, Generic Equipment Operating Guidelines 2.2 Developmental References A. Unit 2 Final Safety Analysis Report - Amendment 109

1. Table 14.2-1, Sheet 25 of 89, Containment Spray System Test Summary B. Drawings
1. Flow Diagrams
a. 2-47W812-1, Rev 10 (CC)

Flow Diagram Containment Spray System

b. 2-47W811-1, Rev 12 (CC)

Flow Diagram Safety Injection System

c. 2-47W81 0-1, Rev 8 (CC)

Flow Diagram Residual Heat Removal System

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 7 of 249 2.2 Developmental References (continued)

2. Electrical
a. 2-45W760-72-1, Rev 3 (CC)

Wiring Diagrams Containment Spray System Schematic Diagram

b. 2-45W760-72-2, Rev 2 (CC)

Wiring Diagrams Containment Spray System Schematic Diagram

c. 2-45W760-72-3, Rev 1 (CC)

Wiring Diagrams Containment Spray System Schematic Diagram

d. 2-45W760-72-4, Rev 1 (CC)

Wiring Diagrams Containment Spray System Schematic Diagram

e. 1-45W760-211-13, Rev 14 (CC)

Wiring Diagram 6900V Shutdown Power 2A-A Schematic Diagrams

f. 1-45W760-211-15, Rev 24 (CC)

Wiring Diagrams 6900V Shutdown Power 2B-B Schematic Diagrams

g. 2-45W760-270-2, Rev 2 (CC)

Wiring Diagrams Miscellaneous System Schematic Diagrams

h. 2-45W760-30-19, Rev 2 (CC)

Wiring Diagrams Ventilating System Schematic Diagrams

i. 2-45W600-57-6, Rev 2 (CC)

Wiring Diagrams Separation, Misc Aux Relays Schematic Diagram

j. 1-45W760-55-1A, Rev 14 (CC)

Wiring Diagrams Annunciator System Schematic Diagrams

k. 1-45W760-55-2A, Rev 12 (CC)

Wiring Diagrams Annunciator System Schematic Diagrams

1. 1-45W760-55-3A, Rev 3 (CC)

Wiring Diagrams Annunciator System Schematic Diagrams

m. 45N2645-5, Rev G (AC)

Wiring Diagrams Unit Control Board - Panel 2-M-6 Connection Diagrams SH-5

n. 45N2645-9, Rev 12 (AD)

Wiring Diagrams Unit Control Board - Panel 2-M-6 Connection Diagrams SH-9

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 8 of 249 2.2 Developmental References (continued)

o. 45N2676-5, Rev L (AC)

Wiring Diagrams Solid State Protection Sys Train "A" Connection Diagrams SH-5 (1) 54255-096, Rev 0

p. 45N2677-5, Rev 9 (AD)

Wiring Diagrams Solid State Protection Sys Train "B" Connection Diagrams SH-5

q. 45W2766-1, R17 (AD)

Wiring Diagrams 480V Reactor MOV BD 2A1-A Connection Diagram

r. 45W2766-2, R20 (AD)

Wiring Diagrams 480V Reactor MOV BD 2A1-A Connection Diagram (1) 54255-017, Rev 1

s. 45W2766-3, R12 (AD)

Wiring Diagrams 480V Reactor MOV BD 2A1-A Connection Diagram (1) 54255-014, Rev 0 (2) 54255-015, Rev 1 (3) 54255-036, Rev 1 (4) 54255-045, Rev 0 (5) 54255-070, Rev 0 (6) 54255-098, Rev 0

t. 45W2768-2, Rev 16 (AD)

Wiring Diagrams 480V Reactor MOV BD 2B1-B Connection Diagram

u. 45W2768-3, Rev 20 (AD)

Wiring Diagrams 480V Reactor MOV BD 2B1-B Connection Diagram (1) 54255-011, Rev 1 (2) 54255-084, Rev 0

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 9 of 249 2.2 Developmental References (continued)

v. 45W2768-5, Rev 14 (AD)

Wiring Diagrams 480V Reactor MOV BD 2B1-B Connection Diagram (1) 54255-010, Rev 1

w. 45W2768-6, Rev 10 (AD)

Wiring Diagrams 480V Reactor MOV BD 2B1-B Connection Diagram (1) 54255-010, Rev 1

x. 45W2770-5, Rev 12 (AD)

Wiring Diagrams 480V Cont & Aux Bldg Vent BD 2A1-A Connection Diagram (1) 54255-050, Rev 1 (2) 54255-052, Rev 1

y. 45W2772-5, Rev 13(AD)

Wiring Diagrams 480V Cont & Aux Bldg Vent BD 2B1-B Connection Diagram (1) 54255-059, Rev 1 (2) 54255-061, Rev 1

3. Mechanical None
4. Logic/Control None

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 10 of 249 2.2 Developmental References (continued)

5. Annunciator
a. 2-45B655-1B, Rev 1 (CC)

Main Control Room Annunciator Inputs Window Box XA-55-1 B

b. 2-45B655-6D, Rev 2 (CC)

Main Control Room Annunciator Inputs Window Box XA-55-6D

c. 2-45B655-6F, Rev 0 (CC)

Main Control Room Annunciator Inputs Window Box XA-55-6F

d. 2-45B655-E1 B, Rev 0 (CC)

Annunciator Window Box XA-55-1 B Engraving

e. 2-45B655-E6D, Rev 1 (CC)

Annunciator Window Box XA-55-6D Engraving

f. 2-45B655-E6F, Rev 0 (CC)

Annunciator Window Box XA-55-6F Engraving

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 11 of 249 2.2 Developmental References (continued)

6. Vendor Drawing
a. 0126D4453, Rev 907 (AD), 6900V Shutdown Board 2A-A, compartment 13 Metal-Clad Switchgear Connection Diagram, (Contract No. 74-84376)
b. 0126D4512, Rev 907 (AD), 6900V Shutdown Board 2B-B, compartment 13 Metal-Clad Switchgear Connection Diagram, (Contract No. 74-84376)
c. 8756D77 Sheet 6, Rev 3 (MD),

Safeguards Test Cabinet, (Contract No. 71 C62-54114-1)

d. 7246D1 1 Sheet 56, Rev 6 (MD)

Solid State Protection System Interconnection Diagram, (Contract No. 71C62-54114-1)

e. 7246D1 1 Sheet 23, Rev 7 (MD)

Solid State Protection System Interconnection Diagram, (Contract No. 71C62-54114-1)

f. 1082H70 Sheet 19, Rev AF (MD)

Containment Pressure

g. 1082H70 Sheet 20A, Rev AP (MD)

Containment Pressure C. Documents

1. Vendor Manuals
a. WBN-VTM-W120-0050, Containment Spray Pump Vendor Manual, Rev 5
2. Surveillance Instructions
a. 1-SI-99-644-A, Rev 0007, Response Time Test - Containment Spray Relay K644 - Train A
3. System Description
a. WBN2-72-4001, System Description for Containment Heat Removal Spray System, Rev 1

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 12 of 249 2.2 Developmental References (continued)

4. Setpoint Scaling Documents
a. 2-F-72-13 Rev 0
b. 2-F-72-34 Rev 0
c. 2-62-72-34-A Rev 0
d. 2-62-72-13-B Rev 0
5. Test Scoping Documents
a. 2-TSD-030A-1, Rev. 0002 Select Auxiliary Building ESF Coolers and HELB Detection
b. 2-TSD-72-1, Rev. 0003 Containment Heat Removal Spray System
6. Other
a. Cameron Hydraulic Data, 19th edition

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 13 of 249 3.0 PRECAUTIONS AND LIMITATIONS A. The following pump/motor operating limitations apply during performance of this test:

CS Pumps Motor Bearings Max. 185 0F from bearing thermocouple Max. 140OF when read from housing surface Motor Stator Max. 126 0 F greater than ambient Pump Bearings Max 160°F inboard bearing Max 165 0F outboard bearing Vibration Max 1 mil, peak to peak at 1775 Hz B. GOI-7, Section 5.2.5, Motor Operating and Starting Limitations should be observed when starting CS Pumps.

C. Do NOT operate pumps without a flowpath established.

D. Do NOT exceed CS Pump runout limit of 4950 gpm.

E. Do NOT exceed 4750 gpm during full flow testing of the CS Pumps to ensure Maximum Heat Exchanger tube side flow is avoided.

F. Steps may be repeated if all components cannot be tested in a step. However, if the test has been exited, prerequisite steps must be re-verified and a Chronological Test Log (CTL) entry made.

G. All wires removed/lifted from a terminal shall be identified and taped or covered with an insulator to prevent personnel or equipment hazard and possible spurious initiations. The wires should be grouped together and labeled with the work implementing document number that required them to be lifted if left unattended.

H. Observe all Radiation Protection (RP) requirements when working in or near radiological areas.

I. Test personnel will coordinate with Unit 1 Operations when manipulating Unit 1 equipment.

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 14 of 249 3.0 PRECAUTIONS AND LIMITATIONS (continued)

J. System water chemistry is within system specifiable parameters especially for fluids supplied from external sources.

K. Standard precautions shall be followed for working in confined spaces in accordance with TVA Safety Manual Procedure 801.

L. Standard precautions shall be followed for working around energized electrical equipment in accordance with TVA Safety Manual Procedure 1021 and TI-300.

M. Water from the Refueling Water Storage Tank (RWST) must NOT be allowed to enter the Containment Sump.

N. Water flow through CS and Residual Heat Removal (RHR) Spray Header isolation Valves 2-FCV-72-39, 2-FCV-72-2, 2-FCV-72-40, and 2-FCV-72-41 must NOT be permitted. Ensure these valves are locked closed and under administrative control. Valves can be tested only when system is at static conditions.

0. Ensure the CS Pumps are properly filled, vented, and the adequate Net Positive Suction Head (NPSH) is available prior to operation.

P. The CS test line is orificed to prevent pump run-out while performing a full-flow test. Only one pump at a time may be tested with this arrangement.

Q. Discrepancies between component ID tags and the description in a procedure/instruction do not require a Test Deficiency Notice (TDN), in accordance with SMP-14.0, if the UNIDs match, exclusive of place keeping zeros and train designators (e.g.; 2-HS-31-468 vs. 2-HS-031-0468) and the noun description is sufficient to identify the component. Ifthe component label needs to be changed, a Tag Request Form (TR Card) should be processed in accordance with TI-12.14. Make an entry in the CTL and continue testing.

R. All open problems are to be tracked by a corrective action document and entered on the appropriate system punchlist.

S. Problems identified during the test shall be annotated on the Chronological Test Log from SMP-9.0 including a description of the problem, the procedure step when/where the problem was identified, corrective action steps taken to resolve the problem, and the number of the corrective action document, if one was required.

T. Ensure there are no adverse effects to the operation of Unit 1 structures, systems, or components.

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 15 of 249 3.0 PRECAUTIONS AND LIMITATIONS (continued)

U. During the performance of this procedure visual observation of piping and components is required. This includes steady state and transient operations with visual confirmation that vibration is not excessive.

V. If the vibration is determined to be excessive the Test Engineer shall initiate a TDN.

W. MCC run lights are only lit while the motor is operating. Any steps requiring observation of run lights may have to be repeated if the light verification is missed.

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 16 of 249 4.0 PREREQUISITE ACTIONS NOTE Prerequisite steps may be performed in any order unless otherwise stated and should be completed as close in time as practicable to the start of the instruction subsection to which they apply.

4.1 Preliminary Actions

[1] EVALUATE open items in Watts Bar Integrated Task Equipment List (WITEL), AND ENSURE they will NOT adversely affect the test performance and results.

[2] VERIFY current revisions and change paper for referenced drawings has been reviewed and determined NOT to adversely affect the test performance, AND ATTACH documentation of current drawing revision numbers and change paper that were reviewed to the data package.

[3] ENSURE changes to the references listed on Appendix A, have been reviewed, and determined NOT to adversely affect the test performance.

[4] VERIFY the test/performance copy of this Preoperational Test Instruction (PTI) is the current revision including any change notices and as needed, each test person assisting in this test has the current revision including any change notices.

[5] ENSURE outstanding Design Change Notices (DCN's),

Engineering Document Construction Releases (EDCR's) or Temporary Alterations (TA's) do NOT adversely impact testing, AND ATTACH documentation of DCN's, EDCR's and TA's that were reviewed to the data package.

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 17 of 249 4.1 Preliminary Actions (continued)

[6] ENSURE required Component Testing has been completed prior to start of test.

A. Subsection 6.1 B. Subsection 6.2 C. Subsection 6.3 D. Subsection 6.4 E. Subsection 6.5 F. Subsection 6.6 G. Subsection 6.7 H. Subsection 6.8 I. Subsection 6.9 J. Subsection 6.10 K. Subsection 6.11 L. Subsection 6.12

[7] VERIFY System cleanness as required for the performance of this test has been completed in accordance with SMP-7.0 for piping systems.

A. Subsection 6.11 B. Subsection 6.12

[8] ENSURE confined space entry form is completed AND confined space personnel are available to support this test.

A. Subsection 6.3 B. Subsection 6.4

[9] ENSURE the CS pump startup strainers have been removed after flushing.

Wo #

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 18 of 249 4.1 Preliminary Actions (continued)

[10] ENSURE communications are available for areas where testing is to be conducted.

[11] ENSURE components contained within the boundaries of this test are under the jurisdictional control of Preoperational Startup Engineering (PSE) and/or Plant Operations.

NOTE Selecting 'Points' from the top menu of the ICS screen, then 'By Plant System', then 072, will show all the computer points in Appendix F.

[12] ENSURE the Plant Computer is available, AND VERIFY the following in Appendix F:

A. The QUAL for each computer point is GOOD or ALM B. The description for each computer point is correct

[13] ENSURE the following systems are operational and have been placed in service to the extent necessary to perform this test:

A. System 030A, Auxiliary Building Room and Area Coolers - CS Pump room coolers B. System 055, Plant Annunciator- System Annunciator Testing C. System 063, Safety Injection System - Valve alignment for off-normal valve position Annunciator testing D. System 067, Essential Raw Cooling Water System-Cooling Water for CS heat exchanger and room coolers E. System 070, Component Cooling Water System - Cooling Water to CS Pump oil coolers F. System 074, Residual Heat Removal System - Valve alignment for off-normal valve position Annunciator testing G. System 211, 6.9kV Shutdown Boards - Power Supplies for CS Pump motors

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 19 of 249 4.1 Preliminary Actions (continued)

H. System 213, 480V Reactor MOV Boards - Power Supplies for motor operated valves I. System 214, 480V C&A Bldg Vent Boards - Power Supplies for motor operated valves and CS Pump room coolers J. System 235, 120 VAC Vital Power System - For System Control Power K. System 236, 125 VDC Power System - For System Control Power L. System 261, Plant Process Computer - CS System computer points.

[14] ENSURE all piping supports required for testing are installed and adjusted as required.

Civil Design Date

[15] ENSURE water chemistry for systems/components with water sources other than normal water sources is appropriate for testing.

[16] ENSURE a review of outstanding Clearances has been coordinated with Operations for impact to the test performance, AND RECORD in Appendix B, Temporary Condition Log if required.

[17] OBTAIN copies of the applicable forms from the latest revision of SMP-9.0, AND ATTACH to this PTI for use during the performance of this PTI.

[18] PERFORM a pretest walkdown on equipment to be tested to ensure no conditions exist that will impact test performance.

4.1 Preliminary Actions (continued)

[19] REVIEW preventive maintenance for system/components covered by this test, AND VERIFY no conditions exist that will impact test performance.

[20] CONDUCT a pretest briefing with Test and Operations personnel in accordance with SMP-9.0.

4.2 Special Tools, Measuring and Test Equipment, Parts, and Supplies A. The following Measuring and Test Equipment (M&TE) or equivalent is available:

Equipment Range Accuracy Subsection Use Two Digital 0 - 60 minutes +/-1.5 sec/hr 6.1 thru 6.12 Stopwatches Dranetz Pwr Sys Time +/-0.12% or less 6.9 thru 6.10 Polymeter Model 325 Interval Range OR 0 to 999 sec Lin Tech Model TM-2 or TM-200 Panametrics transducers + 3% of range 6.11 and 6.12 Ultrasonic Flowmeter calibrated to 0 - 1000 gpm Two Digital Pressure 0 - 100 psig +/- 0.5% of span 6.11 and 6.12 gauges Two Digital Pressure 0 - 500 psig +/- 0.5% of span 6.11 and 6.12 gauges Digital Differential 0 - 150 psid +/- 1% of span 6.11 and 6.12 Pressure Gauge B. The following are available:

1. Analog or Digital Volt Ohm Meter (Continuity Tester) for subsections 6.1 thru 6.10.
2. Single pole/single throw (SPST) Test Switch and Jumper assemblies.
3. 1 inch Drain hose - quantity and length as necessary.
4. 3/4 inch Drain hose - quantity and length as necessary.

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 22 of 249 4.3 Field Preparations

[1] PERFORM the Switch Lineup listed in Appendix C.

A. Subsection 6.3 B. Subsection 6.4 C. Subsection 6.5 D. Subsection 6.6 E. Subsection 6.7 F. Subsection 6.8 G. Subsection 6.9 H. Subsection 6.10

[2] PERFORM the Breaker Lineup listed in Appendix D A. Subsection 6.1 B. Subsection 6.2 C. Subsection 6.3 D. Subsection 6.4 E. Subsection 6.5 F. Subsection 6.6 G. Subsection 6.7 H. Subsection 6.8 I. Subsection 6.9 J. Subsection 6.10 K. Subsection 6.11 L. Subsection 6.12

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 23 of 249 4.3 Field Preparations (continued)

[3] VERIFY plant instruments, listed on Appendix E, Permanent Plant Instrumentation Log, are placed in service and are within their calibration interval.

A. Subsection 6.11 B. Subsection 6.12

[4] VERIFY M&TE required for test performance has been (as required) filled, vented, place in service and recorded on Measuring and Test Equipment Log.

A. Subsection 6.1 B. Subsection 6.2 C. Subsection 6.3 D. Subsection 6.4 E. Subsection 6.5 F. Subsection 6.6 G. Subsection 6.7 H. Subsection 6.8 I. Subsection 6.9 J. Subsection 6.10 K. Subsection 6.11 L. Subsection 6.12

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 24 of 249 4.3 Field Preparations (continued)

[5] VERIFY M&TE calibration due dates will support the completion of this test performance.

A. Subsection 6.1 B. Subsection 6.2 C. Subsection 6.3 D. Subsection 6.4 E. Subsection 6.5 F. Subsection 6.6 G. Subsection 6.7 H. Subsection 6.8 I. Subsection 6.9 J. Subsection 6.10 K. Subsection 6.11 L. Subsection 6.12

4.3 Field Preparations (continued)

NOTES

1) Any Annunciator points associated with 2-MUX-55-12 and 2-MUX-55-13 ONLY have master switches at the bottom of each terminal strip.
2) All points associated with 2-TBK-55-25, 2-TBK-55-26, 2-TBK-55-27, and 2-TKB-55-28 will NOT have individual switches or a master switch.

16] ENSURE System 55, Annunciator and Sequential Events Recording System applicable TBK switches are ON, the applicable Master Switches are ON, and window software input (s) are ENABLED for the following Annunciator windows.

ANNUNCIATOR TERMINAL SWITCH TEST INITIALS/DATE BLOCK SUBSECTION 14-D 00 32 6.9, 6.10 14-E 00 31 6.9, 6.10 131-F 05 66 6.5, 6.6 131 -F 05 73 6.3, 6.4 131-F 05 80 6.7, 6.8 134-E 04 19 6.5, 6.7 134-E 04 26 6.6, 6.8 149-A 06 08 6.9 149-C 06 03 6.3, 6.5, 6.7 150-A 06 09 6.10 150-C 06 04 6.4, 6.6, 6.8

4.3 Field Preparations (continued)

NOTE Step 4.3[7] will not be restored in Section 7.0 if the terminal points are found on plastic.

The completion of Subsection 6.1 will allow the points to stay on metal

[7] ENSURE the following terminal points are hard-landed (metal screws and washers) on both vendor and field sides in Panel 2-R-48 (2-FCV-72-34 flow interlocks), AND UPDATE SMP-1 5.0 log to reflect any changes.

(Subsection 6.1)

A. TB655, Terminal 1 B. TB655, Terminal 2 C. TB655, Terminal 9 D. TB655, Terminal 10 NOTE Step 4.3[8] will not be restored in Section 7.0 if the terminal points are found on plastic.

The completion of Subsection 6.2 will allow the points to stay on metal

[81 ENSURE the following terminal points are hard-landed (metal screws and washers) on both vendor and field sides in Panel 2-R-51 (2-FCV-72-13 flow interlocks), AND UPDATE SMP-15.0 log to reflect any changes.

(Subsection 6.2)

A. TB655, Terminal 1 B. TB655, Terminal 2 C. TB655, Terminal 9 D. TB655, Terminal 10

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 27 of 249 4.3 Field Preparations (continued)

[9] ENSURE the Refueling Water Storage Tank (RWST) level is greater than or equal to 45%, as indicated on 2-LI-063-050, SIS RWST LEVEL IND, on Panel 2-M-6. (does NOT apply to Subsection 6.9 and 6.10)

[10] ENSURE a Work Order has been issued to permit removal and reinstallation of Junction Box covers, 2-JB-292-771 (676/A11T), 2-JB-292-1155. (Subsection 6.3)

WO #

Initials Date

[11] ENSURE a Work Order has been issued to permit removal and reinstallation of Junction Box covers; 2-JB-292-770 (676/A 1IT), 2-JB-292-1156 covers. (Subsection 6.4)

WO #

Initials Date

[12] ENSURE a Work Order has been issued to permit removal and reinstallation of Junction Box cover, 2-JB-292-1360.

(Subsection 6.5)

WO #

Initials Date

[13] ENSURE a Work Order has been issued to permit removal and reinstallation of Junction Box cover, 2-JB-292-1362-B.

(Subsection 6.6)

WO #

Initials Date

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 28 of 249 4.3 Field Preparations (continued)

[14] RECORD the as found position in Appendix B, AND ENSURE the following terminal points are hard-landed (metal screws and washers) on both vendor and field sides in Panel 2-R-52: (Subsection 6.7)

A. TB834, Terminal 3 B. TB834, Terminal 4 C. TB834, Terminal 6 D. TB834, Terminal 7 (field wires only)

E. TB834, Terminal 8

[15] RECORD the as found position in Appendix B, AND ENSURE the following terminal points are hard-landed (metal screws and washers) on both vendor and field sides in Panel 2-R-53: (Subsection 6.8)

A. TB834, Terminal 3 B. TB834, Terminal 4 C. TB834, Terminal 6 D. TB834, Terminal 7 (field wires only)

E. TB834, Terminal 8

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 29 of 249 4.3 Field Preparations (continued)

[16] PERFORM the following to install test switch "K643 Spray Signal-A" (Subsection 6.9, 6.11)

A. LABEL open test switch "K643 Spray Signal-A" B. RECORD in Appendix B the as found position, including whether on plastic or metal, of TB639-11 and TB639-12 in cabinet R-48 for relay K643 C. LIFT and LABEL wire from field side of TB639-11 in cabinet R-48 Cv D. BOLT and TAPE wire to one side of "K643 Spray Signal-A" E. LIFT and LABEL wire from field side of TB639-12 in cabinet R-48 Cv F. BOLT and TAPE wire to other side of "K643 Spray Signal-A"

4.3 Field Preparations (continued)

[17] PERFORM the following to install test switch "K643 Spray Signal-B" (Subsection 6.10, 6.12)

A. LABEL open test switch "K643 Spray Signal-B" B. RECORD in Appendix B the as found position, including whether on plastic or metal, of TB639-11 and TB639-12 in cabinet R-51 for relay K643 C. LIFT and LABEL wire from field side of TB639-11 in cabinet R-51 Cv D. BOLT and TAPE wire to one side of "K643 Spray Signal-B" E. LIFT and LABEL wire from field side of TB639-12 in cabinet R-51 Cv F. BOLT and TAPE wire to other side of "K643 Spray Signal-B"

[18] INSTALL 0 to 100 psig test pressure gauge at 2-PI-72-33 test tee (676/A9U) (Subsection 6.11)

Wo #

Initials Date

[19] INSTALL 0 to 500 psig test pressure gauge at 2-PI-72-32 test tee (676/A9U) (Subsection 6.11)

Wo #

Initials Date

4.3 Field Preparations (continued)

[20] INSTALL 0 to 1000 GPM Ultrasonic Flowmeter on CS Pump 2A-A miniflow piping. (Subsection 6.11)

[21] INSTALL 0 to 100 psig test pressure gauge at 2-PI-72-16 test tee (676/A9T) (Subsection 6.12) wo #

Initials Date

[22] INSTALL 0 to 500 psig test pressure gauge at 2-PI-72-15 test tee (676/A9T) (Subsection 6.12) wo #

Initials Date

[23] INSTALL 0 to 1000 GPM Ultrasonic Flowmeter on CS Pump 2B-B miniflow piping. (Subsection 6.12)

[24] INSTALL 0 to 150 psid differential pressure test gauge at 2-FI-72-5 test tees (713/A12V) (Subsection 6.11, 6.12) wo #

Initials Date

4.3 Field Preparations (continued)

[25] ENSURE a clearance has been placed on the following equipment:

" 2-HS-74-1OA in the STOP PULL-TO-LOCK (Subsection 6.5)

" 2-BKR-74-10 in the OPEN position (Subsection 6.5)

" 2-HS-74-20A in the STOP PULL-TO-LOCK (Subsection 6.6)

  • 2-BKR-74-20 in the OPEN position (Subsection 6.6)

" 2-HS-72-27A in the STOP PULL-TO-LOCK (Subsection 6.7)

  • 2-BKR-72-27 in the OPEN position (Subsection 6.7)
  • 2-HS-72-1OA in the STOP PULL-TO-LOCK (Subsection 6.8)
  • 2-BKR-72-10 (Subsection 6.8)
  • 2-BKR-72-39 in the OPEN position (Subsection 6.9)

" 2-BKR-72-2 in the OPEN position (Subsection 6.10)

[26] CONFIGURE the polymeter to accept a start signal with the presence of voltage and a stop signal with continuity (close contact). (Subsection 6.9, 6.10)

4.3 Field Preparations (continued)

NOTES

1) Appendix M shows a typical setup for Steps 4.3[27] and 4.3[28].
2) Long connectors will be required for Steps 4.3[27] and 4.3[28] since they will have to reach from logic relay panel to the breaker compartment.

[27] CONNECT the polymeter with the start signal in parallel with the 2-02-72-27 CSP ST points LI and L2 and the stop signal across any set of 52STA normally closed contacts.

(Subsection 6.9)

[28] CONNECT the polymeter with the start signal in parallel with the 2-02-72-10 CSP ST points LI and L2 and the stop signal across any set of 52STA normally closed contacts.

(Subsection 6.10)

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 34 of 249 4.4 Approvals and Notifications

[1] OBTAIN permission of the Preoperational Startup Manager to start the test.

Preoperational Startup Manager Date Signature

[2] OBTAIN the Unit 2 Unit Supervisor's (US/SRO) or Shift Manager's (SM) authorization.

U2 US/SRO/SM Signature Date

[3] OBTAIN the Unit I Unit Supervisor's (US/SRO) or Shift Manager's (SM) authorization.

UI US/SRO/SM Signature Date

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 35 of 249 5.0 ACCEPTANCE CRITERIA

[1] Containment Spray Pumps 2A-A and 2B-B capacity is greater than or equal to 4000 gpm at 435 feet head. (Steps 6.11[34], 6.12[34])

[2] Containment Spray Pumps 2A-A and 2B-B start and reach test line full flow in less than or equal to 5 seconds. (Steps 6.11[40], 6.12[40])

[3] Containment Spray System Train A and B miniflow paths provide Containment Spray Pump 2A-A and 2B-B flow rates of greater than or equal to 500 gpm. (450-550 gpm) (Steps 6.11[35], 6.12[35])

[4] Annunciator window 149-C, 480 RX MOV BD 2A1-A/2A2-A, ALARMS when the transfer switches are placed in the AUX position for the following valves:

VALVE NUMBER STEP NUMBER 2-FCV-72-39 6.7[29]

2-FCV-72-40 6.5[44]B 2-FCV-72-44 6.3[84]

[5] Annunciator window 150-C, 480 RX MOV BD 2B1-B/2B2-B, ALARMS when the transfer switches are placed in the AUX position for the following valves:

VALVE NUMBER STEP NUMBER 2-FCV-72-2 6.8[29]

2-FCV-72-41 6.6[44]B 2-FCV-72-45 6.4[84]

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 36 of 249 5.0 ACCEPTANCE CRITERIA (continued)

[6] Annunciator window 131-F, ESF COMPONENT NOT NORMAL, ALARMS when any of the following components are not in the normal ESF alignment:

VALVE NUMBER POSITION STEP NUMBER 2-FCV-72-2 FULLY OPEN 6.8[18]D 2-FCV-72-39 FULLY OPEN 6.7[18]D 2-FCV-72-40 FULLY OPEN 6.5[33]D 2-FCV-72-41 FULLY OPEN 6.6[33]D 2-FCV-72-44 FULLY OPEN 6.3[75]B 2-FCV-72-45 FULLY OPEN 6.4[75]B

[7] Annunciator window 134-E, CNTMT/RHR SPRAY FCV-72-2/39/40/41 NOT CLOSED, ALARMS when any of the following components are not in the normal ESF alignment:

VALVE NUMBER POSITION STEP NUMBER 2-FCV-72-2 NOT FULLY CLOSED 6.8[18]B 2-FCV-72-39 NOT FULLY CLOSED 6.7[18]B 2-FCV-72-40 NOT FULLY CLOSED 6.5[33]B 2-FCV-72-41 NOT FULLY CLOSED 6.6[33]B

[8] The following System 72 motor operated valves will operate with the thermal overloads tripped and thermal overload protective device bypass in effect as well as NOT operating with the overload protective device bypass reset:

VALVE NUMBER STEP STEP (OPERATE) (NOT OPERATE) 2-FCV-72-2 6.8[74] 6.8[71]

2-FCV-72-21 6.4[26] 6.4[22]

2-FCV-72-22 6.3[26] 6.3[22]

2-FCV-72-39 6.7[75] 6.7[71]

2-FCV-72-40 6.5[65] 6.5[61]

2-FCV-72-41 6.6[65] 6.6[61]

2-FCV-72-44 6.3[112] 6.3[108]

2-FCV-72-45 6.4[112] 6.4[108]

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 37 of 249 5.0 ACCEPTANCE CRITERIA (continued)

[9] The following components can be operated from the main control room (MCR) and switchgear (SWG) (as applicable).

Valve No. MCR SWG 2-FCV-72-2 6.8[19], 6.8[25] 6.8[35], 6.8[40]

2-FCV-72-13 6.2[17]B, 6.2[20]A N/A 2-FCV-72-21 6.4[12]A, 6.4[15]A N/A 2-FCV-72-22 6.3[12]A, 6.3[15]A N/A 2-FCV-72-34 6.1 [17]B, 6.1 [20]A N/A 2-FCV-72-39 6.7[19], 6.7[25] 6.7[35], 6.7[40]

2-FCV-72-40 6.5[34], 6.5[40] 6.5[48]A, 6.5[52]A 2-FCV-72-41 6.6[34], 6.6[40] 6.6[48]A, 6.6[52]A 2-FCV-72-44 6.3[50], 6.3[63] 6.3[91], 6.3[96]

2-FCV-72-45 6.4[50], 6.4[63] 6.4[91], 6.4[96]

2-PMP-72-10, CS Pump 2B-B 6.10[19]A, 6.10122]A 6.10[45]A, 6.10150]

2-PMP-72-27, CS Pump 2A-A 6.9[19]A, 6.9[22]A 6.9[45]A, 6.9[50]

[10] Indication lights at the main control room and switchgear (as applicable) indicate the correct position.

Valve No. MCR SWG 2-FCV-72-2 6.8[18], 6.8[24], 6.8[31] 6.8[18], 6.8[24]

2-FCV-72-13 6.2[17], 6.2[20] N/A 2-FCV-72-21 6.4[12], 6.4[15] N/A 2-FCV-72-22 6.3[12], 6.3[15] N/A 2-FCV-72-34 6.1[17], 6.1 [20] N/A 2-FCV-72-39 6.7[18], 6.7[24], 6.71311 6.7118], 6.7[24]

2-FCV-72-40 6.5[33], 6.5[39], 6.5[44]A 6.5[33], 6.5[39]

2-FCV-72-41 6.6[33], 6.6[39], 6.6[44]A 6.6[33], 6.6[39]

2-FCV-72-44 6.3[75], 6.3[80], 6.3[86] 6.3175], 6.3[80]

2-FCV-72-45 6.4[75], 6.4[80], 6.4[86] 6.4[75], 6.4[80]

2-PMP-72-10, CS Pump 2B-B 6.10119], 6.10[22], 6.10[40]B 6.10[19], 6.10[22]

2-PMP-72-27, CS Pump 2A-A 6.9[19], 6.9[22], 6.9[40]B 6.9[19], 6.9[22]

5.0 ACCEPTANCE CRITERIA (continued)

[11] The Plant Integrated Computer System (ICS) input reflects the correct status for the following valves.

Valve No. BKR FCV 2-FCV-72-2 6.8[51, 6.8[8] 6.8[10], 6.8[20]

2-FCV-72-13 6.2[4], 6.2[12] 6.2[15], 6.2[18]

2-FCV-72-21 6.4[5], 6.4[7] 6.4[10], 6.4[13]

2-FCV-72-22 6.3[5], 6.3[7] 6.3[10], 6.3[13]

2-FCV-72-34 6.1[4], 6.1[12] 6.1[15], 6.1[18]

2-FCV-72-39 6.7[5], 6.7[8] 6.7[10], 6.7[20]

2-FCV-72-40 6.5[5], 6.5[7] 6.5[9], 6.5[35]

2-FCV-72-41 6.6[5], 6.6[7] 6.6[9], 6.6[35]

2-FCV-72-44 6.3[661, 6.3[681 6.3[69], 6.3[76]

2-FCV-72-45 6.4[66], 6.4[68] 6.4[69], 6.4[76]

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 39 of 249 5.0 ACCEPTANCE CRITERIA (continued)

[12] The following valves have stroke times within the specified time period:

Valve No. Verification Specific Requirements Steps 2-FCV-72-2 Less than or equal to 21.5 sec. 6.8[44]A, 6.8[45]A 2-FCV-72-13 Less than or equal to 10 sec. 6.2[21 ]A, 6.2[22]A 2-FCV-72-21 Less than or equal to 14.6 sec. 6.4[16]A, 6.4[171]A 2-FCV-72-22 Less than or equal to 14.6 sec. 6.3[16]A, 6.3[17]A 2-FCV-72-34 Less than or equal to 10 sec. 6.1[21]A, 6.1 [22]A 6.7[44]A, 2-FCV-72-39 Less than or equal to 21.5 sec. 6.7[45]A 6.7[45]A 2-FCV-72-40 Less than or equal to 15 sec. 6.5[55]A, 6.5[56]A 2-FCV-72-41 Less than or equal to 15 sec. 6.6[55]A, 6.6[56]A 2-FCV-72-44 Less than or equal to 20 sec. 6.3[102]A, 6.3[103]A 2-FCV-72-45 Less than or equal to 20 sec. 6.4[102]A, 6.4[103]A

[13] Annunciator Window 149-A, 6.9 SD BD 2A-A, ALARMS when the transfer switch for CS PUMP 2A-A is in the AUX position (Step 6.9[40]C).

[14] Annunciator Window 150-A, 6.9 SD BD 2B-B, ALARMS when the transfer switch for CS PUMP 2B-B is in the AUX position (Step 6.10[40]C).

[15] Annunciator 14-E, M-1 THROUGH M-6 MOTOR TRIPOUT, ALARMS when a CS pump trips on instantaneous over current.

(Steps 6.9[87], 6.9[101], 6.9[122], 6.9[134], 6.9[146], 6.10[87], 6.10[101],

6.10[122], 6.10[134], 6.10[146])

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 40 of 249 5.0 ACCEPTANCE CRITERIA (continued)

[16] Annunciator 14-D, M-1 THRU M-6 MOTOR OVERLOAD, ALARMS on a simulated overload of each CS pump (Steps 6.9[76], 6.9[113], 6.10[76], 6.10[113])

[17] The Plant Integrated Computer System (ICS) input reflects the correct status for the following pumps.

Valve No. BKR Pump 2-PMP-72-27 6.9[8], 6.9114] 6.9[20], 6.9[23]

2-PMP-72-10 6.10[8], 6.10[14] 6.10[20], 6.10[23]

[18] The following coolers START automatically upon receipt of pump START signal from their respective pump:

A. 2-PMCL-30-177 (Step 6.9[19]B)

B. 2-PMCL-30-178 (Step 6.10[19]B)

(19] Containment Spray Header Isolation Valves 2-FCV-72-39 and 2-FCV-72-2 OPEN in response to a (Simulated) Containment spray actuation signal and when the respective CS pump is (Simulated) running in less than or equal to 28 sec.

(Steps 6.7[50]A, 6.7[50]C, 6.7[59]A, 6.7[59]C, 6.8[50]A, 6.8[50]C, 6.8[59]A, 6.

8[59]C)

[20] Containment Spray Pump Breakers 2-BKR-72-27 and 2-BKR-72-1 0 CLOSE 184 seconds (182.5-185.5 sec) after Switchgear power is restored.

(Steps 6.9[65]A, 6.10[65]A)

[21] Containment Spray Pump Breakers 2-BKR-72-27 and 2-BKR-72-10 CLOSE on a simulated Containment Spray actuation signal. (Steps 6.9[58], 6.10[58])

[22] Containment Sump Suction to Containment Spray Pump 2A-A suction Valve 2-FCV-72-44 can only be opened when Refueling Water Storage Tank (RWST) to Containment Spray Pump 2A-A Suction, Valve 2-FCV-72-22, is FULLY CLOSED. (Steps 6.3[35], 6.3[41], 6.3[50])

[23] Containment Sump Suction to Containment Spray Pump 2B-B Suction Valve 2-FCV-72-45 can only be opened when Refueling Water Storage Tank (RWST) to Containment Spray Pump 2B-B Suction, Valve 2-FCV-72-21, is FULLY CLOSED. (Steps 6.4[35], 6.4[41], 6.4[50])

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 41 of 249 5.0 ACCEPTANCE CRITERIA (continued)

[24] Containment Spray Pump 2A-A Suction Valve 2-FCV-72-22 can only be opened when Refueling Water Storage Tank (RWST) to Containment Sump Suction to Containment Spray Pump 2A-A Suction, Valve 2-FCV-72-44, is FULLY CLOSED. (Steps 6.3[12]A, 6.3[56], 6.3[61])

[25] Containment Spray Pump 2B-B Suction Valve 2-FCV-72-21 can only be opened when Refueling Water Storage Tank (RWST) to Containment Sump Suction to Containment Spray Pump 2B-B Suction, Valve 2-FCV-72-45, is FULLY CLOSED. (Steps 6.4[12]A, 6.4[56], 6.4[61])

[26] Containment Spray Mini-Flow Valves 2-FCV-72-13 and 2-FCV-72-34 OPEN 13.5 seconds after the corresponding Containment Spray Pump is running, and the discharge flow of the pump is still below the low setpoint.

(Steps 6.1[34]A, 6.2[34]A)

[27] Containment Spray Mini-Flow Valves 2-FCV-72-13 and 2-FCV-72-34 CLOSE if the discharge flow of the pump is greater than or equal to the high setpoint.

(Steps 6.1[28], 6.2[28])

[28] Containment Spray Mini-Flow Valves 2-FCV-72-13 and 2-FCV-72-34 CLOSE when the corresponding Containment Spray Pump is not running.

(Steps 6.1[36], 6.2[36])

[29] RHR Spray Header Isolation Valve 2-FCV-72-40 can only be opened when Containment Sump to RHR Pump 2A Isolation Valve 2-FCV-63-72, is FULLY OPEN. (Steps 6.5[16], 6.5[21], 6.5[34])

[30] RHR Spray Header Isolation Valve 2-FCV-72-41 can only be opened when Containment Sump to RHR Pump 2B Isolation Valve 2-FCV-63-73, is FULLY OPEN. (Steps 6.6[16], 6.6[21], 6.6[34])

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 42 of 249 6.0 PERFORMANCE NOTES

1) The Subsections of this test are to be performed per the flow diagram below However, Sections 6.1 through 6.10 may NOT be performed simultaneously unless authorized by the Test Director.
2) 2-TOP-072-01 can used throughout this procedure as directed by the Test Director for activities such as filling, draining, and venting.

6.1 2-FCV-72-34 Logic/Stroke Timing (Containment Spray Train A Miniflow Valve) (692 Al 1V PIPE CH)

[1] VERIFY Prerequisites listed in Section 4.0 for Subsection 6.1 have been completed.

[2] ENSURE Breaker 2-BKR-72-34, CSP 2A-A MINIFLOW (2-FCV-72-34), 480V RX MOV BD 2A1 -A, Compt 1OF, is OPEN.

[3] INSTALL Test Switch "CS-A Pump Run" in the CLOSED position on Terminal Strip DD, across Terminals 8 and 9 at Board 2-BD-21 1-A, 6.9kV SHUTDOWN BOARD 2A-A, Cubicle 13.

CV

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 43 of 249 6.1 2-FCV-72-34 Logic/Stroke Timing (continued)

[4] VERIFY ICS point FD2181 displays "PWR OFF".

(Acc Crit 5.0[11])

[5] LIFT Wire 10F03 from Terminal 1 of Terminal Block TB655 in Panel 2-R-48.

Cv

[6] LIFT Wire 10F02 from Terminal 2 of Terminal Block TB655 in Panel 2-R-48.

Cv

[7] INSTALL Test Switch "CS-A LOW FLOW" in the OPEN position across Lifted Wires 10F03 and 10F02 at Terminal Block TB655 in Panel 2-R-48.

Cv

[8] LIFT Wire 10F04 from Terminal 9 of Terminal Block TB655 in Panel 2-R-48.

Cv

[9] LIFT Wire 1OFC2 from Terminal 10 of Terminal Block TB655 in Panel 2-R-48.

Cv

[10] INSTALL Test Switch "CS-A HIGH FLOW" in the OPEN position across Lifted Wires 10F04 and 1OFC2 at Terminal Block TB655 in Panel 2-R-48.

Cv

[11] CLOSE Breaker 2-BKR-72-34, CSP 2A-A MINIFLOW (2-FCV-72-34), 480V RX MOV BD 2A1-A, Compt 1OF.

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 44 of 249 6.1 2-FCV-72-34 Logic/Stroke Timing (continued)

[12] VERIFY ICS point FD2181 displays "PWR ON".

(Acc Crit 5.0[11])

[13] PLACE Handswitch 2-HS-72-34A, CNTMT SPRAY PMP A MINI FLOW, to the CLOSE position at 2-M-6.

[14] VERIFY locally Valve 2-FCV-72-34, CNTMT SPRAY PMP A MINI FLOW, is CLOSED.

[15] VERIFY ICS point FD2182 displays "NOT OPE".

(Acc Crit 5.0[11])

[16] PLACE Handswitch 2-HS-72-34A, CNTMT SPRAY PMP A MINI FLOW, to the OPEN position, AND WHILE valve 2-FCV-72-34, CNTMT SPRAY PMP A MINI FLOW, is opening, PLACE Handswitch 2-HS-72-34A, CNTMT SPRAY PMP A MINI FLOW, to CLOSE, AND RELEASE.

[17] VERIFY the following:

A. RED run light is LIT at Board 2-MCC-213-Al -A, 480V REACTOR MOV BOARD 2A1-A, compartment 1OF, during valve travel.

B. Valve 2-FCV-72-34, CNTMT SPRAY PMP A MINI FLOW, is OPEN (locally). (Acc Crit 5.0[9])

C. RED light LIT at Handswitch 2-HS-72-34A CNTMT, SPRAY PMP A MINI FLOW. (Acc Crit 5.0[10])

D. GREEN light NOT LIT at Handswitch 2-HS-72-34A, CNTMT SPRAY PMP A MINI FLOW. (Acc Crit 5.0[10])

[18] VERIFY ICS point FD2182 displays "OPEN".

(Acc Crit 5.0[11])

6.1 2-FCV-72-34 Logic/Stroke Timing (continued)

[19] PLACE Handswitch 2-HS-72-34A, CNTMT SPRAY PMP A MINI FLOW, to the CLOSE position, AND WHILE valve 2-FCV-72-34, CNTMT SPRAY PMP A MINI FLOW, is closing, PLACE Handswitch 2-HS-72-34A, CNTMT SPRAY PMP A MINI FLOW, to OPEN, AND RELEASE.

[201 VERIFY the following:

A. Valve 2-FCV-72-34, CNTMT SPRAY PMP A MINI FLOW, is CLOSED (locally). (Acc Crit 5.0[9])

B. RED light NOT LIT at Handswitch 2-HS-72-34A, CNTMT SPRAY PMP A MINI FLOW. (Acc Crit 5.0[10])

C. GREEN light LIT at Handswitch 2-HS-72-34A, CNTMT SPRAY PMP A MINI FLOW. (Acc Crit 5.0[10])

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 46 of 249 6.1 2-FCV-72-34 Logic/Stroke Timing (continued)

NOTES

1) The following steps require valve stroke timing locally at the valve and remotely at the Control Switch in both the Open and Closed positions.
2) Local timing begins with the initiating signal and is concluded with the completion of valve stem movement. Remote timing begins with the initiating signal and is concluded with the position indication lights status change.

[21] PLACE Handswitch 2-HS-72-34A, CNTMT SPRAY PMP A MINI FLOW, to the OPEN position.

A. RECORD remote opening time at Handswitch 2-HS-72-34A, CNTMT SPRAY PMP A MINI FLOW. (Acc Crit 5.0[12])

seconds (_ 10 seconds)

M&TE Cal Due Date B. RECORD local opening time at Valve 2-FCV-72-34, CNTMT SPRAY PMP A MINI FLOW.

seconds (_ 10 seconds)

M&TE Cal Due Date

6.1 2-FCV-72-34 Logic/Stroke Timing (continued)

[22] PLACE Handswitch 2-HS-72-34A, CNTMT SPRAY PMP A MINI FLOW, to the CLOSE position.

A. RECORD remote closing time at Handswitch 2-HS-72-34A, CNTMT SPRAY PMP A MINI FLOW. (Acc Crit 5.0[12])

seconds (_ 10 seconds)

M&TE Cal Due Date B. RECORD local closing time at Valve 2-FCV-72-34, CNTMT SPRAY PMP A MINI FLOW.

seconds (_ 10 seconds)

M&TE Cal Due Date

[23] VERIFY Valve 2-FCV-72-34, CNTMT SPRAY PMP A MINI FLOW, is CLOSED by light indication at Handswitch 2-HS-72-34A, CNTMT SPRAY PMP A MINI FLOW.

[24] CLOSE Test Switch "CS-A LOW FLOW' in Panel 2-R-48, TB655.

[25] VERIFY locally Valve 2-FCV-72-34, CNTMT SPRAY PMP A MINI FLOW OPENS.

[26] OPEN Test Switch "CS-A LOW FLOW" in Panel 2-R-48, TB655.

[27] CLOSE Test Switch "CS-A HIGH FLOW" in Panel 2-R-48, TB655.

[28] VERIFY locally Valve 2-FCV-72-34, CNTMT SPRAY PMP A MINI FLOW, CLOSES (Acc Crit 5.0[27]).

[29] OPEN Test Switch "CS-A PUMP RUN" on Terminal Strip DD at Board 2-BD-21 1-A, 6.9kV SHUTDOWN BOARD 2A-A, Cubicle 13.

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 48 of 249 6.1 2-FCV-72-34 Logic/Stroke Timing (continued)

[30] OPEN Test Switch "CS-A HIGH FLOW" in Panel 2-R-48, TB655.

[31] CLOSE Test Switch "CS-A LOW FLOW" in Panel 2-R-48, TB655.

[32] VERIFY locally Valve 2-FCV-72-34, CNTMT SPRAY PMP A MINI FLOW, remains CLOSED.

NOTES

1) In the following step the time delay of Time Delay Relay 62 will be verified. Timing begins with the closure of Test Switch "CS-A PUMP RUN" and stops when local valve movement is observed.
2) The range listed is the allowable value from NESSD 2-62-72-34 rounded to the nearest tenth.

[33] SIMULTANEOUSLY CLOSE Test Switch "CS-A PUMP RUN",

AND START the stopwatch.

[34] STOP the stopwatch when local movement of Valve 2-FCV-72-34, CNTMT SPRAY PMP A MINI FLOW, is observed.

A. RECORD time delay observed in previous step.

(Acc Crit 5.0[26])

seconds (12.8 to 14.2 secs)

M&TE Cal Due Date B. VERIFY locally Valve 2-FCV-72-34, CNTMT SPRAY PMP A MINI FLOW, is OPEN.

[35] OPEN Test Switch "CS-A PUMP RUN" on Terminal Strip DD at Board 2-BD-21 1-A, 6.9kV SHUTDOWN BOARD 2A-A, Cubicle 13.

[36] VERIFY locally Valve 2-FCV-72-34, CNTMT SPRAY PMP A MINI FLOW, CLOSES (Acc Crit 5.0[28]).

6.1 2-FCV-72-34 Logic/Stroke Timing (continued)

[37] OPEN Breaker 2-BKR-72-34, CSP 2A-A MINIFLOW (2-FCV-72-34), 480V RX MOV BD 2A1-A, Compt 1OF.

[38] REMOVE Test Switch "CS-A PUMP RUN" from Terminal Strip DD, Terminals 8 and 9 at Board 2-BD-21 1-A, 6.9kV SHUTDOWN BOARD 2A-A, Cubicle 13.

CV

[39] REMOVE Test Switch "CS-A LOW FLOW" at Terminal Block TB655 in Panel 2-R-48.

CV

[40] LAND Wire 10F03 on Terminal 1 of Terminal Block TB655 in Panel 2-R-48.

CV

[41] LAND Wire 10F02 on Terminal 2 of Terminal Block TB655 in Panel 2-R-48.

CV

[42] REMOVE Test Switch "CS-A HIGH FLOW" at Terminal Block TB655 in Panel 2-R-48.

CV

[43] LAND Wire 10F04 on Terminal 9 of Terminal Block TB655 in Panel 2-R-48.

CV

6.1 2-FCV-72-34 Logic/Stroke Timing (continued)

[44] LAND Wire 10FC2 on Terminal 10 of Terminal Block TB655 in Panel 2-R-48.

Cv

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 51 of 249 6.2 2-FCV-72-13 Logic/Stroke Timing (Containment Spray Train B Miniflow Valve) (692 Al1V PIPE CH)

[1] VERIFY Prerequisites listed in Section 4.0 for Subsection 6.2 have been completed.

[2) ENSURE Breaker 2-BKR-72-13, CSP 2B-B MINIFLOW (2-FCV-72-13), 480V RX MOV BD 2B1-B, Compt 9F, is OPEN.

[3] INSTALL Test Switch "CS-B PUMP RUN" in the CLOSED position on Terminal Strip DD, across Terminal 8 and 9 at Board 2-BD-21 1-B, 6.9kV SHUTDOWN BOARD 2B-B, Cubicle 13.

CV

[4] VERIFY ICS point FD2333 displays "PWR OFF".

(Acc Crit 5.0[111])

[5] LIFT wire 9F03 from Terminal 1 of Terminal Block TB655 in Panel 2-R-51.

CV

[6] LIFT wire 9F02 from Terminal 2 of Terminal Block TB655 in Panel 2-R-51.

  • CV

[7] INSTALL Test Switch "CS-B LOW FLOW" in the OPEN position across Lifted Wires 9F03 and 9F02 at Terminal Block TB655 in Panel 2-R-51.

CV

6.2 2-FCV-72-13 Logic/Stroke Timing (continued)

[8] LIFT Wire 9F04 from Terminal 9 of Terminal Block TB655 in Panel 2-R-51.

CV

[9] LIFT Wire 9FC2 from Terminal 10 of Terminal Block TB655 in Panel 2-R-51.

CV

[10] INSTALL Test Switch "CS-B HIGH FLOW" in the OPEN position across Lifted Wires 9F04 and 9FC2 at Terminal Block TB655 in Panel 2-R-51.

CV

[11] CLOSE Breaker 2-BKR-72-13, CSP 2B-B MINIFLOW (2-FCV-72-13), 480V RX MOV BD 2B1-B, Compt 9F.

[12] VERIFY ICS point FD2333 displays "PWR ON".

(Acc Crit 5.0[11 ])

[13] PLACE Handswitch 2-HS-72-13A, CNTMT SPRAY PMP B MINI FLOW, to the CLOSE position at 2-M-6.

[14] VERIFY locally Valve 2-FCV-72-13, CNTMT SPRAY PMP B MINI FLOW, is CLOSED.

[15] VERIFY ICS point FD2334 displays "NOT OPE".

(Acc Crit 5.0[11 ])

[16] PLACE Handswitch 2-HS-72-13A, CNTMT SPRAY PMP B MINI FLOW, to the OPEN position, AND WHILE valve 2-FCV-72-13, CNTMT SPRAY PMP B MINI FLOW, is opening, PLACE Handswitch 2-HS-72-13A, CNTMT SPRAY PMP B MINI FLOW, to CLOSE AND RELEASE.

6.2 2-FCV-72-13 Logic/Stroke Timing (continued)

[17] VERIFY the following:

A. RED run light is LIT at Board 2-MCC-213-B1, 480V REACTOR MOV BOARD 2B1-B, Compartment 9F, during valve travel.

B. Valve 2-FCV-72-13, CNTMT SPRAY PMP B MINI FLOW, is OPEN (locally). (Acc Crit 5.0[9])

C. RED light LIT at Handswitch 2-HS-72-13A, CNTMT SPRAY PMP B MINI FLOW. (Acc Crit 5.0[10])

D. GREEN light NOT LIT at Handswitch 2-HS-72-13A, CNTMT SPRAY PMP B MINI FLOW. (Acc Crit 5.0[10])

[18] VERIFY ICS point FD2334 displays "OPEN".

(Acc Crit 5.0[11])

[19] PLACE Handswitch 2-HS-72-13A, CNTMT SPRAY PMP B MINI FLOW to the CLOSE position, AND WHILE valve 2-FCV-72-13, CNTMT SPRAY PMP B MINI FLOW, is closing, PLACE Handswitch 2-HS-72-13A, CNTMT SPRAY PMP B MINI FLOW, to OPEN AND RELEASE.

[20] VERIFY the following:

A. Valve 2-FCV-72-13 CNTMT SPRAY PMP B MINI FLOW is CLOSED (locally). (Acc Crit 5.0[9])

B. RED light NOT LIT at Handswitch 2-HS-72-13A, CNTMT SPRAY PMP B MINI FLOW. (Acc Crit 5.0(10])

C. GREEN light LIT at Handswitch 2-HS-72-13A, CNTMT SPRAY PMP B MINI FLOW. (Acc Crit 5.0[10])

6.2 2-FCV-72-13 Logic/Stroke Timing (continued)

NOTES

1) The following steps require valve stroke timing locally at the valve and remotely at the Control Switch in both the Open and Closed positions.
2) Local timing begins with the initiating signal and is concluded with the completion of valve stem movement. Remote timing begins with the initiating signal and is concluded with the position indication lights status change.

[21] PLACE Handswitch 2-HS-72-13A, CNTMT SPRAY PMP B MINI FLOW, to the OPEN position.

A. RECORD remote opening time at Handswitch 2-HS-72-13A, CNTMT SPRAY PMP B MINI FLOW. (Acc Crit 5.0[12])

seconds (_ 10 seconds)

M&TE Cal Due Date B. RECORD local opening time at Valve 2-FCV-72-13, CNTMT SPRAY PMP B MINI FLOW.

seconds (* 10 seconds)

M&TE Cal Due Date

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 55 of 249 6.2 2-FCV-72-13 Logic/Stroke Timing (continued)

[22] PLACE Handswitch 2-HS-72-13A, CNTMT SPRAY PMP B MINI FLOW, to the CLOSE position.

A. RECORD remote closing time at Handswitch 2-HS-72-13A, CNTMT SPRAY PMP B MINI FLOW. (Acc Crit 5.0[12])

seconds (< 10 seconds)

M&TE Cal Due Date B. RECORD local closing time at Valve 2-FCV-72-13, CNTMT SPRAY PMP B MINI FLOW.

seconds (< 10 seconds)

M&TE Cal Due Date

[23] VERIFY Valve 2-FCV-72-13, CNTMT SPRAY PMP B MINI FLOW, is CLOSED by light indication at Handswitch 2-HS-72-13A, CNTMT SPRAY PMP B MINI FLOW.

[24] CLOSE Test Switch "CS-B LOW FLOW" in Panel 2-R-51, TB655.

[25] VERIFY locally Valve 2-FCV-72-13, CNTMT SPRAY PMP B MINI FLOW OPENS.

[26] OPEN Test Switch "CS-B LOW FLOW" in Panel 2-R-51, TB655.

[27] CLOSE Test Switch "CS-B HIGH FLOW" in Panel 2-R-51, TB655.

[28] VERIFY locally Valve 2-FCV-72-13, CNTMT SPRAY PMP B MINI FLOW, CLOSES (Acc Crit 5.0[27]).

[29] OPEN Test Switch "CS-B PUMP RUN" on Terminal Strip DD at Board 2-BD-21 1-B, 6.9kV SHUTDOWN BOARD 2B-B, Cubicle 13.

6.2 2-FCV-72-13 Logic/Stroke Timing (continued)

[30] OPEN Test Switch "CS-B HIGH FLOW" in Panel 2-R-51, TB655.

[31] CLOSE Test Switch "CS-B LOW FLOW" in Panel 2-R-51, TB655.

[32] VERIFY locally Valve 2-FCV-72-13, CNTMT SPRAY PMP B MINI FLOW, remains CLOSED.

NOTES

1) In the following step the time delay of Time Delay Relay 62 will be verified. Timing begins with the closure of Test Switch "CS-B PUMP RUN" and stops when local valve movement is observed.
2) The range listed is the allowable value from NESSD 2-62-72-13 rounded to the nearest tenth.

[33] SIMULTANEOUSLY CLOSE Test Switch "CS-B PUMP RUN",

AND START the stopwatch

[34] STOP the stopwatch when local movement of Valve 2-FCV-72-13, CNTMT SPRAY PMP B MINI FLOW, is observed.

A. RECORD time delay observed in previous step.

(Acc Crit 5.0[26])

seconds (12.8 to 14.2 secs)

M&TE Cal Due Date B. VERIFY locally Valve 2-FCV-72-13, CNTMT SPRAY PMP B MINI FLOW, is OPEN.

[35] OPEN Test Switch "CS-B PUMP RUN" on Terminal Strip DD at Board 2-BD-21 1-B, 6.9kV SHUTDOWN BOARD 2B-B, Cubicle 13.

[36] VERIFY locally Valve 2-FCV-72-13 CNTMT SPRAY PMP B MINI FLOW CLOSES (Acc Crit 5.0[28]).

6.2 2-FCV-72-13 Logic/Stroke Timing (continued)

[37] OPEN Breaker 2-BKR-72-13, CSP 2B-B MINIFLOW (2-FCV-72-13), 480V RX MOV BD 2B1-B, Compt 9F.

[38] REMOVE Test Switch "CS-B PUMP RUN" from Terminal Strip DD, Terminals 8 and 9 at Board 2-BD-211-B, 6.9kV SHUTDOWN BOARD 2B-B, Cubicle 13.

CV

[39] REMOVE Test Switch "CS-B LOW FLOW" at Terminal Block TB655 in Panel 2-R-51.

CV

[40] LAND Wire 9F03 on Terminal 1 of Terminal Block TB655 in Panel 2-R-51.

CV

[41] LAND Wire 9F02 on Terminal 2 of Terminal Block TB655 in Panel 2-R-51.

CV

[42] REMOVE Test Switch "CS-B HIGH FLOW" at Terminal Block TB655 in Panel 2-R-51.

CV

[43] LAND Wire 9F04 on Terminal 9 of Terminal Block TB655 in Panel 2-R-51.

CV

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 58 of 249 6.2 2-FCV-72-13 Logic/Stroke Timing (continued)

[44] LAND Wire 9FC2 on Terminal 10 of Terminal Block TB655 in Panel 2-R-51.

Cv

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 59 of 249 6.3 2-FCV-72-22, and 2-FCV-72-44 Logic /Stroke Timing (RWST to Containment Spray Pump 2A-A Suction Valve 2-FCV-72-22) (680 Al1 U PIPE CH), and (Containment Sump to Containment Spray Pump 2A-A Suction Valve 2-FCV-72-44) (692 Al 3V VLV VAULT)

NOTE Performance of this section will require entry into confined spaces for access to 2-FCV-72-44.

[1] VERIFY Prerequisites listed in Section 4.0 for Subsection 6.3 have been completed.

[2] ENSURE Breaker 2-BKR-72-44, CNTMT SUMP TO CSP 2A-A SUCTION (2-FCV-72-44), 480V RX MOV BD 2A1-A, Compt 13B, is CLOSED

[3] ENSURE locally Valve 2-FCV-72-44, CNTMT SUMP TO CNTMT SPRAY PMP A SUCT, is CLOSED.

[4] ENSURE Breaker 2-BKR-72-22, RWST TO CSP 2A-A (2-FCV-72-22), 480V C & A VENT BD 2A1-A, Compt 7E, is OPEN.

[5] VERIFY ICS point FD2183 displays "PWR OFF".

(Acc Crit 5.0[11])

[6] CLOSE Breaker 2-BKR-72-22, RWST TO CSP 2A-A (2-FCV-72-22), 480V C & A VENT BD 2A1-A, COMPT 7E.

[7] VERIFY ICS point FD2183 displays "PWR ON".

(Acc Crit 5.0[11])

[8] ENSURE Valve 2-FCV-72-22, RWST TO CNTMT SPRAY PMP A SUCTION, is CLOSED from 2-HS-72-22A at 2-M-6.

[9] VERIFY locally Valve 2-FCV-72-22 is CLOSED.

[10] VERIFY ICS point FD2184 displays "CLOSED".

(Acc Crit 5.0[11])

6.3 2-FCV-72-22, and 2-FCV-72-44 Logic /Stroke Timing (continued)

[11] PLACE Handswitch 2-HS-72-22A, RWST TO CNTMT SPRAY PMP A SUCTION, to the OPEN position, AND WHILE valve 2-FCV-72-22 is opening, PLACE Handswitch 2-HS-72-22A, RWST TO CNTMT SPRAY PMP A SUCTION, to CLOSE, AND RELEASE.

[12] VERIFY the following:

A. Valve 2-FCV-72-22, RWST TO CNTMT SPRAY PMP A SUCTION, is OPEN (locally). (Acc Crit 5.0[9] & 5.0[24])

B. RED light is LIT at Handswitch 2-HS-72-22A RWST TO CNTMT SPRAY PMP A SUCTION. (Acc Crit 5.0[10])

C. GREEN light is NOT LIT at Handswitch 2-HS-72-22A.

(Acc Crit 5.0[10])

[13] VERIFY ICS point FD2184 displays "NOT CLS".

(Acc Crit 5.0[11])

[14] PLACE Handswitch 2-HS-72-22A, RWST TO CNTMT SPRAY PMP A SUCTION, to the CLOSE position, AND WHILE valve 2-FCV-72-22, RWST TO CNTMT SPRAY PMP A SUCTION, is closing, PLACE Handswitch 2-HS-72-22A to OPEN, AND RELEASE.

[15] VERIFY the following:

A. Valve 2-FCV-72-22 RWST TO CNTMT SPRAY PMP A SUCTION is CLOSED (locally). (Acc Crit 5.0[9])

B. RED light is NOT LIT at Handswitch 2-HS-72-22A, RWST TO CNTMT SPRAY PMP A SUCTION. (Acc Crit 5.0[10])

C. GREEN light is LIT at Handswitch 2-HS-72-22A, RWST TO CNTMT SPRAY PMP A SUCTION. (Acc Crit 5.0[10])

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 61 of 249 6.3 2-FCV-72-22, and 2-FCV-72-44 Logic /Stroke Timing (continued)

NOTES

1) The following steps require valve stroke timing locally at the valve and remotely at the Control Switch in both the Open and closed positions.
2) Local timing begins with the initiating signal and is concluded with the completion of the valve stem movement. Remote timing begins with the initiating signal and is concluded with the position indication lights status change.

[16] PLACE Handswitch 2-HS-72-22A, RWST TO CNTMT SPRAY PMP A SUCTION, to the OPEN position.

A. RECORD remote opening time at Handswitch 2-HS-72-22A, RWST TO CNTMT SPRAY PMP A SUCTION. (Acc Crit 5.0[12])

seconds (< 14.6 seconds)

M&TE Cal Due Date B. RECORD local opening time at Valve 2-FCV-72-22, RWST TO CNTMT SPRAY PMP A SUCTION.

seconds (< 14.6 seconds)

M&TE Cal Due Date

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 62 of 249 6.3 2-FCV-72-22, and 2-FCV-72-44 Logic /Stroke Timing (continued)

[17] PLACE Handswitch 2-HS-72-22A, RWST TO CNTMT SPRAY PMP A SUCTION, to the CLOSE position.

A. RECORD remote closing time at Handswitch 2-HS-72-22A, RWST TO CNTMT SPRAY PMP A SUCTION. (Acc Crit 5.0[12])

seconds (< 14.6 seconds)

M&TE Cal Due Date B. RECORD local closing time at Valve 2-FCV-72-22, RWST TO CNTMT SPRAY PMP A SUCTION.

seconds (< 14.6 seconds)

M&TE Cal Due Date

[18] OPEN Breaker 2-BKR-72-22, RWST TO CSP 2A-A (2-FCV-72-22), 480V C & A VENT BD 2A1-A, Compt 7E.

[19] MANUALLY TRIP the thermal overload for 2-BKR-72-22, RWST TO CSP 2A-A (2-FCV-72-22), 480V C & A VENT BD 2A1-A, Compt 7E.

[20] CLOSE Breaker 2-BKR-72-22, RWST TO CSP 2A-A (2-FCV-72-22), 480V C & A VENT BD 2A1-A, Compt 7E.

[21] PLACE Handswitch 2-HS-72-22A, RWST TO CNTMT SPRAY PMP A SUCTION, to the OPEN position.

[22] VERIFY locally Valve 2-FCV-72-22, RWST TO CNTMT SPRAY PMP A SUCTION, remains CLOSED (Acc Crit 5.0[8]).

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 63 of 249 6.3 2-FCV-72-22, and 2-FCV-72-44 Logic /Stroke Timing (continued)

[23] ENSURE that actuation of the Relay K5 in the next step will not adversly affect the other associated valves: 2-FCV-72-39, 2-FCV-72-40, 2-FCV-72-44, and 2-FCV-74-1.

[24] DEPRESS and HOLD the armature of Relay K5 located in back of Panel 4F on 480V RX MOV BD 2A1-A to simulate Overload Bypass.

CV

[25] PLACE Handswitch 2-HS-72-22A, RWST TO CNTMT SPRAY PMP A SUCTION, to the OPEN position.

[26] VERIFY Valve 2-FCV-72-22, RWST TO CNTMT SPRAY PMP A SUCTION,OPENS by RED light LIT at Handswitch 2-HS-72-22A, RWST TO CNTMT SPRAY PMP A SUCTION (Acc Crit 5.0[8]).

[27] RELEASE the armature of Relay K5 located in back of Panel 4F on 480V RX MOV BD 2A1-A.

[28] OPEN Breaker 2-BKR-72-22, RWST TO CSP 2A-A (2-FCV-72-22), 480V C & A VENT BD 2A1-A, Compt 7E.

[29] RESET the thermal overload for 2-BKR-72-22, RWST TO CSP 2A-A (2-FCV-72-22), 480V C & A VENT BD 2A1 -A, Compt 7E.

[30] CLOSE Breaker 2-BKR-72-22, RWST TO CSP 2A-A (2-FCV-72-22), 480V C & A VENT BD 2A1-A, Compt 7E.

NOTE The following steps will verify Valve 2-FCV-72-22, RWST TO CNTMT SPRAY PMP A SUCTION, closed interlock for 2-FCV-72-44, CNTMT SUMP TO CNTMT SPRAY PMP A SUCT.

[31] VERIFY Valve 2-FCV-72-22, RWST TO CNTMT SPRAY PMP A SUCTION, is OPEN by RED light LIT at Handswitch 2-HS-72-22A, CNTMT SUMP TO CNTMT SPRAY PMP A SUCT.

[32] VERIFY locally Valve 2-FCV-72-44, CNTMT SUMP TO CNTMT SPRAY PMP A SUCT, is CLOSED.

6.3 2-FCV-72-22, and 2-FCV-72-44 Logic /Stroke Timing (continued)

[33] VERIFY NO CONTINUITY at Junction Box 2-JB-292-1155 (692/A12V) Terminal Block TB Terminal 5 (Wire 13B01 (white) and Terminal 11 (Wire 13BSM (Black).

[34] PLACE Handswitch 2-HS-72-44A, CNTMT SUMP TO CNTMT SPRAY PMP A SUCT, to the OPEN position at 2-M-6.

[35] VERIFY locally Valve 2-FCV-72-44, CNTMT SUMP TO CNTMT SPRAY PMP A SUCT, remains CLOSED (Acc Crit 5.0[22]).

[36] VERIFY GREEN light is LIT at Handswitch 2-HS-72-44A, CNTMT SUMP TO CNTMT SPRAY PMP A SUCT.

[37] VERIFY RED light is NOT LIT at Handswitch 2-HS-72-44A, CNTMT SUMP TO CS PMP A SUCT.

[38] MANUALLY CLOSE Valve 2-FCV-72-22, RWST TO CNTMT SPRAY PMP A SUCTION, until RED and GREEN lights LIT is observed at Handswitch 2-HS-72-22A, RWST TO CNTMT SPRAY PMP A SUCTION.

[39] VERIFY NO CONTINUITY at Junction Box 2-JB-292-1155 (692/A12V) Terminal Block TB Terminal 5 (Wire 13B01 (white) and Terminal 11 (Wire 13BSM (Black).

[40] PLACE Handswitch 2-HS-72-44A, CNTMT SUMP TO CNTMT SPRAY PMP A SUCT, to the OPEN position at 2-M-6.

[41] VERIFY locally Valve 2-FCV-72-44, CNTMT SUMP TO CNTMT SPRAY PMP A SUCT, remains CLOSED (Acc Crit 5.0[22]).

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 65 of 249 6.3 2-FCV-72-22, and 2-FCV-72-44 Logic /Stroke Timing (continued)

[42] VERIFY GREEN light is LIT at Handswitch 2-HS-72-44A, CNTMT SUMP TO CNTMT SPRAY PMP A SUCT.

[43] VERIFY RED light is NOT LIT at Handswitch 2-HS-72-44A, CNTMT SUMP TO CNTMT SPRAY PMP A SUCT.

[44] PLACE Handswitch 2-HS-72-22A, RWST TO CNTMT SPRAY PMP A SUCTION, to the CLOSED position, AND VERIFY Valve 2-FCV-72-22, RWST TO CNTMT SPRAY PMP A SUCTION, travels to the CLOSED position by GREEN light LIT indication at Handswitch 2-HS-72-22A, RWST TO CNTMT SPRAY PMP A SUCTION.

[45] VERIFY CONTINUITY at Junction Box 2-JB-292-1155 (692/A12V) Terminal Block TB Terminal 5 (Wire 13B01 (White) and Terminal 11 (Wire 13BSM (Black).

NOTE The following steps will verify Valve 2-FCV-72-44, CNTMT SUMP TO CNTMT SPRAY PMP A SUCTION, closed interlocks for Valve 2-FCV-72-22, RWST TO CNTMT SPRAY PMP A SUCTION.

[46] VERIFY CONTINUITY at Terminal Block TA across Terminal 6 (Wire 7E02) and Terminal 11 (Wire 7E04 in Junction Box 2-JB-292-771-A (676/A 1IT).

[47] VERIFY CONTINUITY at Terminal Block TA across Terminal 7 (Wire 7E03) and Terminal 11 (Wire 7E04) in Junction Box 2-JB-292-771 -A (676/A 1iT).

[48] IF Train A CS suction piping is filled with water, THEN DRAIN Train A CS suction piping per 2-TOP-072-01.

[49] PLACE Handswitch 2-HS-72-44A, CNTMT SUMP TO CNTMT SPRAY PMP A SUCT, to the OPEN position.

[50] VERIFY locally valve 2-FCV-72-44, CNTMT SUMP TO CNTMT SPRAY PMP A SUCT, travels to the OPEN position.

(Acc Crit 5.0[9] & 5.0[22])

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 66 of 249 6.3 2-FCV-72-22, and 2-FCV-72-44 Logic /Stroke Timing (continued)

[51] VERIFY RED light is LIT at Handswitch 2-HS-72-44A, CNTMT SUMP TO CNTMT SPRAY PMP A SUCT.

[52] VERIFY GREEN light is NOT LIT at Handswitch 2-HS-72-44A, CNTMT SUMP TO CNTMT SPRAY PMP A SUCT.

[53] VERIFY NO CONTINUITY at Terminal Block TA across Terminal 6 (Wire 7E02) and Terminal 11 (Wire 7E04 in Junction Box 2-JB-292-771-A (676/A 1IT).

[54] VERIFY NO CONTINUITY at Terminal Block TA across Terminal 7 (Wire 7E03) and Terminal 11 (Wire 7E04) in Junction Box 2-JB-292-771-A (676/A 1IT).

[55] PLACE Handswitch 2-HS-72-22A, RWST TO CNTMT SPRAY PMP A SUCTION, to the OPEN position.

[56] VERIFY Valve 2-FCV-72-22, RWST TO CNTMT SPRAY PMP A SUCTION, remains CLOSED by observing GREEN light LIT at Handswitch 2-HS-72-22A, RWST TO CNTMT SPRAY PMP A SUCTION. (Acc Crit 5.0[24]).

[57] MANUALLY CLOSE Valve 2-FCV-72-44, CNTMT SUMP TO CNTMT SPRAY PMP A SUCT, until the RED and GREEN lights are LIT at Handswitch 2-HS-72-44A, CNTMT SUMP TO CNTMT SPRAY PMP A SUCT.

[58] VERIFY NO CONTINUITY at Terminal Block TA across Terminal 6 (Wire 7E02) and Terminal 11 (Wire 7E04 in Junction Box 2-JB-292-771-A (676/A 1IT).

[59] VERIFY NO CONTINUITY at Terminal Block TA across Terminal 7 (Wire 7E03) and Terminal 11 (Wire 7E04) in Junction Box 2-JB-292-771-A (676/A 1iT).

[60] PLACE Handswitch 2-HS-72-22A, RWST TO CNTMT SPRAY PMP A SUCTION, to the OPEN position.

[61] VERIFY 2-FCV-72-22, RWST TO CNTMT SPRAY PMP A SUCTION, remains CLOSED by observing GREEN light LIT at Handswitch 2-HS-72-22A, RWST TO CNTMT SPRAY PMP A SUCTION (Acc Crit 5.0[24]).

[62] PLACE Handswitch 2-HS-72-44A, CNTMT SUMP TO CNTMT SPRAY PMP A SUCT, to the CLOSE position.

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 67 of 249 6.3 2-FCV-72-22, and 2-FCV-72-44 Logic /Stroke Timing (continued)

[63] VERIFY 2-FCV-72-44, CNTMT SUMP TO CNTMT SPRAY PMP A SUCT, travels to the CLOSED position by GREEN light LIT at Handswitch 2-HS-72-44A, CNTMT SUMP TO CNTMT SPRAY PMP A SUCT. (Acc Crit 5.0[9])

[64] ENSURE Handswitch 2-XS-72-44, CNTMT SUMP TO CNTMT SPRAY PMP A SUCT, is in the NORMAL position at Board 2-MCC-213-Al, 480V REACTOR MOV BOARD 2A1 -A, Compartment 13B.

[65] OPEN Breaker 2-BKR-72-44, CNTMT SUMP TO CSP 2A-A SUCTION (2-FCV-72-44), 480V RX MOV BD 2A1-A, Compt 13B.

[66] VERIFY ICS point FD2185 displays "PWR OFF".

(Acc Crit 5.0[11])

[67] CLOSE Breaker 2-BKR-72-44, CNTMT SUMP TO CSP 2A-A SUCTION (2-FCV-72-44), 480V RX MOV BD 2A1-A, Compt 13B.

[68] VERIFY ICS point FD2185 displays "PWR ON".

(Acc Crit 5.0[11])

[69] VERIFY ICS point FD2186 displays "NOT OPE".

(Acc Crit 5.0[11])

[70] ENSURE Annunciator Window 131-F on Panel 2-XA-55-6D, ESF COMPONENT NOT NORMAL; is CLEAR.

[71] ENSURE Event Display Monitor reports 131-F ESF ABNORMAL RECIRCULATION LINE UP is NORMAL (Blue).

[72] PLACE Handswitch 2-HS-72-44C, CNTMT SUMP TO CNTMT SPRAY PMP A SUCT, to the OPEN position, then to NORMAL on Board 2-MCC-213-A1, Compartment 13B.

[73] VERIFY Valve 2-FCV-72-44, CNTMT SUMP TO CNTMT SPRAY PMP A SUCT, remains in the CLOSED position by GREEN light LIT at Handswitch 2-HS-72-44C, CNTMT SUMP TO CNTMT SPRAY PMP A SUCT, at Board 2-MCC-213-A1, Compartment 13B.

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 68 of 249 6.3 2-FCV-72-22, and 2-FCV-72-44 Logic /Stroke Timing (continued)

[74] PLACE Handswitch 2-HS-72-44A, CNTMT SUMP TO CNTMT SPRAY PMP A SUCT, to the OPEN position, AND WHILE valve 2-FCV-72-44, CNTMT SUMP TO CNTMT SPRAY PMP A SUCT, is opening, PLACE Handswitch 2-HS-72-44A, CNTMT SUMP TO CNTMT SPRAY PMP A SUCT, to CLOSE AND RELEASE.

[75] VERIFY the following:

A. During valve travel the RED run light is LIT at Breaker 2-BKR-72-44, CNTMT SUMP TO CSP 2A-A SUCTION (2-FCV-72-44), 480V RX MOV BD 2A1-A, Compt 13B.

B. Annunciator Window 131-F on Panel 2-XA-55-6D, ESF COMPONENT NOT NORMAL, ALARMS (Acc Crit 5.0[6]).

C. Event Display Monitor reports 131-F ESF ABNORMAL RECIRCULATION LINE UP is in ALARM (RED).

D. RED light is LIT at Handswitch 2-HS-72-44A, CNTMT SUMP TO CNTMT SPRAY PMP A SUCT.

(Acc Crit 5.0[10])

E. GREEN light is NOT LIT at Handswitch 2-HS-72-44A, CNTMT SUMP TO CNTMT SPRAY PMP A SUCT.

(Acc Crit 5.0[10])

F. RED light is LIT at Handswitch 2-HS-72-44C, CNTMT SUMP TO CNTMT SPRAY PMP A SUCT, at Board 2-MCC-213-A1, Compartment 13B.

(Acc Crit 5.0[10])

G. GREEN light is NOT LIT at Handswitch 2-HS-72-44C, CNTMT SUMP TO CNTMT SPRAY PMP A SUCT, at Board 2-MCC-213-A1, Compartment 13B.

(Acc Crit 5.0[10])

H. Valve 2-FCV-72-44, CNTMT SUMP TO CNTMT SPRAY PMP A SUCT, is OPEN locally.

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 69 of 249 6.3 2-FCV-72-22, and 2-FCV-72-44 Logic /Stroke Timing (continued)

[76] VERIFY ICS point FD2186 displays "OPEN".

(Acc Crit 5.0[11])

[77] PLACE Handswitch 2-HS-72-44C, CNTMT SUMP TO CNTMT SPRAY PMP A SUCT, to the CLOSE position then to NORMAL at Board 2-MCC-213-A1, Compartment 13B.

[78] VERIFY Valve 2-FCV-72-44, CNTMT SUMP TO CNTMT SPRAY PMP A SUCT, remains in the OPEN position by RED light LIT at Handswitch 2-HS-72-44C, CNTMT SUMP TO CNTMT SPRAY PMP A SUCT.

[79] PLACE Handswitch 2-HS-72-44A, CNTMT SUMP TO CNTMT SPRAY PMP A SUCT, to the CLOSE position, AND WHILE valve 2-FCV-72-44, CNTMT SUMP TO CNTMT SPRAY PMP A SUCT, is closing, PLACE Handswitch 2-HS-72-44A, CNTMT SUMP TO CNTMT SPRAY PMP A SUCT, to OPEN, AND RELEASE.

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 70 of 249 6.3 2-FCV-72-22, and 2-FCV-72-44 Logic /Stroke Timing (continued)

[80] VERIFY the following:

A. Annunciator Window 131-F on Panel 2-XA-55-6D, ESF COMPONENT NOT NORMAL, CLEARS.

B. Event Display Monitor reports 131-F ESF ABNORMAL RECIRCULATION LINE UP is NORMAL (Blue).

C. RED light is NOT LIT at Handswitch 2-HS-72-44A CNTMT SUMP TO CNTMT SPRAY PMP A SUCT.

(Acc Crit 5.0[10])

D. GREEN light is LIT at Handswitch 2-HS-72-44A CNTMT SUMP TO CNTMT SPRAY PMP A SUCT.

(Acc Crit 5.0[10])

E. RED light is NOT LIT at Handswitch 2-HS-72-44C, CNTMT SUMP TO CNTMT SPRAY PMP A SUCT, at Board 2-MCC-213-A1, Compartment 13B.

(Acc Crit 5.0[10])

F. GREEN light LIT at Handswitch 2-HS-72-44C, CNTMT SUMP TO CNTMT SPRAY PMP A SUCT, at Board 2-MCC-213-Al, Compartment 13B.

(Acc Crit 5.0[10])

G. Valve 2-FCV-72-44 CNTMT SUMP TO CNTMT SPRAY PMP A SUCT is CLOSED locally.

[81] ENSURE Annunciator Window 149-C on Panel 2-XA-55-6F, 480 RX MOV BD 2A1-A/2A2-A, is CLEAR.

[82] ENSURE Event Display Monitor reports 149-C 480 RX MOV BD 2A1-A/2A2-A XS IN AUX is NORMAL (Blue).

[83] PLACE Handswitch 2-XS-72-44, CNTMT SUMP TO CNTMT SPRAY PMP A SUCT, in the Aux position on Board 2-MCC-213-A1, compartment 13B.

[84] VERIFY Annunciator Window 149-C, 480 RX MOV BD 2A1-A/2A2-A, ALARMS (Acc Crit 5.0[4]).

[85] VERIFY Event Display Monitor reports 149-C 480 RX MOV BD 2A1-A/2A2-A XS IN AUX is in ALARM (RED).

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 71 of 249 6.3 2-FCV-72-22, and 2-FCV-72-44 Logic /Stroke Timing (continued)

[86] VERIFY RED and GREEN lights are OFF at Handswitch 2-HS-72-44A, CNTMT SUMP TO CNTMT SPRAY PMP A SUCT. (Acc Crit 5.0[10])

[87] PLACE Handswitch 2-HS-72-44A, CNTMT SUMP TO CNTMT SPRAY PMP A SUCT, to the OPEN position.

[88] VERIFY locally Valve 2-FCV-72-44, CNTMT SUMP TO CNTMT SPRAY PMP A SUCT, remains CLOSED.

[89] PLACE Handswitch 2-HS-72-44C, CNTMT SUMP TO CNTMT SPRAY PMP A SUCT, to the OPEN position then to NORMAL.

[90] VERIFY the following:

A. RED light is LIT at Handswitch 2-HS-72-44C CNTMT SUMP TO CNTMT SPRAY PMP A SUCT, at Board 2-MCC-213-A1, Compartment 13B.

B. GREEN light is NOT LIT at Handswitch 2-HS-72-44C, CNTMT SUMP TO CNTMT SPRAY PMP A SUCT, at Board 2-MCC-213-A1, Compartment 13B.

C. RED and GREEN lights are NOT LIT at Handswitch 2-HS-72-44A, CNTMT SUMP TO CNTMT SPRAY PMP A SUCT [2-M-6].

[91] VERIFY locally Valve 2-FCV-72-44, CNTMT SUMP TO CNTMT SPRAY PMP A SUCT, is OPEN. (Acc Crit 5.0[9])

[92] PLACE Handswitch 2-HS-72-44A, CNTMT SUMP TO CNTMT SPRAY PMP A SUCT, to the CLOSE position [2-M-6].

[93] VERIFY locally Valve 2-FCV-72-44, CNTMT SUMP TO CNTMT SPRAY PMP A SUCT, remains OPEN.

[94] PLACE Handswitch 2-HS-72-44C, CNTMT SUMP TO CNTMT SPRAY PMP A SUCT, at Board 2-MCC-213-Al, Compartment 13B, to the CLOSE position, then to NORMAL.

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 72 of 249 6.3 2-FCV-72-22, and 2-FCV-72-44 Logic /Stroke Timing (continued)

[95] VERIFY the following:

A. RED light is NOT LIT at Handswitch 2-HS-72-44C, CNTMT SUMP TO CNTMT SPRAY PMP A SUCT, at Board 2-MCC-213-A1, Compartment 13B.

B. GREEN light is LIT at Handswitch2-HS-72-44C, CNTMT SUMP TO CNTMT SPRAY PMP A SUCT, at Board 2-MCC-213-A1, Compartment 13B.

C. RED and GREEN lights are NOT LIT at Handswitch 2-HS-72-44A, CNTMT SUMP TO CNTMT SPRAY PMP A SUCT [2-M-6].

[96] VERIFY locally Valve 2-FCV-72-44, CNTMT SUMP TO CNTMT SPRAY PMP A SUCT, is CLOSED. (Acc Crit 5.0[9])

[97] PLACE Handswitch 2-XS-72-44, CNTMT SUMP TO CNTMT SPRAY PMP A SUCT, to the NORMAL position on Board 2-MCC-213-A1, Compartment 13B.

[98] VERIFY Annunciator Window 149-C, 480 RX MOV BD 2A1-A/2A2-A, CLEARS.

[99] VERIFY Event Display Monitor reports 149-C 480 RX MOV BD 2A1-A/2A2-A XS IN AUX is NORMAL (Blue).

[100] VERIFY GREEN light is LIT at Handswitch 2-HS-72-44A, CNTMT SUMP TO CNTMT SPRAY PMP A SUCT.

[101] VERIFY RED light is NOT LIT at Handswitch 2-HS-72-44A, CNTMT SUMP TO CNTMT SPRAY PMP A SUCT.

6.3 2-FCV-72-22, and 2-FCV-72-44 Logic /Stroke Timing (continued)

NOTES

1) The following steps require valve stroke timing locally at the valve and remotely at the Control Switch in both the Open and Closed position.
2) Local timing begins with the initiating signal and is concluded with the completion of valve stem movement. Remote timing begins with the initiating signal and is concluded with the position indication lights status change.

[102] PLACE Handswitch 2-HS-72-44A, CNTMT SUMP TO CNTMT SPRAY PMP A SUCT, to the OPEN position.

A. RECORD remote opening time at HANDSWITCH 2-HS-72-44A, CNTMT SUMP TO CNTMT SPRAY PMP A SUCT. (Acc Crit 5.0[12])

seconds (* 20 seconds)

M&TE Cal Due Date B. RECORD local opening time at Valve 2-FCV-72-44, CNTMT SUMP TO CNTMT SPRAY PMP A SUCT.

seconds (_ 20 seconds)

M&TE Cal Due Date

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 74 of 249 6.3 2-FCV-72-22, and 2-FCV-72-44 Logic /Stroke Timing (continued)

[103] PLACE Handswitch 2-HS-72-44A, CNTMT SUMP TO CNTMT SPRAY PMP A SUCT, to the CLOSE position.

A. RECORD remote closing time at HANDSWITCH 2-HS-72-44A, CNTMT SUMP TO CNTMT SPRAY PMP A SUCT. (Acc Crit 5.0[12])

seconds (_ 20 seconds)

M&TE Cal Due Date B. RECORD local closing time at Valve 2-FCV-72-44, CNTMT SUMP TO CNTMT SPRAY PMP A SUCT.

seconds (< 20 seconds)

M&TE Cal Due Date

[104] OPEN Breaker 2-BKR-72-44, CNTMT SUMP TO CSP 2A-A SUCTION (2-FCV-72-44), 480V RX MOV BD 2A1-A, Compt 13B.

[105] MANUALLY TRIP the thermal overload for 2-BKR-72-44, CNTMT SUMP TO CSP 2A-A SUCTION (2-FCV-72-44), 480V RX MOV BD 2A1-A, Compt 13B.

[106] CLOSE Breaker 2-BKR-72-44, CNTMT SUMP TO CSP 2A-A SUCTION (2-FCV-72-44), 480V RX MOV BD 2A1-A, Compt 13B.

[107] PLACE Handswitch 2-HS-72-44A, CNTMT SUMP TO CNTMT SPRAY PMP A SUCT, to the OPEN position.

[108] VERIFY Valve 2-FCV-72-44, CNTMT SUMP TO CNTMT SPRAY PMP A SUCT, remains in the CLOSED position by GREEN light LIT at Handswitch 2-HS-72-44A, CNTMT SUMP TO CNTMT SPRAY PMP A SUCT (Acc Crit 5.0[8]).

[109] ENSURE that actuation of the Relay K5 in the next step will not adversly affect the other associated valves: 2-FCV-72-22, 2-FCV-72-39, 2-FCV-72-40, and 2-FCV-74-1.

6.3 2-FCV-72-22, and 2-FCV-72-44 Logic /Stroke Timing (continued)

[110] DEPRESS and HOLD the armature of Relay K5 located in back of Panel 4F on 480V RX MOV BD 2A1-1 to simulate Overload Bypass.

CV

[111] PLACE Handswitch 2-HS-72-44A, CNTMT SUMP TO CNTMT SPRAY PMP A SUCT, to the OPEN position.

[112] VERIFY Valve 2-FCV-72-44, CNTMT SUMP TO CNTMT SPRAY PMP A SUCT, OPENS by RED light LIT at Handswitch 2-HS-72-44A, CNTMT SUMP TO CNTMT SPRAY PMP A SUCT (Acc Crit 5.0[8]).

[113] RELEASE the armature of Relay K5 located in back of Panel 4F on 480V RX MOV BD 2A1-1.

[114] OPEN Breaker 2-BKR-72-44, CNTMT SUMP TO CSP 2A-A SUCTION (2-FCV-72-44), 480V RX MOV BD 2A1-A, Compt 13B.

[115] RESET the thermal overload for 2-BKR-72-44, CNTMT SUMP TO CSP 2A-A SUCTION (2-FCV-72-44), 480V RX MOV BD 2A1-A, Compt 13B.

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 76 of 249 6.4 2-FCV-72-21, and 2-FCV-72-45 Logic /Stroke Timing (RWST to Containment Spray Pump 2B-B Suction Valve 2-FCV-72-21) (682 A 1IT PIPE CH), and (Containment Sump to Containment Spray Pump 2B-B Suction Valve 2-FCV-72-45) (692 Al 3V VLV VAULT)

NOTE Performance of this section will require entry into confined spaces for access to 2-FCV-72-45.

[1] VERIFY Prerequisites listed in Section 4.0 for Subsection 6.4 have been completed.

[2] ENSURE Breaker 2-BKR-72-45, CNTMT SUMP TO CSP 2B-B SUCTION (2-FCV-72-45), 480V RX MOV BD 2B1-B, Compt 14E, is CLOSED.

[3] ENSURE locally Valve 2-FCV-72-45, CNTMT SUMP TO CNTMT SPRAY PMP B SUCT, is CLOSED.

[4] ENSURE Breaker 2-BKR-72-21, RWST TO CSP 2B-B (2-FCV-72-21), 480V C & A VENT BD 2B1 -B, Compt 7E, is OPEN.

[5] VERIFY ICS point FD2335 displays "PWR OFF".

(Acc Crit 5.0[111])

[6] CLOSE Breaker 2-BKR-72-21, RWST TO CSP 2B-B (2-FCV-72-21), 480V C & A VENT BD 2B1-B, Compt 7E.

[7] VERIFY ICS point FD2335 displays "PWR ON".

(Acc Crit 5.0[11])

[8] ENSURE Valve 2-FCV-72-21, RWST TO CNTMT SPRAY PMP B SUCTION, is CLOSED from 2-HS-72-21A at 2-M-6.

[9] VERIFY locally Valve 2-FCV-72-21, RWST TO CNTMT SPRAY PMP B SUCTION, is CLOSED.

[10] VERIFY ICS point FD2336 displays "CLOSED".

(Acc Crit 5.0[11])

6.4 2-FCV-72-21, and 2-FCV-72-45 Logic /Stroke Timing (continued)

[11] PLACE Handswitch 2-HS-72-21A, RWST TO CNTMT SPRAY PMP B SUCTION, to the OPEN position, AND WHILE valve 2-FCV-72-21 is opening, PLACE Handswitch 2-HS-72-21A RWST TO CNTMT SPRAY PMP B SUCTION to CLOSE, AND RELEASE.

[12] VERIFY the following:

A. Valve 2-FCV-72-21, RWST TO CNTMT SPRAY PMP B SUCTION, is OPEN (locally) (Acc Crit 5.0[9] & 5.0[25]).

B. RED light is LIT at Handswitch 2-HS-72-21A, RWST TO CNTMT SPRAY PMP B SUCTION. (Acc Crit 5.0[10])

C. GREEN light is NOT LIT at Handswitch 2-HS-72-21A, RWST TO CNTMT SPRAY PMP B SUCTION.

(Acc Crit 5.0[10])

[13] VERIFY ICS point FD2336 displays "NOT CLS".

(Acc Crit 5.0[11])

[14] PLACE Handswitch 2-HS-72-21A, RWST TO CNTMT SPRAY PMP B SUCTION, to the CLOSE position, AND WHILE valve 2-FCV-72-21 is closing, PLACE Handswitch 2-HS-72-21A, RWST TO CNTMT SPRAY PMP B SUCTION to OPEN, AND RELEASE.

[15] VERIFY the following:

A. Valve 2-FCV-72-21, RWST TO CNTMT SPRAY PMP B SUCTION, is CLOSED (locally). (Acc Crit 5.0[9])

B. RED light is NOT LIT at Handswitch 2-HS-72-21A, RWST TO CNTMT SPRAY PMP B SUCTION. (Acc Crit 5.0[10])

C. GREEN light is LIT at Handswitch 2-HS-72-21A, RWST TO CNTMT SPRAY PMP B SUCTION. (Acc Crit 5.0[10])

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 78 of 249 6.4 2-FCV-72-21, and 2-FCV-72-45 Logic /Stroke Timing (continued)

NOTES

1) The following steps require valve stroke timing locally at the valve and remotely at the Control Switch in both the Open and closed positions.
2) Local timing begins with the initiating signal and is concluded with the completion of the valve stem movement. Remote timing begins with the initiating signal and is concluded with the position indication lights status change.

[16] PLACE Handswitch 2-HS-72-21A, RWST TO CNTMT SPRAY PMP B SUCTION, to the OPEN position.

A. RECORD remote opening time at Handswitch 2-HS-72-21A, RWST TO CNTMT SPRAY PMP B SUCTION. (Acc Crit 5.0[12])

seconds (_ 14.6 seconds)

M&TE Cal Due Date B. RECORD local opening time at Valve 2-FCV-72-21, RWST TO CNTMT SPRAY PMP B SUCTION.

seconds (_<14.6 seconds)

M&TE Cal Due Date

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 79 of 249 6.4 2-FCV-72-21, and 2-FCV-72-45 Logic /Stroke Timing (continued)

[17] PLACE Handswitch 2-HS-72-21A, RWST TO CNTMT SPRAY PMP B SUCTION, to the CLOSE position.

A. RECORD remote closing time at Handswitch 2-HS-72-21A, RWST TO CNTMT SPRAY PMP B SUCTION. (Acc Crit 5.0[12])

seconds (:5 14.6 seconds)

M&TE Cal Due Date B. RECORD local closing time at Valve 2-FCV-72-21, RWST TO CNTMT SPRAY PMP B SUCTION.

seconds (_ 14.6 seconds)

M&TE Cal Due Date

[18] OPEN Breaker 2-BKR-72-21, RWST TO CSP 2B-B (2-FCV-72-21), 480V C & A VENT BD 2B1-B, Compt 7E.

[19] MANUALLY TRIP the thermal overload for 2-BKR-72-21, RWST TO CSP 2B-B (2-FCV-72-21), 480V C & A VENT BD 2B1-B, Compt 7E.

[20] CLOSE Breaker 2-BKR-72-21, RWST TO CSP 2B-B (2-FCV-72-21), 480V C & A VENT BD 2B1 -B, Compt 7E.

[21] PLACE Handswitch 2-HS-72-21A, RWST TO CNTMT SPRAY PMP B SUCTION, to the OPEN position.

[22] VERIFY locally Valve 2-FCV-72-21, RWST TO CNTMT SPRAY PMP B SUCTION, remains CLOSED (Acc Crit 5.0[8]).

6.4 2-FCV-72-21, and 2-FCV-72-45 Logic /Stroke Timing (continued)

[23] ENSURE that actuation of the Relay K5 in the next step will not adversly affect the other associated valves: 2-FCV-63-172, 2-FCV-63-175, 2-FCV-67-67, and 2-FCV-72-2

[24] DEPRESS and HOLD the armature of Relay K5 located in back of Panel 16D on 480V RX MOV BD 2B1-B to simulate Overload Bypass.

CV

[25] PLACE Handswitch 2-HS-72-21A, RWST TO CNTMT SPRAY PMP B SUCTION, to the OPEN position.

[26] VERIFY Valve 2-FCV-72-21, RWST TO CNTMT SPRAY PMP B SUCTION, OPENS by RED light LIT at Handswitch 2-HS-72-21A, RWST TO CNTMT SPRAY PMP B SUCTION (Acc Crit 5.0[8]).

[27] RELEASE the armature of Relay K5 located in back of Panel 16D on 480V RX MOV BD 2B1-B.

[28] OPEN Breaker 2-BKR-72-21, RWST TO CSP 2B-B (2-FCV-72-21), 480V C & A VENT BD 2B1-B, Compt 7E.

[29] RESET the thermal overload for 2-BKR-72-21, RWST TO CSP 2B-B (2-FCV-72-21), 480V C & A VENT BD 2B1 -B, Compt 7E.

[30] CLOSE Breaker 2-BKR-72-21, RWST TO CSP 2B-B (2-FCV-72-21), 480V C & A VENT BD 2B1-B, Compt 7E.

NOTE The following steps will verify Valve 2-FCV-72-21, RWST TO CNTMT SPRAY PMP B SUCTION, closed interlock for 2-FCV-72-45, CNTMT SUMP TO CNTMT SPRAY PMP B SUCT.

[31] VERIFY Valve 2-FCV-72-21, RWST TO CNTMT SPRAY PMP B SUCTION, is OPEN by RED light LIT at Handswitch 2-HS-72-21A, RWST TO CNTMT SPRAY PMP B SUCTION.

[32] VERIFY locally Valve 2-FCV-72-45, CNTMT SUMP TO CNTMT SPRAY PMP B SUCTION, is CLOSED.

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 81 of 249 6.4 2-FCV-72-21, and 2-FCV-72-45 Logic /Stroke Timing (continued)

[33] VERIFY NO CONTINUITY at Junction Box 2-JB-292-1156 (692/A13V) Terminal Block TB Terminal 5 (Wire 14E01 (white) and Terminal 12 (Wire 14ESM (Black).

[34] PLACE Handswitch 2-HS-72-45A, CNTMT SUMP TO CSPMP SUCTION, to the OPEN position at 2-M-6.

[35] VERIFY locally Valve 2-FCV-72-45, CNTMT SUMP TO CNTMT SPRAY PMP B SUCTION, remains CLOSED (Acc Crit 5.0[23]).

[36] VERIFY GREEN light is LIT at Handswitch 2-HS-72-45A, CNTMT SUMP TO CSPMP SUCTION.

[37] VERIFY RED light is NOT LIT at Handswitch 2-HS-72-45A, CNTMT SUMP TO CSPMP SUCTION.

[38] MANUALLY CLOSE Valve 2-FCV-72-21, RWST TO CNTMT SPRAY PMP B SUCTION, until RED and GREEN light LIT is observed at Handswitch 2-HS-72-21A, RWST TO CNTMT SPRAY PMP B SUCTION.

[39] VERIFY NO CONTINUITY at Junction Box 2-JB-292-1156 (692/A13V) Terminal Block TB Terminal 5 (Wire 14E01 (white) and Terminal 12 (Wire 14ESM (Black).

[40] PLACE Handswitch 2-HS-72-45A, CNTMT SUMP TO CSPMP SUCTION, to the OPEN position at 2-M-6.

[41] VERIFY locally Valve 2-FCV-72-45, CNTMT SUMP TO CNTMT SPRAY PMP B SUCTION, remains CLOSED (Acc Crit 5.0[23]).

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 82 of 249 6.4 2-FCV-72-21, and 2-FCV-72-45 Logic /Stroke Timing (continued)

[42] VERIFY GREEN light is LIT at Handswitch 2-HS-72-45A, CNTMT SUMP TO CSPMP SUCTION.

[43] VERIFY RED light is NOT LIT at Handswitch 2-HS-72-45A, CNTMT SUMP TO CSPMP SUCTION.

[44] PLACE Handswitch 2-HS-72-21A, RWST TO CNTMT SPRAY PMP B SUCTION, to the CLOSED position, AND VERIFY Valve 2-FCV-72-21, RWST TO CNTMT SPRAY PMP B SUCTION, travels to the CLOSED position by GREEN light LIT at Handswitch 2-HS-72-21 A, RWST TO CNTMT SPRAY PMP B SUCTION.

[45] VERIFY CONTINUITY at Junction Box 2-JB-292-1156 (692/A13V) Terminal Block TB Terminal 5 (Wire 14E01 (White) and Terminal 12 (Wire 14ESM (Black).

NOTE The following steps will verify Valve 2-FCV-72-45, CNTMT SUMP TO CNTMT SPRAY PMP B SUCTION, closed interlocks for Valve 2-FCV-72-21, RWST TO CNTMT SPRAY PMP B SUCTION.

[46] VERIFY CONTINUITY at Terminal Block TA across Terminal 6 (Wire 7E02) and Terminal 11 (Wire 7E04 in Junction Box 2-JB-292-770-A (676/A 1iT).

[47] VERIFY CONTINUITY at Terminal Block TA across Terminal 7 (Wire 7E03) and Terminal 11 (Wire 7E04) in Junction Box 2-JB-292-770-A (676/A 1IT).

[48] IF Train B CS suction piping is filled with water, THEN DRAIN Train B CS suction piping per 2-TOP-072-01.

[49] PLACE Handswitch 2-HS-72-45A, CNTMT SUMP TO CSPMP SUCTION, to the OPEN position

[50] VERIFY locally valve 2-FCV-72-45, CNTMT SUMP TO CNTMT SPRAY PMP B SUCTION, travels to the OPEN position (Acc Crit 5.0[9] & 5.0[23]).

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 83 of 249 6.4 2-FCV-72-21, and 2-FCV-72-45 Logic /Stroke Timing (continued)

[51] VERIFY RED light is LIT at Handswitch 2-HS-72-45A, CNTMT SUMP TO CSPMP SUCTION.

[52] VERIFY GREEN light is NOT LIT at Handswitch 2-HS-72-45A, CNTMT SUMP TO CSPMP SUCTION.

[53] VERIFY NO CONTINUITY at Terminal Block TA across Terminal 6 (Wire 7E02) and Terminal 11 (Wire 7E04 in Junction Box 2-JB-292-770-A (676/A 1iT).

[54] VERIFY NO CONTINUITY at Terminal Block TA across Terminal 7 (Wire 7E03) and Terminal 11 (Wire 7E04) in Junction Box 2-JB-292-770-A (676/A 1iT).

[55] PLACE Handswitch 2-HS-72-21A, RWST TO CNTMT SPRAY PMP B SUCTION, to the OPEN position.

[56] VERIFY Valve 2-FCV-72-21, RWST TO CNTMT SPRAY PMP B SUCTION, remains CLOSED by observing GREEN light LIT at Handswitch 2-HS-72-21A, CNTMT SUMP TO CNTMT SPRAY PMP B SUCT. (Acc Crit 5.0[25]).

[57] MANUALLY CLOSE Valve 2-FCV-72-45, CNTMT SUMP TO CNTMT SPRAY PMP B SUCTION, until the RED and GREEN lights are LIT at Handswitch 2-HS-72-45A, CNTMT SUMP TO CSPMP SUCTION.

[58] VERIFY NO CONTINUITY at Terminal Block TA across Terminal 6 (Wire 7E02) and Terminal 11 (Wire 7E04 in Junction Box 2-JB-292-770-A (676/A 1iT).

[59] VERIFY NO CONTINUITY at Terminal Block TA across Terminal 7 (Wire 7E03) and Terminal 11 (Wire 7E04) in Junction Box 2-JB-292-770-A (676/A 1IT).

[60] PLACE Handswitch 2-HS-72-21A, RWST TO CNTMT SPRAY PMP B SUCTION, to the OPEN position.

[61] VERIFY 2-FCV-72-21, RWST TO CNTMT SPRAY PMP B SUCTION, remains CLOSED by observing GREEN light LIT at Handswitch 2-HS-72-21A, RWST TO CNTMT SPRAY PMP B SUCTION (Acc Crit 5.0[25]).

[62] PLACE Handswitch 2-HS-72-45A, CNTMT SUMP TO CSPMP SUCTION, to the CLOSE position.

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 84 of 249 6.4 2-FCV-72-21, and 2-FCV-72-45 Logic /Stroke Timing (continued)

[63] VERIFY 2-FCV-72-45 CNTMT SUMP TO CNTMT SPRAY PMP B SUCTION travels to the CLOSED position by GREEN light LIT at Handswitch 2-HS-72-45A, CNTMT SUMP TO CSPMP SUCTION. (Acc Crit 5.0[9])

[64] ENSURE Handswitch 2-XS-72-45, CNTMT SUMP TO CNTMT SPRAY PMP B SUCTION, is in the NORMAL position at Board 2-MCC-213-Al, 480V REACTOR MOV BOARD 2A1 -A, Compartment 14E.

[65] OPEN Breaker 2-BKR-72-45, CNTMT SUMP TO CSP 2B-B SUCTION (2-FCV-72-45), 480V RX MOV BD 2B1-B, Compt 14E.

[66] VERIFY ICS point FD2337 displays "PWR OFF".

(Acc Crit 5.0[11])

[67] CLOSE Breaker 2-BKR-72-45, CNTMT SUMP TO CSP 2B-B SUCTION (2-FCV-72-45), 480V RX MOV BD 2B1-B, Compt 14E.

[68] VERIFY ICS point FD2337 displays "PWR ON".

(Acc Crit 5.0[11])

[69] VERIFY ICS point FD2338 displays "NOT OPE".

(Acc Crit 5.0[11])

[70] ENSURE Annunciator Window 131-F on Panel 2-XA-55-6D, ESF COMPONENT NOT NORMAL; is CLEAR.

[71] ENSURE Event Display Monitor reports 131-F ESF ABNORMAL RECIRCULATION LINE UP is NORMAL (Blue).

[72] PLACE Handswitch 2-HS-72-45C, CNTMT SUMP TO CNTMT SPRAY PMP B SUCTION, to the OPEN position, then to NORMAL on Board 2-MCC-213-B1, Compartment 14E.

[73] VERIFY Valve 2-FCV-72-45, CNTMT SUMP TO CNTMT SPRAY PMP B SUCTION, remains in the CLOSED position by GREEN light LIT at Handswitch 2-HS-72-45C, CNTMT SUMP TO CNTMT SPRAY PMP B SUCTION at Board 2-MCC-213-B1, Compartment 14E.

6.4 2-FCV-72-21, and 2-FCV-72-45 Logic /Stroke Timing (continued)

[74] PLACE Handswitch 2-HS-72-45A, CNTMT SUMP TO CSPMP SUCTION, to the OPEN position, AND WHILE valve 2-FCV-72-45, CNTMT SUMP TO CNTMT SPRAY PMP B SUCTION, is opening, PLACE Handswitch 2-HS-72-45A, CNTMT SUMP TO CSPMP SUCTION, to CLOSE, AND RELEASE.

[75] VERIFY the following:

A. During valve travel the RED run light is LIT at Breaker 2-BKR-72-45, CNTMT SUMP TO CSP 2B-B SUCTION (2-FCV-72-45), 480V RX MOV BD 2B1-B, Compt 14E.

B. Annunciator Window 131-F on Panel 2-XA-55-6D, ESF COMPONENT NOT NORMAL, ALARMS (Acc Crit 5.0[6]).

C. Event Display Monitor reports 131-F ESF ABNORMAL RECIRCULATION LINE UP is in ALARM (RED).

D. RED light is LIT at Handswitch 2-HS-72-45A, CNTMT SUMP TO CSPMP SUCTION. (Acc Crit 5.0[10])

E. GREEN light is NOT LIT at Handswitch 2-HS-72-45A, CNTMT SUMP TO CSPMP SUCTION. (Acc Crit 5.0110])

F. RED light is LIT at Handswitch 2-HS-72-45C, CNTMT SUMP TO CNTMT SPRAY PMP B SUCTION, at Board 2-MCC-213-B1, Compartment 14E.

(Acc Crit 5.0[10])

G. GREEN light is NOT LIT at Handswitch 2-HS-72-45C, CNTMT SUMP TO CNTMT SPRAY PMP B SUCTION, at Board 2-MCC-213-B1, Compartment 14E.

(Acc Crit 5.0[10])

H. Valve 2-FCV-72-45, CNTMT SUMP TO CNTMT SPRAY PMP B SUCTION, is OPEN locally.

6.4 2-FCV-72-21, and 2-FCV-72-45 Logic /Stroke Timing (continued)

[76] VERIFY ICS point FD2338 displays "OPEN".

(Acc Crit 5.0[11])

[77] PLACE Handswitch 2-HS-72-45C, CNTMT SUMP TO CNTMT SPRAY PMP B SUCTION, to the CLOSE position then to NORMAL at Board 2-MCC-213-B1, Compartment 14E.

[78] VERIFY Valve 2-FCV-72-45, CNTMT SUMP TO CNTMT SPRAY PMP B SUCTION, remains in the OPEN position by RED light LIT at Handswitch 2-HS-72-45C, CNTMT SUMP TO CNTMT SPRAY PMP B SUCTION.

[79] PLACE Handswitch 2-HS-72-45A, CNTMT SUMP TO CSPMP SUCTION, to the CLOSE position, AND WHILE valve 2-FCV-72-45, CNTMT SUMP TO CNTMT SPRAY PMP B SUCTION, is closing, PLACE Handswitch 2-HS-72-45A, CNTMT SUMP TO CSPMP SUCTION, to OPEN, AND RELEASE.

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 87 of 249 6.4 2-FCV-72-21, and 2-FCV-72-45 Logic /Stroke Timing (continued)

[80] VERIFY the following:

A. Annunciator Window 131-F on Panel 2-XA-55-6D, ESF COMPONENT NOT NORMAL, CLEARS.

B. Event Display Monitor reports 131-F ESF ABNORMAL RECIRCULATION LINE UP is NORMAL (Blue).

C. RED light is NOT LIT at Handswitch 2-HS-72-45A, CNTMT SUMP TO CSPMP SUCTION. (Acc Crit 5.0[10])

D. GREEN light is LIT at Handswitch 2-HS-72-45A, CNTMT SUMP TO CSPMP SUCTION. (Acc Crit 5.0[10])

E. RED light is NOT LIT at Handswitch 2-HS-72-45C, CNTMT SUMP TO CNTMT SPRAY PMP B SUCTION, at Board 2-MCC-213-B1, Compartment 14E.

(Acc Crit 5.0[10])

F. GREEN light LIT at Handswitch 2-HS-72-45C, CNTMT SUMP TO CNTMT SPRAY PMP B SUCTION, at Board 2-MCC-213-B1, Compartment 14E.

(Acc Crit 5.0[10])

G. Valve 2-FCV-72-45 CNTMT SUMP TO CNTMT SPRAY PMP B SUCTION is CLOSED, locally.

[81] ENSURE Annunciator Window 150-C on Panel 2-XA-55-6F, 480 RX MOV BD 2B1-B1/2B2-B, is CLEAR.

[82] ENSURE Event Display Monitor reports 150-C 480 RX MOV BD 2B1-B/2B2-B XS IN AUX is NORMAL (Blue).

[83] PLACE Handswitch 2-XS-72-45, CNTMT SUMP TO CNTMT SPRAY PMP B SUCT, in the Aux position on Board 2-MCC-213-B1, compartment 14E.

[84] VERIFY Annunciator Window 150-C, 480 RX MOV BD 2B1-B/2B2-B, ALARMS (Acc Crit 5.0[5]).

[85] VERIFY Event Display Monitor reports 150-C 480 RX MOV BD 2B1-B/2B2-B XS IN AUX is in ALARM (RED).

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 88 of 249 6.4 2-FCV-72-21, and 2-FCV-72-45 Logic /Stroke Timing (continued)

[86] VERIFY RED and GREEN lights are NOT LIT at Handswitch 2-HS-72-45A, CNTMT SUMP TO CSPMP SUCTION. (Acc Crit 5.0[10])

[87] PLACE Handswitch 2-HS-72-45A, CNTMT SUMP TO CSPMP SUCTION, to the OPEN position.

[88] VERIFY locally Valve 2-FCV-72-45, CNTMT SUMP TO CNTMT SPRAY PMP B SUCT, remains CLOSED.

[89] PLACE Handswitch 2-HS-72-45C, CNTMT SUMP TO CNTMT SPRAY PMP B SUCT, to the OPEN position then to NORMAL.

[90] VERIFY the following:

A. RED light is LIT at Handswitch 2-HS-72-45C, CNTMT SUMP TO CNTMT SPRAY PMP B SUCT, at Board 2-MCC-213-B1, compartment 14E.

B. GREEN light is NOT LIT at Handswitch 2-HS-72-45C, CNTMT SUMP TO CNTMT SPRAY PMP B SUCT, at Board 2-MCC-213-B1, compartment 14E.

C. RED and GREEN lights are NOT LIT at Handswitch 2-HS-72-45A, CNTMT SUMP TO CSPMP SUCTION.

[91] VERIFY locally Valve 2-FCV-72-45, CNTMT SUMP TO CNTMT SPRAY PMP B SUCTION, is OPEN. (Acc Crit 5.0[9])

[92] PLACE Handswitch 2-HS-72-45A, CNTMT SUMP TO CSPMP SUCTION, to the CLOSE position.

[93] VERIFY locally Valve 2-FCV-72-45, CNTMT SUMP TO CNTMT SPRAY PMP B SUCTION, remains OPEN.

[94] PLACE Handswitch 2-HS-72-45C, CNTMT SUMP TO CNTMT SPRAY PMP B SUCTION, at Board 2-MCC-213-B1, Compartment 14E, to the CLOSE position, then to NORMAL.

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 89 of 249 6.4 2-FCV-72-21, and 2-FCV-72-45 Logic /Stroke Timing (continued)

[95] VERIFY the following:

A. RED light is NOT LIT at Handswitch 2-HS-72-45C, CNTMT SUMP TO CNTMT SPRAY PMP B SUCTION at Board 2-MCC-213-B1, Compartment 14E.

B. GREEN light is LIT at Handswitch2-HS-72-45C, CNTMT SUMP TO CNTMT SPRAY PMP B SUCTION at Board 2-MCC-213-B1, Compartment 14E.

C. RED and GREEN lights are NOT LIT at Handswitch 2-HS-72-45A, CNTMT SUMP TO CSPMP SUCTION

[2-M-6].

[96] VERIFY locally Valve 2-FCV-72-45, CNTMT SUMP TO CNTMT SPRAY PMP B SUCT, is CLOSED. (Acc Crit 5.0[9])

[97] PLACE Handswitch 2-XS-72-45, CNTMT SUMP TO CNTMT SPRAY PMP B SUCT, to the NORMAL position on Board 2-MCC-213-B1, Compartment 14E.

[98] VERIFY Annunciator Window 150-C, 480 RX MOV BD 2B1-B/2B2-B, CLEARS.

[99] VERIFY Event Display Monitor reports 150-C 480 RX MOV BD 2B1-B1/2B2-B XS IN AUX is NORMAL (Blue).

[100] VERIFY GREEN light is LIT at Handswitch 2-HS-72-45A, CNTMT SUMP TO CSPMP SUCTION.

[101] VERIFY RED light is NOT LIT at Handswitch.2-HS-72-45A, CNTMT SUMP TO CSPMP SUCTION.

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 90 of 249 6.4 2-FCV-72-21, and 2-FCV-72-45 Logic/Stroke Timing (continued)

NOTES

1) The following steps require valve stroke timing locally at the valve and remotely at the Control Switch in both the Open and Closed position.
2) Local timing begins with the initiating signal and is concluded with the completion of valve stem movement. Remote timing begins with the initiating signal and is concluded with the position indication lights status change.

[102] PLACE Handswitch 2-HS-72-45A, CNTMT SUMP TO CSPMP SUCTION, to the OPEN position.

A. RECORD remote opening time at HANDSWITCH 2-HS-72-45A, CNTMT SUMP TO CSPMP SUCTION.

(Acc Crit 5.0[12])

seconds (< 20 seconds)

M&TE Cal Due Date B. RECORD local opening time at Valve 2-FCV-72-45, CNTMT SUMP TO CNTMT SPRAY PMP B SUCT.

seconds (< 20 seconds)

M&TE Cal Due Date

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 91 of 249 6.4 2-FCV-72-21, and 2-FCV-72-45 Logic /Stroke Timing (continued)

[103] PLACE Handswitch 2-HS-72-45A, CNTMT SUMP TO CSPMP SUCTION, to the CLOSE position.

A. RECORD remote closing time at HANDSWITCH 2-HS-72-45A, CNTMT SUMP TO CSPMP SUCTION. (Acc Crit 5.0[12])

seconds (_ 20 seconds)

M&TE Cal Due Date B. RECORD local closing time at Valve 2-FCV-72-45, CNTMT SUMP TO CNTMT SPRAY PMP B SUCT.

seconds (_ 20 seconds)

M&TE Cal Due Date

[104] OPEN Breaker 2-BKR-72-45, CNTMT SUMP TO CSP 2B-B SUCTION (2-FCV-72-45), 480V RX MOV BD 2B1-B, Compt 14E.

[105] MANUALLY TRIP the thermal overload for 2-BKR-72-45, CNTMT SUMP TO CSP 2B-B SUCTION (2-FCV-72-45), 480V RX MOV BD 2B1-B, Compt 14E.

[106] CLOSE Breaker 2-BKR-72-45, CNTMT SUMP TO CSP 2B-B SUCTION (2-FCV-72-45), 480V RX MOV BD 2B1-B, Compt 14E.

[107] PLACE Handswitch 2-HS-72-45A, CNTMT SUMP TO CSPMP SUCTION, to the OPEN position.

[108] VERIFY Valve 2-FCV-72-45, CNTMT SUMP TO CNTMT SPRAY PMP B SUCTION, remains in the CLOSED position by GREEN light LIT at Handswitch 2-HS-72-45A, CNTMT SUMP TO CSPMP SUCTION. (Acc Crit 5.0[8])

[109] ENSURE that actuation of the Relay K6 in the next step will not adversly affect the other associated valves: 2-FCV-74-2, 2-FCV-74-21, 2-FCV-74-24, and 2-FCV-74-35.

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 92 of 249 6.4 2-FCV-72-21, and 2-FCV-72-45 Logic/Stroke Timing (continued)

[110] DEPRESS and HOLD the armature of Relay K6 located in back of Panel 16D on 480V RX MOV BD 2B1-B to simulate Overload Bypass.

CV

[111] PLACE Handswitch 2-HS-72-45A, CNTMT SUMP TO CSPMP SUCTION, to the OPEN position.

[112] VERIFY Valve 2-FCV-72-45, CNTMT SUMP TO CNTMT SPRAY PMP B SUCTION, OPENS by RED light LIT at Handswitch 2-HS-72-45A, CNTMT SUMP TO CSPMP SUCTION. (Acc Crit 5.0[8])

[113] RELEASE the armature of Relay K6 located in back of Panel 16D on 480V RX MOV BD 2B1-B.

[114] OPEN Breaker 2-BKR-72-45, CNTMT SUMP TO CSP 2B-B SUCTION (2-FCV-72-45), 480V RX MOV BD 2B1-B, Compt 14E.

[115] RESET the thermal overload for 2-BKR-72-45, CNTMT SUMP TO CSP 2B-B SUCTION (2-FCV-72-45), 480V RX MOV BD 2B1-B, Compt 14E.

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 93 of 249 6.5 2-FCV-72-40 Logic/Stroke Timing (Residual Heat Removal (RHR) Train A Spray Header Isolation Flow Control Valve)

(723 All V BIT RM)

NOTE Throughout this Subsection, when directed by the Test Director 2-TOP-074-01 may be used for activities such as filling, draining, or venting for Train A RHR piping

[1] VERIFY Prerequisites listed in Section 4.0 for Subsection 6.5 have been completed.

[2] ENSURE the Valves listed are positioned as follows:

A. 2-FCV-72-2, CNTMT SPRAY HDR B TO CNTMT, is CLOSED.

B. 2-FCV-72-39, CNTMT SPRAY HDR A TO CNTMT, is CLOSED.

C. 2-FCV-72-41, RHR SPRAY HDR B TO CNTMT, is CLOSED.

[3] ENSURE Handswitch 2-XS-72-40, RHR SPRAY HDR A TO CNTMT, to the NORMAL position at Board 2-MCC-213-Al, 480V REACTOR MOV BOARD 2A1-A, Compartment 14A.

[4] ENSURE Breaker 2-BKR-72-40, RHR SPRAY HDR A ISOL (2-FCV-72-40), 480V RX MOV BD 2A1-A, Compt 14A, is OPEN.

[5] VERIFY ICS point FD2187 displays "PWR OFF".

(Acc Crit 5.0[11])

[6] CLOSE Breaker 2-BKR-72-40, RHR SPRAY HDR A ISOL (2-FCV-72-40), 480V RX MOV BD 2A1-A, Compt 14A.

[7] VERIFY ICS point FD2187 displays "PWR ON".

(Acc Crit 5.0[11])

[8] VERIFY locally Valve 2-FCV-72-40, RHR SPRAY HDR A TO CNTMT, is CLOSED.

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 94 of 249 6.5 2-FCV-72-40 Logic/Stroke Timing (continued)

[9] VERIFY ICS point FD2188 displays "NOT OPE".

(Acc Crit 5.0[11])

[10] ENSURE Breaker 2-BKR-63-72, CNTMT SUMP TO RHR PMP A SUCT, is CLOSED at Board 2-MCC-213-Al, 480V REACTOR MOV BOARD 2A1-A, Compartment 12B.

[11] PLACE Handswitch 2-HS-63-72A, CNTMT SUMP TO RHR PMP A SUCT, to the CLOSE position on 2-M-6.

[12] VERIFY locally Valve 2-FCV-63-72, CNTMT SUMP TO RHR PMP A SUCT, is CLOSED.

[13] VERIFY NO CONTINUITY at Terminal Block TB across Terminal 6 (Wire 14A02) and Terminal 11 (Wire 14A07) in Junction Box 2-JB-292-1360-A (713/Al 1V).

[14] VERIFY NO CONTINUITY at Terminal Block TB across Terminal 7 (Wire 14A03) and Terminal 11 (Wire 14A07) in Junction Box 2-JB-292-1360-A (713/Al1V).

[15] PLACE Handswitch 2-HS-72-40A, RHR SPRAY HDR A TO CNTMT, to the OPEN position.

[16] VERIFY locally Valve 2-FCV-72-40, RHR SPRAY HDR A TO CNTMT, remains in the CLOSED position (Acc Crit 5.0[29]).

[17] MANUALLY OPEN Valve 2-FCV-63-72, CNTMT SUMP TO RHR PMP A SUCT, until RED and GREEN light LIT is observed at Handswitch 2-HS-63-72A, CNTMT SUMP TO RHR PMP A SUCT.

[18] VERIFY NO CONTINUITY at Terminal Block TB across Terminal 6 (Wire 14A02) and Terminal 11 (Wire 14A07) in Junction Box 2-JB-292-1360-A (713/Al 1V).

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 95 of 249 6.5 2-FCV-72-40 Logic/Stroke Timing (continued)

[19] VERIFY NO CONTINUITY at Terminal Block TB across Terminal 7 (Wire 14A03) and Terminal 11 (Wire 14A07) in Junction Box 2-JB-292-1360-A (713/A 11V).

[20] PLACE Handswitch 2-HS-72-40A, RHR SPRAY HDR A TO CNTMT, to the OPEN position.

[21] VERIFY locally Valve 2-FCV-72-40, RHR SPRAY HDR A TO CNTMT, remains in the CLOSED position. (Acc Crit 5.0[29])

[22] PLACE Handswitch 2-HS-63-72A, CNTMT SUMP TO RHR PMP A SUCT, to the OPEN position.

[23] VERIFY locally Valve 2-FCV-63-72, CNTMT SUMP TO RHR PMP A SUCT, is OPEN.

[24] VERIFY CONTINUITY at Terminal Block TB across Terminal 6 (Wire 14A02) and Terminal 11 (Wire 14A07) in Junction Box 2-JB-292-1360-A (713/Al1V).

[25] VERIFY CONTINUITY at Terminal Block TB across Terminal 7 (Wire 14A03) and Terminal 11 (Wire 14A07) in Junction Box 2-JB-292-1360-A (713/Al1V).

[26] ENSURE Annunciator Window 134-E on Panel 2-XA-55-6D, CNTMT/RHR SPRAY FCV-72-2/39/40/41 NOT CLOSED, is CLEAR.

[27] ENSURE Event Display Monitor reports 134-E, CNTMT/RHR SPRAY FCV-72-39/40 NOT CLOSED, is NORMAL (Blue).

[28] ENSURE Annunciator Window 131-F on Panel 2-XA-55-6D, ESF COMPONENT NOT NORMAL, is CLEAR.

[29] ENSURE Event Display Monitor reports 131-F ESF ABNORMAL RECIRCULATION MODE is NORMAL (Blue).

[30] PLACE Handswitch 2-HS-72-40C, RHR SPRAY HDR A TO CNTMT, to the OPEN position, then to NORMAL.

[31] VERIFY Valve 2-FCV-72-40, RHR SPRAY HDR A TO CNTMT, remains in the CLOSED position by GREEN light LIT at Handswitch 2-HS-72-40C, RHR SPRAY HDR A TO CNTMT.

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 96 of 249 6.5 2-FCV-72-40 Logic/Stroke Timing (continued)

[32] PLACE Handswitch 2-HS-72-40A, RHR SPRAY HDR A TO CNTMT, to the OPEN position, AND WHILE valve 2-FCV-72-40, RHR SPRAY HDR A TO CNTMT, is opening, PLACE Handswitch 2-HS-72-40A, RHR SPRAY HDR A TO CNTMT, to CLOSE, AND RELEASE.

[33] VERIFY the following:

A. During valve travel the RED run light is LIT at Breaker 2-BKR-72-40, RHR SPRAY HDR A ISOL (2-FCV-72-40),

480V RX MOV BD 2A1-A, Compt 14A.

B. Annunciator Window 134-E on Panel 2-XA-55-6D, CNTMT/RHR SPRAY FCV-72-2/39/40/41 NOT CLOSED, ALARMS (Acc Crit 5.0[7]).

C. Event Display Monitor reports 134-E, CNTMT/RHR SPRAY FCV-72-39/40 NOT CLOSED, is in ALARM (RED).

D. Annunciator Window 131-F on Panel 2-XA-55-6D, ESF COMPONENT NOT NORMAL, ALARMS (Acc Crit 5.0[6]).

E. Event Display Monitor reports 131-F ESF ABNORMAL RECIRCULATION MODE is in ALARM (RED).

F. RED light is LIT at Handswitch 2-HS-72-40A, RHR SPRAY HDR A TO CNTMT. (Acc Crit 5.0[10])

G. GREEN light is NOT LIT at Handswitch 2-HS-72-40A, RHR SPRAY HDR A TO CNTMT. (Acc Crit 5.0[10])

H. RED light is LIT at Handswitch 2-HS-72-40C, RHR SPRAY HDR A TO CNTMT, at Board 2-MCC-213-A1, compartment 14A. (Acc Crit 5.0[10])

I. GREEN light is NOT LIT at Handswitch 2-HS-72-40C, RHR SPRAY HDR A TO CNTMT, at Board 2-MCC-213-A1, compartment 14A.

(Acc Crit 5.0[10])

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 97 of 249 6.5 2-FCV-72-40 Logic/Stroke Timing (continued)

[34] VERIFY locally Valve 2-FCV-72-40, RHR SPRAY HDR A TO CNTMT, is OPEN (Acc Crit 5.0[9] & 5.0[29]).

[35] VERIFY ICS point FD2188 displays "OPEN".

(Acc Crit 5.0[11])

[36] PLACE Handswitch 2-HS-72-40C, RHR SPRAY HDR A TO CNTMT, to the CLOSE position, then to NORMAL.

[37] VERIFY Valve 2-FCV-72-40, RHR SPRAY HDR A TO CNTMT, remains in the OPEN position by RED light LIT at Handswitch 2-HS-72-40A, RHR SPRAY HDR A TO CNTMT.

[38] PLACE Handswitch 2-HS-72-40A, RHR SPRAY HDR A TO CNTMT, to the CLOSE position, AND WHILE valve 2-FCV-72-40, RHR SPRAY HDR A TO CNTMT, is closing, PLACE Handswitch 2-HS-72-40A, RHR SPRAY HDR A TO CNTMT, to OPEN, AND RELEASE.

[39] VERIFY the following:

A. Annunciator Window 134-E on Panel 2-XA-55-6D, CNTMT/RHR SPRAY FCV-72-2/39/40/41 NOT CLOSED, CLEARS.

B. Event Display Monitor reports 134-E, CNTMT/RHR SPRAY FCV-72-39/40 NOT CLOSED, is NORMAL (Blue).

C. Annunciator Window 131-F on Panel 2-XA-55-6D, ESF COMPONENT NOT NORMAL, CLEARS.

D. Event Display Monitor reports 131-F ESF ABNORMAL RECIRCULATION MODE is NORMAL (Blue).

E. GREEN light is LIT at Handswitch 2-HS-72-40A, RHR SPRAY HDR A TO CNTMT. (Acc Crit 5.0[10])

F. RED light is NOT LIT at Handswitch 2-HS-72-40A, RHR SPRAY HDR A TO CNTMT. (Acc Crit 5.0[110])

6.5 2-FCV-72-40 Logic/Stroke Timing (continued)

G. GREEN light is LIT at Handswitch 2-HS-72-40C, RHR SPRAY HDR A TO CNTMT, at Board 2-MCC-213-Al, Compartment 14A. (Acc Crit 5.0[10])

H. RED light is NOT LIT at Handswitch 2-HS-72-40C, RHR SPRAY HDR A TO CNTMT, at Board 2-MCC-213-Al, Compartment 14A. (Acc Crit 5.0[10])

[40] VERIFY locally Valve 2-FCV-72-40, RHR SPRAY HDR A TO CNTMT, is CLOSED. (Acc Crit 5.0[9])

[41] ENSURE Annunciator Window 149-C on Panel 2-XA-55-6F, 480 RX MOV BD 2A1-A/2A2-A, is CLEAR.

[42] ENSURE Event Display Monitor reports 149C, 480 RX MOV BD 2A1-A/2A2-A XS IN AUX, is NORMAL (Blue).

[43] PLACE Handswitch 2-XS-72-40, RHR SPRAY HDR A TO CNTMT, in the AUX position at Board 2-MCC-213-A1, Compartment 14A.

[44] VERIFY the following:

A. RED and GREEN lights at Handswitch 2-HS-72-40A, RHR SPRAY HDR A TO CNTMT, are NOT LIT.

(Acc Crit 5.0[10])

B. Annunciator Window 149-C on Panel 2-XA-55-6F, 480 RX MOV BD 2A1-A/2A2-A, ALARMS (Acc Crit 5.0[4]).

C. Event Display Monitor reports 149-C, 480 RX MOV BD 2A1-A/2A2-A XS IN AUX, is in ALARM (RED).

[45] PLACE Handswitch 2-HS-72-40A, RHR SPRAY HDR A TO CNTMT, to the OPEN position.

[46] VERIFY locally Valve 2-FCV-72-40, RHR SPRAY HDR A TO CNTMT, remains in the CLOSED position.

[47] PLACE Handswitch 2-HS-72-40C, RHR SPRAY HDR A TO CNTMT, to the OPEN position, then to NORMAL.

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 99 of 249 6.5 2-FCV-72-40 Logic/Stroke Timing (continued)

[48] VERIFY the following:

A. Locally Valve 2-FCV-72-40, RHR SPRAY HDR A TO CNTMT, travels to the OPEN position. (Acc Crit 5.0[9])

B. RED light is LIT at Handswitch 2-HS-72-40C, RHR SPRAY HDR A TO CNTMT.

C. GREEN light is NOT LIT at Handswitch 2-HS-72-40C, RHR SPRAY HDR A TO CNTMT.

D. RED and GREEN lights at Handswitch 2-HS-72-40A, RHR SPRAY HDR A TO CNTMT, are NOT LIT.

[49] PLACE Handswitch 2-HS-72-40A, RHR SPRAY HDR A TO CNTMT, to the CLOSE position.

[50] VERIFY Valve 2-FCV-72-40, RHR SPRAY HDR A TO CNTMT, remains in the OPEN position.

[51] PLACE Handswitch 2-HS-72-40C, RHR SPRAY HDR A TO CNTMT, to the CLOSE position, then to NORMAL.

[52] VERIFY the following:

A. Locally Valve 2-FCV-72-40, RHR SPRAY HDR A TO CNTMT, travels to the CLOSED position.

(Acc Crit 5.0[9])

B. GREEN light is LIT at Handswitch 2-HS-72-40C, RHR SPRAY HDR A TO CNTMT.

C. RED light is NOT LIT at Handswitch 2-HS-72-40C, RHR SPRAY HDR A TO CNTMT.

[53] PLACE Handswitch 2-XS-72-40, RHR SPRAY HDR A TO CNTMT, in the NORMAL position.

[54] VERIFY the following:

A. Annunciator Window 149-C on Panel 2-XA-55-6F, 480 RX MOV BD 2A1-A/2A2-A, CLEARS.

B. Event Display Monitor reports 149C, 480 RX MOV BD 2A1-A/2A2-A XS IN AUX, is NORMAL (Blue).

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 100 of 249 6.5 2-FCV-72-40 Logic/Stroke Timing (continued)

NOTES

1) The following steps require valve stroke timing locally at the valve and remotely at the Control Switch in both the Open and Closed position.
2) Local timing begins with the initiating signal and is concluded with the completion of valve stem movement. Remote timing begins with the initiating signal and is concluded with position indication lights status change.

[55] PLACE Handswitch 2-HS-72-40A, RHR SPRAY HDR A TO CNTMT, to the OPEN position.

A. RECORD remote opening time at Handswitch 2-HS-72-40A, RHR SPRAY HDR A TO CNTMT. (Acc Crit 5.0[12])

seconds (< 15 seconds)

M&TE Cal Due Date B. RECORD local opening time at Valve 2-FCV-72-40, RHR SPRAY HDR A TO CNTMT.

seconds (< 15 seconds)

M&TE Cal Due Date

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 101 of 249 6.5 2-FCV-72-40 Logic/Stroke Timing (continued)

[56] PLACE Handswitch 2-HS-72-40A, RHR SPRAY HDR A TO CNTMT, to the CLOSE position.

A. RECORD remote closing time at Handswitch 2-HS-72-40A, RHR SPRAY HDR A TO CNTMT. (Acc Crit 5.0[12])

seconds (_ 15 seconds)

M&TE Cal Due Date B. RECORD local closing time at Valve 2-FCV-72-40, RHR SPRAY HDR A TO CNTMT.

seconds (< 15 seconds)

M&TE Cal Due Date

[57] OPEN Breaker 2-BKR-72-40, RHR SPRAY HDR A ISOL (2-FCV-72-40), 480V RX MOV BD 2A1-A, Compt 14A.

[58] MANUALLY TRIP the thermal overload for 2-BKR-72-40, RHR SPRAY HDR A ISOL (2-FCV-72-40), 480V RX MOV BD 2A1-A, Compt 14A.

[59] CLOSE Breaker 2-BKR-72-40, RHR SPRAY HDR A ISOL (2-FCV-72-40), 480V RX MOV BD 2A1-A, Compt 14A.

[60] PLACE Handswitch 2-HS-72-40A, RHR SPRAY HDR A TO CNTMT, to the OPEN position.

[61] VERIFY Valve 2-FCV-72-40, RHR SPRAY HDR A TO CNTMT, remains CLOSED by GREEN light LIT at Handswitch 2-HS-72-40A, RHR SPRAY HDR A TO CNTMT (Acc Crit 5.0[8]).

[62] ENSURE that actuation of the Relay K5 in the next step will not adversly affect the other associated valves: 2-FCV-72-22, 2-FCV-72-39, 2-FCV-72-44, and 2-FCV-74-1.

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 102 of 249 6.5 2-FCV-72-40 Logic/Stroke Timing (continued)

[63] DEPRESS and HOLD the armature of Relay K5 located in back of Panel 4F on 480V RX MOV BD 2A1 -A to simulate Overload Bypass.

CV

[64] PLACE Handswitch 2-HS-72-40A, RHR SPRAY HDR A TO CNTMT, to the OPEN position.

[65] VERIFY Valve 2-FCV-72-40, RHR SPRAY HDR A TO CNTMT, OPENS by RED light LIT at Handswitch 2-HS-72-40A, RHR SPRAY HDR A TO CNTMT (Acc Crit 5.0[8]).

[66] RELEASE the armature of Relay K5 located in back of Panel 4F on 480V RX MOV BD 2A1-A.

[67] OPEN Breaker 2-BKR-72-40, RHR SPRAY HDR A ISOL (2-FCV-72-40), 480V RX MOV BD 2A1-A, Compt 14A.

[68] RESET the thermal overload for 2-BKR-72-40, RHR SPRAY HDR A ISOL (2-FCV-72-40), 480V RX MOV BD 2A1-A, Compt 14A.

[69] PLACE Handswitch 2-HS-63-72A, CNTMT SUMP TO RHR PMP A SUCT, to the CLOSE position.

[70] VERIFY Valve 2-FCV-63-72, CNTMT SUMP TO RHR PMP A SUCT, CLOSES by GREEN light LIT at Handswitch 2-HS-63-72A, CNTMT SUMP TO RHR PMP A SUCT.

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 103 of 249 6.6 2-FCV-72-41 Logic/Stroke Timing (Residual Heat Removal (RHR) Train B Spray Header Isolation Flow Control Valve)

(723 A 1lV BIT RM)

NOTE Throughout this Subsection, when directed by the Test Director 2-TOP-074-01 may be used for activities such as filling, draining, or venting for Train B RHR piping

[1] VERIFY Prerequisites listed in Section 4.0 for Subsection 6.6 have been completed.

[2] ENSURE the Valves listed are positioned as follows:

A. 2-FCV-72-2, CNTMT SPRAY HDR B TO CNTMT, is CLOSED.

B. 2-FCV-72-39, CNTMT SPRAY HDR A TO CNTMT, is CLOSED.

C. 2-FCV-72-40, RHR SPRAY HDR A TO CNTMT, is CLOSED.

[3] ENSURE Handswitch 2-XS-72-41, RHR SPRAY HDR B TO CNTMT, to the NORMAL position at Board 2-MCC-213-BI, 480V REACTOR MOV BOARD 2B1-B, Compartment 14D.

[4] ENSURE Breaker 2-BKR-72-41, RHR SPRAY HDR B ISOL (2-FCV-72-41), 480V RX MOV BD 2B1-B, Compt 14D, is OPEN.

[5] VERIFY ICS point FD2339 displays "PWR OFF".

(Acc Crit 5.0[11])

[6] CLOSE Breaker 2-BKR-72-41, RHR SPRAY HDR B ISOL (2-FCV-72-41), 480V RX MOV BD 2B1-B, Compt 14D.

[7] VERIFY ICS point FD2339 displays "PWR ON".

(Acc Crit 5.0[111])

[8] VERIFY locally Valve 2-FCV-72-41, RHR SPRAY HDR B TO CNTMT, is CLOSED.

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 104 of 249 6.6 2-FCV-72-41 Logic/Stroke Timing (continued)

[9] VERIFY ICS point FD2340 displays "NOT OPE".

(Acc Crit 5.0[11])

[10] ENSURE Breaker 2-BKR-63-73, CNTMT SUMP TO RHR PMP B SUCT, is CLOSED at Board 2-MCC-213-B1, 480V REACTOR MOV BOARD 2B1-B, Compartment 12D.

[11] PLACE Handswitch 2-HS-63-73A, CNTMT SUMP TO RHR PMP B SUCT, to the CLOSE position on 2-M-6.

[12] VERIFY locally Valve 2-FCV-63-73, CNTMT SUMP TO RHR PMP B SUCT, is CLOSED.

[13] VERIFY NO CONTINUITY at Terminal Block TB across Terminal 6 (Wire 14D02) and Terminal 11 (Wire 14D07) in Junction Box 2-JB-292-1362-B (713/Al 1V).

[14] VERIFY NO CONTINUITY at Terminal Block TB across Terminal 10 (Wire 14D03) and Terminal 11 (Wire 14D07) in Junction Box 2-JB-292-1362-B (713/A1yV).

[15] PLACE Handswitch 2-HS-72-41A, RHR SPRAY HDR B TO CNTMT, to the OPEN position.

[16] VERIFY locally Valve 2-FCV-72-41, RHR SPRAY HDR B TO CNTMT, remains in the CLOSED position. (Acc Crit 5.0[30])

[17] MANUALLY OPEN Valve 2-FCV-63-73, CNTMT SUMP TO RHR PMP B SUCT, until RED and GREEN light LIT is observed at Handswitch 2-HS-63-73A, CNTMT SUMP TO RHR PMP B SUCT.

[18] VERIFY NO CONTINUITY at Terminal Block TB across Terminal 6 (Wire 14D02) and Terminal 11 (Wire 14D07) in Junction Box 2-JB-292-1362-B (713/Al1V).

6.6 2-FCV-72-41 Logic/Stroke Timing (continued)

[19] VERIFY NO CONTINUITY at Terminal Block TB across Terminal 10 (Wire 14D03) and Terminal 11 (Wire 14D07) in Junction Box 2-JB-292-1362-B (713/Al 1V).

[20] PLACE Handswitch 2-HS-72-41A, RHR SPRAY HDR B TO CNTMT, to the OPEN position.

[21] VERIFY locally Valve 2-FCV-72-41, RHR SPRAY HDR B TO CNTMT, remains in the CLOSED position. (Acc Crit 5.0[30])

[22] PLACE Handswitch 2-HS-63-73A, CNTMT SUMP TO RHR PMP B SUCT, to the OPEN position.

[23] VERIFY locally Valve 2-FCV-63-73, CNTMT SUMP TO RHR PMP B SUCT, is OPEN.

[24] VERIFY CONTINUITY at Terminal Block TB across Terminal 6 (Wire 14D02) and Terminal 11 (Wire 14D07) in Junction Box 2-JB-292-1362-B (713/A 11V).

[25] VERIFY CONTINUITY at Terminal Block TB across Terminal 10 (Wire 14D03) and Terminal 11 (Wire 14D07) in Junction Box 2-JB-292-1362-B (713/Al 1V).

[26] ENSURE Annunciator Window 134-E on Panel 2-XA-55-6D, CNTMT/RHR SPRAY FCV-72-2/39/40/41 NOT CLOSED, is CLEAR.

[27] ENSURE Event Display Monitor reports 134-E, CNTMT/RHR SPRAY FCV-72-39/40 NOT CLOSED, is NORMAL (Blue).

[28] ENSURE Annunciator Window 131-F on Panel 2-XA-55-6D, ESF COMPONENT NOT NORMAL, is CLEAR.

[29] ENSURE Event Display Monitor reports 131-F ESF ABNORMAL RECIRCULATION MODE is NORMAL (Blue).

[30] PLACE Handswitch 2-HS-72-41C, RHR SPRAY HDR B TO CNTMT, to the OPEN position, then to NORMAL.

[31] VERIFY Valve 2-FCV-72-41, RHR SPRAY HDR B TO CNTMT, remains in the CLOSED position by GREEN light LIT at Handswitch 2-HS-72-41C, RHR SPRAY HDR B TO CNTMT.

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 106 of 249 6.6 2-FCV-72-41 Logic/Stroke Timing (continued)

[32] PLACE Handswitch 2-HS-72-41A, RHR SPRAY HDR B TO CNTMT, to the OPEN position, AND WHILE valve 2-FCV-72-41, RHR SPRAY HDR B TO CNTMT, is opening, PLACE Handswitch 2-HS-72-41A, RHR SPRAY HDR B TO CNTMT, to CLOSE, AND RELEASE.

[33] VERIFY the following:

A. During valve travel the RED run light is LIT at Breaker 2-BKR-72-41, RHR SPRAY HDR B ISOL (2-FCV-72-41),

480V RX MOV BD 2B1-B, Compt 14D.

B. Annunciator Window 134-E on Panel 2-XA-55-6D, CNTMT/RHR SPRAY FCV-72-2/39/40/41 NOT CLOSED, ALARMS (Acc Crit 5.0[7]).

C. Event Display Monitor reports 134-E, CNTMT/RHR SPRAY FCV-72-39/40 NOT CLOSED, is in ALARM (RED).

D. Annunciator Window 131-F on Panel 2-XA-55-6D, ESF COMPONENT NOT NORMAL, ALARMS (Acc Crit 5.0[6]).

E. Event Display Monitor reports 131-F ESF ABNORMAL RECIRCULATION MODE is in ALARM (RED).

F. RED light is LIT at Handswitch 2-HS-72-41A, RHR SPRAY HDR B TO CNTMT. (Acc Crit 5.0[10])

G. GREEN light is NOT LIT at Handswitch 2-HS-72-41A, RHR SPRAY HDR B TO CNTMT. (Acc Crit 5.0[10])

H. RED light is LIT at Handswitch 2-HS-72-41C, RHR SPRAY HDR B TO CNTMT at Board 2-MCC-213-B1, compartment 14D. (Acc Crit 5.0[10])

I. GREEN light is NOT LIT at Handswitch 2-HS-72-41C, RHR SPRAY HDR B TO CNTMT at Board 2-MCC-213-B1, compartment 14D.

(Acc Crit 5.0[10])

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 107 of 249 6.6 2-FCV-72-41 Logic/Stroke Timing (continued)

[34] VERIFY locally Valve 2-FCV-72-41, RHR SPRAY HDR B TO CNTMT, is OPEN. (Acc Crit 5.0[9] & 5.0[30])

[35] VERIFY ICS point FD2340 displays "OPEN".

(Acc Crit 5.0[11])

[36] PLACE Handswitch 2-HS-72-41C, RHR SPRAY HDR B TO CNTMT, to the CLOSE position, then to NORMAL.

[37] VERIFY Valve 2-FCV-72-41 RHR SPRAY HDR B TO CNTMT remains in the OPEN position by RED light LIT at Handswitch 2-HS-72-41C, RHR SPRAY HDR B TO CNTMT.

[38] PLACE Handswitch 2-HS-72-41A, RHR SPRAY HDR B TO CNTMT, to the CLOSE position, AND WHILE valve 2-FCV-72-41, RHR SPRAY HDR B TO CNTMT, is closing, PLACE Handswitch 2-HS-72-41A RHR SPRAY HDR B TO CNTMT to OPEN, AND RELEASE.

[39] VERIFY the following:

A. Annunciator Window 134-E on Panel 2-XA-55-6D, CNTMT/RHR SPRAY FCV-72-2/39/40/41 NOT CLOSED, CLEARS.

B. Event Display Monitor reports 134-E, CNTMT/RHR SPRAY FCV-72-39/40 NOT CLOSED, is NORMAL (Blue).

C. Annunciator Window 131-F on Panel 2-XA-55-6D, ESF COMPONENT NOT NORMAL, CLEARS.

D. Event Display Monitor reports 131-F ESF ABNORMAL RECIRCULATION MODE is NORMAL (Blue).

E. GREEN light is LIT at Handswitch 2-HS-72-41A RHR SPRAY HDR B TO CNTMT. (Acc Crit 5.0[10])

F. RED light is NOT LIT at Handswitch 2-HS-72-41A RHR SPRAY HDR B TO CNTMT. (Acc Crit 5.0[10])

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 108 of 249 6.6 2-FCV-72-41 Logic/Stroke Timing (continued)

G. GREEN light is LIT at Handswitch 2-HS-72-41C RHR SPRAY HDR B TO CNTMT, at Board 2-MCC-213-B1, Compartment 14D. (Acc Crit 5.0[10])

H. RED light is NOT LIT at Handswitch 2-HS-72-41C RHR SPRAY HDR B TO CNTMT at Board 2-MCC-213-B1, Compartment 14D. (Acc Crit 5.0[10])

[40] VERIFY locally Valve 2-FCV-72-41, RHR SPRAY HDR B TO CNTMT, is CLOSED. (Acc Crit 5.0[9])

[41] ENSURE Annunciator Window 150-C on Panel 2-XA-55-6F, 480 RX MOV BD 2B1-B/2B2-B, is CLEAR.

[42] ENSURE Event Display Monitor reports 150C, 480 RX MOV BD 2B1-B/2B2-B XS IN AUX, is NORMAL (Blue).

[43] PLACE Handswitch 2-XS-72-41, RHR SPRAY HDR B TO CNTMT, in the AUX position at Board 2-MCC-213-B1, Compartment 14D.

[44] VERIFY the following:

A. RED and GREEN lights at Handswitch 2-HS-72-41A, RHR SPRAY HDR B TO CNTMT, are NOT LIT.

(Acc Crit 5.0[10])

B. Annunciator Window 150-C on Panel 2-XA-55-6F, 480 RX MOV BD 2B1-B/2B2-B, ALARMS. (Acc Crit 5.0[5])

C. Event Display Monitor reports 150-C, 480 RX MOV BD 2B1-B/2B2-A XS IN AUX, is in ALARM (RED).

[45] PLACE Handswitch 2-HS-72-41A, RHR SPRAY HDR B TO CNTMT, to the OPEN position.

[46] VERIFY locally Valve 2-FCV-72-41, RHR SPRAY HDR B TO CNTMT, remains in the CLOSED position.

[47] PLACE Handswitch 2-HS-72-41 C, RHR SPRAY HDR B TO CNTMT, to the OPEN position, then to NORMAL.

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 109 of 249 6.6 2-FCV-72-41 Logic/Stroke Timing (continued)

[48] VERIFY the following:

A. Locally Valve 2-FCV-72-41, RHR SPRAY HDR B TO CNTMT, travels to the OPEN position. (Acc Crit 5.0[9])

B. RED light is LIT at Handswitch 2-HS-72-41C, RHR SPRAY HDR B TO CNTMT.

C. GREEN light is NOT LIT at Handswitch 2-HS-72-41C, RHR SPRAY HDR B TO CNTMT.

D. RED and GREEN lights at Handswitch 2-HS-72-41A, RHR SPRAY HDR B TO CNTMT are NOT LIT.

[49] PLACE Handswitch 2-HS-72-41A, RHR SPRAY HDR B TO CNTMT, to the CLOSE position.

[50] VERIFY Valve 2-FCV-72-41, RHR SPRAY HDR B TO CNTMT, remains in the OPEN position.

[51] PLACE Handswitch 2-HS-72-41C, RHR SPRAY HDR B TO CNTMT, to the CLOSE position, then to NORMAL.

[52] VERIFY the following:

A. Locally Valve 2-FCV-72-41, RHR SPRAY HDR B TO CNTMT, travels to the CLOSED position.

(Acc Crit 5.0[9])

B. GREEN light is LIT at Handswitch 2-HS-72-41C, RHR SPRAY HDR B TO CNTMT.

C. RED light is NOT LIT at Handswitch 2-HS-72-41C, RHR SPRAY HDR B TO CNTMT.

[53] PLACE Handswitch 2-XS-72-41, RHR SPRAY HDR B TO CNTMT, in the NORMAL position.

[54] VERIFY the following:

A. Annunciator Window 150-C on Panel 2-XA-55-6F, 480 RX MOV BD 2B1-B/2B2-B, CLEARS.

B. Event Display Monitor reports 150C, 480 RX MOV BD 2B1-B/2B2-B XS IN AUX, is NORMAL (Blue).

6.6 2-FCV-72-41 Logic/Stroke Timing (continued)

NOTES

1) The following steps require valve stroke timing locally at the valve and remotely at the Control Switch in both the Open and Closed position.
2) Local timing begins with the initiating signal and is concluded with the completion of valve stem movement. Remote timing begins with the initiating signal and is concluded with position indication lights status change.

[55] PLACE Handswitch 2-HS-72-41A, RHR SPRAY HDR B TO CNTMT, to the OPEN position.

A. RECORD remote opening time at Handswitch 2-HS-72-41A, RHR SPRAY HDR B TO CNTMT. (Acc Crit 5.0[12])

seconds (_ 15 seconds)

M&TE Cal Due Date B. RECORD local opening time at Valve 2-FCV-72-41, RHR SPRAY HDR B TO CNTMT.

seconds (* 15 seconds)

M&TE Cal Due Date

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 111 of 249 6.6 2-FCV-72-41 Logic/Stroke Timing (continued)

[56] PLACE Handswitch 2-HS-72-41A, RHR SPRAY HDR B TO CNTMT, to the CLOSE position.

A. RECORD remote closing time at Handswitch 2-HS-72-41A, RHR SPRAY HDR B TO CNTMT. (Acc Crit 5.0[12])

seconds (_515 seconds)

M&TE Cal Due Date B. RECORD local closing time at Valve 2-FCV-72-41, RHR SPRAY HDR B TO CNTMT.

seconds (< 15 seconds)

M&TE Cal Due Date

[57] OPEN Breaker 2-BKR-72-41, RHR SPRAY HDR B ISOL (2-FCV-72-41), 480V RX MOV BD 2B1-B, Compt 14D.

[58] MANUALLY TRIP the thermal overload for 2-BKR-72-41, RHR SPRAY HDR B ISOL (2-FCV-72-41), 480V RX MOV BD 2B1-B, Compt 14D.

[59] CLOSE Breaker 2-BKR-72-41, RHR SPRAY HDR B ISOL (2-FCV-72-41), 480V RX MOV BD 2B1-B, Compt 14D.

[60] PLACE Handswitch 2-HS-72-41A, RHR SPRAY HDR B TO CNTMT, to the OPEN position.

[61] VERIFY Valve 2-FCV-72-41, RHR SPRAY HDR B TO CNTMT, remains CLOSED by GREEN light LIT at Handswitch 2-HS-72-41A, RHR SPRAY HDR B TO CNTMT.

(Acc Crit 5.0[8])

[62] ENSURE that actuation of the Relay K7 in the next step will not adversly affect the other associated valves: 2-FCV-63-5, 2-FCV-63-48, 2-FCV-63-157, and 2-FCV-26-241.

6.6 2-FCV-72-41 Logic/Stroke Timing (continued)

[63] DEPRESS and HOLD the armature of Relay K7 located in back of Panel 16D on 480V RX MOV BD 2B1-B to simulate Overload Bypass.

CV

[64] PLACE Handswitch 2-HS-72-41A, RHR SPRAY HDR B TO CNTMT, to the OPEN position.

[65] VERIFY Valve 2-FCV-72-41, RHR SPRAY HDR B TO CNTMT, OPENS by RED light LIT at Handswitch 2-HS-72-41A, RHR SPRAY HDR B TO CNTMT.

(Acc Crit 5.0[8])

[66] RELEASE the armature of Relay K7 located in back of Panel 16D on 480V RX MOV BD 2B1-B.

[67] OPEN Breaker 2-BKR-72-41, RHR SPRAY HDR B ISOL (2-FCV-72-41), 480V RX MOV BD 2B1-B, Compt 14D.

[68] RESET the thermal overload for 2-BKR-72-41, RHR SPRAY HDR B ISOL (2-FCV-72-41), 480V RX MOV BD 2B1-B, Compt 14D.

[69] PLACE Handswitch 2-HS-63-73A, CNTMT SUMP TO RHR PMP B SUCT, to the CLOSE position.

[70] VERIFY Valve 2-FCV-63-73 CNTMT SUMP TO RHR PMP B SUCT, CLOSES by GREEN light LIT at Handswitch 2-HS-63-73A, CNTMT SUMP TO RHR PMP B SUCT.

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 113 of 249 6.7 2-FCV-72-39 Logic/Stroke Timing (Containment Spray Header Train A Isolation Valve) (745 A12W PENT RM)

[1] VERIFY prerequisites listed in Section 4.0 for Subsection 6.7 have been completed.

[2] ENSURE Breaker 2-BKR-72-39, CS HDR A ISOL (2-FCV-72-39), 480V RX MOV BD 2A1-A, Compt 13E, is OPEN.

[3] INSTALL Test Switch "K644 SPRAY SIGNAL-A" in the OPEN position across the field side of Terminals 1 and 2 on Terminal Block TB641 in Panel 2-R-48.

[4] INSTALL Test Switch "CS-A 52STA" in the OPEN position on Terminal Block DD, Terminals 10 and 11 at Board 2-BD-21 1-A, 6.9kV SHUTDOWN BOARD 2A-A, Cubicle 13.

[5] VERIFY ICS point FD2179 displays "PWR OFF".

(Acc Crit 5.0[11])

[6] ENSURE Handswitch 2-XS-72-39, CNTMT SPRAY HDR A TO CNTMT, is in the NORMAL position at Board 2-MCC-213-Al, Compartment 13E.

[7] CLOSE Breaker 2-BKR-72-39, CS HDR A ISOL (2-FCV-72-39), 480V RX MOV BD 2A1-A, Compt 13E.

[8] VERIFY ICS point FD2179 displays "PWR ON".

(Acc Crit 5.0[11])

[9] VERIFY locally Valve 2-FCV-72-39, CNTMT SPRAY HDR A TO CNTMT, is CLOSED.

[10] VERIFY ICS point FD2180 displays "NOT OPE".

(Acc Crit 5.0[11J])

[11] ENSURE Annunciator Window 134-E on Panel 2-XA-55-6D, CNTMT/RHR SPRAY FCV-72-2/39/40/41 NOT CLOSED, is CLEAR.

[12] ENSURE Event Display Monitor reports 134-E, CNTMT/RHR SPRAY FCV-72-39/40 NOT CLOSED, is in NORMAL (Blue).

6.7 2-FCV-72-39 Logic/Stroke Timing (continued)

[13] ENSURE Annunciator Window 131-F on Panel 2-XA-55-6D, ESF COMPONENT NOT NORMAL, is CLEAR.

[14] ENSURE Event Display Monitor reports 131-F ESF ABNORMAL CONTAINMENT SPRAY is NORMAL (Blue).

[15] PLACE Handswitch 2-HS-72-39C, CNTMT SPRAY HDR A TO CNTMT, to the OPEN position, then to NORMAL.

[16] VERIFY 2-FCV-72-39, CNTMT SPRAY HDR A TO CNTMT, remains in the CLOSED position by GREEN light LIT at Handswitch 2-HS-72-39C, CNTMT SPRAY HDR A TO CNTMT.

[17] PLACE Handswitch 2-HS-72-39A, CNTMT SPRAY HDR A TO CNTMT, to the OPEN position, AND WHILE valve 2-FCV-72-39, CNTMT SPRAY HDR A TO CNTMT, is opening, PLACE Handswitch 2-HS-72-39A, CNTMT SPRAY HDR A TO CNTMT, to CLOSE, AND RELEASE.

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 115 of 249 6.7 2-FCV-72-39 Logic/Stroke Timing (continued)

[18] VERIFY the following:

A. During valve travel the RED Power On light is LIT at Breaker 2-BKR-72-39, CS HDR A ISOL (2-FCV-72-39),

480V RX MOV BD 2A1-A, Compt 13E.

B. Annunciator Window 134-E on Panel 2-XA-55-6D, CNTMT/RHR SPRAY FCV-72-2/39/40/41 NOT CLOSED, ALARMS (Acc Crit 5.0[7]).

C. Event Display Monitor reports 134-E, CNTMT/RHR SPRAY FCV-72-39/40 NOT CLOSED, is in ALARM (RED).

D. Annunciator Window 131-F on Panel 2-XA-55-6D, ESF COMPONENT NOT NORMAL ALARMS (Acc Crit 5.0[6]).

E. Event Display Monitor reports 131-F ESF ABNORMAL CONTAINMENT SPRAY is in ALARM (RED).

F. RED light is LIT at Handswitch 2-HS-72-39A, CNTMT SPRAY HDR A TO CNTMT. (Acc Crit 5.0[10])

G. GREEN light is NOT LIT at Handswitch 2-HS-72-39A, CNTMT SPRAY HDR A TO CNTMT. (Acc Crit 5.0[10])

H. RED light is LIT at Handswitch 2-HS-72-39C, CNTMT SPRAY HDR A TO CNTMT, at Board 2-MCC-213-A1, Compartment 13E. (Acc Crit 5.0[10])

I. GREEN light is NOT LIT at Handswitch 2-HS-72-39C, CNTMT SPRAY HDR A TO CNTMT. (Acc Crit 5.0[10])

[19] VERIFY locally Valve 2-FCV-72-39, CNTMT SPRAY HDR A TO CNTMT, is OPEN. (Acc Crit 5.0[9])

[20] VERIFY ICS point FD2180 displays "OPEN".

(Acc Crit 5.0[11])

[21] PLACE Handswitch 2-HS-72-39C, CNTMT SPRAY HDR A TO CNTMT, to the CLOSE position, then to NORMAL.

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 116 of 249 6.7 2-FCV-72-39 Logic/Stroke Timing (continued)

[22] VERIFY 2-FCV-72-39, CNTMT SPRAY HDR A TO CNTMT, remains in the OPEN position by RED light LIT at Handswitch 2-HS-72-39C, CNTMT SPRAY HDR A TO CNTMT.

[23] PLACE Handswitch 2-HS-72-39A, CNTMT SPRAY HDR A TO CNTMT, to the CLOSE position, AND WHILE valve 2-FCV-72-39, CNTMT SPRAY HDR A TO CNTMT, is closing, PLACE Handswitch 2-HS-72-39A, CNTMT SPRAY HDR A TO CNTMT, to OPEN, AND RELEASE.

[24] VERIFY the following:

A. Annunciator Window 134-E on Panel 2-XA-55-6D, CNTMT/RHR SPRAY FCV-72-2/39/40/41 NOT CLOSED, CLEARS.

B. Event Display Monitor reports 134-E, CNTMT/RHR SPRAY FCV-72-39/40 NOT CLOSED, is in NORMAL (Blue).

C. Annunciator Window 131-F on Panel 2-XA-55-6D, ESF COMPONENT NOT NORMAL, CLEARS.

D. Event Display Monitor reports 131-F ESF ABNORMAL CONTAINMENT SPRAY is NORMAL (Blue).

E. GREEN light is LIT at Handswitch 2-HS-72-39A, RHR SPRAY HDR A TO CNTMT. (Acc Crit 5.0[10])

F. RED light is NOT LIT at Handswitch 2-HS-72-39A, RHR SPRAY HDR A TO CNTMT. (Acc Crit 5.0[10])

G. GREEN light is LIT at Handswitch 2-HS-72-39C, RHR SPRAY HDR A TO CNTMT. (Acc Crit 5.0[10])

H. RED light is NOT LIT at Handswitch 2-HS-72-39C, RHR SPRAY HDR A TO CNTMT. (Acc Crit 5.0110])

WBN CONTAINMENT SPRAY PUMP VALVE 22-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 117 of 249 6.7 2-FCV-72-39 Logic/Stroke Timing (continued)

[25] VERIFY locally Valve 2-FCV-72-39, CNTMT SPRAY HDR A TO CNTMT, is CLOSED. (Acc Crit 5.0[9])

[26] ENSURE Annunciator Window 149-C on Panel 2-XA-55-6F, 480 RX MOV BD 2A1-A/2A2-A, is CLEAR.

[27] ENSURE Event Display Monitor reports 149-C 480 RX MOV BD 2A1-A/2A2-A XS IN AUX is NORMAL (Blue).

[28] PLACE Handswitch 2-XS-72-39, CNTMT SPRAY HDR A TO CNTMT, to the AUX position.

[29] VERIFY Annunciator Window 149-C on Panel 2-XA-55-6F, 480 RX MOV BD 2A1-A/2A2-A, ALARMS. (Acc Crit 5.0[4])

[30] VERIFY Event Display Monitor reports 149-C, 480 RX MOV BD 2A1-A/2A2-A XS IN AUX, is in ALARM (RED).

[31] VERIFY RED and GREEN lights are NOT LIT at Handswitch 2-HS-72-39A, CNTMT SPRAY HDR A TO CNTMT. (Acc Crit 5.0[10])

[32] PLACE Handswitch 2-HS-72-39A, CNTMT SPRAY HDR A TO CNTMT, to the OPEN position, AND VERIFY locally Valve 2-FCV-72-39, CNTMT SPRAY HDR A TO CNTMT, remains CLOSED.

[33] PLACE Handswitch 2-HS-72-39C, CNTMT SPRAY HDR A TO CNTMT, to the OPEN position, then to NORMAL.

[34] VERIFY the following:

A. RED light is LIT at Handswitch 2-HS-72-39C, CNTMT SPRAY HDR A TO CNTMT.

B. GREEN light is NOT LIT at Handswitch 2-HS-72-39C, CNTMT SPRAY HDR A TO CNTMT.

C. RED and GREEN light is NOT LIT at Handswitch 2-HS-72-39A, CNTMT SPRAY HDR A TO CNTMT.

[35] VERIFY locally Valve 2-FCV-72-39, CNTMT SPRAY HDR A TO CNTMT, is OPEN. (Acc Crit 5.0[9])

6.7 2-FCV-72-39 Logic/Stroke Timing (continued)

[36] PLACE Handswitch 2-HS-72-39A, CNTMT SPRAY HDR A TO CNTMT, to the CLOSE position.

[37] VERIFY locally Valve 2-FCV-72-39, CNTMT SPRAY HDR A TO CNTMT, remains OPEN.

[38] PLACE Handswitch 2-HS-72-39C, CNTMT SPRAY HDR A TO CNTMT, to the CLOSE position, then to NORMAL.

[39] VERIFY the following:

A. RED light is NOT LIT at Handswitch 2-HS-72-39C, CNTMT SPRAY HDR A TO CNTMT.

B. GREEN light is LIT at Handswitch 2-HS-72-39C, CNTMT SPRAY HDR A TO CNTMT.

[40] VERIFY locally Valve 2-FCV-72-39, CNTMT SPRAY HDR A TO CNTMT, is CLOSED. (Acc Crit 5.0[9])

[41] PLACE Handswitch 2-XS-72-39, CNTMT SPRAY HDR A TO CNTMT, to the NORMAL position.

[42] VERIFY Annunciator Window 149-C, 480 RX MOV BD 2A1-A/2A2-A, CLEARS.

[43] VERIFY Event Display Monitor reports 149-C 480 RX MOV BD 2A1-A/2A2-A XS IN AUX is NORMAL (Blue).

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 119 of 249 6.7 2-FCV-72-39 Logic/Stroke Timing (continued)

NOTES

1) The following steps require valve stroke timing locally at the valve and remotely at the control switch in both the Open and Closed positions.
2) Local timing begins with the initiating signal and is concluded with the completion of the valve stem movement. Remote timing begins with the initiating signal and is concluded with the position indication lights status change.

[44] PLACE Handswitch 2-HS-72-39A, CNTMT SPRAY HDR A TO CNTMT, to the OPEN position.

A. RECORD remote opening time at Handswitch 2-HS-72-39A, CNTMT SPRAY HDR A TO CNTMT. (Acc Crit 5.0112])

seconds (< 21.5 seconds)

M&TE Cal Due Date B. RECORD local opening time at Valve 2-FCV-72-39, CNTMT SPRAY HDR A TO CNTMT.

seconds (< 21.5 seconds)

M&TE Cal Due Date

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 120 of 249 6.7 2-FCV-72-39 Logic/Stroke Timing (continued)

[45] PLACE Handswitch 2-HS-72-39A, CNTMT SPRAY HDR A TO CNTMT, to the CLOSE position.

A. RECORD remote closing time at Handswitch 2-HS-72-39A, CNTMT SPRAY HDR A TO CNTMT. (Acc Crit 5.0[12])

seconds (5 21.5 seconds)

M&TE Cal Due Date B. RECORD local closing time at Valve 2-FCV-72-39, CNTMT SPRAY HDR A TO CNTMT.

seconds (* 21.5 seconds)

M&TE Cal Due Date

[46] ENSURE Red test lamp 081 (2-R-52) is NOT LIT.

[47] ROTATE to PUSH TO TEST AND HOLD Test Switch 820 in safeguard Test Cabinet (2-R-52).

[48] VERIFY Red test lamp 081 (2-R-52) is LIT.

[49] VERIFY White light is LIT at Panel 2-R-52 for Test Relay K81 1.

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 121 of 249 6.7 2-FCV-72-39 Logic/Stroke Timing (continued)

NOTES

1) The following steps require valve stroke timing locally at the valve and remotely at the control switch in the Open position.
2) Local timing begins with the initiating signal and is concluded with the completion of the valve stem movement. Remote timing begins with the initiating signal and is concluded with the position indication lights status change.

[50] PUSH and RELEASE Switch S820, Containment Spray Actuation 2-R-52.

A. RECORD remote opening time at Handswitch 2-HS-72-39A, CNTMT SPRAY HDR A TO CNTMT. (Acc Crit 5.0[119])

seconds (< 28 seconds)

M&TE Cal Due Date B. RECORD local opening time at Valve 2-FCV-72-39, CNTMT SPRAY HDR A TO CNTMT.

seconds (< 28 seconds)

M&TE Cal Due Date C. VERIFY Valve 2-FCV-72-39, CNTMT SPRAY HDR A TO CNTMT, travels to the OPEN position by RED light LIT at Handswitch 2-HS-72-39A, CNTMT SPRAY HDR A TO CNTMT (Acc Crit 5.0[19]).

[51] RESET Test Relay K811 and K644 with Switch S821 2-R-52.

[52] VERIFY Red test lamp 081 (2-R-52) is NOT LIT.

[53] VERIFY White light is NOT LIT at Panel 2-R-52 for Test Relay K811.

[54] VERIFY Valve 2-FCV-72-39 CNTMT SPRAY HDR A TO CNTMT remains in the OPEN position by RED light LIT at Handswitch 2-HS-72-39A, CNTMT SPRAY HDR A TO CNTMT.

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 122 of 249 6.7 2-FCV-72-39 Logic/Stroke Timing (continued)

[55] PLACE Handswitch 2-HS-72-39A, CNTMT SPRAY HDR A TO CNTMT, to the CLOSE position.

[56] VERIFY Valve 2-FCV-72-39, CNTMT SPRAY HDR A TO CNTMT, CLOSES by GREEN light LIT at Handswitch 2-HS-72-39A, CNTMT SPRAY HDR A TO CNTMT.

[57] CLOSE Test Switch "K644 SPRAY SIGNAL-A" installed at Terminal Block TB641, Terminals 1 and 2 in Panel 2-R-48.

[58] VERIFY Valve 2-FCV-72-39 CNTMT SPRAY HDR A TO CNTMT remains in the CLOSED position by GREEN light LIT at Handswitch 2-HS-72-39A, CNTMT SPRAY HDR A TO CNTMT.

6.7 2-FCV-72-39 Logic/Stroke Timing (continued)

NOTES

1) The following steps require valve stroke timing locally at the valve and remotely at the control switch in the Open position.
2) Local timing begins with the initiating signal and is concluded with the completion of the valve stem movement. Remote timing begins with the initiating signal and is concluded with the position indication lights status change.

[59] CLOSE Test Switch "CS-B 52STA" installed at Terminal Block DD, Terminals 10 and 11 at Board 2-BD-211-A, Cubicle 13.

A. RECORD remote opening time at Handswitch 2-HS-72-39A, CNTMT SPRAY HDR A TO CNTMT. (Acc Crit 5.0[119])

seconds (_ 28 seconds)

M&TE Cal Due Date B. RECORD local opening time at Valve 2-FCV-72-39, CNTMT SPRAY HDR A TO CNTMT.

seconds (_ 28 seconds)

M&TE Cal Due Date C. VERIFY Valve 2-FCV-72-39, CNTMT SPRAY HDR A TO CNTMT, travels to the OPEN position by RED light LIT at Handswitch 2-HS-72-39A, CNTMT SPRAY HDR A TO CNTMT. (Acc Crit 5.0[19]).

[60] OPEN Test Switch "K644 SPRAY SIGNAL-A" installed at Terminal Block TB641, Terminals 1 and 2 in Panel 2-R-48.

[61] VERIFY Valve 2-FCV-72-39, CNTMT SPRAY HDR A TO CNTMT, remains in the OPEN position by RED light LIT at Handswitch 2-HS-72-39A, CNTMT SPRAY HDR A TO CNTMT.

[62] PLACE Handswitch 2-HS-72-39A, CNTMT SPRAY HDR A TO CNTMT, to the CLOSE position.

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 124 of 249 6.7 2-FCV-72-39 Logic/Stroke Timing (continued)

[63] VERIFY Valve 2-FCV-72-39, CNTMT SPRAY HDR A TO CNTMT, CLOSES by GREEN light LIT at Handswitch 2-HS-72-39A, CNTMT SPRAY HDR A TO CNTMT.

[64] OPEN Test Switch "CS-B 52STA" installed at Terminal Block DD, Terminals 10 and 11 at Board 2-BD-211-A, Cubicle 13.

[65] REMOVE Test Switch "K644 SPRAY SIGNAL-A" at Terminal Block TB641, Terminals 1 and 2 in Panel 2-R-48.

CV

[66] REMOVE Test Switch "CS-B 52STA" at Terminal Block DD, Terminals 10 and 11 in Board 2-BD-21 1-A, Cubicle 13.

CV

[67] OPEN Breaker 2-BKR-72-39, CS HDR A ISOL (2-FCV-72-39),

480V RX MOV BD 2A1-A, Compt 13E.

[68] MANUALLY TRIP the thermal overload for 2-BKR-72-39, CS HDR A ISOL (2-FCV-72-39), 480V RX MOV BD 2A1-A, Compt 13E.

[69] CLOSE Breaker 2-BKR-72-39, CS HDR A ISOL (2-FCV-72-39), 480V RX MOV BD 2A1-A, Compt 13E.

[70] PLACE Handswitch 2-HS-72-39A, CNTMT SPRAY HDR A TO CNTMT, to the OPEN position.

[71] VERIFY Valve 2-FCV-72-39, CNTMT SPRAY HDR A TO CNTMT, remains in the CLOSED position by GREEN light LIT at Handswitch 2-HS-72-39A, CNTMT SPRAY HDR A TO CNTMT. (Acc Crit 5.0[8])

[72] ENSURE that actuation of the Relay K5 in the next step will not adversly affect the other associated valves: 2-FCV-72-22, 2-FCV-72-40, 2-FCV-72-44, and 2-FCV-74-1.

6.7 2-FCV-72-39 Logic/Stroke Timing (continued)

[73] DEPRESS and HOLD the armature of Relay K5 located in back of Panel 4F on 480V RX MOV BD 2A1-A to simulate Overload Bypass.

CV

[74] PLACE Handswitch 2-HS-72-39A, CNTMT SPRAY HDR A TO CNTMT, to the OPEN position.

[75] VERIFY Valve 2-FCV-72-39, CNTMT SPRAY HDR A TO CNTMT, OPENS by RED light LIT at 2-HS-72-39A, CNTMT SPRAY HDR A TO CNTMT (Acc Crit 5.0[8]).

[76] RELEASE the armature of Relay K5 located in back of Panel 4F on 480V RX MOV BD 2A1-A to simulate Overload Bypass.

[77] OPEN Breaker 2-BKR-72-39, CS HDR A ISOL (2-FCV-72-39),

480V RX MOV BD 2A1-A, Compt 13E.

[78] RESET the thermal overload for 2-BKR-72-39, CS HDR A ISOL (2-FCV-72-39), 480V RX MOV BD 2A1-A, Compt 13E.

[79] CLOSE Breaker 2-BKR-72-2, CS HDR B ISOL (2-FCV-72-2),

480V RX MOV BD 2B1-B, Compt 14A.

[80] PLACE Handswitch 2-HS-72-39A, CNTMT SPRAY HDR A TO CNTMT, to the CLOSE position.

[81] VERIFY Valve 2-FCV-72-39, CNTMT SPRAY HDR A TO CNTMT, CLOSES by GREEN light LIT at Handswitch 2-HS-72-39A, CNTMT SPRAY HDR A TO CNTMT.

[82] OPEN Breaker 2-BKR-72-39, CS HDR A ISOL (2-FCV-72-39),

480V RX MOV BD 2A1-A, Compt 13E.

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 126 of 249 6.8 2-FCV-72-2 Logic/Stroke Timing (Containment Spray Header Train B Isolation Valve) (745 A12W PENT RM)

[1] VERIFY prerequisites listed in Section 4.0 for Subsection 6.8 have been completed.

12] ENSURE Breaker 2-BKR-72-2, CS HDR B ISOL (2-FCV-72-2),

480V RX MOV BD 2B1-B, Compt 14A, is OPEN.

[3] INSTALL Test Switch "K644 SPRAY SIGNAL-B" in the OPEN position across the field side of Terminals 1 and 2 on Terminal Block TB641 in Panel 2-R-51.

[4] INSTALL Test Switch "CS-B 52STA" in the OPEN position on Terminal Block DD, Terminals 10 and 11 at Board 2-BD-21 1-B, 6.9kV SHUTDOWN BOARD 2B-B, Cubicle 13.

[5] VERIFY ICS point FD2331 displays "PWR OFF".

(Acc Crit 5.0[11])

[6] ENSURE Handswitch 2-XS-72-2, CNTMT SPRAY HDR B TO CNTMT, to the NORMAL position at Board 2-MCC-213-B1, Compartment 14A.

[7] CLOSE Breaker 2-BKR-72-2, CS HDR B ISOL (2-FCV-72-2),

480V RX MOV BD 2B1-B, Compt 14A.

[8] VERIFY ICS point FD2331 displays "PWR ON".

(Acc Crit 5.0[11])

[9] VERIFY locally Valve 2-FCV-72-2, CNTMT SPRAY HDR B TO CNTMT, is CLOSED.

[10] VERIFY ICS point FD2332 displays "NOT OPE".

(Acc Crit 5.0[11])

[11] ENSURE Annunciator Window 134-E on Panel 2-XA-55-6D, CNTMT/RHR SPRAY FCV-72-2/39/40/41 NOT CLOSED, is CLEAR.

[12] ENSURE Event Display Monitor reports 134-E, CNTMT/RHR SPRAY FCV-72-2/41 NOT CLOSED, is in NORMAL (Blue).

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 127 of 249 6.8 2-FCV-72-2 Logic/Stroke Timing (continued)

[13] ENSURE Annunciator Window 131-F on Panel 2-XA-55-6D, ESF COMPONENT NOT NORMAL, is CLEAR.

[14] ENSURE Event Display Monitor reports 131-F ESF ABNORMAL CONTAINMENT SPRAY is in NORMAL (Blue).

[15] PLACE Handswitch 2-HS-72-2C, CNTMT SPRAY HDR B TO CNTMT, to the OPEN position, then to NORMAL.

[16] VERIFY 2-FCV-72-2, CNTMT SPRAY HDR B TO CNTMT, remains in the CLOSED position by GREEN light LIT at Handswitch 2-HS-72-2C, CNTMT SPRAY HDR B TO CNTMT.

[17] PLACE Handswitch 2-HS-72-2A, CNTMT SPRAY HDR B TO CNTMT, to the OPEN position, AND WHILE valve 2-FCV-72-2, CNTMT SPRAY HDR B TO CNTMT, is opening, PLACE Handswitch 2-HS-72-2A, CNTMT SPRAY HDR B TO CNTMT, to CLOSE, AND RELEASE.

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 128 of 249 6.8 2-FCV-72-2 Logic/Stroke Timing (continued)

[18] VERIFY the following:

A. During valve travel the RED Power On light is LIT at Breaker 2-BKR-72-2, CS HDR B ISOL (2-FCV-72-2),

480V RX MOV BD 2B1-B, Compt 14A.

B. Annunciator Window 134-E on Panel 2-XA-55-6D, CNTMT/RHR SPRAY FCV-72-2/39/40/41 NOT CLOSED, ALARMS (Acc Crit 5.0[7]).

C. Event Display Monitor reports 134-E, CNTMT/RHR SPRAY FCV-72-2/41 NOT CLOSED, is in ALARM (RED).

D. Annunciator Window 131-F on Panel 2-XA-55-6D, ESF COMPONENT NOT NORMAL ALARMS. (Acc Crit 5.0[6])

E. Event Display Monitor reports 131-F ESF ABNORMAL CONTAINMENT SPRAY is in ALARM (RED).

F. RED light is LIT at Handswitch 2-HS-72-2A, CNTMT SPRAY HDR B TO CNTMT. (Acc Crit 5.0[10])

G. GREEN light is NOT LIT at Handswitch 2-HS-72-2A, CNTMT SPRAY HDR B TO CNTMT. (Acc Crit 5.0[10])

H. RED light is LIT at Handswitch 2-HS-72-2C, CNTMT SPRAY HDR B TO CNTMT at Board 2-MCC-213-B1, Compartment 14A. (Acc Crit 5.0[10])

I. GREEN light is NOT LIT at Handswitch 2-HS-72-2C, CNTMT SPRAY HDR B TO CNTMT. (Acc Crit 5.0[10])

[19] VERIFY locally Valve 2-FCV-72-2, CNTMT SPRAY HDR B TO CNTMT, is OPEN. (Acc Crit 5.0[9])

[20] VERIFY ICS point FD2332 displays "OPEN".

(Acc Crit 5.0[11])

[21] PLACE Handswitch 2-HS-72-2C, CNTMT SPRAY HDR B TO CNTMT, to the CLOSE position, then to NORMAL.

[22] VERIFY 2-FCV-72-2, CNTMT SPRAY HDR B TO CNTMT, remains in the OPEN position by RED light LIT at Handswitch 2-HS-72-2C, CNTMT SPRAY HDR B TO CNTMT.

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 129 of 249 6.8 2-FCV-72-2 Logic/Stroke Timing (continued)

[23] PLACE Handswitch 2-HS-72-2A, CNTMT SPRAY HDR B TO CNTMT, to the CLOSE position, AND WHILE valve 2-FCV-72-2, CNTMT SPRAY HDR B TO CNTMT, is closing, PLACE Handswitch 2-HS-72-2A, CNTMT SPRAY HDR B TO CNTMT, to OPEN, AND RELEASE.

[24] VERIFY the following:

A. Annunciator Window 134-E on Panel 2-XA-55-6D, CNTMT/RHR SPRAY FCV-72-2/39/40/41 NOT CLOSED, CLEARS.

B. Event Display Monitor reports 134-E, CNTMT/RHR SPRAY FCV-72-2/41 NOT CLOSED, is in NORMAL (Blue).

C. Annunciator Window 131-F on Panel 2-XA-55-6D, ESF COMPONENT NOT NORMAL, CLEARS.

D. Event Display Monitor reports 131-F ESF ABNORMAL CONTAINMENT SPRAY is NORMAL (Blue).

E. GREEN light is LIT at Handswitch 2-HS-72-2A CNTMT SPRAY HDR A TO CNTMT. (Acc Crit 5.0[10])

F. RED light is NOT LIT at Handswitch 2-HS-72-2A CNTMT SPRAY HDR A TO CNTMT. (Acc Crit 5.0[10])

G. GREEN light is LIT at Handswitch 2-HS-72-2C CNTMT SPRAY HDR A TO CNTMT. (Acc Crit 5.0[10])

H. RED light is NOT LIT at Handswitch 2-HS-72-2C CNTMT SPRAY HDR A TO CNTMT. (Acc Crit 5.0[10])

[25] VERIFY locally Valve 2-FCV-72-2, CNTMT SPRAY HDR B TO CNTMT, is CLOSED. (Acc Crit 5.0[9])

[26] ENSURE Annunciator Window 150-C on Panel 2-XA-55-6F, 480 RX MOV BD 2B1-B1/2B2-B, is CLEAR.

[27] ENSURE Event Display Monitor reports 150-C 480 RX MOV BD 2B1-B/2B2-B XS IN AUX is NORMAL (Blue).

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 130 of 249 6.8 2-FCV-72-2 Logic/Stroke Timing (continued)

[28] PLACE Handswitch 2-XS-72-2, CNTMT SPRAY HDR B TO CNTMT, to the AUX position.

[29] VERIFY Annunciator Window 150-C on Panel 2-XA-55-6F, 480 RX MOV BD 2B1-B/2B2-B, ALARMS. (Acc Crit 5.0[5])

[30] VERIFY Event Display Monitor reports 150-C, 480 RX MOV BD 2B1-B/2B2-B XS IN AUX, is in ALARM (RED).

[31] VERIFY RED and GREEN lights are NOT LIT at Handswitch 2-HS-72-2A, CNTMT SPRAY HDR B TO CNTMT.

(Acc Crit 5.0[10])

[32] PLACE Handswitch 2-HS-72-2A, CNTMT SPRAY HDR B TO CNTMT, to the OPEN position, AND VERIFY locally Valve 2-FCV-72-2, CNTMT SPRAY HDR B TO CNTMT, remains CLOSED.

[33] PLACE Handswitch 2-HS-72-2C, CNTMT SPRAY HDR B TO CNTMT, to the OPEN position, then to NORMAL.

[34] VERIFY the following:

A. RED light is LIT at Handswitch 2-HS-72-2C, CNTMT SPRAY HDR B TO CNTMT.

B. GREEN light is NOT LIT at Handswitch 2-HS-72-2C, CNTMT SPRAY HDR B TO CNTMT.

C. RED and GREEN light is NOT LIT at Handswitch 2-HS-72-2A, CNTMT SPRAY HDR B TO CNTMT.

[35] VERIFY locally Valve 2-FCV-72-2, CNTMT SPRAY HDR B TO CNTMT, is OPEN. (Acc Crit 5.0[9])

[36] PLACE Handswitch 2-HS-72-2A, CNTMT SPRAY HDR B TO CNTMT, to the CLOSE position.

[37] VERIFY locally Valve 2-FCV-72-2, CNTMT SPRAY HDR B TO CNTMT remains OPEN.

[38] PLACE Handswitch 2-HS-72-2C, CNTMT SPRAY HDR B TO CNTMT, to the CLOSE position, then to NORMAL.

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 131 of 249 6.8 2-FCV-72-2 Logic/Stroke Timing (continued)

[39] VERIFY the following:

A. RED light is NOT LIT at Handswitch 2-HS-72-2C, CNTMT SPRAY HDR B TO CNTMT.

B. GREEN light is LIT at Handswitch 2-HS-72-2C, CNTMT SPRAY HDR B TO CNTMT.

[40] VERIFY locally Valve 2-FCV-72-2, CNTMT SPRAY HDR B TO CNTMT, is CLOSED. (Acc Crit 5.0[9])

[41] PLACE Handswitch 2-XS-72-2, CNTMT SPRAY HDR B TO CNTMT, to the NORMAL position.

[42] VERIFY Annunciator Window 150-C, 480 RX MOV BD 2B1-B/2B2-B, CLEARS.

[43] VERIFY Event Display Monitor reports 150-C 480 RX MOV BD 2B1-B/2B2-B XS IN AUX is NORMAL (Blue).

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 132 of 249 6.8 2-FCV-72-2 Logic/Stroke Timing (continued)

NOTES

1) The following steps require valve stroke timing locally at the valve and remotely at the control switch in both the Open and Closed positions.
2) Local timing begins with the initiating signal and is concluded with the completion of the valve stem movement. Remote timing begins with the initiating signal and is concluded with the position indication lights status change.

[44] PLACE Handswitch 2-HS-72-2A, CNTMT SPRAY HDR B TO CNTMT, to the OPEN position.

A. RECORD remote opening time at Handswitch 2-HS-72-2A, CNTMT SPRAY HDR B TO CNTMT. (Acc Crit 5.0[12])

seconds (< 21.5 seconds)

M&TE Cal Due Date B. RECORD local opening time at Valve 2-FCV-72-2, CNTMT SPRAY HDR B TO CNTMT.

seconds (< 21.5 seconds)

M&TE Cal Due Date

[45] PLACE Handswitch 2-HS-72-2A, CNTMT SPRAY HDR B TO CNTMT, to the CLOSE position.

A. RECORD remote closing time at Handswitch 2-HS-72-2A, CNTMT SPRAY HDR B TO CNTMT. (Acc Crit 5.0112])

seconds (< 21.5 seconds)

M&TE Cal Due Date B. RECORD local closing time at Valve 2-FCV-72-2, CNTMT SPRAY HDR B TO CNTMT.

seconds (< 21.5 seconds)

M&TE Cal Due Date

[46] ENSURE Red test lamp 081 (2-R-53) is NOT LIT.

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 133 of 249 6.8 2-FCV-72-2 Logic/Stroke Timing (continued)

[47] ROTATE to PUSH TO TEST AND HOLD Test Switch 820 in safeguard Test Cabinet (2-R-53).

[48] VERIFY Red test lamp 081 (2-R-53) is LIT.

[49] VERIFY White light is LIT at Panel 2-R-53 for Test Relay K81 1.

NOTES

1) The following steps require valve stroke timing locally at the valve and remotely at the control switch in the Open position.
2) Local timing begins with the initiating signal and is concluded with the completion of the valve stem movement. Remote timing begins with the initiating signal and is concluded with the position indication lights status change.

[50] PUSH and RELEASE Switch S820, Containment Spray Actuation 2-R-53.

A. RECORD remote opening time at Handswitch 2-HS-72-2A, CNTMT SPRAY HDR B TO CNTMT. (Acc Crit 5.0[119])

seconds (_ 28 seconds)

M&TE _Cal Due Date B. RECORD local opening time at Valve 2-FCV-72-2, CNTMT SPRAY HDR B TO CNTMT.

seconds (_ 28 seconds)

M&TE _Cal Due Date C. VERIFY Valve 2-FCV-72-2, CNTMT SPRAY HDR B TO CNTMT, travels to the OPEN position by RED light LIT at Handswitch 2-HS-72-2A, CNTMT SPRAY HDR B TO CNTMT. (Acc Crit 5.0[119])

[51] RESET Test Relay K81 I and K644 with Switch S821 2-R-52.

[52] VERIFY Red test lamp 081 (2-R-52) is NOT LIT.

[53] VERIFY White light is NOT LIT at Panel 2-R-52 for Test Relay K811.

6.8 2-FCV-72-2 Logic/Stroke Timing (continued)

[54] VERIFY Valve 2-FCV-72-2, CNTMT SPRAY HDR B TO CNTMT, remains in the OPEN position by RED light LIT at Handswitch 2-HS-72-2A, CNTMT SPRAY HDR B TO CNTMT.

[55] PLACE Handswitch 2-HS-72-2A, CNTMT SPRAY HDR B TO CNTMT, to the CLOSE position.

[56] VERIFY Valve 2-FCV-72-2, CNTMT SPRAY HDR B TO CNTMT, CLOSES by GREEN light LIT at Handswitch 2-HS-72-2A, CNTMT SPRAY HDR B TO CNTMT.

[57] CLOSE Test Switch "K644 SPRAY SIGNAL-B" installed at Terminal Block TB641, Terminals 1 and 2 in Panel 2-R-51.

[58] VERIFY Valve 2-FCV-72-2, CNTMT SPRAY HDR B TO CNTMT, remains in the CLOSED position by GREEN light LIT at Handswitch 2-HS-72-2A, CNTMT SPRAY HDR B TO CNTMT.

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 135 of 249 6.8 2-FCV-72-2 Logic/Stroke Timing (continued)

NOTES

1) The following steps require valve stroke timing locally at the valve and remotely at the control switch in the Open position.
2) Local timing begins with the initiating signal and is concluded with the completion of the valve stem movement. Remote timing begins with the initiating signal and is concluded with the position indication lights status change.

[59] CLOSE Test Switch "CS-B 52STA" installed at Terminal Block DD, Terminals 10 and 11 at Board 2-BD-21 1-B, Cubicle 13.

A. RECORD remote opening time at Handswitch 2-HS-72-2A, CNTMT SPRAY HDR B TO CNTMT. (Acc Crit 5.0[19])

seconds (< 28 seconds)

M&TE Cal Due Date B. RECORD local opening time at Valve 2-FCV-72-2, CNTMT SPRAY HDR B TO CNTMT.

seconds (< 28 seconds)

M&TE Cal Due Date C. VERIFY Valve 2-FCV-72-2, CNTMT SPRAY HDR B TO CNTMT, travels to the OPEN position by RED light LIT at Handswitch 2-HS-72-2A, CNTMT SPRAY HDR B TO CNTMT. (Acc Crit 5.0119])

[60] OPEN Test Switch "K644 SPRAY SIGNAL-B" installed at Terminal Block TB641, Terminals 1 and 2 in Panel 2-R-51.

[61] VERIFY Valve 2-FCV-72-2, CNTMT SPRAY HDR B TO CNTMT, remains in the OPEN position by RED light LIT at Handswitch 2-HS-72-2A, CNTMT SPRAY HDR B TO CNTMT.

[62] PLACE Handswitch 2-HS-72-2A, CNTMT SPRAY HDR B TO CNTMT, to the CLOSE position.

[63] VERIFY Valve 2-FCV-72-2, CNTMT SPRAY HDR B TO CNTMT, CLOSES by GREEN light LIT at Handswitch 2-HS-72-2A, CNTMT SPRAY HDR B TO CNTMT.

6.8 2-FCV-72-2 Logic/Stroke Timing (continued)

[64] OPEN Test Switch "CS-B 52STA" installed at Terminal Block DD, Terminals 10 and 11 at Board 2-BD-21 1-B, Cubicle 13.

[65] REMOVE Test Switch "K644 SPRAY SIGNAL-B" at Terminal Block TB641, Terminals 1 and 2 in Panel 2-R-51.

CV

[66] REMOVE Test Switch "CS-B 52STA" at Terminal Block DD, Terminals 10 and 11 in Board 2-BD-21 1-B, Cubicle 13.

CV

[67] OPEN Breaker 2-BKR-72-2, CS HDR B ISOL (2-FCV-72-2),

480V RX MOV BD 2B1-B, Compt 14A.

[68] MANUALLY TRIP the thermal overload for 2-BKR-72-2, CS HDR B ISOL (2-FCV-72-2), 480V RX MOV BD 2B1-B, Compt 14A.

[69] CLOSE Breaker 2-BKR-72-2, CS HDR B ISOL (2-FCV-72-2),

480V RX MOV BD 2B1-B, Compt 14A.

[70] PLACE Handswitch 2-HS-72-2A, CNTMT SPRAY HDR B TO CNTMT, to the OPEN position.

[71] VERIFY Valve 2-FCV-72-2, CNTMT SPRAY HDR B TO CNTMT, remains in the CLOSED position by GREEN light LIT at Handswitch 2-HS-72-2A, CNTMT SPRAY HDR B TO CNTMT. (Acc Crit 5.0[8])

[72] DEPRESS and HOLD the Armature of Relay K5 located in the back of Panel 16D on 480V RX MOV BD 2A1-A to simulate Overload Bypass.

CV

6.8 2-FCV-72-2 Logic/Stroke Timing (continued)

[73] PLACE Handswitch 2-HS-72-2A, CNTMT SPRAY HDR B TO CNTMT, to the OPEN position.

[74] VERIFY Valve 2-FCV-72-2, CNTMT SPRAY HDR B TO CNTMT, OPENS by RED light LIT at 2-HS-72-2A, CNTMT SPRAY HDR B TO CNTMT. (Acc Crit 5.0[8])

[75] RELEASE the armature of Relay K5 located in back of Panel 16D on 480V RX MOV BD 2A1-A to simulate Overload Bypass.

[76] OPEN Breaker 2-BKR-72-2, CS HDR B ISOL (2-FCV-72-2),

480V RX MOV BD 2B1-B, Compt 14A.

[77] RESET the thermal overload for 2-BKR-72-2, CS HDR B ISOL (2-FCV-72-2), 480V RX MOV BD 2B1-B, Compt 14A.

[78] CLOSE Breaker 2-BKR-72-2, CS HDR B ISOL (2-FCV-72-2),

480V RX MOV BD 2B1-B, Compt 14A.

[79] PLACE Handswitch 2-HS-72-2A, CNTMT SPRAY HDR B TO CNTMT, to the CLOSE position.

[80] VERIFY 2-FCV-72-2, CNTMT SPRAY HDR B TO CNTMT, travels to the CLOSED position by GREEN light LIT at Handswitch 2-HS-72-2A, CNTMT SPRAY HDR B TO CNTMT.

[81] OPEN Breaker 2-BKR-72-2, CS HDR B ISOL (2-FCV-72-2),

480V RX MOV BD 2B1-B, Compt 14A.

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 138 of 249 6.9 Containment Spray Pump 2A-A Logic Test

[1] VERIFY Prerequisites listed in Section 4.0 for Subsection 6.9 have been completed.

CAUTIONS

1) This Subsection involves working in 2-PNL-21 1-A-A (2A-A 6.9 KV SD Bd), panel 4.
2) Steps 6.9[60] to 6.9[69] will involve placing the GROUP K TEST RELAYS 43TK hand switch to TEST and pressing and holding the GROUP K BLACK-OUT BO-CS push button.
3) Auxiliary Building General Supply (ABGS 2A) & Auxiliary Building General Exhaust Fan 2A (ABGE 2A) are also part of GROUP K and will lose power temporarily.
4) ABGS 2B and ABGE 2B may need to be placed in service.

[2] OBTAIN permission from U1 Operations to perform this Subsection due to the temporary power loss of the ABGS 2A and ABGE 2A.

Ul SRO

[3] ENSURE Breaker 2-BKR-72-27, CONTAINMENT SPRAY PUMP 2A-A (2-PMP-72-27), 6.9kV SD BD 2A-A, Panel 13, is OPEN.

[4] ENSURE Breaker 2-BKR-30-177, CS PUMP2A-A RM CLR (2-PMCL-30-177), is CLOSED.

[5] ENSURE the following relays INSTALLED on front side of (2A-A 6.9 kV SD Bd) 2-PNL-211-A-A, panel 2.

A. CSP BOX.

B. CSP BOY.

C. CSP UVX.

D. CSP UVY.

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 139 of 249 6.9 Containment Spray Pump 2A-A Logic Test (continued)

[6] ENSURE the following initial conditions:

A. 2-XS-72-27, 2A CNTMT SPRAY PMP, 6.9kV SD Bd 2A-A, Panel 13, NOR.

B. 2-HS-72-27A, CNTMT SPRAY PMP A, M-6, in STOP Pull-To-Lock.

C. 2-HS-72-27A, CNTMT SPRAY PMP A, GREEN light only LIT.

D. 2-HS-72-27C, 2A CNTMT SPRAY PMP, mid-position after STOP.

E. 2-HS-72-27C, 2A CNTMT SPRAY PMP, GREEN light only LIT.

F. 6900 Shutdown Bd 2A-A Logic Panel 2-PNL-211-A-A, Containment Spray PMP 2A-A, RED light NOT LIT.

[7] PLACE 2-BKR-72-27, CONTAINMENT SPRAY PUMP 2A-A (2-PMP-72-27), 6.9kV SD BD 2A-A, Panel 13, in the TEST position per GOI-7 (with DC Test Coupler and mechanical linkage).

[8] VERIFY ICS point XD4003 displays "PWR OFF".

(Acc Crit 5.0[17])

[9] PRESS the TEST CLOSE pushbutton on 2-BKR-72-27, CONTAINMENT SPRAY PUMP 2A-A (2-PMP-72-27), 6.9kV SD BD 2A-A, Panel 13.

[10] VERIFY 2-BKR-72-27, CONTAINMENT SPRAY PUMP 2A-A (2-PMP-72-27), 6.9kV SD BD 2A-A, Panel 13, CLOSES.

[11] PRESS the TEST TRIP pushbutton on 2-BKR-72-27, CONTAINMENT SPRAY PUMP 2A-A (2-PMP-72-27), 6.9kV SD BD 2A-A, Panel 13.

[12] VERIFY 2-BKR-72-27, CONTAINMENT SPRAY PUMP 2A-A (2-PMP-72-27), 6.9kV SD BD 2A-A, Panel 13, OPENS.

6.9 Containment Spray Pump 2A-A Logic Test (continued)

[13] PLACE 2-BKR-72-27, CONTAINMENT SPRAY PUMP 2A-A (2-PMP-72-27), 6.9kV SD BD 2A-A, Panel 13, in the TEST position per GOI-7 (with DC Test Coupler, mechanical linkage, elevator raised).

[14] VERIFY ICS point XD4003 displays "PWR ON".

(Acc Crit 5.0[17])

[15] ENSURE 2-HS-30-177, CS PUMP 2A-A ROOM COOLER, is in AUTO.

[16] ATTACH a cool damp cloth to the bulb of the temperature sensor for cooler 2-PMCL-30-177, 2A CNTMT SPRAY PMP RM CLR.

[17] VERIFY cooler 2-PMCL-30-177, 2A CNTMT SPRAY PMP RM CLR is NOT RUNNING.

[18] MOMENTARILY PLACE 2-HS-72-27A, CNTMT SPRAY PMP A, in START.

[19] VERIFY the following:

A. 2-BKR-72-27, CONTAINMENT SPRAY PUMP 2A-A (2-PMP-72-27), 6.9kV SD BD 2A-A, Panel 13, is CLOSED. (Acc Crit 5.0[9])

B. Cooler 2-PMCL-30-177, 2A CNTMT SPRAY A PMP RM CLR, STARTS. (Acc Crit 5.0[18]A)

C. 2-HS-72-27C, 2A CNTMT SPRAY PMP, switch lights are RED LIT only. (Acc Crit 5.0[10])

D. 2-HS-72-27A, CNTMT SPRAY PMP A, switch lights are RED LIT only. (Acc Crit 5.0[10])

E. 6900 Shutdown Bd 2A-A Logic Panel RED light LIT.

[20] VERIFY ICS point XD4004 displays "RUNNING".

(Acc Crit 5.0[17])

[21] PLACE 2-HS-72-27A, CNTMT SPRAY PMP A, in STOP.

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 141 of 249 6.9 Containment Spray Pump 2A-A Logic Test (continued)

[22] VERIFY the following:

A. 2-BKR-72-27, CONTAINMENT SPRAY PUMP 2A-A (2-PMP-72-27), 6.9kV SD BD 2A-A, Panel 13, is OPEN.

(Acc Crit 5.0[9])

B. 2-HS-72-27C, 2A CNTMT SPRAY PMP, GREEN light only LIT. (Acc Crit 5.0[10])

C. 2-HS-72-27A, CNTMT SPRAY PMP A, GREEN light only LIT. (Acc Crit 5.0[10])

D. 6900 Shutdown Bd 2A-A Logic Panel RED light NOT LIT.

E. Cooler 2-PMCL-30-177, 2A CNTMT SPRAY A PMP RM CLR, STOPS.

[23] VERIFY ICS point XD4004 displays "NOT RUN".

(Acc Crit 5.0[17])

[24] REMOVE the cloth from the bulb of the temperature sensor for cooler 2-PMCL-30-177, 2A CNTMT SPRAY PMP RM CLR.

[25] PLACE 2-HS-72-27C, 2A CNTMT SPRAY PMP, in START.

[26] VERIFY 2-BKR-72-27, CONTAINMENT SPRAY PUMP 2A-A (2-PMP-72-27), 6.9kV SD BD 2A-A, Panel 13, remains OPEN.

[27] VERIFY ICS point HD2029 displays "NOT P-L".

[28] PLACE 2-HS-72-27A, CNTMT SPRAY PMP A, in STOP PULL-TO-LOCK.

[29] VERIFY 2-HS-72-27A, CNTMT SPRAY PMP A, GREEN Light LIT.

[30] VERIFY ICS point HD2029 displays "PULLT-L".

[31] PLACE 2-HS-72-27A, CNTMT SPRAY PMP A, to the A-AUTO.

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 142 of 249 6.9 Containment Spray Pump 2A-A Logic Test (continued)

[32] PLACE 2-HS-72-27A, CNTMT SPRAY PMP A, in START, AND VERIFY 2-HS-72-27A, CNTMT SPRAY PMP A, RED Light LIT.

[33] PLACE 2-HS-72-27C, 2A CNTMT SPRAY PMP, in STOP.

[34] VERIFY 2-BKR-72-27, CONTAINMENT SPRAY PUMP 2A-A (2-PMP-72-27), 6.9kV SD BD 2A-A, Panel 13, remains CLOSED.

[35] PLACE 2-HS-72-27A, CNTMT SPRAY PMP A, in STOP.

[36] VERIFY 2-HS-72-27A, CNTMT SPRAY PMP A, GREEN light LIT.

[37] ENSURE Annunciator Window 149-A on Panel 2-XA-55-6F, 6.9 SD BD 2A-A, is CLEAR.

[38] ENSURE Event Display Monitor reports 149-A, 6.9 SD BD 2A-A XS INAUX; is NORMAL (Blue).

[39] PLACE 2-XS-72-27, 6.9kV SD Bd 2A-A, Panel 13 in AUX.

[40] VERIFY the following:

A. 2-HS-72-27C, 2A CNTMT SPRAY PMP, GREEN light only LIT.

B. 2-HS-72-27A, CNTMT SPRAY PMP A, GREEN light NOT LIT, RED light NOT LIT, White light NOT LIT.

(Acc Crit 5.0[10])

C. Annunciator Window 149-A on Panel 2-XA-55-6F, 6.9 SD BD 2A-A XS IN AUX; ALARMS. (Acc Crit 5.0[13])

D. Event Display Monitor reports 149-A, 6.9 SD BD 2A-A XS IN AUX; is in ALARM (RED).

[41] PLACE 2-HS-72-27A, CNTMT SPRAY PMP A, in START.

[42] VERIFY 2-BKR-72-27, CONTAINMENT SPRAY PUMP 2A-A (2-PMP-72-27), 6.9kV SD BD 2A-A, Panel 13, remains OPEN.

6.9 Containment Spray Pump 2A-A Logic Test (continued)

[43] VERIFY the light status does NOT change:

A. 2-HS-72-27C, 2A CNTMT SPRAY PMP, GREEN light only LIT.

B. 2-HS-72-27A, CNTMT SPRAY PMP A, NO HS lights are LIT.

[44] PLACE 2-HS-72-27C, 2A CNTMT SPRAY PMP, Panel 13, in START.

[45] VERIFY the following:

A. 2-BKR-72-27, CONTAINMENT SPRAY PUMP 2A-A (2-PMP-72-27), 6.9kV SD BD 2A-A, Panel 13, CLOSES.

(Acc Crit 5.0[9])

B. 2-HS-72-27C, 2A CNTMT SPRAY PMP, RED light only LIT.

C. 2-HS-72-27A, CNTMT SPRAY PMP A, NO HS lights are LIT.

D. 6900 Shutdown Bd 2A-A Logic Panel RED light LIT.

[46] PLACE 2-HS-72-27A, CNTMT SPRAY PMP A, in STOP.

[47] VERIFY 2-BKR-72-27, CONTAINMENT SPRAY PUMP 2A-A (2-PMP-72-27), 6.9kV SD BD 2A-A, Panel 13, remains CLOSED.

[48] VERIFY the light status does NOT change:

A. 2-HS-72-27C,2A CNTMT SPRAY PMP, RED light only is LIT.

B. 2-HS-72-27A, CNTMT SPRAY PMP A, NO HS lights are LIT.

[49] PLACE 2-HS-72-27C, 2A CNTMT SPRAY PMP, in STOP.

WBN CONTAINMENT SPRAY PUMP VALVE 22-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 144 of 249 6.9 Containment Spray Pump 2A-A Logic Test (continued)

[50] VERIFY that 2-BKR-72-27, CONTAINMENT SPRAY PUMP 2A-A (2-PMP-72-27), 6.9kV SD BD 2A-A, Panel 13, OPENS.

(Acc Crit 5.0[9])

[51] PLACE 2-XS-72-27, 6.9kV SD Bd 2A-A, Panel 13 in NORMAL.

[52] VERIFY Annunciator Window 149-A on Panel 2-XA-55-6F, 6.9 SD BD 2A-A, is CLEAR.

[53] VERIFY Event Display Monitor reports 149-A, 6.9 SD BD 2A-A XS INAUX, is NORMAL (Blue).

[54] PLACE 2-HS-72-27C, 2A CNTMT SPRAY PMP, in mid-position.

[55] PLACE and HOLD 2-HS-72-27A, CNTMT SPRAY PMP A, in STOP.

[56] CLOSE "K643 Spray Signal-A" test switch in cabinet R-48 for relay K643.

[57] RELEASE 2-HS-72-27A, CNTMT SPRAY PMP A.

[58] VERIFY that 2-BKR-72-27, CONTAINMENT SPRAY PUMP 2A-A (2-PMP-72-27), 6.9kV SD BD 2A-A, Panel 13, CLOSES without apparent time delay. (Acc Crit 5.0[21])

CAUTIONS

1) The following sequence of steps will involve placing the GROUP K TEST RELAYS 43TK hand switch to TEST and pressing and holding the GROUP K BLACK-OUT BO-CS push button.
2) Auxiliary Building General Supply & Exhaust Fan 2A is also part of GROUP K and will lose power temporarily.
3) ABGS 2B and ABGE 2B may need to be placed in service.

[59] NOTIFY U1 Operations that Auxiliary Building General Supply

& Exhaust Fan 2A will temporarily lose power.

Ul SRO

6.9 Containment Spray Pump 2A-A Logic Test (continued)

[60] LOCATE and IDENTIFY the following items on the FRONT of black out test panel (2-PNL-21 1-A-A, panel 4):

A. GROUP K TEST RELAYS 43TK hand switch.

B. GROUP K BLACK-OUT BO-CS pushbutton.

[61] PLACE hand switch GROUP K TEST RELAYS 43TK to TEST position [2-PNL-21 1-A-A, panel 4].

[62] ENSURE the polymeter is zeroed and ready to record.

NOTES

1) The following steps simulate CS with BO before the breaker closes. Timing will begin as soon as the GROUP K BLACK-OUT BO-CS pushbutton is pressed. Timing will end when breaker closes.
2) The TDPU for 2-02-72-27, CSP ST, is 184 secs.

[63] MOMENTARILY PRESS the GROUP K BLACK-OUT BO-CS pushbutton [2-PNL-211-A-A, panel 4].

[64] VERIFY that 2-BKR-72-27, CONTAINMENT SPRAY PUMP 2A-A (2-PMP-72-27), 6.9kV SD BD 2A-A, Panel 13, OPENS.

[65] VERIFY the following occurs 182.5-185.5 seconds after pressing GROUP K BLACK-OUT BO-CS pushbutton:

A. 2-BKR-72-27, CONTAINMENT SPRAY PUMP 2A-A (2-PMP-72-27), 6.9kV SD BD 2A-A, Panel 13, CLOSES.

(Acc Crit 5.0[20])

B. Relay CSP ST is ENERGIZED.

[66] RECORD the time from the polymeter.

seconds (182.5-185.5 seconds)

M&TE Cal Due Date

[67] OPEN "K643 Spray Signal-A" test switch in cabinet R-48 for relay K643.

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 146 of 249 6.9 Containment Spray Pump 2A-A Logic Test (continued)

[68] VERIFY that 2-BKR-72-27, CONTAINMENT SPRAY PUMP 2A-A (2-PMP-72-27), 6.9kV SD BD 2A-A, Panel 13, remains CLOSED.

[69] PLACE 43TK to RESET and then to NORMAL.

[70] VERIFY 2-BKR-72-27, CONTAINMENT SPRAY PUMP 2A-A (2-PMP-72-27), 6.9kV SD BD 2A-A, Panel 13, remains CLOSED.

[71] ENSURE Annunciator 14-D "M-1 THRU M-6 MOTOR OVERLOAD" is CLEAR.

[72] ENSURE Event Display Monitor reports 14-D "M-1 THRU M-6 MOTOR OVERLOAD" is NORMAL (Blue).

[73] CLOSE the contacts on Relay 51/83 AO on 2-BKR-72-27, CONTAINMENT SPRAY PUMP 2A-A (2-PMP-72-27), 6.9kV SD BD 2A-A, Panel 13, by manually rotating the disk, AND HOLD.

[74] VERIFY 2-BKR-72-27, CONTAINMENT SPRAY PUMP 2A-A (2-PMP-72-27), 6.9kV SD BD 2A-A, Panel 13, remains CLOSED.

[75] VERIFY 2-HS-72-27A, CNTMT SPRAY PMP A, White light is LIT.

[76] VERIFY Annunciator 14-D "M-1 THRU M-6 MOTOR OVERLOAD" ALARMS. (Acc Crit 5.0[16])

[77] VERIFY Event Display Monitor reports 14-D "M-1 THRU M-6 MOTOR OVERLOAD" is in ALARM (RED).

[78] RELEASE the disk on Relay 51/83 AO on 2-BKR-72-27, CONTAINMENT SPRAY PUMP 2A-A (2-PMP-72-27), 6.9kV SD BD 2A-A, Panel 13.

[79] VERIFY 2-HS-72-27A, CNTMT SPRAY PMP A, White light is NOT LIT.

[80] VERIFY Annunciator 14-D "M-1 THRU M-6 MOTOR OVERLOAD" CLEARS.

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 147 of 249 6.9 Containment Spray Pump 2A-A Logic Test (continued)

[81] VERIFY Event Display Monitor reports 14-D "M-1 THRU M-6 MOTOR OVERLOAD" is NORMAL (Blue).

[82] ENSURE Annunciator 14-E "M-1 THRU M-6 MOTOR TRIPOUT" is CLEAR.

[83] ENSURE Event Display Monitor reports 14-E "M-1 THRU M-6 MOTOR TRIPOUT" is NORMAL (Blue).

[84] CLOSE the contacts on Relay 51/83 A0 on 2-BKR-72-27, CONTAINMENT SPRAY PUMP 2A-A (2-PMP-72-27), 6.9kV SD BD 2A-A, Panel 13, by manually rotating the disk, AND HOLD.

[85] MOMENTARILY PLACE a jumper across terminals 9 and 10 on the back of Relay 51/83 A0 on 2-BKR-72-27, CONTAINMENT SPRAY PUMP 2A-A (2-PMP-72-27), 6.9kV SD BD 2A-A, Panel 13.

[86] VERIFY the following:

A. 2-HS-72-27A, CNTMT SPRAY PMP A, White light is LIT.

B. 2-HS-72-27A, CNTMT SPRAY PMP A, GREEN light is LIT.

C. 2-BKR-72-27, CONTAINMENT SPRAY PUMP 2A-A (2-PMP-72-27), 6.9kV SD BD 2A-A, Panel 13, OPEN.

[87] VERIFY Annunciator 14-E "M-1 THRU M-6 MOTOR TRIPOUT" ALARMS. (Acc Crit 5.0[15])

[88] VERIFY Event Display Monitor reports 14-E "M-1 THRU M-6 MOTOR TRIPOUT" is in ALARM (RED).

[89] RELEASE the disk on Relay 51/83 AO on 2-BKR-72-27, CONTAINMENT SPRAY PUMP 2A-A (2-PMP-72-27), 6.9kV SD BD 2A-A, Panel 13.

[90] PLACE handswitch 2-HS-72-27A, CNTMT SPRAY PMP A, to START.

[91] VERIFY 2-BKR-72-27, CONTAINMENT SPRAY PUMP 2A-A (2-PMP-72-27), 6.9kV SD BD 2A-A, Panel 13, remains OPEN.

6.9 Containment Spray Pump 2A-A Logic Test (continued)

[92] PLACE handswitch 2-HS-72-27A, CNTMT SPRAY PMP A, momentarily to STOP.

[93] VERIFY the following:

A. 2-HS-72-27A, CNTMT SPRAY PMP A, White light is NOT LIT.

B. 2-HS-72-27A, CNTMT SPRAY PMP A, GREEN light is LIT.

[94] VERIFY Annunciator 14-E "M-1 THRU M-6 MOTOR TRI POUT" CLEARS.

[95] VERIFY Event Display Monitor reports 14-E "M-1 THRU M-6 MOTOR TRIPOUT" is NORMAL (Blue).

[96] PLACE 2-HS-72-27A, CNTMT SPRAY PMP A, to START.

[97] VERIFY 2-BKR-72-27, CONTAINMENT SPRAY PUMP 2A-A (2-PMP-72-27), 6.9kV SD BD 2A-A, Panel 13, CLOSES.

[98] MANUALLY ACTUATE the Contacts on 2-BKR-72-27, CONTAINMENT SPRAY PUMP 2A-A (2-PMP-72-27), 6.9kV SD BD 2A-A, Panel 13, 50 A) Instantaneous Overcurrent Relay.

[99] VERIFY 2-BKR-72-27, CONTAINMENT SPRAY PUMP 2A-A (2-PMP-72-27), 6.9kV SD BD 2A-A, Panel 13, OPENS.

[100] VERIFY the following:

A. 2-HS-72-27A, CNTMT SPRAY PMP A, White light is LIT.

B. 2-HS-72-27A, CNTMT SPRAY PMP A, GREEN light is LIT.

[101] VERIFY Annunciator 14-E "M-1 THRU M-6 MOTOR TRI POUT" ALARMS (Acc Crit 5.0[15]).

[102] VERIFY Event Display Monitor reports 14-E "M-1 THRU M-6 MOTOR TRIPOUT" is in ALARM (RED).

6.9 Containment Spray Pump 2A-A Logic Test (continued)

[103] RESET the trip target on time overcurrent relay 50 A4 on 2-BKR-72-27, CONTAINMENT SPRAY PUMP 2A-A (2-PMP-72-27), 6.9kV SD BD 2A-A, Panel 13.

[104] PLACE handswitch 2-HS-72-27A, CNTMT SPRAY PMP A, momentarily to STOP.

[105] VERIFY the following:

A. 2-HS-72-27A, CNTMT SPRAY PMP A, White light is NOT LIT.

B. 2-HS-72-27A, CNTMT SPRAY PMP A, GREEN light is LIT.

C. MOTOR TRIPOUT buzzer silences.

[106] VERIFY Annunciator 14-E "M-1 THRU M-6 MOTOR TRIPOUT" CLEARS.

[107] VERIFY Event Display Monitor reports 14-E "M-1 THRU M-6 MOTOR TRIPOUT" is NORMAL (Blue).

[108] PLACE 2-HS-72-27A, CNTMT SPRAY PMP A, to START.

[109] VERIFY 2-BKR-72-27, CONTAINMENT SPRAY PUMP 2A-A (2-PMP-72-27), 6.9kV SD BD 2A-A, Panel 13, CLOSES.

[110] CLOSE the contacts on Relay 51/83 CO on 2-BKR-72-27, CONTAINMENT SPRAY PUMP 2A-A (2-PMP-72-27), 6.9kV SD BD 2A-A, Panel 13, by manually rotating the disk, AND HOLD.

[111] VERIFY 2-BKR-72-27, CONTAINMENT SPRAY PUMP 2A-A (2-PMP-72-27), 6.9kV SD BD 2A-A, Panel 13, remains CLOSED.

[112] VERIFY 2-HS-72-27A, CNTMT SPRAY PMP A, White light is LIT.

[113] VERIFY Annunciator 14-D "M-1 THRU M-6 MOTOR OVERLOAD" ALARMS. (Acc Crit 5.0[16])

[114] VERIFY Event Display Monitor reports 14-D "M-1 THRU M-6 MOTOR OVERLOAD" is in ALARM (RED).

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 150 of 249 6.9 Containment Spray Pump 2A-A Logic Test (continued)

[115] RELEASE the disk on Relay 51/83 C0 on 2-BKR-72-27, CONTAINMENT SPRAY PUMP 2A-A (2-PMP-72-27), 6.9kV SD BD 2A-A, Panel 13.

[116] VERIFY 2-HS-72-27A, CNTMT SPRAY PMP A, White light is NOT LIT.

[117] VERIFY Annunciator 14-D "M-1 THRU M-6 MOTOR OVERLOAD" CLEARS.

[118] ENSURE Annunciator 14-E "M-1 THRU M-6 MOTOR TRIPOUT" is CLEAR.

[119] CLOSE the contacts on Relay 51/83 C0 on 2-BKR-72-27, CONTAINMENT SPRAY PUMP 2A-A (2-PMP-72-27), 6.9kV SD BD 2A-A, Panel 13, by manually rotating the disk, AND HOLD.

[120] MOMENTARILY PLACE a jumper across terminals 9 and 10 on the back of Relay 51/83 CO on 2-BKR-72-27, CONTAINMENT SPRAY PUMP 2A-A (2-PMP-72-27), 6.9kV SD BD 2A-A, Panel 13.

[121] VERIFY the following:

A. 2-HS-72-27A, CNTMT SPRAY PMP A, White light is LIT.

B. 2-HS-72-27A, CNTMT SPRAY PMP A, GREEN light is LIT.

C. 2-BKR-72-27, CONTAINMENT SPRAY PUMP 2A-A (2-PMP-72-27), 6.9kV SD BD 2A-A, Panel 13, OPEN.

[122] VERIFY Annunciator 14-E "M-1 THRU M-6 MOTOR TRIPOUT" ALARMS. (Acc Crit 5.0[15])

[123] VERIFY Event Display Monitor reports 14-E "M-1 THRU M-6 MOTOR TRIPOUT" is in ALARM (RED).

[124] RELEASE the disk on Relay 51/83 C0 on 2-BKR-72-27, CONTAINMENT SPRAY PUMP 2A-A (2-PMP-72-27), 6.9kV SD BD 2A-A, Panel 13.

[125] PLACE handswitch 2-HS-72-27A, CNTMT SPRAY PMP A, momentarily to STOP.

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 151 of 249 6.9 Containment Spray Pump 2A-A Logic Test (continued)

[126] VERIFY the following.

A. 2-HS-72-27A, CNTMT SPRAY PMP A, White light is NOT LIT.

B. 2-HS-72-27A, CNTMT SPRAY PMP A, GREEN light is LIT.

[127] VERIFY Annunciator 14-E "M-1 THRU M-6 MOTOR TRIPOUT" CLEARS.

[128] VERIFY Event Display Monitor reports 14-E "M-1 THRU M-6 MOTOR TRIPOUT" is NORMAL (Blue).

[129] PLACE 2-HS-72-27A, CNTMT SPRAY PMP A, to START.

[130] VERIFY 2-BKR-72-27, CONTAINMENT SPRAY PUMP 2A-A (2-PMP-72-27), 6.9kV SD BD 2A-A, Panel 13, CLOSES.

[131] MANUALLY ACTUATE the Contacts on 2-BKR-72-27, CONTAINMENT SPRAY PUMP 2A-A (2-PMP-72-27), 6.9kV SD BD 2A-A, Panel 13, 50 CO Instantaneous Overcurrent Relay.

[132] VERIFY 2-BKR-72-27, CONTAINMENT SPRAY PUMP 2A-A (2-PMP-72-27), 6.9kV SD BD 2A-A, Panel 13, OPENS.

[133] VERIFY the following:

A. 2-HS-72-27A, CNTMT SPRAY PMP A, White light is LIT.

B. 2-HS-72-27A, CNTMT SPRAY PMP A, GREEN light is LIT.

[134] VERIFY Annunciator 14-E "M-1 THRU M-6 MOTOR TRIPOUT" ALARMS. (Acc Crit 5.0[15])

[135] VERIFY Event Display Monitor reports 14-E "M-1 THRU M-6 MOTOR TRIPOUT" is in ALARM (RED).

[136] RESET the trip target on time overcurrent relay 50 Cý on 2-BKR-72-27, CONTAINMENT SPRAY PUMP 2A-A (2-PMP-72-27), 6.9kV SD BD 2A-A, Panel 13.

6.9 Containment Spray Pump 2A-A Logic Test (continued)

[137] PLACE handswitch 2-HS-72-27A, CNTMT SPRAY PMP A, momentarily to STOP.

[138] VERIFY the following:

A. 2-HS-72-27A, CNTMT SPRAY PMP A, White light is NOT LIT.

B. 2-HS-72-27A, CNTMT SPRAY PMP A, GREEN light is LIT.

[139] VERIFY Annunciator 14-E "M-1 THRU M-6 MOTOR TRI POUT" CLEARS.

[140] VERIFY Event Display Monitor reports 14-E "M-1 THRU M-6 MOTOR TRIPOUT" is NORMAL (Blue).

[141] PLACE 2-HS-72-27A, CNTMT SPRAY PMP A, to START.

[142] VERIFY 2-BKR-72-27, CONTAINMENT SPRAY PUMP 2A-A (2-PMP-72-27), 6.9kV SD BD 2A-A, Panel 13, CLOSES.

[143] ACTUATE the Contacts by manually rotating the disk on 2-BKR-72-27, CONTAINMENT SPRAY PUMP 2A-A (2-PMP-72-27), 6.9kV SD BD 2A-A, Panel 13, 50G Ground Overcurrent Relay.

[144] VERIFY the following:

A. 2-HS-72-27A, CNTMT SPRAY PMP A, White light is LIT.

B. 2-HS-72-27A, CNTMT SPRAY PMP A, GREEN light is LIT.

[145] VERIFY 2-BKR-72-27, CONTAINMENT SPRAY PUMP 2A-A (2-PMP-72-27), 6.9kV SD BD 2A-A, Panel 13, OPENS.

[146] VERIFY Annunciator 14-E "M-1 THRU M-6 MOTOR TRIPOUT" ALARMS. (Acc Crit 5.0[15])

[147] VERIFY Event Display Monitor reports 14-E "M-1 THRU M-6 MOTOR TRIPOUT" is in ALARM (RED).

6.9 Containment Spray Pump 2A-A Logic Test (continued)

[148] RESET the trip target on Ground Overcurrent Relay 50G on 2-BKR-72-27, CONTAINMENT SPRAY PUMP 2A-A (2-PMP-72-27), 6.9kV SD BD 2A-A, Panel 13.

[149] PLACE handswitch 2-HS-72-27A, CNTMT SPRAY PMP A, momentarily to STOP.

[150] VERIFY the following:

A. 2-HS-72-27A, CNTMT SPRAY PMP A, White light is NOT LIT.

B. 2-HS-72-27A, CNTMT SPRAY PMP A, GREEN light is LIT.

[151] VERIFY Annunciator 14-E "M-1 THRU M-6 MOTOR TRIPOUT" CLEARS.

[152] VERIFY Event Display Monitor reports 14-E "M-1 THRU M-6 MOTOR TRIPOUT" is NORMAL (Blue).

[153] REMOVE 2-BKR-72-27, CONTAINMENT SPRAY PUMP 2A-A (2-PMP-72-27), 6.9kV SD BD 2A-A, Panel 13, from the TEST position per GOI-7.

6.10 Containment Spray Pump 2B-B Logic Test

[1] VERIFY Prerequisites listed in Section 4.0 for Subsection 6.10 have been completed.

CAUTIONS

1) This Subsection involves working in 2-PNL-21 1-B-B (2B-B 6.9 KV SD Bd), panel 4.
2) Steps 6.10[60] to 6.10[69] will involve placing the GROUP K TEST RELAYS 43TK hand switch to TEST and pressing and holding the GROUP K BLACK-OUT BO-CS push button.
3) Auxiliary Building General Supply (ABGS 2B) & Auxiliary Building General Exhaust Fan 2B (ABGE 2B) are also part of GROUP K and will lose power temporarily.
4) ABGS 2A and ABGE 2A may need to be placed in service.

[2] OBTAIN permission from Ul Operations to perform this Subsection due to the temporary power loss of the ABGS 2B and ABGE 2B.

Ul SRO

[3] ENSURE Breaker 2-BKR-72-10, CONTAINMENT SPRAY PUMP 2B-B (2-PMP-72-10), 6.9kV SD BD 2B-B, Panel 13, is OPEN.

[4] ENSURE Breaker 2-BKR-30-178, CS PUMP2B-B RM CLR (2-PMCL-30-178), is CLOSED.

[5] ENSURE the following relays INSTALLED on front side of 2-PNL-211-B-B, panel 2.

A. CSP BOX.

B. CSP BOY.

C. CSP UVX.

D. CSP UVY.

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 155 of 249 6.10 Containment Spray Pump 2B-B Logic Test (continued)

[6] ENSURE the following initial conditions:

A. 2-XS-72-10, 2B CNTMT SPRAY PMP, 6.9kV SD Bd 2B-B, Panel 13, NOR.

B. 2-HS-72-10A, CNTMT SPRAY PMP B, M-6, in STOP Pull-To-Lock.

C. 2-HS-72-1OA, CNTMT SPRAY PMP B, GREEN light only LIT.

D. 2-HS-72-10C, 2B CNTMT SPRAY PMP, mid-position after STOP.

E. 2-HS-72-10C, 2B CNTMT SPRAY PMP, GREEN light only LIT.

F. 6900 Shutdown Bd 28-B Logic Panel 2-PNL-211-B-B, Containment Spray PMP 2B-B, RED light NOT LIT.

[7] PLACE 2-BKR-72-10, CONTAINMENT SPRAY PUMP 2B-B (2-PMP-72-10), 6.9kV SD BD 2B-B, Panel 13, in the TEST position per GOl-7 (with DC Test Coupler and mechanical linkage).

[8] VERIFY ICS point XD4001 displays "PWR OFF".

(Acc Crit 5.0[17])

[9] PRESS the TEST CLOSE pushbutton on 2-BKR-72-10, CONTAINMENT SPRAY PUMP 28-B (2-PMP-72-10), 6.9kV SD BD 2B-B, Panel 13.

[10] VERIFY 2-BKR-72-10, CONTAINMENT SPRAY PUMP 28-B (2-PMP-72-10), 6.9kV SD BD 2B-B, Panel 13, CLOSES.

[11] PRESS the TEST TRIP pushbutton on 2-BKR-72-10, CONTAINMENT SPRAY PUMP 28-B (2-PMP-72-10), 6.9kV SD BD 28-B, Panel 13.

[12] VERIFY 2-BKR-72-10, CONTAINMENT SPRAY PUMP 28-B (2-PMP-72-10), 6.9kV SD BD 28-B, Panel 13, OPENS.

6.10 Containment Spray Pump 2B-B Logic Test (continued)

[13] PLACE 2-BKR-72-10, CONTAINMENT SPRAY PUMP 28-B (2-PMP-72-10), 6.9kV SD BD 2B-B, Panel 13, in the TEST position per GOI-7 (with DC Test Coupler, mechanical linkage, elevator raised).

[14] VERIFY ICS point XD4001 displays "PWR ON".

(Acc Crit 5.0[17])

[15] ENSURE 2-HS-30-178, CS PUMP 2B-B ROOM COOLER, is in AUTO.

[16] ATTACH a cool damp cloth to the bulb of the temperature sensor for cooler 2-PMCL-30-178, 2B CNTMT SPRAY PMP RM CLR.

[17] VERIFY cooler 2-PMCL-30-178, 2B CNTMT SPRAY PMP RM CLR, is NOT RUNNING.

[18] MOMENTARILY PLACE 2-HS-72-10A, CNTMT SPRAY PMP B, in START.

[19] VERIFY the following:

A. 2-BKR-72-10, CONTAINMENT SPRAY PUMP 28-B (2-PMP-72-10), 6.9kV SD BD 28-B, Panel 13, is CLOSED. (Acc Crit 5.0[9])

B. Cooler 2-PMCL-30-178, 2B CNTMT SPRAY B PMP RM CLR, STARTS. (Acc Crit 5.0[18]B)

C. 2-HS-72-10C, 2B CNTMT SPRAY PMP, RED light only LIT. (Acc Crit 5.0[10])

D. 2-HS-72-1OA, CNTMT SPRAY PMP B, RED light only LIT. (Acc Crit 5.0[10])

E. 6900 Shutdown Bd 2B-B Logic Panel RED light LIT.

[20] VERIFY ICS point XD4002 displays "RUNNING".

(Acc Crit 5.0[17])

[21] PLACE 2-HS-72-10A, CNTMT SPRAY PMP B, in STOP.

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 157 of 249 6.10 Containment Spray Pump 2B-B Logic Test (continued)

[22] VERIFY the following:

A. 2-BKR-72-10, CONTAINMENT SPRAY PUMP 2B-B (2-PMP-72-10), 6.9kV SD BD 2B-B, Panel 13, is OPEN.

(Acc Crit 5.0[9])

B. 2-HS-72-10C, 2B CNTMT SPRAY PMP, GREEN light only LIT. (Acc Crit 5.0[10])

C. 2-HS-72-10A, CNTMT SPRAY PMP B, GREEN light only LIT. (Acc Crit 5.0[10])

D. 6900 Shutdown Bd 2B-B Logic Panel RED light NOT LIT.

E. Cooler 2-PMCL-30-178, 2B CNTMT SPRAY B PMP RM CLR, STOPS.

[23] VERIFY ICS point XD4002 displays "NOT RUN".

(Acc Crit 5.0[17])

[24] REMOVE the cloth from the bulb of the temperature sensor for cooler 2-PMCL-30-178, 2B CNTMT SPRAY B PMP RM CLR.

[25] PLACE 2-HS-72-10C, 2B CNTMT SPRAY PMP, in START.

[26] VERIFY 2-BKR-72-10, CONTAINMENT SPRAY PUMP 2B-B (2-PMP-72-10), 6.9kV SD BD 2B-B, Panel 13, remains OPEN.

[27] VERIFY ICS point HD2063 displays "NOT P-L".

[28] PLACE 2-HS-72-10A, CNTMT SPRAY PMP B, in STOP PULL-TO-LOCK.

[29] VERIFY 2-HS-72-10A, CNTMT SPRAY PMP B, GREEN light only LIT.

[30] VERIFY ICS point HD2063 displays "PULLT-L".

[31] PLACE 2-HS-72-10A, CNTMT SPRAY PMP B, to the A-AUTO.

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 158 of 249 6.10 Containment Spray Pump 2B-B Logic Test (continued)

[32] PLACE 2-HS-72-10A, CNTMT SPRAY PMP B, in START, AND VERIFY 2-HS-72-10A, CNTMT SPRAY PMP B, RED Light LIT.

[33] PLACE 2-HS-72-1 0C, 2B CNTMT SPRAY PMP, in STOP.

[34] VERIFY 2-BKR-72-10, CONTAINMENT SPRAY PUMP 2B-B (2-PMP-72-10), 6.9kV SD BD 2B-B, Panel 13, remains CLOSED.

[35] PLACE 2-HS-72-10A, CNTMT SPRAY PMP B, in STOP.

[36] VERIFY 2-HS-72-10A, CNTMT SPRAY PMP B, GREEN only LIT.

[37] ENSURE Annunciator Window 150-A on Panel 2-XA-55-6F, 6.9 SD BD 2B-B, is CLEAR.

[38] ENSURE Event Display Monitor reports 150-A, 6.9 SD BD 2B-B XS IN AUX; is NORMAL (Blue).

[39] PLACE 2-XS-72-10, 6.9kV SD Bd 2B-B, Panel 13, in AUX.

[40] VERIFY the following:

A. 2-HS-72-10C, 2B CNTMT SPRAY PMP, GREEN light only LIT.

B. 2-HS-72-1OA, CNTMT SPRAY PMP B, NO lights are LIT.

(Acc Crit 5.0[10])

C. Annunciator Window 150-A on Panel 2-XA-55-6F, 6.9 SD BD 2B-B XS IN AUX; ALARMS. (Acc Crit 5.0[14])

D. Event Display Monitor reports 150-A, 6.9 SD BD 2B-B XS IN AUX; is in ALARM (RED).

[41] PLACE 2-HS-72-10A, CNTMT SPRAY PMP B, in START.

[42] VERIFY 2-BKR-72-10, CONTAINMENT SPRAY PUMP 2B-B (2-PMP-72-10), 6.9kV SD BD 2B-B, Panel 13, remains OPEN.

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 159 of 249 6.10 Containment Spray Pump 2B-B Logic Test (continued)

[43] VERIFY the light status does NOT change:

A. 2-HS-72-10C, 2B CNTMT SPRAY PMP, GREEN light only LIT.

B. 2-HS-72-10A, CNTMT SPRAY PMP B, NO HS lights are LIT.

[44] PLACE 2-HS-72-10C, 2B CNTMT SPRAY PMP, Panel 13, in START.

[45] VERIFY the following:

A. 2-BKR-72-10, CONTAINMENT SPRAY PUMP 2B-B (2-PMP-72-10), 6.9kV SD BD 2B-B, Panel 13, CLOSES.

(Acc Crit 5.0[9])

B. 2-HS-72-10C, 2B CNTMT SPRAY PMP, RED light only LIT.

C. 2-HS-72-10A, CNTMT SPRAY PMP B, NO HS lights are LIT.

D. 6900 Shutdown Bd 2B-B Logic Panel RED light LIT.

[46] PLACE 2-HS-72-10A, CNTMT SPRAY PMP B, in STOP.

[47] VERIFY 2-BKR-72-10, CONTAINMENT SPRAY PUMP 2B-B (2-PMP-72-10), 6.9kV SD BD 2B-B, Panel 13, remains CLOSED.

[48] VERIFY the light status does NOT change:

A. 2-HS-72-10C, 2B CNTMT SPRAY PMP, RED light only is LIT.

B. 2-HS-72-10A, CNTMT SPRAY PMP B, NO HS lights are LIT.

[49] PLACE 2-HS-72-10C, 6.9kV SD Bd 2B-B, Panel 13, in STOP.

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 160 of 249 6.10 Containment Spray Pump 2B-B Logic Test (continued)

[50] VERIFY that 2-BKR-72-10, CONTAINMENT SPRAY PUMP 2B-B (2-PMP-72-10), 6.9kV SD BD 2B-B, Panel 13, OPENS.

(Acc Crit 5.0[9])

[51] PLACE 2-XS-72-10, 6.9kV SD Bd 2B-B, Panel 13, in NORMAL.

[52] VERIFY Annunciator Window 150-A on Panel 2-XA-55-6F, 6.9 SD BD 2B-B, is CLEAR.

[53] VERIFY Event Display Monitor reports 150-A, 6.9 SD BD 2B-B XS INAUX, is NORMAL (Blue).

[54] PLACE 2-HS-72-10C, 2B CNTMT SPRAY PMP, in mid-position.

[55] PLACE and HOLD 2-HS-72-10A, CNTMT SPRAY PMP B, in STOP.

[56] CLOSE "K643 Spray Signal-B" test switch in cabinet R-51 for relay K643.

[57] RELEASE 2-HS-72-10A, CNTMT SPRAY PMP B.

[58] VERIFY that 2-BKR-72-10, CONTAINMENT SPRAY PUMP 2B-B (2-PMP-72-10), 6.9kV SD BD 2B-B, Panel 13, CLOSES without apparent time delay. (Acc Crit 5.0[21])

CAUTIONS

1) The following sequence of steps will involve placing the GROUP K TEST RELAYS 43TK hand switch to TEST and pressing and holding the GROUP K BLACK-OUT BO-CS push button.
2) Auxiliary Building General Supply & Exhaust Fan 2B is also part of GROUP K and will lose power temporarily.
3) ABGS 2A and ABGE 2A may need to be placed in service.

[59] NOTIFY Ul Operations that Auxiliary Building General Supply

& Exhaust Fan 2B will temporarily lose power.

Ul SRO

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 161 of 249 6.10 Containment Spray Pump 2B-B Logic Test (continued)

[60] LOCATE and IDENTIFY the following items on the FRONT of 2-PNL-211-B-B, panel 4:

A. GROUP K TEST RELAYS 43TK hand switch.

B. GROUP K BLACK-OUT BO-CS pushbutton.

[61] PLACE hand switch GROUP K TEST RELAYS 43TK to TEST position [2-PNL-21 1-B-B, panel 4].

[62] ENSURE the polymeter is zeroed and ready to record.

NOTES

1) The following steps simulate CS with BO before the breaker closes. Timing will begin as soon as the GROUP K BLACK-OUT BO-CS pushbutton is pressed. Timing will end when breaker closes.
2) The TDPU for 2-02-72-10, CSP ST, is 184 secs.

[63] MOMENTARILY PRESS the GROUP K BLACK-OUT BO-CS pushbutton [2-PNL-21 1-B-B, panel 4].

[64] VERIFY that 2-BKR-72-10, CONTAINMENT SPRAY PUMP 2B-B (2-PMP-72-10), 6.9kV SD BD 2B-B, Panel 13, OPENS.

[65] VERIFY the following occurs 182.5-185.5 seconds after pressing GROUP K BLACK-OUT BO-CS pushbutton:

A. 2-BKR-72-10, CONTAINMENT SPRAY PUMP 2B-B (2-PMP-72-10), 6.9kV SD BD 2B-B, Panel 13, CLOSES.

(Acc Crit 5.0[20])

B. Relay CSP ST is ENERGIZED.

[66] RECORD the time from the polymeter.

seconds (182.5-185.5 seconds)

M&TE Cal Due Date

[67] OPEN "K643 Spray Signal-B" test switch in cabinet R-51 for relay K643.

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 162 of 249 6.10 Containment Spray Pump 2B-B Logic Test (continued)

[68] VERIFY that 2-BKR-72-10, CONTAINMENT SPRAY PUMP 2B-B (2-PMP-72-10), 6.9kV SD BD 2B-B, Panel 13, remains CLOSED.

[69] PLACE 43TK to RESET and then to NORMAL.

[70] VERIFY 2-BKR-72-10, CONTAINMENT SPRAY PUMP 2B-B (2-PMP-72-10), 6.9kV SD BD 2B-B, Panel 13, remains CLOSED.

[71] ENSURE Annunciator 14-D "M-1 THRU M-6 MOTOR OVERLOAD" is CLEAR.

[72] ENSURE Event Display Monitor reports 14-D "M-1 THRU M-6 MOTOR OVERLOAD" is NORMAL (Blue).

[73] CLOSE the contacts on Relay 51/83 AO on 2-BKR-72-10, CONTAINMENT SPRAY PUMP 2B-B (2-PMP-72-10), 6.9kV SD BD 2B-B, Panel 13, by manually rotating the disk, AND HOLD.

[74] VERIFY 2-BKR-72-10, CONTAINMENT SPRAY PUMP 2B-B (2-PMP-72-10), 6.9kV SD BD 2B-B, Panel 13, remains CLOSED.

[75] VERIFY 2-HS-72-10A, CNTMT SPRAY PMP B, White light is LIT.

[76] VERIFY Annunciator 14-D "M-1 THRU M-6 MOTOR OVERLOAD" ALARMS. (Acc Crit 5.0[16])

[77] VERIFY Event Display Monitor reports 14-D "M-1 THRU M-6 MOTOR OVERLOAD" is in ALARM (RED).

[78] RELEASE the disk on Relay 51/83 AO on 2-BKR-72-10, CONTAINMENT SPRAY PUMP 2B-B (2-PMP-72-10), 6.9kV SD BD 2B-B, Panel 13.

[79] VERIFY 2-HS-72-10A, CNTMT SPRAY PMP B, White light is NOT LIT.

[80] VERIFY Annunciator 14-D "M-1 THRU M-6 MOTOR OVERLOAD" CLEARS.

6.10 Containment Spray Pump 2B-B Logic Test (continued)

[81] VERIFY Event Display Monitor reports 14-D "M-1 THRU M-6 MOTOR OVERLOAD" is NORMAL (Blue).

[82] ENSURE Annunciator 14-E "M-1 THRU M-6 MOTOR TRIPOUT" is CLEAR.

[83] ENSURE Event Display Monitor reports 14-E "M-1 THRU M-6 MOTOR TRIPOUT" is NORMAL (Blue).

[84] CLOSE the contacts on Relay 51/83 A0 on 2-BKR-72-10, CONTAINMENT SPRAY PUMP 2B-B (2-PMP-72-10), 6.9kV SD BD 2B-B, Panel 13, by manually rotating the disk, AND HOLD.

[85] MOMENTARILY PLACE a jumper across terminals 9 and 10 on the back of Relay 51/83 A0 on 2-BKR-72-10, CONTAINMENT SPRAY PUMP 28-B (2-PMP-72-10), 6.9kV SD BD 2B-B, Panel 13.

[86] VERIFY the following:

A. 2-HS-72-10A, CNTMT SPRAY PMP B, White light is LIT.

B. 2-HS-72-10A, CNTMT SPRAY PMP B, GREEN light is LIT.

C. 2-BKR-72-10, CONTAINMENT SPRAY PUMP 2B-B (2-PMP-72-10), 6.9kV SD BD 2B-B, Panel 13, OPEN.

[87] VERIFY Annunciator 14-E "M-1 THRU M-6 MOTOR TRIPOUT" ALARMS. (Acc Crit 5.0[15])

[88] VERIFY Event Display Monitor reports 14-E "M-1 THRU M-6 MOTOR TRIPOUT" is in ALARM (RED).

[89] RELEASE the disk on Relay 51/83 AO on 2-BKR-72-10, CONTAINMENT SPRAY PUMP 2B-B (2-PMP-72-10), 6.9kV SD BD 2B-B, Panel 13.

[90] PLACE handswitch 2-HS-72-10A, CNTMT SPRAY PMP B, to START.

[91] VERIFY 2-BKR-72-10, CONTAINMENT SPRAY PUMP 28-B (2-PMP-72-10), 6.9kV SD BD 28-B, Panel 13, remains OPEN.

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 164 of 249 6.10 Containment Spray Pump 2B-B Logic Test (continued)

[92] PLACE handswitch 2-HS-72-10A, CNTMT SPRAY PMP B, momentarily to STOP.

[93] VERIFY the following:

A. 2-HS-72-10A, CNTMT SPRAY PMP B, White light is NOT LIT.

B. 2-HS-72-10A, CNTMT SPRAY PMP B, GREEN light is LIT.

[94] VERIFY Annunciator 14-E "M-1 THRU M-6 MOTOR TRIPOUT" CLEARS.

[95] VERIFY Event Display Monitor reports 14-E "M-1 THRU M-6 MOTOR TRIPOUT" is NORMAL (Blue).

[96] PLACE 2-HS-72-10A, CNTMT SPRAY PMP B, to START.

[97] VERIFY 2-BKR-72-10, CONTAINMENT SPRAY PUMP 2B-B (2-PMP-72-10), 6.9kV SD BD 2B-B, Panel 13, CLOSES.

[98] MANUALLY ACTUATE the Contacts on 2-BKR-72-1 0, CONTAINMENT SPRAY PUMP 2B-B (2-PMP-72-10), 6.9kV SD BD 2B-B, Panel 13, 50 A4 Instantaneous Overcurrent Relay.

[99] VERIFY 2-BKR-72-1 0, CONTAINMENT SPRAY PUMP 2B-B (2-PMP-72-10), 6.9kV SD BD 2B-B, Panel 13, OPENS.

[100] VERIFY the following:

A. 2-HS-72-10A, CNTMT SPRAY PMP B, White light is LIT.

B. 2-HS-72-10A, CNTMT SPRAY PMP B, GREEN light is LIT.

[101] VERIFY Annunciator 14-E "M-1 THRU M-6 MOTOR TRIPOUT" ALARMS. (Acc Crit 5.0[15])

[102] VERIFY Event Display Monitor reports 14-E "M-1 THRU M-6 MOTOR TRIPOUT" is in ALARM (RED).

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 165 of 249 6.10 Containment Spray Pump 2B-B Logic Test (continued)

[103] RESET the trip target on time overcurrent relay 50 AI on 2-BKR-72-10, CONTAINMENT SPRAY PUMP 2B-B (2-PMP-72-10), 6.9kV SD BD 2B-B, Panel 13.

[104] PLACE handswitch 2-HS-72-10A, CNTMT SPRAY PMP B, momentarily to STOP.

[105] VERIFY the following:

A. 2-HS-72-10A, CNTMT SPRAY PMP B, White light is NOT LIT.

B. 2-HS-72-1OA, CNTMT SPRAY PMP B, GREEN light is LIT.

C. MOTOR TRIPOUT buzzer silences.

[106] VERIFY Annunciator 14-E "M-1 THRU M-6 MOTOR TRIPOUT" CLEARS.

[107] VERIFY Event Display Monitor reports 14-E "M-1 THRU M-6 MOTOR TRIPOUT" is NORMAL (Blue).

[108] PLACE 2-HS-72-10A, CNTMT SPRAY PMP B, to START.

[109] VERIFY 2-BKR-72-10, CONTAINMENT SPRAY PUMP 2B-B (2-PMP-72-10), 6.9kV SD BD 2B-B, Panel 13, CLOSES.

[110] CLOSE the contacts on Relay 51/83 C0 on 2-BKR-72-1 0, CONTAINMENT SPRAY PUMP 2B-B (2-PMP-72-10), 6.9kV SD BD 2B-B, Panel 13, by manually rotating the disk, AND HOLD.

[111] VERIFY 2-BKR-72-1 0, CONTAINMENT SPRAY PUMP 2B-B (2-PMP-72-10), 6.9kV SD BD 2B-B, Panel 13, remains CLOSED.

[112] VERIFY 2-HS-72-10A, CNTMT SPRAY PMP B, White light is LIT.

[113] VERIFY Annunciator 14-D "M-1 THRU M-6 MOTOR OVERLOAD" ALARMS. (Acc Crit 5.0[16])

[114] VERIFY Event Display Monitor reports 14-D "M-1 THRU M-6 MOTOR OVERLOAD" is in ALARM (RED).

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 166 of 249 6.10 Containment Spray Pump 2B-B Logic Test (continued)

[115] RELEASE the disk on Relay 51/83 CO on 2-BKR-72-10, CONTAINMENT SPRAY PUMP 2B-B (2-PMP-72-10), 6.9kV SD BD 2B-B, Panel 13.

[116] VERIFY 2-HS-72-10A, CNTMT SPRAY PMP B, White light is NOT LIT.

[117] VERIFY Annunciator 14-D "M-1 THRU M-6 MOTOR OVERLOAD" CLEARS.

[118] ENSURE Annunciator 14-E "M-1 THRU M-6 MOTOR TRIPOUT" is CLEAR.

[119] CLOSE the contacts on Relay 51/83 CO on 2-BKR-72-10, CONTAINMENT SPRAY PUMP 2B-B (2-PMP-72-10), 6.9kV SD BD 2B-B, Panel 13, by manually rotating the disk, AND HOLD.

[120] MOMENTARILY PLACE a jumper across terminals 9 and 10 on the back of Relay 51/83 C0 on 2-BKR-72-10, CONTAINMENT SPRAY PUMP 2B-B (2-PMP-72-10), 6.9kV SD BD 2B-B, Panel 13.

[121] VERIFY the following:

A. 2-HS-72-1OA, CNTMT SPRAY PMP B, White light is LIT.

B. 2-HS-72-1OA, CNTMT SPRAY PMP B, GREEN light is LIT.

C. 2-BKR-72-10, CONTAINMENT SPRAY PUMP 2B-B (2-PMP-72-10), 6.9kV SD BD 2B-B, Panel 13, OPEN.

[122] VERIFY Annunciator 14-E "M-1 THRU M-6 MOTOR TRIPOUT" ALARMS. (Acc Crit 5.0[15])

[123] VERIFY Event Display Monitor reports 14-E "M-1 THRU M-6 MOTOR TRIPOUT" is in ALARM (RED).

[124] RELEASE the disk on Relay 51/83 CO on 2-BKR-72-10, CONTAINMENT SPRAY PUMP 2B-B (2-PMP-72-10), 6.9kV SD BD 2B-B, Panel 13.

[125] PLACE handswitch 2-HS-72-1OA, CNTMT SPRAY PMP B, momentarily to STOP.

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 167 of 249 6.10 Containment Spray Pump 2B-B Logic Test (continued)

[126] VERIFY the following.

A. 2-HS-72-10A, CNTMT SPRAY PMP B, White light is NOT LIT.

B. 2-HS-72-10A, CNTMT SPRAY PMP B, GREEN light is LIT.

[127] VERIFY Annunciator 14-E "M-1 THRU M-6 MOTOR TRIPOUT" CLEARS.

[128] VERIFY Event Display Monitor reports 14-E "M-1 THRU M-6 MOTOR TRIPOUT" is NORMAL (Blue).

[129] PLACE 2-HS-72-10A, CNTMT SPRAY PMP B, to START.

[130] VERIFY 2-BKR-72-10, CONTAINMENT SPRAY PUMP 2B-B (2-PMP-72-10), 6.9kV SD BD 2B-B, Panel 13, CLOSES.

[131] MANUALLY ACTUATE the Contacts on 2-BKR-72-10, CONTAINMENT SPRAY PUMP 2B-B (2-PMP-72-10), 6.9kV SD BD 2B-B, Panel 13, 50 C0 Instantaneous Overcurrent Relay.

[132] VERIFY 2-BKR-72-10, CONTAINMENT SPRAY PUMP 2B-B (2-PMP-72-10), 6.9kV SD BD 2B-B, Panel 13, OPENS.

[133] VERIFY the following:

A. 2-HS-72-1 OA, CNTMT SPRAY PMP B, White light is LIT.

B. 2-HS-72-10A, CNTMT SPRAY PMP B, GREEN light is LIT.

[134] VERIFY Annunciator 14-E "M-1 THRU M-6 MOTOR TRIPOUT" ALARMS. (Acc Crit 5.0[15])

[135] VERIFY Event Display Monitor reports 14-E "M-1 THRU M-6 MOTOR TRIPOUT" is in ALARM (RED).

[136] RESET the trip target on time overcurrent relay 50 Cý on 2-BKR-72-10, CONTAINMENT SPRAY PUMP 2B-B (2-PMP-72-10), 6.9kV SD BD 2B-B, Panel 13.

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 168 of 249 6.10 Containment Spray Pump 2B-B Logic Test (continued)

[137] PLACE handswitch 2-HS-72-10A, CNTMT SPRAY PMP B, momentarily to STOP.

[138] VERIFY the following:

A. 2-HS-72-10A, CNTMT SPRAY PMP B, White light is NOT LIT.

B. 2-HS-72-10A, CNTMT SPRAY PMP B, GREEN light is LIT.

[139] VERIFY Annunciator 14-E "M-1 THRU M-6 MOTOR TRIPOUT" CLEARS.

[140] VERIFY Event Display Monitor reports 14-E "M-1 THRU M-6 MOTOR TRIPOUT" is NORMAL (Blue).

[141] PLACE 2-HS-72-10A, CNTMT SPRAY PMP B, to START.

[142] VERIFY 2-BKR-72-10, CONTAINMENT SPRAY PUMP 2B-B (2-PMP-72-10), 6.9kV SD BD 2B-B, Panel 13, CLOSES.

[143] ACTUATE the Contacts by manually rotating the disk on 2-BKR-72-10, CONTAINMENT SPRAY PUMP 2B-B (2-PMP-72-10), 6.9kV SD BD 2B-B, Panel 13, 50G Ground Overcurrent Relay.

[144] VERIFY the following:

A. 2-HS-72-10A, CNTMT SPRAY PMP B, White light is LIT.

B. 2-HS-72-10A, CNTMT SPRAY PMP B, GREEN light is LIT.

[145] VERIFY 2-BKR-72-10, CONTAINMENT SPRAY PUMP 2B-B (2-PMP-72-10), 6.9kV SD BD 2B-B, Panel 13, OPENS.

[146] VERIFY Annunciator 14-E "M-1 THRU M-6 MOTOR TRIPOUT" ALARMS. (Acc Crit 5.0[15])

[147] VERIFY Event Display Monitor reports 14-E "M-1 THRU M-6 MOTOR TRIPOUT" is in ALARM (RED).

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 169 of 249 6.10 Containment Spray Pump 2B-B Logic Test (continued)

[148] RESET the trip target on Ground Overcurrent Relay 50G on 2-BKR-72-10, CONTAINMENT SPRAY PUMP 2B-B (2-PMP-72-10), 6.9kV SD BD 2B-B, Panel 13.

[149] PLACE handswitch 2-HS-72-10A, CNTMT SPRAY PMP B, momentarily to STOP.

[150] VERIFY the following:

A. 2-HS-72-10A, CNTMT SPRAY PMP B, White light is NOT LIT.

B. 2-HS-72-10A, CNTMT SPRAY PMP B, GREEN light is LIT.

[151] VERIFY Annunciator 14-E "M-1 THRU M-6 MOTOR TRIPOUT" CLEARS.

[152] VERIFY Event Display Monitor reports 14-E "M-1 THRU M-6 MOTOR TRIPOUT" is NORMAL (Blue).

[153] REMOVE 2-BKR-72-10, CONTAINMENT SPRAY PUMP 2B-B (2-PMP-72-10), 6.9kV SD BD 2B-B, Panel 13, from the TEST position per GOI-7.

6.11 Containment Spray Pump 2A-A Flow Performance Test

[ CAUTION The heat up of the CS system should be monitored closely. No cooling water is initially placed through the CS Heat Exchanger in the following steps.

NOTES

1) During the performance of this Subsection, piping vibration data will be collected. The TE is responsible for performance of piping vibration activities in accordance with 2-PTI-999-01.
2) The target differential pressure (dP) values listed in this Subsection are only approximations and actual flow can vary without affecting desired outcome which is flow >_4000 gpm at 435 ft head.

[1] VERIFY Prerequisites listed in Section 4.0 for Subsection 6.11 have been completed.

[2] ENSURE 2-FCV-72-39, CNTMT SPRAY HDR A TO CNTMT is CLOSED.

[3] PERFORM fill and vent up to 2-FCV-72-39 for Containment Spray A Header per 2-TOP-072-01.

[4] ENSURE the Piping Vibration Test Engineer (TE) has personnel and test equipment in place, as needed, to support vibration testing.

VIB Engr

[5] ENSURE the RWST level is greater than or equal to 45%,

AND RECORD the values per the following instruments:

A. 2-LI-63-50 (2-M-6)

B. 2-LI-63-51 (2-M-6)

6.11 Containment Spray Pump 2A-A Flow Performance Test (continued)

[6] ENSURE the RWST temperature is between 66 0 F - 98 0 F, AND RECORD the values per the following instruments:

A. 2-TI-63-131 (2-M-6)

OF B. 2-TI-63-132 (2-M-6)

OF.

NOTES

1) The minimum temperature is to maintain some margin with RWST minimum operating temperature of 60 0 F.
2) The maximum temperature is to maintain some margin with the maximum piping design temperature for the CS recirc line to the RWST of 105 0 F.
3) Steps 6.11 [7] through 6.11[8] apply throughout Section 6.11.

[7] MONITOR the RWST temperature. (66 0F - 98 0 F)

A. 2-TI-63-131 (2-M-6)

B. 2-TI-63-132 (2-M-6)

CAUTION Performance of Step 6.11[8] may lower ERCW header pressure. Additional ERCW pumps may need to be placed in service to maintain head pressure.

[8] IF RWST temperature is high, THEN PERFORM valve lineup per 2-TOP-072-01 to place cooling through 2-HTX-072-2A (CNTMT SPRAY HTX 2A).

[9] RECORD ambient Computer Point Temperature Data, for Containment Spray Pump 2A-A, on page 1 of Appendix G.

6.11 Containment Spray Pump 2A-A Flow Performance Test (continued)

[10] VERIFY permanent plant and M&TE instrumentation have been filled and vented.

[11] LINE UP system for mini-flow operation per 2-TOP-072-01.

[12] PLACE system in mini-flow operation per 2-TOP-072-01.

[13] VERIFY 2-MTR-30-177 (2A CNTMT SPRAY 2A RM CLR) is RUNNING, locally, after Containment Spray Pump 2A-A starts.

[14] RECORD Computer Point Temperature Data, at 10 minute intervals until three successive Temperature readings are within +/- 3% during Mini-Flow conditions, for Containment Spray Pump 2A-A, on page 2 of Appendix G.

[15] RECORD Containment Spray Pump 2A-A Minimum Flow Recirculation Data as required per page 7 of Appendix H 1.1.3.

[16] NOTIFY Vibration TE responsible for 2-PTI-999-01 that conditions have been established for steady state vibration for System 072, CNTMT SPRAY PUMP 2A-A, at Mini-flow conditions.

[17] PERFORM vibration testing in accordance with 2-PTI-999-01, AND RECORD an entry in the Chronological Test Log.

VIB Engr

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 173 of 249 6.11 Containment Spray Pump 2A-A Flow Performance Test (continued)

[18] ENSURE the following valve lineup:

A. Valve 2-ISV-72-502, CNTMT SPRAY TEST LINE ISOLATION, CLOSED.

B. Valve 2-ISV-72-504, CNTMT SPRAY HDR B TEST LINE ISOLATION, CLOSED.

C. Valve 2-ISV-72-503, CNTMT SPRAY HDR A TEST LINE ISOLATION, OPEN.

D. Valve 2-RTV-72-215, 2-FI-72-5 ROOT, OPEN.

E. Valve 2-RTV-72-216, 2-FI-72-5 ROOT, OPEN.

F. Valve 2-DRV-72-505, CNTMT SPRAY TEST LINE DRAIN, CLOSED.

[19] SLOWLY OPEN 2-ISV-72-502, CNTMT SPRAY TEST LINE ISOLATION, AND VERIFY 2-FCV-72-34, CNTMT SPRAY PMP A MINI-FLOW, CLOSES at 2000 (1778 - 2250) GPM as read on 2-FI-72-34.

[20] RECORD flow read on 2-FI-72-34.

GPM

[21] THROTTLE 2-ISV-72-502, CNTMT SPRAY TEST LINE ISOLATION, to obtain approximately 19.3 - 19.6 psid (2300 GPM) as read on the M&TE d/p gauge installed at 2-FI-72-5.

[22] RECORD CNTMT SPRAY PUMP 2A-A performance data at 2300 GPM as required on page 7 of Appendix H.

[23] THROTTLE 2-ISV-72-502, CNTMT SPRAY TEST LINE ISOLATION, to obtain approximately 33.8 - 34.4 psid (3100 GPM) as read on the M&TE d/p gauge installed at 2-FI-72-5.

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 174 of 249 6.11 Containment Spray Pump 2A-A Flow Performance Test (continued)

[24] RECORD CNTMT SPRAY PUMP 2A-A performance data at 3100 GPM as required on page 7 of Appendix H.

[25] THROTTLE 2-ISV-72-502, CNTMT SPRAY TEST LINE ISOLATION, to obtain approximately 55.2 - 56.3 psid (4000 GPM) as read on the M&TE d/p gauge installed at 2-FI-72-5.

[26] RECORD CNTMT SPRAY PUMP 2A-A performance data at 4000 GPM as required on page 7 of Appendix H.

[27] THROTTLE 2-ISV-72-502, CNTMT SPRAY TEST LINE ISOLATION, to obtain test line full flow conditions, between 77.3 - 78.8 psid (4750 gpm) as read on the M&TE d/p gauge installed at 2-FI-72-5.

[28] RECORD CNTMT SPRAY PUMP 2A-A performance data at test line full flow as required on page 7 of Appendix H.

[29] RECORD Computer Point Temperature Data at 10 minute intervals during test line full flow conditions until three successive temperature readings agree within +/- 3% for Containment Spray Pump 2A-A, on page 3 Appendix G.

[30] RECORD Containment Spray System Train A operating parameters on Appendix K.

[31] NOTIFY Vibration TE responsible for 2-PTI-999-01 that conditions have been established for steady state vibration for System 072, CNTMT SPRAY PUMP 2A-A, at test line full flow conditions.

[32] PERFORM vibration testing in accordance with 2-PTI-999-01.

VIB Engr

[33] PERFORM pump calculations in Sub Subsection 1.1.4 of Appendix H

[34] VERIFY CNTMT SPRAY PUMP 2A-A pump discharge head and flowrate point for 435 ft is equal to or greater than 4000 gpm from page 12 and 17 of Appendix H (1.1.4J).

(Acc Crit 5.0[1])

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 175 of 249 6.11 Containment Spray Pump 2A-A Flow Performance Test (continued)

[35] VERIFY Containment Spray Train A miniflow flowrate is greater than or equal to 550 gpm as calculated on page 13 of Appendix H (1.1.4F). (Acc Crit 5.0[3])

[36] RECORD CNTMT SPRAY PUMP 2A-A flowrate at 2-FI-72-34, CNTMT SPRAY PMP A FLOW (2-M-6).

GPM

[37] PLACE Handswitch 2-HS-72-27A, CNTMT SPRAY PUMP 2A on MCR Panel 2-M-6 to the PULL-STOP position, AND VERIFY locally CNTMT SPRAY PUMP 2A STOPS.

[38] PLACE Handswitch 2-HS-72-27A, CNTMT SPRAY PMP 2A on MCR Panel 2-M-6 to the A-AUTO position, AND VERIFY locally CNTMT SPRAY PUMP 2A DOES NOT START.

NOTE The following step requires communication between test personnel in the Main Control Room. The stopwatch is to be started on closure of the test switch and stopped when the reference flow recorded in Step 6.11[36] is reached as read on 2-FI-72-34.

[39] SIMULTANEOUSLY START Stopwatch, AND CLOSE test switch "K643 Spray Signal-A" in cabinet 2-R-48.

[40] WHEN CNTMT SPRAY PMP A flowrate is equal to or greater than the reference flowrate recorded in Step 6.11[36] as read on 2-FI-72-34, THEN RECORD TIME AND FLOWRATE. (Acc Crit 5.0[2])

seconds (*<5 secs)

M&TE Cal Due Date GPM 2-FI-72-34

6.11 Containment Spray Pump 2A-A Flow Performance Test (continued)

NOTE From SSD 2-F-72-34, Acceptable As Found is +129.10 to -141.31 gpm. +/-1_00 will be used below.

[41] SLOWLY CLOSE 2-ISV-72-502, CNTMT SPRAY TEST LINE ISOLATION, AND VERIFY 2-FCV-72-34, CNTMT SPRAY PMP 2A-A MIN-FLOW, OPENS at 1500 (1400 - 1600 GPM) as read on 2-FI-72-34, CNTMT SPRAY PMP A FLOW

[42] RECORD flow as read on 2-FI-72-34.

GPM (1400-1600)

[43] PLACE Handswitch 2-HS-72-27A, CNTMT SPRAY PMP A on MCR Panel 2-M-6 to the PULL-STOP position, AND VERIFY locally CNTMT SPRAY PMP A STOPS.

[44] OPEN test switch "K643 Spray Signal-A" in cabinet 2-R-48.

[45] ENSURE the following valve lineup:

A. Valve 2-ISV-72-502, CNTMT SPRAY TEST LINE ISOLATION, is CLOSED.

B. Valve 2-ISV-72-503, CNTMT SPRAY HDR A TEST LINE ISOLATION, is CLOSED.

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 177 of 249 6.12 Containment Spray Pump 2B-B Flow Performance Test CAUTION The heat up of the CS system should be monitored closely. No cooling water is initially placed through the CS Heat Exchanger in the following steps.

NOTES

1) During the performance of this Subsection, piping vibration data will be collected. The TE is responsible for performance of piping vibration activities in accordance with 2-PTI-999-01.
2) The target differential pressure (dP) values listed in this Subsection are only approximations and actual flow can vary without affecting desired outcome which is flow > 4000 gpm at 435 ft head.

[1] VERIFY Prerequisites listed in Section 4.0 for Subsection 6.12 have been completed.

[2] ENSURE 2-FCV-72-2, CNTMT SPRAY HDR B TO CNTMT, is CLOSED.

[3] PERFORM fill and vent up to 2-FCV-72-2 for Containment Spray B Header per 2-TOP-072-01.

[4] ENSURE the Piping Vibration Test Engineer (TE) has personnel and test equipment, as needed, in place to support vibration testing.

VIB Engr

[5] ENSURE the RWST level is greater than or equal to 45%,

AND RECORD the values per the following instruments:

A. 2-LI-63-50 (2-M-6)

B. 2-LI-63-51 (2-M-6)

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 178 of 249 6.12 Containment Spray Pump 2B-B Flow Performance Test (continued)

[6] ENSURE the RWST temperature is between 66 0F - 980 F, AND RECORD the values per the following instruments:

A. 2-TI-63-131 (2-M-6)

OF B. 2-TI-63-132 (2-M-6)

OF NOTES

1) The minimum temperature is to maintain some margin with RWST minimum operating temperature of 60°F.
2) The maximum temperature is to maintain some margin with the maximum piping design temperature for the CS recirc line to the RWST of 1051F.
3) Steps 6.12[7] and 6.12[8] apply throughout Section 6.12.

[7] MONITOR the RWST temperature. (660 F - 98°F)

A. 2-TI-63-131 (2-M-6)

B. 2-TI-63-132 (2-M-6)

CAUTION Performance of Step 6.12[8] may lower ERCW header pressure. Additional ERCW pumps may need to be placed in service to maintain head pressure.

[8] IF RWST temperature is high, THEN PERFORM valve lineup per 2-TOP-072-01 to place cooling through 2-HTX-072-2B, B CNTMT SPRAY HTX.

[9] RECORD ambient Computer Point Temperature Data, for Containment Spray Pump 2B-B, on page 1 of Appendix I.

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 179 of 249 6.12 Containment Spray Pump 2B-B Flow Performance Test (continued)

[10] VERIFY permanent plant and M&TE instrumentation have been filled and vented.

[11] LINE UP system for mini-flow operation per 2-TOP-072-01.

[12] PLACE system in mini-flow operation per 2-TOP-072-01.

[13] VERIFY 2-MTR-30-178, B CNTMT SPRAY RM CLR, is RUNNING, locally, after Containment Spray Pump 2B-B starts.

[14] RECORD Computer Point Temperature Data, at 10 minute intervals until three successive Temperature readings are within +/- 3% during Mini-Flow conditions, for Containment Spray Pump 2B-B, on page 2 of Appendix I.

[15] RECORD Containment Spray Pump 2B-B Minimum Flow Recirculation Data as required per page 7 of Appendix J 1.1.3.

[16] NOTIFY Vibration TE responsible for 2-PTI-999-01 that conditions have been established for steady state vibration for System 072, CNTMT SPRAY PUMP 28-B, at Mini-flow conditions.

[17] PERFORM vibration testing in accordance with 2-PTI-999-01, AND RECORD an entry in the Chronological Test Log.

VIB Engr

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 180 of 249 6.12 Containment Spray Pump 2B-B Flow Performance Test (continued)

[18] ENSURE the following valve lineup:

A. Valve 2-ISV-72-502, CNTMT SPRAY TEST LINE ISOLATION, CLOSED.

B. Valve 2-ISV-72-504, CNTMT SPRAY HDR B TEST LINE ISOLATION, OPEN.

C. Valve 2-ISV-72-503, CNTMT SPRAY HDR A TEST LINE ISOLATION, CLOSED.

D. Valve 2-RTV-72-215, 2-FI-72-5 ROOT, OPEN.

E. Valve 2-RTV-72-216, 2-FI-72-5 ROOT, OPEN.

F. Valve 2-DRV-72-505, CNTMT SPRAY TEST LINE DRAIN, CLOSED.

[19] SLOWLY OPEN 2-ISV-72-502, AND VERIFY 2-FCV-72-13 CLOSES at 2000 (1778 - 2250) GPM as read on 2-FI-72-13.

[20] RECORD flow as read on 2-FI-72-13.

GPM

[21] THROTTLE 2-ISV-72-502, CNTMT SPRAY TEST LINE ISOLATION, to obtain approximately 19.3 - 19.6 psid (2300 GPM) as read on the M&TE d/p gauge installed at 2-FI-72-5.

[22] RECORD CNTMT SPRAY PUMP 2B-B performance data at 2300 GPM as required on page 7 of Appendix J.

[23] THROTTLE 2-ISV-72-502, CNTMT SPRAY TEST LINE ISOLATION, to obtain approximately 33.8 - 34.4 psid (3100 GPM) as read on the M&TE d/p gauge installed at 2-FI-72-5.

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 181 of 249 6.12 Containment Spray Pump 2B-B Flow Performance Test (continued)

[24] RECORD CNTMT SPRAY PUMP 2B-B performance data at 3100 GPM as required on page 7 of Appendix J.

[25] THROTTLE 2-ISV-72-502, CNTMT SPRAY TEST LINE ISOLATION, to obtain approximately 55.2 - 56.3 psid (4000 GPM) as read on the M&TE d/p gauge installed at 2-FI-72-5

[26] RECORD CNTMT SPRAY PUMP 2B-B performance data at 4000 GPM as required on page 7 of Appendix J.

[27] THROTTLE 2-ISV-72-502, CNTMT SPRAY TEST LINE ISOLATION, to obtain test line full flow conditions, between 77.3 - 78.8 psid (4750 gpm) as read on the M&TE d/p gauge installed at 2-FI-72-5.

[28] RECORD CNTMT SPRAY PUMP 2B-B performance data at test line full flow as required on page 7 of Appendix J.

[29] RECORD Computer Point Temperature Data at 10 minute intervals during test line full flow conditions until three successive temperature readings agree within +/- 3% for Containment Spray Pump 2B-B, on page 3 of Appendix I.

[30] RECORD Containment Spray System Train B operating parameters on Appendix L.

[31] NOTIFY Vibration TE responsible for 2-PTI-999-01 that conditions have been established for steady state vibration for System 072, CNTMT SPRAY PUMP 2B-B, at test line full flow conditions.

[32] PERFORM vibration testing in accordance with 2-PTI-999-01.

VIB Engr

[33] PERFORM pump calculations in Sub Subsection 1.1.8 of Appendix J.

[34] VERIFY CNTMT SPRAY PUMP 2B-B pump discharge head and flowrate point for 435 ft is equal to or greater than 4000 gpm from page 12 and 17 of Appendix J (1.1.8J).

(Acc Crit 5.0[1])

6.12 Containment Spray Pump 2B-B Flow Performance Test (continued)

[35] VERIFY Containment Spray Train B miniflow flowrate is greater than or equal to 550 gpm as calculated on page 13 of Appendix J (1.1.8J). (Acc Crit 5.0[3])

[36] RECORD CNTMT SPRAY PUMP 28-B flowrate at 2-FI-72-13, CNTMT SPRAY PMP B FLOW (2-M-6).

GPM

[37] PLACE Handswitch 2-HS-72-10A, CNTMT SPRAY PUMP B on MCR Panel 2-M-6 to the PULL-STOP position, AND VERIFY locally CNTMT SPRAY PUMP B STOPS.

[38] PLACE Handswitch 2-HS-72-10A, CNTMT SPRAY PMP B on MCR Panel 2-M-6 to the A-AUTO position, AND VERIFY locally CNTMT SPRAY PUMP 2B DOES NOT START.

NOTE The following step requires communication between test personnel in the Main Control Room. The stopwatch is to be started on closure of the test switch and stopped when the reference flow recorded in Step 6.12[36] is reached as read on 2-FI-72-13.

[39] SIMULTANEOUSLY START Stopwatch, AND CLOSE test switch "Spray-B" in cabinet 2-R-51.

[40] WHEN CNTMT SPRAY PMP B flowrate is equal to or greater than the reference flowrate recorded in Step 6.12[36] as read on 2-FI-72-13, THEN RECORD TIME AND FLOWRATE. (Acc Crit 5.0[2])

seconds (*<5 secs)

M&TE Cal Due Date GPM 2-FI-72-13

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 183 of 249 6.12 Containment Spray Pump 2B-B Flow Performance Test (continued)

NOTE From SSD 2-F-72-13, Acceptable As Found is +129.10 to -141.31 gpm. +/-100 will be used below.

[41] SLOWLY CLOSE 2-ISV-72-502, CNTMT SPRAY TEST LINE ISOLATION, AND VERIFY 2-FCV-72-13, CNTMT SPRAY PMP 2B-B MIN-FLOW, OPENS at 1500 (1400 - 1600 GPM) as read on 2-FI-72-13, CNTMT SPRAY PMP B FLOW.

[42] RECORD flow as read on 2-FI-72-13.

GPM (1400-1600)

[43] PLACE Handswitch 2-HS-72-10A, CNTMT SPRAY PMP B on MCR Panel 2-M-6 to the PULL-STOP position, AND VERIFY locally CNTMT SPRAY PMP B STOPS.

[44] OPEN test switch "Spray-B" in cabinet 2-R-51.

[45] ENSURE the following valve lineup:

A. Valve 2-ISV-72-502, CNTMT SPRAY TEST LINE ISOLATION, CLOSED.

B. Valve 2-ISV-72-503, CNTMT SPRAY HDR A TEST LINE ISOLATION, CLOSED.

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 184 of 249 7.0 POST-PERFORMANCE ACTIVITIES NOTE Post-performance steps may be performed in any order unless otherwise stated and should be completed as close in time as practicable to the end of the instruction performance

[1] PERFORM the following to remove test switch "K643 Spray Signal-A" installed by Step 4.3[16]

A. UNBOLT both ends of test switch "K643 Spray Signal-A" in cabinet R-48 B. RESTORE field side wire from TB639-11 in cabinet R-48 to as found condition listed in Appendix B CV C. RESTORE field side wire from TB639-12 in cabinet R-48 to as found condition listed in Appendix B CV

[2] PERFORM the following to remove test switch "K643 Spray Signal-B" installed by Step 4.3[17]

A. UNBOLT both ends of test switch "K643 Spray Signal-B" in cabinet R-51 B. RESTORE field side wire from TB639-11 in cabinet R-51 to as found condition listed in Appendix B CV C. RESTORE field side wire from TB639-12 in cabinet R-51 to as found condition listed in Appendix B CV

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 185 of 249 7.0 POST-PERFORMANCE ACTIVITIES (continued)

[3] REMOVE 0-100 psig test pressure gauge at 2-PI-72-33, test tee (676/A9U)

Cv

[4] REMOVE 0-500 psig test pressure gauge at 2-PI-72-32 test tee (676/A9U)

Cv

[5] REMOVE 0 to 1000 GPM Ultrasonic Flowmeter from CS Pump 2A-A min-flow piping, Location 692/A11V pipe chase Cv

[6] REMOVE 0-100 psig test pressure gauge at 2-PI-72-16 test tee (676/A9U)

Cv

[7] REMOVE 0-500 psig test pressure gauge at 2-PI-72-15 test tee (676/A9T)

Cv

[8] REMOVE 0 to 1000 gpm Ultrasonic Flowmeter from CS Pump 2B-B min-flow piping, Location 692/Al 1V pipe chase Cv

[9] REMOVE 0 to 150 psig differential pressure test gauge at 2-FI-72-5 test tees (713/A12V)

Cv

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 186 of 249 7.0 POST-PERFORMANCE ACTIVITIES (continued)

[10] VERIFY Junction Box covers have been reinstalled for 2-JB-292-771 and 2-JB-292-1155 per Work Order in step 4.3[10].

CV

[11] VERIFY Junction Box covers have been reinstalled for 2-JB-292-770 and 2-JB-292-1156 per Work Order in step 4.3[11].

CV

[12] VERIFY Junction Box covers have been reinstalled for 2-JB-292-1360 per Work Order in step 4.3[12].

CV

[13] VERIFY Junction Box covers have been reinstalled for 2-JB-292-1362 per Work Order in step 4.3[13].

CV

[14] RESTORE terminal points from Step 4.3[14] to the as-found position listed in Appendix B.

CV

[15] RESTORE terminal points from Step 4.3[15] to the as-found position listed in Appendix B.

CV

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 187 of 249 7.0 POST-PERFORMANCE ACTIVITIES (continued)

[16] REMOVE the polymeter with the start signal in parallel with the 2-02-72-27 CSP ST points LI and L2 and the stop signal across any set of 52STA normally closed contacts.

[17] REMOVE the polymeter with the start signal in parallel with the 2-02-72-10 CSP ST points Li and L2 and the stop signal across any set of 52STA normally closed contacts.

[18] VERIFY that Post-test calibration of the M&TE used to record quantitative acceptance criteria has been satisfactorily performed, AND RECORD the results on Measuring and Test Equipment (M&TE) Log.

[19] VERIFY that Post-test calibration of permanent plant instruments used to record quantitative acceptance criteria has been satisfactorily performed, AND RECORD the results on Appendix C, Permanent Plant Instrumentation Log.

[20] NOTIFY the Unit 2 US/SRO of the test completion and system alignment.

[21] NOTIFY the Unit 1 US/SRO of the test completion and system alignment

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 188 of 249 8.0 RECORDS A. QA Records Completed Test Package B. Non-QA Records None

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 189 of 249 Appendix A (Page 1 of 1)

Procedures/Instructions Reference Review NOTES

1) Additional copies of this table may be made as necessary.
2) Initial and date indicates review has been completed for impact.

PROCEDURE/ IMPACT INITIAL AND DATE.

INSTRUCTION Yes/No (N/A for no change)

Unit 2 Final Safety Analysis Report -

Amendment 109 2-F-72-13 Rev 0 2-F-72-34 Rev 0 2-62-72-34-A Rev 0 2-62-72-13-B Rev 0 2-TSD-030A-1, Rev. 0002 Select Auxiliary Building ESF Coolers and HELB Detection 2-TSD-72-1, Rev. 0003 Containment Heat Removal Spray System WBN-VTM-W120-0050, Rev 5 1-SI-99-644-A, Rev 0007

______ I_____ J

___ [

Appendix B (Page 1 of 1)

Temporary Condition Log NOTE These steps will be N/A'd if no temporary condition existed.

Additional copies of this table may be made as necessary ITEM TEMPORARY CONDITION PERFORMED RETURNED TO NORMAL No. DESCRIPTION Step Performed By/Date Step Returned By/Date

_________________No. CV By/Date No. CV By/Date

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 191 of 249 Appendix C (Page 1 of 3)

Switch Lineup UNID SWITCH LOCATION NOMENCLATURE POSITION SEC VERIFIED BY INITIALS/DATE 2-XS-72-44 480V REACTOR MOV CNTMT SUMP TO HDR A NORMAL 6.3 BOARD 2A1-A, (2-MCC-213-AO01) FLOW CONT TRANS SW COMPT 13B (772/A12-T) 2-HS-72-44C 480V REACTOR MOV CNTMT SUMP TO HDR A NORMAL 6.3 BOARD 2A1-A, (2-MCC-213-AO01) FLOW CONT TRANS SW COMPT 13B (772/A12-T) 2-XS-72-45 480V REACTOR MOV CNTMT SUMP TO NORMAL 6.4 BOARD 2B1-B, (2-MCC-213-B001) HDR B FLOW CONT COMPT 14E (772/A12-S) TRANS SW 2-HS-72-45C 480V REACTOR MOV CNTMT SUMP TO HDR NORMAL 6.4 BOARD 2B1-B, (2-MCC-213-B001) B FLOW CONT TRANS COMPT 14E (772/A12-S) SW 2-HS-72-40C 480V REACTOR MOV RHR SPRAY HDR A NORMAL 6.5 BOARD 2A1-A, (2-MCC-213-AO01) ISOLATION V SW COMPT 14A (772/Al2-T) 2-XS-72-40 480V REACTOR MOV RHR SPRAY HDR A NORMAL 6.5 BOARD 2A1-A, (2-MCC-213-AO01) ISOLATION TRANS SW COMPT 14A (772/A12-T) 2-HS-72-41C 480V REACTOR MOV RHR SPRAY HDR B NORMAL 6.6 BOARD 2B1-B, (2-MCC-213-B001) ISOLATION V SW COMPT 14D (772/Al2-S) I I II

Appendix C (Page 2 of 3)

Switch Lineup UNID SWITCH LOCATION NOMENCLATURE POSITION SEC VERIFIED BY INITIALS/DATE 2-XS-72-41 480V REACTOR MOV RHR SPRAY HDR B NORMAL 6.6 BOARD 2B1-B, (2-MCC-213-B001) ISOLATION TRANS SW COMPT 14D (772/A12-S) 2-HS-72-39C 480V REACTOR MOV CNTMT SPRAY HDR A NORMAL 6.7 BOARD 2A1-A, (2-MCC-213-AO01) ISOLATION V SW COMPT 13E (772/A12-T) 2-XS-72-39 480V REACTOR MOV CNTMT SPRAY HDR A NORMAL 6.7 BOARD 2A1-A, (2-MCC-213-AO01) ISOLATION TRANS SW COMPT 13E (772/A12-T) 2-HS-72-2C 480V REACTOR MOV CNTMT SPRAY HDR B NORMAL 6.8 BOARD 2B1-B, (2-MCC-213-B001) ISOLATION HAND SW COMPT 14A (772/A12-S) 2-XS-72-2 480V REACTOR MOV CNTMT SPRAY HDR B NORMAL 6.8 BOARD 2B1-B, (2-MCC-213-B001) ISOLATION TRANS SW COMPT 14A (772/A12-S) 2-HS-72-27A MCR Panel 2-M-6 CNTMT SPRAY PMP A PULL TO LOCK 6.9 2-HS-72-27C MCR Panel 2-M-6 CNTMT SPRAY PMP A STOP 6.9

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 193 of 249 Appendix C (Page 3 of 3)

Switch Lineup UNID SWITCH LOCATION NOMENCLATURE POSITION SEC VERIFIED BY INITIALS/DATE 2-XS-72-27 6.9kV SHUTDOWN BOARD 2A-A CONTAINMENT SPRAY NORMAL 6.9 (2-BD-21 1-A) COMPT. 13 PUMP A TRANS SW (757/A2-T) 2-HS-72-10A MCR Panel 2-M-6 CNTMT SPRAY PMP B PULL TO LOCK 6.10 2-HS-72-1OC MCR Panel 2-M-6 CNTMT SPRAY PMP B STOP 6.10 2-XS-72-10 6.9kV SHUTDOWN BOARD 2B-B CNTMT SPRAY PUMP B NORMAL 6.10 (2-BD-21 1-B) COMPT. 13 TRANSFER SW (757/Al 2S)

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 194 of 249 Appendix D (Page 1 of 5)

Breaker Lineup UNID LOCATION NOMENCLATURE POSITION SEC VERIFIED BY INITIALS/DATE 2-BKR-72-34 480V REACTOR MOV CSP 2A MINI-FLOW OPEN 6.1 BOARD 2A1-A, (2-MCC-213-AO01) (2-FCV-72-34)

COMPT 1OF 2-BKR-72-27 6.9kV SHUTDOWN BOARD 2A-A CONTAINMENT SPRAY OPEN AND 6.1 (2-BD-211-A) PNL 13 PUMP 2A-A RACKED DOWN (2-PMP-72-27) 2-BKR-72-13 480V REACTOR MOV CSP 2B MINI-FLOW OPEN 6.2 BOARD 2B13-B, (2-MCC-213-BO01) (2-FCV-72-13)

COMPT9F 2-BKR-72-10 6.9kV SHUTDOWN BOARD 2B-B CONTAINMENT SPRAY OPEN AND 6.2 (2-BD-211-B) PNL 13 PUMP 2B-B RACKED DOWN (2-PMP-72-10) 2-BKR-72-22 480V C&A BUILDING VENT RWST TO CSP 2A OPEN 6.3 BOARD 2A1-A, (2-MCC-214-AO01) (2-FCV-72-22)

COMPT 7E 2-BKR-72-44 480V REACTOR MOV CNTMT SUMP TO CSP CLOSED 6.3 BOARD 2A1-A, (2-MCC-213-AO01) 2A SUCTION COMPT 13B (2-FCV-72-44) 2-BKR-235-1/7 2-I-Vital Inst Pwr Bd. SEPARATION AUX ON 6.3 (2-BD-235-0001) RELAY PANEL 2-R-76 BUS A

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 195 of 249 Appendix D (Page 2 of 5)

Breaker Lineup UNID LOCATION NOMENCLATURE POSITION SEC VERIFIED BY INITIALS/DATE 2-BKR-72-21 480V C&A BUILDING VENT CNTMT SPRAY TO OPEN 6.4 BOARD 2B1-B, (2-MCC-214-BO01) CNTMT SPRAY PMP B COMPT 7E SUCTION (2-FCV-72-21) 2-BKR-72-45 480V REACTOR MOV CNTMT SUMP TO CSP CLOSED 6.4 BOARD 2B1-B, (2-MCC-213-BO01) 2B SUCTION COMPT 14E (2-FCV-72-45) 2-BKR-235-2/6 2-11-Vital Inst Pwr Bd. SEPARATION AUX ON 6.4 (2-BD-235-0002) RELAY PANEL 2-R-76 BUS B 2-BKR-72-40 480V REACTOR MOV RHR SPRAY HDR A OPEN 6.5 BOARD 2A1 -A, (2-MCC-213-AO01) ISOL (2-FCV-72-40)

COMPT 14A 2-BKR-74-10 6.9kV SHUTDOWN BOARD 2A-A RHR PUMP 2A-A OPEN AND 6.5 (2-BD-211-A) PNL 14 (2-PMP-74-10) RACKED DOWN 2-BKR-235-1/7 2-I-Vital Inst Pwr Bd. SEPARATION AUX ON 6.5 (2-BD-235-0001) RELAY PANEL 2-R-76 BUS A

Appendix D (Page 3 of 5)

Breaker Lineup UNID LOCATION NOMENCLATURE POSITION SEC VERIFIED BY INITIALS/DATE 2-BKR-72-41 480V REACTOR MOV RHR SPRAY HDR B OPEN 6.6 BOARD 2B13-B, (2-MCC-213-B001) ISOL (2-FCV-72-41)

COMPT 14A 2-BKR-235-2/6 2-11-Vital Inst Pwr Bd. SEPARATION AUX ON 6.6 (2-BD-235-0002) RELAY PANEL 2-R-76 BUS B 2-BKR-74-20 6.9kV SHUTDOWN BOARD 2B-B RHR PUMP 2B-B OPEN AND 6.6 (2-BD-211-B) PNL 14 (2-PMP-74-20) RACKED DOWN 2-BKR-72-39 480V REACTOR MOV CS HDR A ISOL OPEN 6.7 BOARD 2A1 -A, (2-MCC-213-AO01) (2-FCV-72-39)

COMPT 13E 2-BKR-72-27 6.9kV SHUTDOWN BOARD 2A-A CONTAINMENT SPRAY OPEN AND 6.7 (2-BD-21 1-A) PNL 13 PUMP 2A-A RACKED DOWN (2-PMP-72-27) 2-BKR-235-1/7 2-I-Vital Inst Pwr Bd. SEPARATION AUX ON 6.7 (2-BD-235-0001) RELAY PANEL 2-R-76 BUS A

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 197 of 249 Appendix D (Page 4 of 5)

Breaker Lineup UNID LOCATION NOMENCLATURE POSITION SEC VERIFIED BY INITIALS/DATE 2-BKR-72-2 480V REACTOR MOV CS HDR B ISOL OPEN 6.8 BOARD 2B11-B, (2-MCC-213-B001) (2-FCV-72-2)

COMPT 14A 2-BKR-72-10 6.9kV SHUTDOWN BOARD 2B-B CNTMT SPRAY PUMP OPEN AND 6.8 (2-BD-211-B) PNL 13 2B-B (2-PMP-72-10) RACKED DOWN 2-BKR-235-2/6 2-11-Vital Inst Pwr Bd. SEPARATION AUX ON 6.8 (2-BD-235-0002) RELAY PANEL 2-R-76 BUS B 2-BKR-72-27 6.9kV SHUTDOWN BOARD 2A-A CNTMT SPRAY OPEN AND 6.9 (2-BD-211-A) PNL 13 PUMP 2A-A RACKED DOWN (2-PMP-72-27) 2-BKR-30-177 480V C&A BUILDING VENT CS PUMP 2A-A RM CLR CLOSED 6.9 BOARD 2A1-A, (2-MCC-214-AO01) (2-PMCL-30-177)

CMPT 3C 2-BKR-72-10 6.9kV SHUTDOWN BOARD 2B-B CNTMT SPRAY PUMP OPEN AND 6.10 (2-BD-21 1-B) PNL 13 2B-AB (2-PMP-72-10) RACKED DOWN

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 198 of 249 Appendix D (Page 5 of 5)

Breaker Lineup UNID LOCATION NOMENCLATURE POSITION SEC VERIFIED BY INITIALS/DATE 2-BKR-30-178 480V C&A BUILDING VENT CS PUMP 2B-B RM CLR CLOSED 6.10 BOARD 2B13-B, (2-MCC-214-B001) (2-PMCL-30-178)

CMPT 3C 2-BKR-30-177 480V C&A BUILDING VENT CS PUMP 2A-A RM CLR CLOSED 6.11 BOARD 2A1 -A, (2-MCC-214-AO01) (2-PMCL-30-177)

CMPT 3C 2-BKR-30-178 480V C&A BUILDING VENT CS PUMP 2B-B RM CLR CLOSED 6.12 BOARD 2B1-B, (2-MCC-214-B001) (2-PMCL-30-178)

CMPT 3C

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 199 of 249 Appendix E (Page 1 of 3)

Permanent Plant Instrumentation Log INSTRUMENT OR POST-TEST INSTRUMENT LOOP# CALIBRATION ACCEPTABLE INITIAL/DATE 2 Subsections 6.11 and 6.12 2-TE-72-25A

+ 4 4 4 4 4 4 2-TE-72-25B 1- 4 1 4 4 4 t 2-TE-72-25D 2-TE-72-25F 4- 4 4 4 4 4 2-TE-72-25H

+ 4 4 4 4 4 4 2-EI-72-26A 1- 4 1 4 4 4 4 2-EI-72-26B 2-EI-72-12A 4 4 4 4 4 4 2-EI-72-12B 1- 4 4 4 4 4 4 2-EI-57-39 2-EI-57-66B

4. 4 4 4 4 4 4 2-PI-72-32 I- 4 4 4 4 4 2-LPF-72-34 4- 4 4 4 4 4 4 2-TI-72-28 2-P 1-72-29t_

2-PI-72-30

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 200 of 249 Appendix E (Page 2 of 3)

Permanent Plant Instrumentation Log INSTRUMENT OR POST-TEST INSTRUMENT LOOP# CALIBRATION ACCEPTABLE INITIAL/DATE 2 Subsections 6.11 and 6.12 2-FI-72-5__ _ _ _ _ _ ____ ____

2-PDI-72-1 6 _______

2-PI-72-1 6 2-PDI-72-33___ _____

2-PI-72-33 ______ _______

2-PI1-72-15 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

2-TE-72-1 lA _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

2-TE-72-1 18 B_______

2-TE-72-1 1D 2-TE-72-1 1F 2-TE-72-1 1H 2-LDF-72-1 3

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 201 of 249 Appendix E (Page 3 of 3)

Permanent Plant Instrumentation Log INSTRUMENT OR POST-TEST INSTRUMENT LOOP# CALIBRATION ACCEPTABLE INITIALIDATE 2 Subsections 6.11 and 6.12 2-TI-72-8 2-PI-72-9 2-PI-72-7 2-LPL-63-50 2-PLP-63-51_____ ________ _____

2-LPT-63-1 31 These items may be initialed and dated by personnel performing the task. Instrumentation not required to be filled and vented may be identified as NOT Applicable (NA) 2 May be identified as NA if instrument was not used to verify/record quantitative acceptance criteria data

Appendix F (Page 1 of 3)

Computer Point Verification Log COMPUTER DESCRIPTION Point Quality Description INITIAL/DATE POINT is GOOD/ALM Correct F9000A CNTMT SPRAY HDR B FLOW XMTR YES / NO YES / NO F9001A CNTMT SPRAY HDR A FLOW XMTR YES / NO YES / NO FD2179 CNTMT SPRAY HDR A PWR YES / NO YES / NO FD2180 CNTMT SPRAY HDR A POS YES / NO YES / NO FD2181 CNTMT SP PMP A RECIRC FLOW PWR YES / NO YES / NO FD2182 CNTMT SP PMP A RECIRC FLOW POS YES / NO YES / NO FD2183 RWSTTOSPHDRAPWR YES / NO YES / NO FD2184 RWSTTOSPHDRAPOS YES / NO YES / NO FD2185 CNTMT SUMP SP HDR A PWR YES / NO YES / NO FD2186 CNTMT SUMP SP HDR A POS YES / NO YES / NO FD2187 RHR SPRAY HDR A PWR YES / NO YES / NO FD2188 RHR SPRAY HDRA POS YES / NO YES / NO FD2331 CNTMT SPRAY HDR B PWR YES / NO YES / NO FD2332 CNTMT SPRAY HDR B POS YES / NO YES / NO FD2333 CNTMT SP PMP B RECIRC FLOW PCS YES / NO YES / NO FD2334 CNTMT SP PMP B RECIRC FLOW PCS YES / NO YES / NO FD2335 RWST TO SP HDR B PWR YES / NO YES / NO FD2336 RWST TO SP HDR B POS YES / NO YES / NO FD2337 CNTMT SUMP SP HDR B PWR YES / NO YES / NO

Appendix F (Page 2 of 3)

Computer Point Verification Log COMPUTER DESCRIPTION Point Quality Description INITIAUDATE POINT is GOOD/ALM Correct FD2338 CNTMT SUMP SP HDR B POS YES / NO YES / NO FD2339 RHR SPRAY HDR B PWR YES / NO YES / NO FD2340 RHR SPRAY HDR B POS YES / NO YES / NO HD2029 CNTMT SPRAY TR A HS-27A SW POS YES / NO YES / NO HD2063 SPRAY TR B HS-1OA SW POS YES / NO YES / NO T0168A CNTMT SPRAY HX A OUT TEMP YES / NO YES / NO T0169A CNTMT SPRAY HX B OUT TEMP YES / NO YES / NO T0170A CNTMT SPRAY PMP B-B UPR RADL BRG YES / NO YES / NO T0171A CNTMT SPRAY PMP B-B LWR RADL BRG YES / NO YES / NO TO1 72A CNTMT SPRAY PMP B-B PHASE A WNDG YES / NO YES / NO T0173A CNTMT SPRAY PMP B-B PHASE B WNDG YES / NO YES / NO T0174A CNTMT SPRAY PMP B-B PHASE C WNDG YES / NO YES / NO T0175A CNTMT SPRAY PMP A-A UPR RADL BRG YES / NO YES / NO T0176A CNTMT SPRAY PMP A-A LWR RADL BRG YES / NO YES / NO T0177A CNTMT SPRAY PMP A-A PHASE A WNDG YES / NO YES / NO T0178A CNTMT SPRAY PMP A-A PHASE B WNDG YES / NO YES / NO

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 204 of 249 Appendix F (Page 3 of 3)

Computer Point Verification Log COMPUTER DESCRIPTION Point Quality Description INITIAL/DATE POINT is GOOD/ALM Correct T0179A CNTMT SPRAY PMP A-A PHASE C WNDG YES / NO YES / NO XD4001 CNTMT SPRAY PUMP B-B YES / NO YES / NO XD4002 CNTMT SPRAY PUMP B-B YES / NO YES / NO XD4003 CNTMT SPRAY PUMP A-A YES / NO YES / NO XD4004 CNTMT SPRAY PUMP A-A YES / NO YES / NO

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 205 of 249 Appendix G (Page 1 of 3)

Containment Spray Pump 2A-A Computer Point Temperature Data Step 6.11[9] AMBIENT TEMPERATURE COMPUTER DESCRIPTION LIMITS READINGS INITIAUDATE POINT T0175A CNTMT SPRAY PMP A-A UPR RADL BRG <185 0F OF T0176A CNTMT SPRAY PMP A-A LWR RADL BRG <1850 F OF T0177A CNTMT SPRAY PMP A-A PHASE A WNDG <2750 F OF T0178A CNTMT SPRAY PMP A-A PHASE B WNDG <2750 F OF T0179A CNTMT SPRAY PMP A-A PHASE C WNDG <2750 F °F

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 206 of 249 Appendix G (Page 2 of 3)

Containment Spray Pump 2A-A Computer Point Temperature Data Step 6.11[14], MINI FLOW TIME T0175A OF OF OF OF OF OF OF OF OF OF T0176A OF OF OF OF OF OF OF OF OF OF T0177A OF OF OF OF OF OF OF OF OF OF T0178A OF OF OF °F OF OF OF OF OF OF T0179A OF OF OF OF OF OF OF OF OF OF

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 207 of 249 Appendix G (Page 3 of 3)

Containment Spray Pump 2A-A Computer Point Temperature Data Step 6.11[29],TEST LINE FULL FLOW TIME T0175A OF OF OF OF OF OF OF OF OF OF T0176A 0F 0F 0F 0F 0F 0F 0F 0F 0F °F T0177A 0F 0F 0F 0F 0F 0F 0F 0F 0F OF T0178A 0F 0F 0F 0F 0F 0F 0F 0F 0F OF T0179A 0F 0F 0F OF OF OF OF OF OF OF

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 208 of 249 Appendix H (Page 1 of 17)

Containment Spray Pump 2A-A Performance Data Sheet 1.1.1 Background calculations for determination of Containment Spray Pump flow rates A. Uncorrected pump flow through the RWST recirculation line can be determined by the following equation (from SSD-2-FI-72-5):

Equation: Quncorrected = 5000 j(APMTE/FIF)-5/ 84.8 Where: Quncorfected = pump flowrate before making corrections for instrument errors 84.8 = 2350 IN WC from SSD-2-FI-72-5 converted to psid APMT'rfE-5 = differential pressure recorded from M&TE gauge installed at 2-FI-72-5 The following equation will be used to determine pump flow corrected for maximum flow instrument errors:

Equation: Qpump = 5000 j(APMTE/FE 5 -- 1.5psid) / 84.8 Where: Qpump = final corrected pump flow 1.5psid = M&TE dip gauge error of 1 psid (0 to 100 psid +/- 1% of span)

Equation: Q pump = V(APMTE/FE-5 -1.5psid) /84.8 5000

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 209 of 249 Appendix H (Page 2 of 17)

Containment Spray Pump 2A-A Performance Data Sheet 1.1,1 Background calculations for determination of Containment Spray Pump flow rates (continued)

( up 2 Equation: =(APMTE/FE 1.5psid) /84.8 Equation: 84.8Qp P= -1.5psid) y 500 Equation: APMTEFE-5 = 84.8~Qpump+1.pi

+ 1.5psid (5000)

Appendix H (Page 3 of 17)

Containment Spray Pump 2A-A Performance Data Sheet 1.1.2 Containment Spray Pump 2A-A Total Dynamic Head (TDH) velocity head correction coefficients The measured TDH is corrected for velocity head and piping losses from the pump suction/discharge pressure taps to the pump suction/discharge.

V D2 V s 2 v2 V

s AH=_ +KDX D+Ksx 2g 2g 2g 2g Where: AH = pump differential head correction at reference flowrate, ft.

VD = water velocity at the pump discharge pressure tap. ft/sec.

Vs = water velocity at the pump suction pressure tap, ft/sec.

KD = pump discharge to pump discharge tap loss coefficient Ks = pump suction to pump suction pressure tap loss coefficient as: K AH For varying flow rates a correction K can be defined

)2 (Q re

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 211 of 249 Appendix H (Page 4 of 17)

Containment Spray Pump 2A-A Performance Data Sheet 1.1.2 Containment Spray Pump 2A-A Total Dynamic Head (TDH) velocity head correction coefficients (continued)

VlGPMx ift3 1 1min V=GMxx x-7.4805gal 7( ID, in )2 60sec 24in / ft A. Containment Spray Pump 2A-A Suction - one 900 LR elbow between suction and 2-PI-72-33 Discharge - no piping components between discharge and 2-PI-72-32 From Cameron Hydraulic data, 19th edition Ks=0.21, KD=0 Pump discharge 10" SCH 40, ID=10.02 in.

Pump suction 14" SCH 40, ID=13.025 in.

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 212 of 249 Appendix H (Page 5 of 17)

Containment Spray Pump 2A-A Performance Data Sheet 1.1.2 Containment Spray Pump 2A-A Total Dynamic Head (TDH) velocity head correction coefficients (continued)

At 4000 gpm lft3 1 1min VD =4000 x x x - =16.27 7.4805gal 10.02in , 60sec 24in /ft At 4000 gpm lft3 1 Imin Vs = 4000X x x -9.63 7.4805gal 13.025in , 60sec 24in / ft At 4000 gpm AH = (16.27)2 (9.63)2 (16.27)2 +/- 0.21 (9.63)2 2.98ft 2x 32.174 2x32.174 2x32.174 2x32.174 2

K= 2.98ft = 1.86 x 10-7 ft/gpm (4000gpm)-

Appendix H (Page 6 of 17)

Containment Spray Pump 2A-A Performance Data Sheet 1.1.3 Pump total discharge head TDH.

For Miniflow: governing flow equation from SSD-2-F-72-34, uncorrected for instrument error TDH = (PDISCHM&TE -PSUCTM&TE - 3.0) x 2.308 + (K x (Q) 2 )

For Flow greater than Miniflow: governing flow equation from SSD-2-F-72-5, uncorrected for instrument error TDH = (PDISCHM&TE -PSUCTM&TE - 3.0) x 2.308 + (K x (5000j(APMTE/FE-5 )/84.8)2)

Where: TDH = pump Total Dynamic Head PDISCHM&TE = pump discharge pressure (psig) recorded from M&TE at 2-PI-72-33 PSUCTM&TE = pump suction pressure (psig) recorded from M&TE at 2-PI-72-32 2.308 = conversion from lb/in2 to ft H2 0 K = correction coefficient Q = Flow from ultrasonics on miniflow line 3.0 = M&TE error correction for 0 to 500(+/-0.5%) and a 0 to 100(+/-0.5%) pressure gauges, error is 2.5 and 0.5 for a total of 3.0.

Appendix H (Page 7 of 17)

Containment Spray Pump 2A-A Performance Data Sheet 1.1.3 Pump total discharge head TDH. (continued)

TARGET DISCHARGE SUCTION Flow Q 2-FI-72-34 DIP (M&TE) MOTOR CURRENT 6.9kV SD BD INITIAL/DATE FLOW/ PRESSURE PRESSURE Ultrasonic (2-M-6) @ 2-FI-72-5 2-EI-72-26B VOLTS STEP NO. @PI-72-3q @PI-72-33 @ miniflow line M&TE ID # (6.9kV SD BD 2A-A 2-EI-57-39 M&TE ID#"-' M&TE ID# M&TE ID# CMPT 13) (2-M-1)

Miniflow PH 1 amps 6.11[15] PH 2 amps psig __ psig __ .gpmgpm _ _pm PH 3 amps Volts 2300 PH 1 amps 6.11[22] PH 2 amps psig __ .psig __ ____gpm psid PH 3 amps Volts 3100 PH 1 amps 6.11[24] PH 2 amps psig ___ psig __ .gpm __ .psid PH 3 amps Volts 4000 PH 1 amps 6.11[26] PH 2 amps psig __ psig ____gpm __ .psid PH 3 amps Volts Full Flow PH 1 amps

< 4750 PH 2 amps 6.11[28] psig -psig __ gpm _ psid PH 3 amps Volts

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 215 of 249 Appendix H (Page 8 of 17)

Containment Spray Pump 2A-A Performance Data Sheet 1.1.4 Containment Spray Train A Pump Calculations A. CALCULATE TDH at Miniflow (Q from data table)

TDH = (PDISCHM4&TE -PSUCTM&TE -3.0)x2.308+(Kx(Q) 2 )

TDH = -3.0)x 2.308 + (1.86x 10-7 x 2)

TDH = ft Calculation Performed By:

Initials Date Calculation Verified By:

Initials Date

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 216 of 249 Appendix H (Page 9 of 17)

Containment Spray Pump 2A-A Performance Data Sheet 1.1.4 Containment Spray Train A Pump Calculations (continued)

B. CALCULATE TDH at 2300 gpm (APM&TE from data table)

TDH = (PDISCHM&TE -PSUCTM&TE -3.0)x2.308+(Kx(500041(APMTEFE-5)/84.8 ) 2 )

TDH - - -3.0)x2.308+(1.86x10- 7 x(5000 __ /_84.8)2)

TDH = ft Calculation Performed By:

Initials Date Calculation Verified By:

Initials Date

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 217 of 249 Appendix H (Page 10 of 17)

Containment Spray Pump 2A-A Performance Data Sheet 1.1.4 Containment Spray Train A Pump Calculations (continued)

C. CALCULATE TDH at 3100 gpm (APM&TE from data table)

TDH = (PDISCH M&TE - PSUCTM&TE -3.0) x 2.308 + (K x (5000 (APMTE /FE-5) / 84.8)2)

TDH =( -3.0)x 2.308 + (1.86x10-7 x (5000 /84.8)2)

TDH = ft Calculation Performed By:

Initials Date Calculation Verified By:

Initials Date

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 218 of 249 Appendix H (Page 11 of 17)

Containment Spray Pump 2A-A Performance Data Sheet 1.1.4 Containment Spray Train A Pump Calculations (continued)

D. CALCULATE TDH at 4000 gpm (APM&TE from data table)

TDH = (PDISCH M&TE - PSUCTMM&TE -3.0) x 2.308 + (K x (5000 V%(APMTE IFE-5) / 84.8)2)

TDH = - -3.0)x2.308+(1.86x10- 7 x (5000 /84.8)2)

TDH = ft Calculation Performed By:

Initials Date Calculation Verified By:

Initials Date

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 219 of 249 Appendix H (Page 12 of 17)

Containment Spray Pump 2A-A Performance Data Sheet 1.1.4 Containment Spray Train A Pump Calculations (continued)

E. CALCULATE TDH at Full flow (APM&TE from data table)

TDH = (PDISCH M&TE - PSUCTM&TE -3.0) x 2.308 + (K x (5000 1(APMTE /FE-5) / 84.8)2)

TDH =- __ -3.0)x 2.308 + (1.86x10-7 x (5000V _ / 84.8)2)

TDH = ft Calculation Performed By:

Initials Date Calculation Verified By:

Initials Date

Appendix H (Page 13 of 17)

Containment Spray Pump 2A-A Performance Data Sheet 1.1.4 Containment Spray Train A Pump Calculations (continued)

F. CALCULATE the corrected Miniflow flowrate from the Ultrasonic flowmeter flow. recorded in Data Table above Q - 30gpm = Qcorrected

_____gpm - 30gpm= ___gpm Calculation Performed By:

Initials Date Calculation Verified By:

Initials Date

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 221 of 249 Appendix H (Page 14 of 17)

Containment Spray Pump 2A-A Performance Data Sheet 1.1.4 Containment Spray Train A Pump Calculations (continued)

G. CALCULATE the corrected pump flow for the 2300 gpm flow point by inserting the d/p recorded in the data table above (M&TE @ 2-FI-72-5):

Qpump = 50001/(4MTEFE-5 -1 .5spsid) / 84.8 Qpump = 5000,( - 1.5psid) / 84.8 Qpu =

Calculation Performed By:

Initials Date Calculation Verified By:

Initials Date

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 222 of 249 Appendix H (Page 15 of 17)

Containment Spray Pump 2A-A Performance Data Sheet 1.1.4 Containment Spray Train A Pump Calculations (continued)

H. CALCULATE the corrected pump flow for the 3100 gpm flow point by inserting the d/p recorded in the data table above (M&TE @ 2-FI-72-5):

Qpump = 50001(APMTE/FE -- l.5psid) / 84.8 Qpump = 5000( -1.5psid) /84.8 Qpump -=

Calculation Performed By:

Initials Date Calculation Verified By:

Initials Date

Appendix H (Page 16 of 17)

Containment Spray Pump 2A-A Performance Data Sheet 1.1.4 Containment Spray Train A Pump Calculations (continued)

I. CALCULATE the corrected pump flow for the 4000 gpm flow point by inserting the d/p recorded in the data table above (M&TE @ 2-FI-72-5):

Qpump = 50001(APMTE/E 5 -- 1.5psid) / 84.8 Qpump 5 0004j - 1.5psid) / 84.8 Qp np Calculation Performed By:

Initials Date Calculation Verified By:

Initials Date

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 224 of 249 Appendix H (Page 17 of 17)

Containment Spray Pump 2A-A Performance Data Sheet 1.1.4 Containment Spray Train A Pump Calculations (continued)

J. CALCULATE the corrected pump flow at the full flow point by inserting the d/p recorded in the data table above (M&TE @ 2-FI-72-5):

Qpump = 5000/(,PMTEFE 5 -- 1.5psid) / 84.8 Qpump = 5000( -1.5psid) /84.8 Qpump =

Calculation Performed By:

Initials Date Calculation Verified By:

Initials Date

Appendix I (Page 1 of 3)

Containment Spray Pump 2B-B Computer Point Temperature Data Step 6.12[9] AMBIENT TEMPERATURE COMPUTER DESCRIPTION LIMITS READINGS INITIAL/DATE POINT T0170A CNTMT SPRAY PMP B-B UPPER RAD BRG <1850 F OF T0171A CNTMT SPRAY PMP B-B LWR RAD BRG <1850 F °F T0172A CNTMT SPRAY PMP B-B PHASE A WDG <2750 F OF T0173A CNTMT SPRAY PMP B-B PHASE B WDG <2750 F OF T0174A CNTMT SPRAY PMP B-B PHASE C WDG <275 0 F OF

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 226 of 249 Appendix I (Page 2 of 3)

Containment Spray Pump 2B-B Computer Point Temperature Data Step 6.12[14], MINI FLOW TIME T0170A OF OF OF OF OF OF OF OF OF OF T0171A OF OF OF OF OF OF OF OF OF OF T0172A OF OF OF OF OF OF OF OF OF OF T0173A OF OF OF oF OF OF OF OF oF OF T0174A OF OF OF OF OF OF OF OF OF I

Appendix I (Page 3 of 3)

Containment Spray Pump 2B-B Computer Point Temperature Data

Appendix J (Page 1 of 17)

Containment Spray Pump 2B-B Performance Data 1.1.5 Background calculations for determination of Containment Spray Pump flow rates A. Uncorrected pump flow through the RWST recirculation line can be determined by the following equation (from SSD-2-FI-72-5):

Equation: Quncorrected = 50001(APMTE/FE-5)/ 84.8 Where: Quncorrected = pump flowrate before making corrections for instrument errors 84.8 = 2350 IN WC from SSD-2-FI-72-5 converted to psid APMTE/FE-5 = differential pressure recorded from M&TE gauge installed at 2-FI-72-5 The following equation will be used to determine pump flow corrected for maximum flow instrument errors:

Equation: Qpump = 50001(APMTE/FE- 5 -1.5psid) /84.8 Where: Qpump = final corrected pump flow 1.5psid = M&TE d/p gauge error of I psid (0 to 100 psid +/- 1% of span)

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 229 of 249 Appendix J (Page 2 of 17)

Containment Spray Pump 2B-B Performance Data 1.1.5 Background calculations for determination of Containment Spray Pump flow rates (continued)

Equation: QPUMP = j/(APMTE/FE_5 - 1.5psid)/84.8 5000 Equation: 5000 (APMTE/FE-5 -1.5psid) /84.8 Equation: 84.8 Qpump = (APMTE/FE_5 -1.5psid)

(5000 PMTE/FE-5 = 84.8 Qpump Equation:

(5000 9+ 1.5psid

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 230 of 249 Appendix J (Page 3 of 17)

Containment Spray Pump 2B-B Performance Data 1.1.6 Cntmt Spray Pump 2B-B Total Dynamic Head (TDH) velocity head correction coefficients The measured TDH is corrected for velocity head and piping losses from the pump suction/discharge pressure taps to the pump suction/discharge.

AHn=- D VS + KD x V_2g +Ks X V- 2g 2g 2g Where: AH = pump differential head correction at reference flowrate, ft.

VD = water velocity at the pump discharge pressure tap. ft/sec.

Vs = water velocity at the pump suction pressure tap, ft/sec.

KD = pump discharge to pump discharge tap loss coefficient Ks = pump suction to pump suction pressure tap loss coefficient AH For varying flow ratEes a correction K can be defined as: K - Qe (Q¢ref)2 2

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 231 of 249 Appendix J (Page 4 of 17)

Containment Spray Pump 2B-B Performance Data 1.1.6 Cntmt Spray Pump 2B-B Total Dynamic Head (TDH) velocity head correction coefficients (continued)

V =GPM x ift 3 x 1 x min ID, in ) 2 60sec 7.4805gal1 rt(2*

24in / ft A. Containment Spray Pump 2B-B Suction - two 900 LR elbow between suction and 2-PI-72-16 Discharge - no piping components between discharge and 2-PI-72-15 From Cameron Hydraulic data, 19th edition Ks=0.42, KD=0 Pump discharge 10" SCH 40, ID=10.02 in.

Pump suction 14" SCH 40, 1D=13.025 in.

At 4000 gpm lft3 1 1min VD =4000x x xIm = 16.27 7.4805gal 10.02in 2 60sec 24in /ft

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 232 of 249 Appendix J (Page 5 of 17)

Containment Spray Pump 2B-B Performance Data 1.1.6 Cntmt Spray Pump 2B-B Total Dynamic Head (TDH) velocity head correction coefficients (continued)

At 4000 gpm lft 3 1 1 min Vs = 4000x x x -9.63 7.4805gal 71(13.025in-2 60sec 24in / ft At 4000 gpm (9.63)2 +OX (16.27)2 + 0.42 (9.63)Y 3.28ft AH= (16.27)2 2x 32.174 2x32.174 2x32.174 2x32.174 2

K= 3.28ft 2 = 2.05 X 10_ 7 ft/gpm (4000gpm)

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 233 of 249 Appendix J (Page 6 of 17)

Containment Spray Pump 2B-B Performance Data 1.1.7 Pump total discharge head TDH.

For Miniflow: governing flow equation from SSD-2-F-72-13, uncorrected for instrument error TDH = (PDISCH M&TE - PSUCTM&TE - 3.0) x 2.308 + (K x (Q) 2 )

For Flow greater than Miniflow: governing flow equation from SSD-2-F-72-5, uncorrected for instrument error TDH = (PDISCH M&TE - PSUCTM&TE - 3.0) x 2.308 + (K x (5000 (APMTE/FE 5 ) / 84.8)2)

Where: TDH = pump Total Dynamic Head PDISCHM&TE = pump discharge pressure (psig) recorded from M&TE at 2-PI-72-33 PSUCTM&TE = pump suction pressure (psig) recorded from M&TE at 2-PI-72-32 2.308 = conversion from lb/in 2 to ft H20 K = correction coefficient Q = Flow from ultrasonics on miniflow line 3.0 = M&TE error correction for 0 to 500(+/-0.5%) and a 0 to 100(+/-0.5%) pressure gauges, error is 2.5 and 0.5 for a total of 3.0.

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 234 of 249 Appendix J (Page 7 of 17)

Containment Spray Pump 2B-B Performance Data 1.1.7 Pump total discharge head TDH. (continued)

TARGET DISCHARGE SUCTION Flow Q 2-FI-72-13 DIP (M&TE) MOTOR CURRENT 6.9kV SD BD INITIAL/DATE FLOW/ PRESSURE PRESSURE Ultrasonic (2-M-6) @ 2-FI-72-5 2-EI-72-12B VOLTS STEP NO. @PI-72-15 @PI-72-16 @ miniflow line M&TE ID# (6.9kV SD BD 2B-B 2-EI-57-66 M&TE ID# M&TE ID# M&TE ID # CMPT 13) (2-M-1)

Miniflow PH 1 amps 6.12[15] PH 2 amps

__ psig __ psig __ gpm __gpm PH 3 amps Volts 2300 PH 1 amps 6.12[22] PH 2 amps

__ psig _ psig __gpm __ psid PH 3 amps Volts 3100 PH 1 amps 6.12[24] PH 2 amps

__ psig _ psig ____gpm __ psid PH 3 amps Volts 4000 _ PH 1 amps 6.12[26] _ PH 2 amps

__ psig _ psig ___gpm _ psid PH 3 amps Volts Full Flow PH 1 amps

  • 4750 PH 2 amps 6.12[28] __psig __ .psig __ gpm _ psid PH 3 amps Volts

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 235 of 249 Appendix J (Page 8 of 17)

Containment Spray Pump 2B-B Performance Data 1.1.8 Containment Spray Train B Pump Calculations A. CALCULATE TDH at Miniflow (Q from data table)

TDH= (PDISC1M&TE -PSUCTMTE -3.0)x2.308+(Kx (Q) 2)

TDH -3.0) x 2.308 + (2.05 x10-7 x )2)

TDH = ft Calculation Performed By:

Initials Date Calculation Verified By:

Initials Date

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 236 of 249 Appendix J (Page 9 of 17)

Containment Spray Pump 2B-B Performance Data 1.1.8 Containment Spray Train B Pump Calculations (continued)

B. CALCULATE TDH at 2300 gpm (APM&TE from data table)

TDH = (PDISCH M&TE - PSUCTM&TE -3.0) x 2.308 + (K x (50001(APMTEIFE_5 )/84.8) 2 )

TDH = - -3.0)x 2.308 + (2.05 x10-7 x (5000 ____/ 84.8)2)

TDH = ft Calculation Performed By:

Initials Date Calculation Verified By:

Initials Date

Appendix J (Page 10 of 17)

Containment Spray Pump 2B-B Performance Data 1.1.8 Containment Spray Train B Pump Calculations (continued)

C. CALCULATE TDH at 3100 gpm (APM&TE from data table)

TDH = (PDISCH M&TE - PSUCTM&TE -3.0) x 2.308 + (K x (5000 V(APMTE IFE-5) /84.8 )2)

TDH ( - -3.0)x 2.308 + (2.05 x 10-7 x (5000 ___/ 84.8)2)

TDH = ft Calculation Performed By:

Initials Date Calculation Verified By:

Initials Date

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 238 of 249 Appendix J (Page 11 of 17)

Containment Spray Pump 2B-B Performance Data 1.1.8 Containment Spray Train B Pump Calculations (continued)

D. CALCULATE TDH at 4000 gpm (APM&TE from data table)

TDH = (PDISCH M&TE - PSUCTM&TE -3.0) x 2.308 + (K x (5000 f(APMTE I E-5 )/84.8 ) 2 )

TDH = - -3.0) x 2.308 + (2.05 x10- x (500, / 84.8)2)

TDH = ft Calculation Performed By:

Initials Date Calculation Verified By:

Initials Date

Appendix J (Page 12 of 17)

Containment Spray Pump 2B-B Performance Data 1.1.8 Containment Spray Train B Pump Calculations (continued)

E. CALCULATE TDH at Full flow (APM&TE from data table)

TDH = (PDISCH M&TE - PSUCTM&TE - 3.0) x 2.308 + (K x (50001(APMTEIFE- 5 ) /84.8) 2)

TDH =( - -3.0)x2.308+(2.05x10 x (5000 /84.8)2)

TDH = ft Calculation Performed By:

Initials Date Calculation Verified By:

Initials Date

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 240 of 249 Appendix J (Page 13 of 17)

Containment Spray Pump 2B-B Performance Data 1.1.8 Containment Spray Train B Pump Calculations (continued)

F. CALCULATE the corrected Miniflow flowrate from the Ultrasonic flowmeter flow recorded in Data Table above Q - 30gpm = Qcorrected

____gpm - 30gpm= gpm Calculation Performed By:

Initials Date Calculation Verified By:

Initials Date

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 241 of 249 Appendix J (Page 14 of 17)

Containment Spray Pump 2B-B Performance Data 1.1.8 Containment Spray Train B Pump Calculations (continued)

G. CALCULATE the corrected pump flow for the 2300 gpm flow point by inserting the d/p recorded in the data table above (M&TE @ 2-FI-72-5):

Qpump = 5000 (APMTE/FE-5 -- 1.5psid) / 84.8 Qpump = 5000J( - 1.5psid) / 84.8 Qpump -=

Calculation Performed By:

Initials Date Calculation Verified By:

Initials Date

Appendix J (Page 15 of 17)

Containment Spray Pump 2B-B Performance Data 1.1.8 Containment Spray Train B Pump Calculations (continued)

H. CALCULATE the corrected pump flow for the 3100 gpm flow point by inserting the d/p recorded in the data table above (M&TE @ 2-FI-72-5):

Qpump = 5000 /(APMTE/FE 1.5psid) / 84.8 Qpump =5000/( - 1.Spsid) / 84.8 Qpump -

Calculation Performed By:

Initials Date Calculation Verified By:

Initials Date

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 243 of 249 Appendix J (Page 16 of 17)

Containment Spray Pump 2B-B Performance Data 1.1.8 Containment Spray Train B Pump Calculations (continued)

I. CALCULATE the corrected pump flow for the 4000 gpm flow point by inserting the d/p recorded in the data table above (M&TE @ 2-FI-72-5):

Qpump = 5000q(APMTE/FE 1.5psid) / 84.8 Qpump =5000J( - 1.5psid) / 84.8 Q pump Calculation Performed By:

Initials Date Calculation Verified By:

Initials Date

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 244 of 249 Appendix J (Page 17 of 17)

Containment Spray Pump 2B-B Performance Data 1.1.8 Containment Spray Train B Pump Calculations (continued)

J. CALCULATE the corrected pump flow at the full flow point by inserting the d/p recorded in the data table above (M&TE @ 2-FI-72-5):

Qpump = 5000(APMTE/FE- 5 - 1.5psid) / 84.8 Qpump = 50001( - 1.5psid) / 84.8 Qpump =

Calculation Performed By:

Initials Date Calculation Verified By:

Initials Date

Appendix K (Page 1 of 2)

Containment Spray System Train A Operating Parameters Step 6.11[30]

2-PDI-72-33, CNTMT SPRAY PUMP 2A-A SUCTION DIFF PRESSURE (676/A9U) psid Initials Date 2-PI-72-33, CNTMT SPRAY PUMP 2A-A SUCTION PRESSURE (676/A9U) psig Initials Date 2-PI-72-32, CNTMT SPRAY PUMP 2A-A DISCHARGE PRESSURE (676/A9U) psig Initials Date 2-TI-72-28, CNTMT SPRAY PUMP HX 2A-A INLET TEMPERATURE (713/A1OV)

OF Initials Date 2-PI-72-29, CNTMT SPRAY PUMP HX 2A-A INLET PRESSURE (713/A9U) psig Initials Date

Appendix K (Page 2 of 2)

Containment Spray System Train A Operating Parameters 2-PI-72-30, CNTMT SPRAY PUMP HX 2A-A OUTLET PRESSURE (713/A9V) psig Initials Date 2-FI-72-5, CNTMT SPRAY RWST TEST FLOW (713/A12V)

_gpm Initials Date 2-EI-72-26A, CNTMT SPRAY PMP A AMPS Amps Initials Date

Appendix L (Page 1 of 2)

Containment Spray System Train B Operating Parameters Step 6.12[30]

2-PDI-72-16, CNTMT SPRAY PUMP 2B-B SUCTION DIFF PRESSURE (676/A9T) psid Initials Date 2-PI-72-16, CNTMT SPRAY PUMP 2B-B SUCTION PRESSURE (676/A9T) psig Initials Date 2-PI-72-15, CNTMT SPRAY PUMP 2B-B DISCHARGE PRESSURE (676/A9T) psig Initials Date 2-TI-72-8, CNTMT SPRAY PUMP HX 2B-B INLET TEMPERATURE (713/A1OV)

OF Initials Date 2-PI-72-9, CNTMT SPRAY PUMP HX 2B-B INLET PRESSURE (713/A9U) psig Initials Date

Appendix L (Page 2 of 2)

Containment Spray System Train B Operating Parameters 2-PI-72-7, CNTMT SPRAY PUMP HX 2B-B OUTLET PRESSURE (713/A9U) psig Initials Date 2-FI-72-5, CNTMT SPRAY RWST TEST FLOW (713/A12V) gpm Initials Date 2-EI-72-12A, CNTMT SPRAY PMP B AMPS Amps Initials Date

WBN CONTAINMENT SPRAY PUMP VALVE 2-PTI-072-01 Unit 2 LOGIC TEST Rev. 0000 Page 249 of 249 Appendix M (Page 1 of 1)

Breaker Response Timer Setup TIMER1 TIMER START STOP Li N, BREAKER LI[ CSP 52STA CONTROL 1_2 ST VOLTAGE NC CONTACT