 Issue dateTitleTopic
RA-23-0279, Supplement to Application to Adopt Risk-Informed Completion Times TSTF-505, Revision 2 and Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power2 November 2023Supplement to Application to Adopt Risk-Informed Completion Times TSTF-505, Revision 2 and Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear PowerSafe Shutdown
High winds
Anticipated operational occurrence
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
Qualified Offsite Circuit
Incorporated by reference
FLEX
Fukushima Dai-Ichi
Seismically rugged
Design basis earthquake
Large early release frequency
Flooding Focused Evaluation
Earthquake
Commercial Grade
Maintenance Rule Program
Pandemic
Turbine Missile
COVID-19
Offsite Circuit
Seismic Walkdown Report
RA-23-0121, License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation Area5 October 2023License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation AreaHigh Radiation Area
Fuel cladding
RA-23-0005, License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specifications31 May 2023License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical SpecificationsSafe Shutdown
Boric Acid
High Radiation Area
Offsite Dose Calculation Manual
Anticipated operational occurrence
Probabilistic Risk Assessment
Incorporated by reference
Locked High Radiation Area
Surveillance Frequency Control Program
Process Control Program
ML23145A16025 May 2023Submittal of Updated Final Safety Analysis Report (Revision No. 30), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 28), Technical Specifications Bases Revisions, Quality
RA-23-0042, Submittal of Updated Final Safety Analysis Report (Revision 23), Technical Specification Bases Revisions, Ufsar/Selected Licensee Commitment Changes, 10 CFR 50.59 Evaluation Summary Report, and Notification of a Commitment Change24 April 2023Submittal of Updated Final Safety Analysis Report (Revision 23), Technical Specification Bases Revisions, Ufsar/Selected Licensee Commitment Changes, 10 CFR 50.59 Evaluation Summary Report, and Notification of a Commitment ChangeSafe Shutdown
Time of Discovery
Reactor Vessel Water Level
Grab sample
Offsite Dose Calculation Manual
Slow transfer
Anticipated operational occurrence
Post Accident Monitoring
Hydrostatic
Probabilistic Risk Assessment
Operating Basis Earthquake
Qualified Offsite Circuit
Surveillance Frequency Control Program
Annual Radiological Environmental Operating Report
Operability Determination
Battery sizing
License Renewal
Earthquake
Commercial Grade
Power Operated Valves
Turbine Missile
Offsite Circuit
Fire Watch
Power change
Overspeed trip
Manual Operator Action
RA-22-0292, License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies4 April 2023License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test FrequenciesSafe Shutdown
Mission time
Offsite Dose Calculation Manual
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Coatings
Incorporated by reference
Finite Element Analysis
FLEX
Aging Management
Seismically rugged
Local Leak Rate Testing
Foreign Material Exclusion
Large early release frequency
Severe Accident Management Guideline
Moisture barrier
License Renewal
Subsequent License Renewal
Earthquake
Fuel cladding
Recently irradiated fuel
Scaffolding
RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements16 February 2023Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage RequirementsOffsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Surveillance Frequency Control Program
Stress corrosion cracking
Pressure Boundary Leakage
Unidentified leakage
Operational leakage
RA-18-0190, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b16 February 2023License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4bSafe Shutdown
High winds
High Radiation Area
Ultimate heat sink
Anticipated operational occurrence
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
Qualified Offsite Circuit
FLEX
Fukushima Dai-Ichi
Seismically rugged
Surveillance Frequency Control Program
Large early release frequency
Battery sizing
Flooding Focused Evaluation
Earthquake
Commercial Grade
Pandemic
Turbine Missile
COVID-19
Offsite Circuit
Seismic Walkdown Report
Manual Operator Action
RA-22-0081, License Amendment Request to Address Administrative Changes to the Operating License and Technical Specifications7 February 2023License Amendment Request to Address Administrative Changes to the Operating License and Technical SpecificationsAnticipated operational occurrence
Incorporated by reference
Liquid penetrant
RA-22-0118, License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies1 February 2023License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement FrequenciesEnforcement Discretion
Probabilistic Risk Assessment
Incorporated by reference
Surveillance Frequency Control Program
Operational leakage
RA-22-0153, License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 and Update the List of Analytical Methods Used in the Determination of Core.21 September 2022License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 and Update the List of Analytical Methods Used in the Determination of Core.Surveillance Frequency Control Program
Fuel cladding
ML22186A00821 June 2022SLC Revision to 16.9-22, TS Bases 3.7.7Surveillance Frequency Control Program
Fire Watch
RA-21-0183, Remove 4.160 Kilovolt Bus 2 from Surveillance Requirement 3.8.1.16 (Automatic Transfer Capability from Unit Auxiliary Transformer to Startup Transformer)28 April 2022Remove 4.160 Kilovolt Bus 2 from Surveillance Requirement 3.8.1.16 (Automatic Transfer Capability from Unit Auxiliary Transformer to Startup Transformer)Safe Shutdown
Qualified Offsite Circuit
Emergency Lighting
Fuel cladding
Offsite Circuit
RA-22-0080, Independent Spent Fuel Storage Installation, McGuire, Units 1 & 2, Independent Spent Fuel Storage Installation, Request for an Exemption to the Requirements of Certificate of Compliance No. 1031 for the NAC Magnastor Storage System7 April 2022Independent Spent Fuel Storage Installation, McGuire, Units 1 & 2, Independent Spent Fuel Storage Installation, Request for an Exemption to the Requirements of Certificate of Compliance No. 1031 for the NAC Magnastor Storage SystemTornado Missile
Commercial Grade Dedication
Condition Adverse to Quality
Tornado-Generated Missile
Design basis earthquake
Exemption Request
Liquid penetrant
Affidavit
RA-21-0302, Application to Revise Technical Specifications to Adopt TSTF-569, Rev. 2, Revise Response Time Testing Definition24 February 2022Application to Revise Technical Specifications to Adopt TSTF-569, Rev. 2, Revise Response Time Testing DefinitionSafe Shutdown
Shutdown Margin
Packing leak
Surveillance Frequency Control Program
Process Control Program
Pressure Boundary Leakage
Unidentified leakage
RA-20-0107, Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position18 January 2022Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated PositionUltimate heat sink
Water Inventory Control
Surveillance Frequency Control Program
Operability Determination
Recently irradiated fuel
Power Uprate
RA-22-0017, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections6 January 2022Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube InspectionsStress corrosion cracking
Eddy Current Testing
RA-21-0282, Submittal of Updated Final Safety Analysis Report (Amendment 64), Technical Specification Bases Revision, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes15 November 2021Submittal of Updated Final Safety Analysis Report (Amendment 64), Technical Specification Bases Revision, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment ChangesSafe Shutdown
Boric Acid
Shutdown Margin
Ultimate heat sink
Fire Barrier
Anticipated operational occurrence
Tornado Missile
Internal Flooding
Hydrostatic
Past operability
Probabilistic Risk Assessment
Fire impairment
Nondestructive Examination
Incorporated by reference
Missed surveillance
Surveillance Frequency Control Program
Stress corrosion cracking
Operability Determination
Maintenance Rule Program
Turbine Missile
Fuel cladding
Pressure Boundary Leakage
Offsite Circuit
Power change
Unidentified leakage
Overspeed trip
Operational leakage
RA-21-0213, License Amendment Request to Remove Limitation to Perform Certain Surveillance Requirements During Shutdown23 September 2021License Amendment Request to Remove Limitation to Perform Certain Surveillance Requirements During ShutdownSafe Shutdown
Anticipated operational occurrence
Surveillance Frequency Control Program
Offsite Circuit
Overspeed trip
RA-21-0027, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections16 September 2021Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube InspectionsShutdown Margin
Non-Destructive Examination
Nondestructive Examination
Operational leakage
RA-21-0005, Application to Revise Technical Specification 3.7.7, Low Pressure Service Water (LPSW) System, to Extend the Completion Time for One Required Inoperable LPSW Pump on a Temporary Basis2 September 2021Application to Revise Technical Specification 3.7.7, Low Pressure Service Water (LPSW) System, to Extend the Completion Time for One Required Inoperable LPSW Pump on a Temporary BasisProbabilistic Risk Assessment
Surveillance Frequency Control Program
Large early release frequency
Fuel cladding
RA-21-0057, Independent Spent Fuel Storage Installation, Submittal of Updated Final Safety Analysis Report (Revision No. 29), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 27), Technical .27 May 2021Independent Spent Fuel Storage Installation, Submittal of Updated Final Safety Analysis Report (Revision No. 29), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 27), Technical .
ML21116A2074 May 2021Correction to Amendment No. 184 Regarding TSTF Traveler TSTF-505, Rev. 2, Provide Risk Informed Extended Completion Times - RITSTF Initiative 4B
RA-20-0252, License Amendment Request to Remove Extraneous Content and Requirements from the Operating License and Technical Specifications24 February 2021License Amendment Request to Remove Extraneous Content and Requirements from the Operating License and Technical SpecificationsShutdown Margin
High Radiation Area
Anticipated operational occurrence
Probabilistic Risk Assessment
Annual Radioactive Effluent Release Report
Surveillance Frequency Control Program
Annual Radiological Environmental Operating Report
Process Control Program
Unidentified leakage
Operational leakage
RA-20-0207, Duke Energy - Application to Revise the Technical Specification for Engineered Safety Feature Actuation System (ESFAS) Instrumentation3 December 2020Duke Energy - Application to Revise the Technical Specification for Engineered Safety Feature Actuation System (ESFAS) InstrumentationShutdown Margin
Anticipated operational occurrence
Surveillance Frequency Control Program
Loss of condenser vacuum
ML20237F4354 September 2020Issuance of Amendments Regarding the Technical Specification Requirements Pertaining to Mode Change LimitationsSafe Shutdown
Time of Discovery
Post Accident Monitoring
Probabilistic Risk Assessment
Missed surveillance
Significance Determination Process
Surveillance Frequency Control Program
Large early release frequency
Offsite Circuit
Power change
RA-20-0223, Supplement to Application to Revise Harris Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b27 July 2020Supplement to Application to Revise Harris Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4bHot Short
Safe Shutdown
Boric Acid
High winds
Internal Flooding
Probabilistic Risk Assessment
Multiple Spurious Operation
FLEX
Tornado-Generated Missile
Tornado Generated Missile
Large early release frequency
Offsite Circuit
Fire Protection Program
Very Early Warning Fire Detection
RA-20-0148, Supplement to License Amendment Request to Eliminate Certain Technical Specification Requirements in Alignment with Improved Standard Technical Specifications27 May 2020Supplement to License Amendment Request to Eliminate Certain Technical Specification Requirements in Alignment with Improved Standard Technical SpecificationsHigh Radiation Area
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
ML20147A03315 May 2020Amendment 63 to Update Final Safety Analysis Report, Chapter 16, Preliminary Technical SpecificationIncorporated by reference
ML20147A04015 May 2020Amendment 63 to Updated Final Safety Analysis Report, Administrative Procedure Non-Safety Related PLP-106 Technical Specification Equipment List Program, Revision 073 (Redacted)Safe Shutdown
Boric Acid
Fitness for Duty
Grab sample
Offsite Dose Calculation Manual
Stroke time
Commercial Grade Dedication
Coatings
Nondestructive Examination
Emergency Lighting
Functionality Assessment
Incorporated by reference
Condition Adverse to Quality
Aging Management
Annual Radioactive Effluent Release Report
Surveillance Frequency Control Program
Process Control Program
Stress corrosion cracking
Operability Determination
License Renewal
Commercial Grade
Maintenance Rule Program
Power-Operated Valves
Fatigue Rule
Fire Protection Program
Power Uprate
Overspeed trip
RA-19-0359, License Amendment Request to Correct Non-Conservative Technical Specification 3/4.4.9, Pressure/Temperature Limits - Reactor Coolant System12 May 2020License Amendment Request to Correct Non-Conservative Technical Specification 3/4.4.9, Pressure/Temperature Limits - Reactor Coolant SystemHydrostatic
RA-20-0105, Supplement to License Amendment Request to Revise Technical Specifications for the Adoption of 10 CFR 50, Appendix J, Option B for Type B and C Testing and for Permanent Extension of Type a, B and C Leak Rate Test Frequencies16 April 2020Supplement to License Amendment Request to Revise Technical Specifications for the Adoption of 10 CFR 50, Appendix J, Option B for Type B and C Testing and for Permanent Extension of Type a, B and C Leak Rate Test FrequenciesHigh Radiation Area
RA-19-0039, License Amendment Request to Revise Technical Specifications to Adopt Two NRC-Approved Generic Technical Specification Changes13 April 2020License Amendment Request to Revise Technical Specifications to Adopt Two NRC-Approved Generic Technical Specification ChangesBoric Acid
Probabilistic Risk Assessment
Incorporated by reference
Surveillance Frequency Control Program
Liquid penetrant
Overspeed trip
RA-20-0011, Application for Technical Specifications Change Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process6 February 2020Application for Technical Specifications Change Regarding Mode Change Limitations Using the Consolidated Line Item Improvement ProcessSafe Shutdown
Time of Discovery
Hydrostatic
Past operability
Incorporated by reference
Surveillance Frequency Control Program
Operability Determination
Offsite Circuit
Unidentified leakage
Overspeed trip
RA-19-0440, Supplement to License Amendment Request for Extension of the Essential Services Chilled Water System Allowed Outage Time and Removal of an Expired Note from Technical Specifications21 November 2019Supplement to License Amendment Request for Extension of the Essential Services Chilled Water System Allowed Outage Time and Removal of an Expired Note from Technical SpecificationsSurveillance Frequency Control Program
RA-19-0067, License Amendment Request to Revise Technical Specifications for the Adoption of 10 CFR 50, Appendix J, Option B for Type B and C Testing and for Permanent Extension of Type a, B and C Leak Rate Test Frequencies8 November 2019License Amendment Request to Revise Technical Specifications for the Adoption of 10 CFR 50, Appendix J, Option B for Type B and C Testing and for Permanent Extension of Type a, B and C Leak Rate Test FrequenciesHigh winds
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Coatings
Incorporated by reference
Locked High Radiation Area
FLEX
Aging Management
Surveillance Frequency Control Program
Local Leak Rate Testing
Foreign Material Exclusion
Large early release frequency
Spent Fuel Pool Instrumentation
Moisture barrier
Flooding Focused Evaluation
License Renewal
Fuel cladding
Very Early Warning Fire Detection
Power Uprate
Manual Operator Action
RA-19-0001, License Amendment Request to Revise Technical Specifications to Adopt Risk- Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b7 October 2019License Amendment Request to Revise Technical Specifications to Adopt Risk- Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b
RA-19-0183, License Amendment Request to Add New Feedwater Bypass Valves to Technical Specification 3.7.329 July 2019License Amendment Request to Add New Feedwater Bypass Valves to Technical Specification 3.7.3Unanalyzed Condition
Earthquake
RA-19-0123, License Amendment Request to Eliminate Certain Technical Specification Requirements in Alignment with Improved Standard Technical Specifications25 July 2019License Amendment Request to Eliminate Certain Technical Specification Requirements in Alignment with Improved Standard Technical SpecificationsUnanalyzed Condition
Offsite Dose Calculation Manual
Anticipated operational occurrence
Annual Radioactive Effluent Release Report
Surveillance Frequency Control Program
Annual Radiological Environmental Operating Report
Process Control Program
Offsite Circuit
Overspeed trip
RA-19-0006, License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description8 July 2019License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program DescriptionCoatings
RA-18-0282, Technical Specification Bases Changes26 June 2019Technical Specification Bases ChangesSafe Shutdown
Boric Acid
Time of Discovery
High Radiation Area
Fire Barrier
Tornado Missile
Internal Flooding
Past operability
Probabilistic Risk Assessment
Incorporated by reference
Missed surveillance
Tornado Missile Protection
Surveillance Frequency Control Program
Operability Determination
Battery sizing
Power Operated Valves
Turbine Missile
Fire Protection Program
Power change
Manual Operator Action
RA-18-0281, Technical Specification Bases Changes25 June 2019Technical Specification Bases ChangesSafe Shutdown
Fire Barrier
Tornado Missile
Internal Flooding
Missed surveillance
Surveillance Frequency Control Program
Turbine Missile
Fuel cladding
Recently irradiated fuel
RA-19-0017, License Amendment Request to Modify the Departure from Nucleate Boiling Ratio Safety Limit to Address Transition to New Fuel Type10 April 2019License Amendment Request to Modify the Departure from Nucleate Boiling Ratio Safety Limit to Address Transition to New Fuel TypeShutdown Margin
Anticipated operational occurrence
Hydrostatic
Fuel cladding
Exclusive Use
Affidavit
RA-18-0232, Proposed Editorial Error Correction of Technical Specification (TS) 3.0, Surveillance Requirement Applicability, SR 3.0.5 and Proposed Removal of Expired TS Footnotes from the MNS5 February 2019Proposed Editorial Error Correction of Technical Specification (TS) 3.0, Surveillance Requirement Applicability, SR 3.0.5 and Proposed Removal of Expired TS Footnotes from the MNSSafe Shutdown
Surveillance Frequency Control Program
Offsite Circuit
RA-18-0219, Technical Specification Bases Changes and Ufsar/Selected Licensee Commitment Changes4 December 2018Technical Specification Bases Changes and Ufsar/Selected Licensee Commitment ChangesSafe Shutdown
Boric Acid
High Radiation Area
Fire Barrier
Stroke time
Anticipated operational occurrence
Tornado Missile
Internal Flooding
Operator Manual Action
Incorporated by reference
Missed surveillance
Surveillance Frequency Control Program
Battery sizing
License Renewal
Power Operated Valves
Turbine Missile
Fire Protection Program
Fire Watch
Hourly Fire Watch
Grace period
Power change
GOTHIC
RA-18-0226, Supplement to License Amendment Request to Revise Technical Specification Section 3.7.8, Nuclear Service Water System.15 November 2018Supplement to License Amendment Request to Revise Technical Specification Section 3.7.8, Nuclear Service Water System.Cyber Security
Surveillance Frequency Control Program
Safeguards Contingency Plan
Fire Protection Program
RA-18-0204, Transmittal of Technical Specification Bases12 November 2018Transmittal of Technical Specification BasesSafe Shutdown
Boric Acid
Shutdown Margin
Ultimate heat sink
Fire Barrier
Anticipated operational occurrence
Tornado Missile
Internal Flooding
Hydrostatic
Past operability
Nondestructive Examination
Incorporated by reference
FLEX
Missed surveillance
Surveillance Frequency Control Program
Stress corrosion cracking
Operability Determination
Turbine Missile
Fuel cladding
Pressure Boundary Leakage
Offsite Circuit
Power change
Unidentified leakage
Overspeed trip
Operational leakage
Negative Flux Rate Trip
RA-18-0166, Supplement to Non-Voluntary License Amendment Request (LAR) to Correct Non-Conservative Technical Specification 3.4.11 - PORVs13 September 2018Supplement to Non-Voluntary License Amendment Request (LAR) to Correct Non-Conservative Technical Specification 3.4.11 - PORVsSurveillance Frequency Control Program
HNP-18-004, License Amendment Request to Change Shearon Harris Nuclear Power Plant, Unit 1, Emergency Plan Emergency Action Level Scheme13 August 2018License Amendment Request to Change Shearon Harris Nuclear Power Plant, Unit 1, Emergency Plan Emergency Action Level Scheme
CNS-18-008, License Amendment Request to Remove the Containment Valve Injection Water System Supply from Specified Containment Isolation Valves and to Exempt These CIVs from Type-C Local Leak Rate Testing19 July 2018License Amendment Request to Remove the Containment Valve Injection Water System Supply from Specified Containment Isolation Valves and to Exempt These CIVs from Type-C Local Leak Rate TestingLocal Leak Rate Testing