RA-23-0279, Supplement to Application to Adopt Risk-Informed Completion Times TSTF-505, Revision 2 and Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power | 2 November 2023 | Supplement to Application to Adopt Risk-Informed Completion Times TSTF-505, Revision 2 and Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power | Safe Shutdown High winds Anticipated operational occurrence Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Operating Basis Earthquake Qualified Offsite Circuit Incorporated by reference FLEX Fukushima Dai-Ichi Seismically rugged Design basis earthquake Large early release frequency Flooding Focused Evaluation Earthquake Commercial Grade Maintenance Rule Program Pandemic Turbine Missile COVID-19 Offsite Circuit Seismic Walkdown Report |
RA-23-0121, License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation Area | 5 October 2023 | License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation Area | High Radiation Area Fuel cladding |
RA-23-0005, License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specifications | 31 May 2023 | License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specifications | Safe Shutdown Boric Acid High Radiation Area Offsite Dose Calculation Manual Anticipated operational occurrence Probabilistic Risk Assessment Incorporated by reference Locked High Radiation Area Surveillance Frequency Control Program Process Control Program |
ML23145A160 | 25 May 2023 | Submittal of Updated Final Safety Analysis Report (Revision No. 30), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 28), Technical Specifications Bases Revisions, Quality | |
RA-23-0042, Submittal of Updated Final Safety Analysis Report (Revision 23), Technical Specification Bases Revisions, Ufsar/Selected Licensee Commitment Changes, 10 CFR 50.59 Evaluation Summary Report, and Notification of a Commitment Change | 24 April 2023 | Submittal of Updated Final Safety Analysis Report (Revision 23), Technical Specification Bases Revisions, Ufsar/Selected Licensee Commitment Changes, 10 CFR 50.59 Evaluation Summary Report, and Notification of a Commitment Change | Safe Shutdown Time of Discovery Reactor Vessel Water Level Grab sample Offsite Dose Calculation Manual Slow transfer Anticipated operational occurrence Post Accident Monitoring Hydrostatic Probabilistic Risk Assessment Operating Basis Earthquake Qualified Offsite Circuit Surveillance Frequency Control Program Annual Radiological Environmental Operating Report Operability Determination Battery sizing License Renewal Earthquake Commercial Grade Power Operated Valves Turbine Missile Offsite Circuit Fire Watch Power change Overspeed trip Manual Operator Action |
RA-22-0292, License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies | 4 April 2023 | License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies | Safe Shutdown Mission time Offsite Dose Calculation Manual Internal Flooding Hydrostatic Probabilistic Risk Assessment Coatings Incorporated by reference Finite Element Analysis FLEX Aging Management Seismically rugged Local Leak Rate Testing Foreign Material Exclusion Large early release frequency Severe Accident Management Guideline Moisture barrier License Renewal Subsequent License Renewal Earthquake Fuel cladding Recently irradiated fuel Scaffolding |
RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements | 16 February 2023 | Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Surveillance Frequency Control Program Stress corrosion cracking Pressure Boundary Leakage Unidentified leakage Operational leakage |
RA-18-0190, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | 16 February 2023 | License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | Safe Shutdown High winds High Radiation Area Ultimate heat sink Anticipated operational occurrence Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Operating Basis Earthquake Qualified Offsite Circuit FLEX Fukushima Dai-Ichi Seismically rugged Surveillance Frequency Control Program Large early release frequency Battery sizing Flooding Focused Evaluation Earthquake Commercial Grade Pandemic Turbine Missile COVID-19 Offsite Circuit Seismic Walkdown Report Manual Operator Action |
RA-22-0081, License Amendment Request to Address Administrative Changes to the Operating License and Technical Specifications | 7 February 2023 | License Amendment Request to Address Administrative Changes to the Operating License and Technical Specifications | Anticipated operational occurrence Incorporated by reference Liquid penetrant |
RA-22-0118, License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies | 1 February 2023 | License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies | Enforcement Discretion Probabilistic Risk Assessment Incorporated by reference Surveillance Frequency Control Program Operational leakage |
RA-22-0153, License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 and Update the List of Analytical Methods Used in the Determination of Core. | 21 September 2022 | License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 and Update the List of Analytical Methods Used in the Determination of Core. | Surveillance Frequency Control Program Fuel cladding |
ML22186A008 | 21 June 2022 | SLC Revision to 16.9-22, TS Bases 3.7.7 | Surveillance Frequency Control Program Fire Watch |
RA-21-0183, Remove 4.160 Kilovolt Bus 2 from Surveillance Requirement 3.8.1.16 (Automatic Transfer Capability from Unit Auxiliary Transformer to Startup Transformer) | 28 April 2022 | Remove 4.160 Kilovolt Bus 2 from Surveillance Requirement 3.8.1.16 (Automatic Transfer Capability from Unit Auxiliary Transformer to Startup Transformer) | Safe Shutdown Qualified Offsite Circuit Emergency Lighting Fuel cladding Offsite Circuit |
RA-22-0080, Independent Spent Fuel Storage Installation, McGuire, Units 1 & 2, Independent Spent Fuel Storage Installation, Request for an Exemption to the Requirements of Certificate of Compliance No. 1031 for the NAC Magnastor Storage System | 7 April 2022 | Independent Spent Fuel Storage Installation, McGuire, Units 1 & 2, Independent Spent Fuel Storage Installation, Request for an Exemption to the Requirements of Certificate of Compliance No. 1031 for the NAC Magnastor Storage System | Tornado Missile Commercial Grade Dedication Condition Adverse to Quality Tornado-Generated Missile Design basis earthquake Exemption Request Liquid penetrant Affidavit |
RA-21-0302, Application to Revise Technical Specifications to Adopt TSTF-569, Rev. 2, Revise Response Time Testing Definition | 24 February 2022 | Application to Revise Technical Specifications to Adopt TSTF-569, Rev. 2, Revise Response Time Testing Definition | Safe Shutdown Shutdown Margin Packing leak Surveillance Frequency Control Program Process Control Program Pressure Boundary Leakage Unidentified leakage |
RA-20-0107, Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position | 18 January 2022 | Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position | Ultimate heat sink Water Inventory Control Surveillance Frequency Control Program Operability Determination Recently irradiated fuel Power Uprate |
RA-22-0017, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections | 6 January 2022 | Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections | Stress corrosion cracking Eddy Current Testing |
RA-21-0282, Submittal of Updated Final Safety Analysis Report (Amendment 64), Technical Specification Bases Revision, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes | 15 November 2021 | Submittal of Updated Final Safety Analysis Report (Amendment 64), Technical Specification Bases Revision, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes | Safe Shutdown Boric Acid Shutdown Margin Ultimate heat sink Fire Barrier Anticipated operational occurrence Tornado Missile Internal Flooding Hydrostatic Past operability Probabilistic Risk Assessment Fire impairment Nondestructive Examination Incorporated by reference Missed surveillance Surveillance Frequency Control Program Stress corrosion cracking Operability Determination Maintenance Rule Program Turbine Missile Fuel cladding Pressure Boundary Leakage Offsite Circuit Power change Unidentified leakage Overspeed trip Operational leakage |
RA-21-0213, License Amendment Request to Remove Limitation to Perform Certain Surveillance Requirements During Shutdown | 23 September 2021 | License Amendment Request to Remove Limitation to Perform Certain Surveillance Requirements During Shutdown | Safe Shutdown Anticipated operational occurrence Surveillance Frequency Control Program Offsite Circuit Overspeed trip |
RA-21-0027, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections | 16 September 2021 | Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections | Shutdown Margin Non-Destructive Examination Nondestructive Examination Operational leakage |
RA-21-0005, Application to Revise Technical Specification 3.7.7, Low Pressure Service Water (LPSW) System, to Extend the Completion Time for One Required Inoperable LPSW Pump on a Temporary Basis | 2 September 2021 | Application to Revise Technical Specification 3.7.7, Low Pressure Service Water (LPSW) System, to Extend the Completion Time for One Required Inoperable LPSW Pump on a Temporary Basis | Probabilistic Risk Assessment Surveillance Frequency Control Program Large early release frequency Fuel cladding |
RA-21-0057, Independent Spent Fuel Storage Installation, Submittal of Updated Final Safety Analysis Report (Revision No. 29), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 27), Technical . | 27 May 2021 | Independent Spent Fuel Storage Installation, Submittal of Updated Final Safety Analysis Report (Revision No. 29), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 27), Technical . | |
ML21116A207 | 4 May 2021 | Correction to Amendment No. 184 Regarding TSTF Traveler TSTF-505, Rev. 2, Provide Risk Informed Extended Completion Times - RITSTF Initiative 4B | |
RA-20-0252, License Amendment Request to Remove Extraneous Content and Requirements from the Operating License and Technical Specifications | 24 February 2021 | License Amendment Request to Remove Extraneous Content and Requirements from the Operating License and Technical Specifications | Shutdown Margin High Radiation Area Anticipated operational occurrence Probabilistic Risk Assessment Annual Radioactive Effluent Release Report Surveillance Frequency Control Program Annual Radiological Environmental Operating Report Process Control Program Unidentified leakage Operational leakage |
RA-20-0207, Duke Energy - Application to Revise the Technical Specification for Engineered Safety Feature Actuation System (ESFAS) Instrumentation | 3 December 2020 | Duke Energy - Application to Revise the Technical Specification for Engineered Safety Feature Actuation System (ESFAS) Instrumentation | Shutdown Margin Anticipated operational occurrence Surveillance Frequency Control Program Loss of condenser vacuum |
ML20237F435 | 4 September 2020 | Issuance of Amendments Regarding the Technical Specification Requirements Pertaining to Mode Change Limitations | Safe Shutdown Time of Discovery Post Accident Monitoring Probabilistic Risk Assessment Missed surveillance Significance Determination Process Surveillance Frequency Control Program Large early release frequency Offsite Circuit Power change |
RA-20-0223, Supplement to Application to Revise Harris Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | 27 July 2020 | Supplement to Application to Revise Harris Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | Hot Short Safe Shutdown Boric Acid High winds Internal Flooding Probabilistic Risk Assessment Multiple Spurious Operation FLEX Tornado-Generated Missile Tornado Generated Missile Large early release frequency Offsite Circuit Fire Protection Program Very Early Warning Fire Detection |
RA-20-0148, Supplement to License Amendment Request to Eliminate Certain Technical Specification Requirements in Alignment with Improved Standard Technical Specifications | 27 May 2020 | Supplement to License Amendment Request to Eliminate Certain Technical Specification Requirements in Alignment with Improved Standard Technical Specifications | High Radiation Area Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program |
ML20147A033 | 15 May 2020 | Amendment 63 to Update Final Safety Analysis Report, Chapter 16, Preliminary Technical Specification | Incorporated by reference |
ML20147A040 | 15 May 2020 | Amendment 63 to Updated Final Safety Analysis Report, Administrative Procedure Non-Safety Related PLP-106 Technical Specification Equipment List Program, Revision 073 (Redacted) | Safe Shutdown Boric Acid Fitness for Duty Grab sample Offsite Dose Calculation Manual Stroke time Commercial Grade Dedication Coatings Nondestructive Examination Emergency Lighting Functionality Assessment Incorporated by reference Condition Adverse to Quality Aging Management Annual Radioactive Effluent Release Report Surveillance Frequency Control Program Process Control Program Stress corrosion cracking Operability Determination License Renewal Commercial Grade Maintenance Rule Program Power-Operated Valves Fatigue Rule Fire Protection Program Power Uprate Overspeed trip |
RA-19-0359, License Amendment Request to Correct Non-Conservative Technical Specification 3/4.4.9, Pressure/Temperature Limits - Reactor Coolant System | 12 May 2020 | License Amendment Request to Correct Non-Conservative Technical Specification 3/4.4.9, Pressure/Temperature Limits - Reactor Coolant System | Hydrostatic |
RA-20-0105, Supplement to License Amendment Request to Revise Technical Specifications for the Adoption of 10 CFR 50, Appendix J, Option B for Type B and C Testing and for Permanent Extension of Type a, B and C Leak Rate Test Frequencies | 16 April 2020 | Supplement to License Amendment Request to Revise Technical Specifications for the Adoption of 10 CFR 50, Appendix J, Option B for Type B and C Testing and for Permanent Extension of Type a, B and C Leak Rate Test Frequencies | High Radiation Area |
RA-19-0039, License Amendment Request to Revise Technical Specifications to Adopt Two NRC-Approved Generic Technical Specification Changes | 13 April 2020 | License Amendment Request to Revise Technical Specifications to Adopt Two NRC-Approved Generic Technical Specification Changes | Boric Acid Probabilistic Risk Assessment Incorporated by reference Surveillance Frequency Control Program Liquid penetrant Overspeed trip |
RA-20-0011, Application for Technical Specifications Change Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process | 6 February 2020 | Application for Technical Specifications Change Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process | Safe Shutdown Time of Discovery Hydrostatic Past operability Incorporated by reference Surveillance Frequency Control Program Operability Determination Offsite Circuit Unidentified leakage Overspeed trip |
RA-19-0440, Supplement to License Amendment Request for Extension of the Essential Services Chilled Water System Allowed Outage Time and Removal of an Expired Note from Technical Specifications | 21 November 2019 | Supplement to License Amendment Request for Extension of the Essential Services Chilled Water System Allowed Outage Time and Removal of an Expired Note from Technical Specifications | Surveillance Frequency Control Program |
RA-19-0067, License Amendment Request to Revise Technical Specifications for the Adoption of 10 CFR 50, Appendix J, Option B for Type B and C Testing and for Permanent Extension of Type a, B and C Leak Rate Test Frequencies | 8 November 2019 | License Amendment Request to Revise Technical Specifications for the Adoption of 10 CFR 50, Appendix J, Option B for Type B and C Testing and for Permanent Extension of Type a, B and C Leak Rate Test Frequencies | High winds Tornado Missile Safe Shutdown Earthquake Internal Flooding Hydrostatic Probabilistic Risk Assessment Coatings Incorporated by reference Locked High Radiation Area FLEX Aging Management Surveillance Frequency Control Program Local Leak Rate Testing Foreign Material Exclusion Large early release frequency Spent Fuel Pool Instrumentation Moisture barrier Flooding Focused Evaluation License Renewal Fuel cladding Very Early Warning Fire Detection Power Uprate Manual Operator Action |
RA-19-0001, License Amendment Request to Revise Technical Specifications to Adopt Risk- Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | 7 October 2019 | License Amendment Request to Revise Technical Specifications to Adopt Risk- Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | |
RA-19-0183, License Amendment Request to Add New Feedwater Bypass Valves to Technical Specification 3.7.3 | 29 July 2019 | License Amendment Request to Add New Feedwater Bypass Valves to Technical Specification 3.7.3 | Unanalyzed Condition Earthquake |
RA-19-0123, License Amendment Request to Eliminate Certain Technical Specification Requirements in Alignment with Improved Standard Technical Specifications | 25 July 2019 | License Amendment Request to Eliminate Certain Technical Specification Requirements in Alignment with Improved Standard Technical Specifications | Unanalyzed Condition Offsite Dose Calculation Manual Anticipated operational occurrence Annual Radioactive Effluent Release Report Surveillance Frequency Control Program Annual Radiological Environmental Operating Report Process Control Program Offsite Circuit Overspeed trip |
RA-19-0006, License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description | 8 July 2019 | License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description | Coatings |
RA-18-0282, Technical Specification Bases Changes | 26 June 2019 | Technical Specification Bases Changes | Safe Shutdown Boric Acid Time of Discovery High Radiation Area Fire Barrier Tornado Missile Internal Flooding Past operability Probabilistic Risk Assessment Incorporated by reference Missed surveillance Tornado Missile Protection Surveillance Frequency Control Program Operability Determination Battery sizing Power Operated Valves Turbine Missile Fire Protection Program Power change Manual Operator Action |
RA-18-0281, Technical Specification Bases Changes | 25 June 2019 | Technical Specification Bases Changes | Safe Shutdown Fire Barrier Tornado Missile Internal Flooding Missed surveillance Surveillance Frequency Control Program Turbine Missile Fuel cladding Recently irradiated fuel |
RA-19-0017, License Amendment Request to Modify the Departure from Nucleate Boiling Ratio Safety Limit to Address Transition to New Fuel Type | 10 April 2019 | License Amendment Request to Modify the Departure from Nucleate Boiling Ratio Safety Limit to Address Transition to New Fuel Type | Shutdown Margin Anticipated operational occurrence Hydrostatic Fuel cladding Exclusive Use Affidavit |
RA-18-0232, Proposed Editorial Error Correction of Technical Specification (TS) 3.0, Surveillance Requirement Applicability, SR 3.0.5 and Proposed Removal of Expired TS Footnotes from the MNS | 5 February 2019 | Proposed Editorial Error Correction of Technical Specification (TS) 3.0, Surveillance Requirement Applicability, SR 3.0.5 and Proposed Removal of Expired TS Footnotes from the MNS | Safe Shutdown Surveillance Frequency Control Program Offsite Circuit |
RA-18-0219, Technical Specification Bases Changes and Ufsar/Selected Licensee Commitment Changes | 4 December 2018 | Technical Specification Bases Changes and Ufsar/Selected Licensee Commitment Changes | Safe Shutdown Boric Acid High Radiation Area Fire Barrier Stroke time Anticipated operational occurrence Tornado Missile Internal Flooding Operator Manual Action Incorporated by reference Missed surveillance Surveillance Frequency Control Program Battery sizing License Renewal Power Operated Valves Turbine Missile Fire Protection Program Fire Watch Hourly Fire Watch Grace period Power change GOTHIC |
RA-18-0226, Supplement to License Amendment Request to Revise Technical Specification Section 3.7.8, Nuclear Service Water System. | 15 November 2018 | Supplement to License Amendment Request to Revise Technical Specification Section 3.7.8, Nuclear Service Water System. | Cyber Security Surveillance Frequency Control Program Safeguards Contingency Plan Fire Protection Program |
RA-18-0204, Transmittal of Technical Specification Bases | 12 November 2018 | Transmittal of Technical Specification Bases | Safe Shutdown Boric Acid Shutdown Margin Ultimate heat sink Fire Barrier Anticipated operational occurrence Tornado Missile Internal Flooding Hydrostatic Past operability Nondestructive Examination Incorporated by reference FLEX Missed surveillance Surveillance Frequency Control Program Stress corrosion cracking Operability Determination Turbine Missile Fuel cladding Pressure Boundary Leakage Offsite Circuit Power change Unidentified leakage Overspeed trip Operational leakage Negative Flux Rate Trip |
RA-18-0166, Supplement to Non-Voluntary License Amendment Request (LAR) to Correct Non-Conservative Technical Specification 3.4.11 - PORVs | 13 September 2018 | Supplement to Non-Voluntary License Amendment Request (LAR) to Correct Non-Conservative Technical Specification 3.4.11 - PORVs | Surveillance Frequency Control Program |
HNP-18-004, License Amendment Request to Change Shearon Harris Nuclear Power Plant, Unit 1, Emergency Plan Emergency Action Level Scheme | 13 August 2018 | License Amendment Request to Change Shearon Harris Nuclear Power Plant, Unit 1, Emergency Plan Emergency Action Level Scheme | |
CNS-18-008, License Amendment Request to Remove the Containment Valve Injection Water System Supply from Specified Containment Isolation Valves and to Exempt These CIVs from Type-C Local Leak Rate Testing | 19 July 2018 | License Amendment Request to Remove the Containment Valve Injection Water System Supply from Specified Containment Isolation Valves and to Exempt These CIVs from Type-C Local Leak Rate Testing | Local Leak Rate Testing |