RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling | 25 May 2023 | Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling | Hydrostatic Surveillance Frequency Control Program |
NMP1L3482, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | 15 December 2022 | License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | Hot Short Safe Shutdown High winds Reactor Vessel Water Level Mission time Tornado Missile Safe Shutdown Earthquake Internal Flooding Hydrostatic Probabilistic Risk Assessment Operating Basis Earthquake Operator Manual Action Zebra Mussel Emergency Lighting FLEX Fukushima Dai-Ichi Seismically rugged Surveillance Frequency Control Program Scram Discharge Volume Large early release frequency Excess Flow Check Valve Flooding Focused Evaluation Earthquake Turbine Missile Offsite Circuit Seismic Walkdown Report |
ML22298A011 | 25 October 2022 | License Amendment Request to Adopt Technical Specification Task Force TSTF-295-A, Modify Note 2 to Actions of (Post-Accident Monitoring) PAM Table To. | Reactor Vessel Water Level Post Accident Monitoring |
ML22292A131 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Technical Specification Bases, Rev. 69 | |
RS-22-092, Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration | 3 October 2022 | Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration | Reactor Vessel Water Level |
NMP1L3477, License Amendment Request - Application to Partially Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2, to Revise. | 12 August 2022 | License Amendment Request - Application to Partially Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2, to Revise. | Surveillance Frequency Control Program |
NMP2L2780, Application to Revise Technical Specifications to Adopt TSTF-582, Revision 0, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements | 30 September 2021 | Application to Revise Technical Specifications to Adopt TSTF-582, Revision 0, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements | Reactor Vessel Water Level Ultimate heat sink Stroke time Water Inventory Control Operating Basis Earthquake Surveillance Frequency Control Program Control of Heavy Loads Power Operated Valves Fuel cladding Offsite Circuit Scaffolding |
NMP2L2762, License Amendment Request Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control | 26 May 2021 | License Amendment Request Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control | Safe Shutdown Anticipated operational occurrence Surveillance Frequency Control Program Offsite Circuit |
JAFP-20-0049, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability | 22 June 2020 | Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability | Time of Discovery |
NMP2L2718, Supplemental Information No.1 for Nine Mile Point Nuclear Station, Unit 2, to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 | 12 December 2019 | Supplemental Information No.1 for Nine Mile Point Nuclear Station, Unit 2, to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 | Surveillance Frequency Control Program |
JAFP-19-0067, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability | 27 June 2019 | Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability | Fire Barrier Tornado Missile Internal Flooding Incorporated by reference Turbine Missile |
RS-19-039, Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls | 26 June 2019 | Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls | High Radiation Area Locked High Radiation Area Process Control Program Deep Dose Equivalent |
RA-19-019, Submittal of Changes to Technical Specifications Bases | 12 April 2019 | Submittal of Changes to Technical Specifications Bases | Hydrostatic Missed surveillance |
NMP2L2693, Technical Specification Bases, Rev. 57 | 24 October 2018 | Technical Specification Bases, Rev. 57 | |
RA-18-018, Submittal of Changes to Technical Specifications Bases | 13 April 2018 | Submittal of Changes to Technical Specifications Bases | Shutdown Margin Scram Discharge Volume Fuel cladding Power change Failure to Scram |
NMP2L2664, Supplemental Information No. 2 for Nine Mile Point Nuclear Station, Unit 2, to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 | 12 January 2018 | Supplemental Information No. 2 for Nine Mile Point Nuclear Station, Unit 2, to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 | Water Inventory Control |
NMP2L2652, License Amendment Request - Revise Surveillance Requirement 3.5.1.2 to Remove Note | 22 August 2017 | License Amendment Request - Revise Surveillance Requirement 3.5.1.2 to Remove Note | |
NMP2L2640, License Amendment Request - Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 | 28 February 2017 | License Amendment Request - Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 | Shutdown Margin Reactor Vessel Water Level Ultimate heat sink Stroke time Water Inventory Control Post Accident Monitoring Operating Basis Earthquake Surveillance Frequency Control Program Scram Discharge Volume Power Operated Valves Fuel cladding Pressure Boundary Leakage Recently irradiated fuel Offsite Circuit Scaffolding |
ML16309A400 | 24 October 2016 | Revision 47 to Technical Specification Bases, List of Effective Pages | |
ML16309A401 | 24 October 2016 | Revision 47 to Technical Specification Bases, Table of Contents | Shutdown Margin Ultimate heat sink Post Accident Monitoring Hydrostatic Scram Discharge Volume |
ML16309A402 | 24 October 2016 | Revision 47 to Technical Specification Bases, Section B2.0, Safety Limits (Sls) | Reactor Vessel Water Level Anticipated operational occurrence Hydrostatic Fuel cladding |
ML16309A403 | 24 October 2016 | Revision 47 to Technical Specification Bases, Section B3.0, Limiting Condition for Operation (LCO) Applicability | Fire Barrier Internal Flooding Tornado Generated Missile Missed surveillance Turbine Missile Offsite Circuit |
ML16309A405 | 24 October 2016 | Revision 47 to Technical Specification Bases, Section B3.2, Power Distribution Limits | Anticipated operational occurrence Surveillance Frequency Control Program Feedwater Controller Failure Fuel cladding |
ML16309A408 | 24 October 2016 | Revision 47 to Technical Specification Bases, Section B3.5, Emergency Core Cooling Systems (ECCS) and Reactor Core Isolation Cooling (RCIC) System | Reactor Vessel Water Level Ultimate heat sink Stroke time Surveillance Frequency Control Program |
ML16309A413 | 24 October 2016 | Revision 47 to Technical Specification Bases, Section B3.9, Refueling Operations | Shutdown Margin Ultimate heat sink Surveillance Frequency Control Program |
ML16209A218 | 26 July 2016 | Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing. | Shutdown Margin Reactor Vessel Water Level Packing leak High Radiation Area Stroke time Hydrostatic Squib Incorporated by reference Missed surveillance Surveillance Frequency Control Program Excess Flow Check Valve Power Operated Valves Pressure Boundary Leakage Recently irradiated fuel Power change Unidentified leakage |
NMP1L3070, License Amendment Request - Reactivity Anomalies Surveillance | 18 March 2016 | License Amendment Request - Reactivity Anomalies Surveillance | Shutdown Margin Anticipated operational occurrence |
NMP2L2592, Supplemental Information Regarding TSTF-425 License Amendment Request | 24 September 2015 | Supplemental Information Regarding TSTF-425 License Amendment Request | Shutdown Margin Ultimate heat sink Squib Surveillance Frequency Control Program Scram Discharge Volume Offsite Circuit |
NMP1L3027, Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3) | 12 May 2015 | Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3) | |
NMP1L3010, Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3) | 26 March 2015 | Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3) | Shutdown Margin Reactor Vessel Water Level Ultimate heat sink Squib Surveillance Frequency Control Program Scram Discharge Volume Excess Flow Check Valve Recently irradiated fuel Offsite Circuit |
ML15089A231 | 26 March 2015 | Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3) | High winds Stroke time Hydrostatic Probabilistic Risk Assessment Squib Multiple Spurious Operation Incorporated by reference Surveillance Frequency Control Program Foreign Material Exclusion Scram Discharge Volume Excess Flow Check Valve Overtravel Power-Operated Valves Recently irradiated fuel Fire Protection Program Unidentified leakage |
NMP2L2576, License Amendment Request - Relocation of Secondary Containment Bypass Leakage Paths Table from Technical Specifications to the Technical Requirements Manual | 23 March 2015 | License Amendment Request - Relocation of Secondary Containment Bypass Leakage Paths Table from Technical Specifications to the Technical Requirements Manual | Stroke time Squib |
NMP2L2563, License Amendment Request - Primary Containment Isolation Instrumentation Technical Specification Allowable Value Change | 17 November 2014 | License Amendment Request - Primary Containment Isolation Instrumentation Technical Specification Allowable Value Change | Anticipated operational occurrence |
ML14191A255 | 10 July 2014 | Nine Mile Point and Ginna, Unit 1 - Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process | Unanalyzed Condition Boric Acid Reactor Vessel Water Level Ultimate heat sink Stroke time Time to boil Fuel cladding |
RA-14-035, Submittal of Changes to Technical Specifications Bases | 10 April 2014 | Submittal of Changes to Technical Specifications Bases | |
RA-13-039, Submittal of Changes to Technical Specifications Bases | 10 April 2013 | Submittal of Changes to Technical Specifications Bases | |
ML12156A363 | 1 June 2012 | Emergency License Amendment Request Pursuant to 10 CFR 50.90: Revision of the Main Steam Isolation Valve Allowable Leakage Rate Limit | Stroke time Excess Flow Check Valve Liquid penetrant Power Uprate |
RA-12-046, Submittal of Changes to Technical Specifications Bases | 12 April 2012 | Submittal of Changes to Technical Specifications Bases | Safe Shutdown Time of Discovery Shutdown Margin Safety Limit Minimum Critical Power Ratio High Radiation Area Ultimate heat sink Offsite Dose Calculation Manual Anticipated operational occurrence Hydrostatic Cyber Security Missed surveillance Pressure and Temperature Limits Report Annual Radioactive Effluent Release Report Surveillance Frequency Control Program Scram Discharge Volume Annual Radiological Environmental Operating Report Process Control Program Excess Flow Check Valve Safeguards Contingency Plan Battery sizing License Renewal Earthquake Deep Dose Equivalent Fuel cladding Fire Protection Program Power change Unidentified leakage Failure to Scram |
ML11306A298 | 27 October 2011 | Submittal of Revision 22 to the Final Safety Analysis Report (Updated), 10 CFR 50.59 Evaluation Summary Report, Technical Specifications Bases Changes, and Report Consistent with 10 CFR 54.37(b) | Anticipated operational occurrence Hydrostatic Aging Management Missed surveillance Pressure and Temperature Limits Report Foreign Material Exclusion |
ML11214A214 | 25 July 2011 | License Amendment Request, Extension of the Completion Time for Inoperable Diesel Generator - Response to NRC Request for Additional Information | High winds Mission time Probabilistic Risk Assessment |
RA-11-021, Submittal of Changes to Technical Specifications Bases | 15 April 2011 | Submittal of Changes to Technical Specifications Bases | Safe Shutdown Time of Discovery Shutdown Margin High Radiation Area Ultimate heat sink Offsite Dose Calculation Manual Anticipated operational occurrence Hydrostatic Emergency Lighting Missed surveillance Pressure and Temperature Limits Report Annual Radioactive Effluent Release Report Surveillance Frequency Control Program Scram Discharge Volume Annual Radiological Environmental Operating Report Process Control Program Excess Flow Check Valve Safeguards Contingency Plan Battery sizing License Renewal Earthquake Deep Dose Equivalent Fuel cladding Fire Protection Program Power change Unidentified leakage Failure to Scram |
ML110960283 | 30 March 2011 | License Amendment Request Pursuant to 10 CFR 50.90: Request for Adoption of Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage ... | Grab sample |
RA-10-027, Technical Specification Change Request No. 356, Elimination of Daily Testing of an Operable Emergency Diesel Generator (EDG) When the Other EDG Is Declared Inoperable | 25 June 2010 | Technical Specification Change Request No. 356, Elimination of Daily Testing of an Operable Emergency Diesel Generator (EDG) When the Other EDG Is Declared Inoperable | Safe Shutdown Anticipated operational occurrence Fuel cladding |
RA-10-037, Submittal of Changes to Technical Specifications Bases | 22 April 2010 | Submittal of Changes to Technical Specifications Bases | Safe Shutdown Time of Discovery Shutdown Margin Safety Limit Minimum Critical Power Ratio High Radiation Area Ultimate heat sink Offsite Dose Calculation Manual Anticipated operational occurrence Hydrostatic Missed surveillance Pressure and Temperature Limits Report Annual Radioactive Effluent Release Report Scram Discharge Volume Annual Radiological Environmental Operating Report Process Control Program Excess Flow Check Valve Safeguards Contingency Plan Battery sizing Earthquake Deep Dose Equivalent Fuel cladding Fire Protection Program Power change Unidentified leakage Failure to Scram |
RA-10-009, Oyster Creek, License Amendment Request, Changes to Trunnion Room Secondary Containment Boundary | 25 February 2010 | Oyster Creek, License Amendment Request, Changes to Trunnion Room Secondary Containment Boundary | Earthquake |
ML100620011 | 25 February 2010 | Oyster Creek, License Amendment Request, Changes to Trunnion Room Secondary Containment Boundary | Earthquake |
ML093500090 | 9 December 2009 | License Amendment Request to Remove Operating Mode Restrictions for Performing Surveillance Testing of the Division 3 Battery - Technical Specification 3.8.4, DC Sources - Operating | Safe Shutdown Fuel cladding |
RA-09-065, Application for Technical Specifications Change Regarding Risk-Informed Justification for Relocation of Specific Surveillance Frequency Requirements to Licensee Controlled Program (Adoption of TSTF-425, Rev 3) | 30 October 2009 | Application for Technical Specifications Change Regarding Risk-Informed Justification for Relocation of Specific Surveillance Frequency Requirements to Licensee Controlled Program (Adoption of TSTF-425, Rev 3) | High winds High Radiation Area Ultimate heat sink Mission time Offsite Dose Calculation Manual Tornado Missile Internal Flooding Probabilistic Risk Assessment Squib Incorporated by reference Pressure and Temperature Limits Report Surveillance Frequency Control Program Scram Discharge Volume Battery sizing Turbine Missile Offsite Circuit |
ML093160257 | 26 October 2009 | Submittal of Revision 21 to the Final Safety Analysis Report (Updated), 10 CFR 50.59 Evaluation Summary Report, Technical Specifications Bases Changes, and Report Consistent with 10 CFR 54.37(b) | Hydrostatic Overtravel |
RA-09-036, Submittal of Changes to Technical Specifications Bases, Includes Changes Through April 2, 2009 | 17 April 2009 | Submittal of Changes to Technical Specifications Bases, Includes Changes Through April 2, 2009 | Safe Shutdown Time of Discovery Shutdown Margin High Radiation Area Ultimate heat sink Offsite Dose Calculation Manual Anticipated operational occurrence Hydrostatic Missed surveillance Pressure and Temperature Limits Report Annual Radioactive Effluent Release Report Scram Discharge Volume Annual Radiological Environmental Operating Report Process Control Program Excess Flow Check Valve Battery sizing Earthquake Deep Dose Equivalent Fuel cladding Fire Protection Program Power change Unidentified leakage Failure to Scram |