RA-23-0121, License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation Area | 5 October 2023 | License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation Area | High Radiation Area Fuel cladding |
RA-23-0005, License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specifications | 31 May 2023 | License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specifications | Safe Shutdown Boric Acid High Radiation Area Offsite Dose Calculation Manual Anticipated operational occurrence Probabilistic Risk Assessment Incorporated by reference Locked High Radiation Area Surveillance Frequency Control Program Process Control Program |
ML23145A160 | 25 May 2023 | Submittal of Updated Final Safety Analysis Report (Revision No. 30), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 28), Technical Specifications Bases Revisions, Quality | |
RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements | 16 February 2023 | Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Surveillance Frequency Control Program Stress corrosion cracking Pressure Boundary Leakage Unidentified leakage Operational leakage |
RA-22-0081, License Amendment Request to Address Administrative Changes to the Operating License and Technical Specifications | 7 February 2023 | License Amendment Request to Address Administrative Changes to the Operating License and Technical Specifications | Anticipated operational occurrence Incorporated by reference Liquid penetrant |
RA-22-0118, License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies | 1 February 2023 | License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies | Enforcement Discretion Probabilistic Risk Assessment Incorporated by reference Surveillance Frequency Control Program Operational leakage |
RA-22-0153, License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 and Update the List of Analytical Methods Used in the Determination of Core. | 21 September 2022 | License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 and Update the List of Analytical Methods Used in the Determination of Core. | Surveillance Frequency Control Program Fuel cladding |
RA-21-0183, Remove 4.160 Kilovolt Bus 2 from Surveillance Requirement 3.8.1.16 (Automatic Transfer Capability from Unit Auxiliary Transformer to Startup Transformer) | 28 April 2022 | Remove 4.160 Kilovolt Bus 2 from Surveillance Requirement 3.8.1.16 (Automatic Transfer Capability from Unit Auxiliary Transformer to Startup Transformer) | Safe Shutdown Qualified Offsite Circuit Emergency Lighting Fuel cladding Offsite Circuit |
RA-22-0110, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf. | 25 March 2022 | Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf. | High Radiation Area |
RA-21-0302, Application to Revise Technical Specifications to Adopt TSTF-569, Rev. 2, Revise Response Time Testing Definition | 24 February 2022 | Application to Revise Technical Specifications to Adopt TSTF-569, Rev. 2, Revise Response Time Testing Definition | Safe Shutdown Shutdown Margin Packing leak Surveillance Frequency Control Program Process Control Program Pressure Boundary Leakage Unidentified leakage |
RA-20-0107, Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position | 18 January 2022 | Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position | Ultimate heat sink Water Inventory Control Surveillance Frequency Control Program Operability Determination Recently irradiated fuel Power Uprate |
RA-22-0017, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections | 6 January 2022 | Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections | Stress corrosion cracking Eddy Current Testing |
RA-21-0282, Submittal of Updated Final Safety Analysis Report (Amendment 64), Technical Specification Bases Revision, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes | 15 November 2021 | Submittal of Updated Final Safety Analysis Report (Amendment 64), Technical Specification Bases Revision, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes | Safe Shutdown Boric Acid Shutdown Margin Ultimate heat sink Fire Barrier Anticipated operational occurrence Tornado Missile Internal Flooding Hydrostatic Past operability Probabilistic Risk Assessment Fire impairment Nondestructive Examination Incorporated by reference Missed surveillance Surveillance Frequency Control Program Stress corrosion cracking Operability Determination Maintenance Rule Program Turbine Missile Fuel cladding Pressure Boundary Leakage Offsite Circuit Power change Unidentified leakage Overspeed trip Operational leakage |
RA-21-0272, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | 1 November 2021 | Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | Hot Short Safe Shutdown High winds Reactor Vessel Water Level High Radiation Area Ultimate heat sink Mission time Anticipated operational occurrence Water Inventory Control Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Operating Basis Earthquake FLEX Fukushima Dai-Ichi Surveillance Frequency Control Program Scram Discharge Volume Large early release frequency Earthquake Fuel cladding Offsite Circuit |
RA-21-0213, License Amendment Request to Remove Limitation to Perform Certain Surveillance Requirements During Shutdown | 23 September 2021 | License Amendment Request to Remove Limitation to Perform Certain Surveillance Requirements During Shutdown | Safe Shutdown Anticipated operational occurrence Surveillance Frequency Control Program Offsite Circuit Overspeed trip |
RA-21-0027, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections | 16 September 2021 | Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections | Shutdown Margin Non-Destructive Examination Nondestructive Examination Operational leakage |
RA-21-0057, Independent Spent Fuel Storage Installation, Submittal of Updated Final Safety Analysis Report (Revision No. 29), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 27), Technical . | 27 May 2021 | Independent Spent Fuel Storage Installation, Submittal of Updated Final Safety Analysis Report (Revision No. 29), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 27), Technical . | |
ML21116A207 | 4 May 2021 | Correction to Amendment No. 184 Regarding TSTF Traveler TSTF-505, Rev. 2, Provide Risk Informed Extended Completion Times - RITSTF Initiative 4B | |
RA-18-0183, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | 1 April 2021 | License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | Safe Shutdown High winds Shutdown Margin Reactor Vessel Water Level Ultimate heat sink Stroke time Anticipated operational occurrence Tornado Missile Water Inventory Control Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment FLEX Tornado Generated Missile Fukushima Dai-Ichi Surveillance Frequency Control Program Scram Discharge Volume Large early release frequency Earthquake Turbine Missile Fuel cladding Offsite Circuit |
ML20342A347 | 4 March 2021 | Issuance of Amendment Nos. 303 and 331 Revise Technical Specification to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control Enhancements | Water Inventory Control Surveillance Frequency Control Program Fuel cladding Fire Protection Program |
RA-20-0252, License Amendment Request to Remove Extraneous Content and Requirements from the Operating License and Technical Specifications | 24 February 2021 | License Amendment Request to Remove Extraneous Content and Requirements from the Operating License and Technical Specifications | Shutdown Margin High Radiation Area Anticipated operational occurrence Probabilistic Risk Assessment Annual Radioactive Effluent Release Report Surveillance Frequency Control Program Annual Radiological Environmental Operating Report Process Control Program Unidentified leakage Operational leakage |
RA-20-0207, Duke Energy - Application to Revise the Technical Specification for Engineered Safety Feature Actuation System (ESFAS) Instrumentation | 3 December 2020 | Duke Energy - Application to Revise the Technical Specification for Engineered Safety Feature Actuation System (ESFAS) Instrumentation | Shutdown Margin Anticipated operational occurrence Surveillance Frequency Control Program Loss of condenser vacuum |
ML20237F435 | 4 September 2020 | Issuance of Amendments Regarding the Technical Specification Requirements Pertaining to Mode Change Limitations | Safe Shutdown Time of Discovery Post Accident Monitoring Probabilistic Risk Assessment Missed surveillance Significance Determination Process Surveillance Frequency Control Program Large early release frequency Offsite Circuit Power change |
RA-20-0223, Supplement to Application to Revise Harris Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | 27 July 2020 | Supplement to Application to Revise Harris Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | Hot Short Safe Shutdown Boric Acid High winds Internal Flooding Probabilistic Risk Assessment Multiple Spurious Operation FLEX Tornado-Generated Missile Tornado Generated Missile Large early release frequency Offsite Circuit Fire Protection Program Very Early Warning Fire Detection |
RA-20-0148, Supplement to License Amendment Request to Eliminate Certain Technical Specification Requirements in Alignment with Improved Standard Technical Specifications | 27 May 2020 | Supplement to License Amendment Request to Eliminate Certain Technical Specification Requirements in Alignment with Improved Standard Technical Specifications | High Radiation Area Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program |
ML20147A040 | 15 May 2020 | Amendment 63 to Updated Final Safety Analysis Report, Administrative Procedure Non-Safety Related PLP-106 Technical Specification Equipment List Program, Revision 073 (Redacted) | Safe Shutdown Boric Acid Fitness for Duty Grab sample Offsite Dose Calculation Manual Stroke time Commercial Grade Dedication Coatings Nondestructive Examination Emergency Lighting Functionality Assessment Incorporated by reference Condition Adverse to Quality Aging Management Annual Radioactive Effluent Release Report Surveillance Frequency Control Program Process Control Program Stress corrosion cracking Operability Determination License Renewal Commercial Grade Maintenance Rule Program Power-Operated Valves Fatigue Rule Fire Protection Program Power Uprate Overspeed trip |
ML20147A033 | 15 May 2020 | Amendment 63 to Update Final Safety Analysis Report, Chapter 16, Preliminary Technical Specification | Incorporated by reference |
RA-19-0359, License Amendment Request to Correct Non-Conservative Technical Specification 3/4.4.9, Pressure/Temperature Limits - Reactor Coolant System | 12 May 2020 | License Amendment Request to Correct Non-Conservative Technical Specification 3/4.4.9, Pressure/Temperature Limits - Reactor Coolant System | Hydrostatic |
RA-20-0105, Supplement to License Amendment Request to Revise Technical Specifications for the Adoption of 10 CFR 50, Appendix J, Option B for Type B and C Testing and for Permanent Extension of Type a, B and C Leak Rate Test Frequencies | 16 April 2020 | Supplement to License Amendment Request to Revise Technical Specifications for the Adoption of 10 CFR 50, Appendix J, Option B for Type B and C Testing and for Permanent Extension of Type a, B and C Leak Rate Test Frequencies | High Radiation Area |
RA-19-0431, Application to Revise Technical Specifications to Adopt TSTF 564, Safety Limit MCPR | 9 March 2020 | Application to Revise Technical Specifications to Adopt TSTF 564, Safety Limit MCPR | Reactor Vessel Water Level Safety Limit Minimum Critical Power Ratio Anticipated operational occurrence Fuel cladding Exclusive Use Affidavit |
RA-20-0011, Application for Technical Specifications Change Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process | 6 February 2020 | Application for Technical Specifications Change Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process | Safe Shutdown Time of Discovery Hydrostatic Past operability Incorporated by reference Surveillance Frequency Control Program Operability Determination Offsite Circuit Unidentified leakage Overspeed trip |
RA-19-0440, Supplement to License Amendment Request for Extension of the Essential Services Chilled Water System Allowed Outage Time and Removal of an Expired Note from Technical Specifications | 21 November 2019 | Supplement to License Amendment Request for Extension of the Essential Services Chilled Water System Allowed Outage Time and Removal of an Expired Note from Technical Specifications | Surveillance Frequency Control Program |
RA-19-0067, License Amendment Request to Revise Technical Specifications for the Adoption of 10 CFR 50, Appendix J, Option B for Type B and C Testing and for Permanent Extension of Type a, B and C Leak Rate Test Frequencies | 8 November 2019 | License Amendment Request to Revise Technical Specifications for the Adoption of 10 CFR 50, Appendix J, Option B for Type B and C Testing and for Permanent Extension of Type a, B and C Leak Rate Test Frequencies | High winds Tornado Missile Safe Shutdown Earthquake Internal Flooding Hydrostatic Probabilistic Risk Assessment Coatings Incorporated by reference Locked High Radiation Area FLEX Aging Management Surveillance Frequency Control Program Local Leak Rate Testing Foreign Material Exclusion Large early release frequency Spent Fuel Pool Instrumentation Moisture barrier Flooding Focused Evaluation License Renewal Fuel cladding Very Early Warning Fire Detection Power Uprate Manual Operator Action |
RA-19-0001, License Amendment Request to Revise Technical Specifications to Adopt Risk- Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | 7 October 2019 | License Amendment Request to Revise Technical Specifications to Adopt Risk- Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | |
RA-19-0183, License Amendment Request to Add New Feedwater Bypass Valves to Technical Specification 3.7.3 | 29 July 2019 | License Amendment Request to Add New Feedwater Bypass Valves to Technical Specification 3.7.3 | Unanalyzed Condition Earthquake |
RA-19-0123, License Amendment Request to Eliminate Certain Technical Specification Requirements in Alignment with Improved Standard Technical Specifications | 25 July 2019 | License Amendment Request to Eliminate Certain Technical Specification Requirements in Alignment with Improved Standard Technical Specifications | Unanalyzed Condition Offsite Dose Calculation Manual Anticipated operational occurrence Annual Radioactive Effluent Release Report Surveillance Frequency Control Program Annual Radiological Environmental Operating Report Process Control Program Offsite Circuit Overspeed trip |
RA-19-0006, License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description | 8 July 2019 | License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description | Coatings |
RA-19-0017, License Amendment Request to Modify the Departure from Nucleate Boiling Ratio Safety Limit to Address Transition to New Fuel Type | 10 April 2019 | License Amendment Request to Modify the Departure from Nucleate Boiling Ratio Safety Limit to Address Transition to New Fuel Type | Shutdown Margin Anticipated operational occurrence Hydrostatic Fuel cladding Exclusive Use Affidavit |
RA-19-0157, Supplement to Request for License Amendment Technical Specification 3.8.3, Diesel Fuel Oil, One-Time Extension of Main Fuel Oil Storage Tank Completion Time | 26 March 2019 | Supplement to Request for License Amendment Technical Specification 3.8.3, Diesel Fuel Oil, One-Time Extension of Main Fuel Oil Storage Tank Completion Time | |
ML18298A078 | 3 December 2018 | 2nd Correction to Issuance of Amendments to Adopt Technical Specifications Task Force 542, Revision 2, Reactor Pressure Vessel Water Inventory Control | Water Inventory Control Surveillance Frequency Control Program |
RA-18-0204, Transmittal of Technical Specification Bases | 12 November 2018 | Transmittal of Technical Specification Bases | Safe Shutdown Boric Acid Shutdown Margin Ultimate heat sink Fire Barrier Anticipated operational occurrence Tornado Missile Internal Flooding Hydrostatic Past operability Nondestructive Examination Incorporated by reference FLEX Missed surveillance Surveillance Frequency Control Program Stress corrosion cracking Operability Determination Turbine Missile Fuel cladding Pressure Boundary Leakage Offsite Circuit Power change Unidentified leakage Overspeed trip Operational leakage Negative Flux Rate Trip |
RA-18-0079, Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO | 14 August 2018 | Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO | Surveillance Frequency Control Program Offsite Circuit |
HNP-18-004, License Amendment Request to Change Shearon Harris Nuclear Power Plant, Unit 1, Emergency Plan Emergency Action Level Scheme | 13 August 2018 | License Amendment Request to Change Shearon Harris Nuclear Power Plant, Unit 1, Emergency Plan Emergency Action Level Scheme | |
RNP-RA/18-0044, Supplement to License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transform | 11 July 2018 | Supplement to License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transformers | Qualified Offsite Circuit Offsite Circuit |
RA-18-000, Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications | 10 May 2018 | Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications | Post Accident Monitoring Surveillance Frequency Control Program Stress corrosion cracking Recently irradiated fuel |
ML18130A807 | 10 May 2018 | Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications | Post Accident Monitoring Surveillance Frequency Control Program Stress corrosion cracking Recently irradiated fuel |
RA-18-0001, Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - License Amendment Application to Remove Heaters from Ventilation System Technical Specifications | 10 May 2018 | Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - License Amendment Application to Remove Heaters from Ventilation System Technical Specifications | Ultimate heat sink Post Accident Monitoring Hydrostatic Surveillance Frequency Control Program Recently irradiated fuel |
BSEP 18-0045, Request for License Amendment: Technical Specification 3.8.3, Diesel Fuel Oil, One-Time Extension of Main Fuel Oil Storage Tank Completion Time | 25 April 2018 | Request for License Amendment: Technical Specification 3.8.3, Diesel Fuel Oil, One-Time Extension of Main Fuel Oil Storage Tank Completion Time | Probabilistic Risk Assessment FLEX Large early release frequency Manual Operator Action |
HNP-18-039, Supplement to License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses | 13 April 2018 | Supplement to License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses | Time to boil Incorporated by reference FLEX Fuel cladding Affidavit Water rod |
BSEP 18-0001, Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements | 23 January 2018 | Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements | Surveillance Frequency Control Program Recently irradiated fuel Power Uprate |