Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
RA-23-0121, License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation Area5 October 2023License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation AreaHigh Radiation Area
Fuel cladding
RA-23-0005, License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specifications31 May 2023License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical SpecificationsSafe Shutdown
Boric Acid
High Radiation Area
Offsite Dose Calculation Manual
Anticipated operational occurrence
Probabilistic Risk Assessment
Incorporated by reference
Locked High Radiation Area
Surveillance Frequency Control Program
Process Control Program
ML23145A16025 May 2023Submittal of Updated Final Safety Analysis Report (Revision No. 30), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 28), Technical Specifications Bases Revisions, Quality
RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements16 February 2023Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage RequirementsOffsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Surveillance Frequency Control Program
Stress corrosion cracking
Pressure Boundary Leakage
Unidentified leakage
Operational leakage
RA-22-0081, License Amendment Request to Address Administrative Changes to the Operating License and Technical Specifications7 February 2023License Amendment Request to Address Administrative Changes to the Operating License and Technical SpecificationsAnticipated operational occurrence
Incorporated by reference
Liquid penetrant
RA-22-0118, License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies1 February 2023License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement FrequenciesEnforcement Discretion
Probabilistic Risk Assessment
Incorporated by reference
Surveillance Frequency Control Program
Operational leakage
RA-22-0153, License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 and Update the List of Analytical Methods Used in the Determination of Core.21 September 2022License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 and Update the List of Analytical Methods Used in the Determination of Core.Surveillance Frequency Control Program
Fuel cladding
RA-21-0183, Remove 4.160 Kilovolt Bus 2 from Surveillance Requirement 3.8.1.16 (Automatic Transfer Capability from Unit Auxiliary Transformer to Startup Transformer)28 April 2022Remove 4.160 Kilovolt Bus 2 from Surveillance Requirement 3.8.1.16 (Automatic Transfer Capability from Unit Auxiliary Transformer to Startup Transformer)Safe Shutdown
Qualified Offsite Circuit
Emergency Lighting
Fuel cladding
Offsite Circuit
RA-22-0110, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf.25 March 2022Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf.High Radiation Area
RA-21-0302, Application to Revise Technical Specifications to Adopt TSTF-569, Rev. 2, Revise Response Time Testing Definition24 February 2022Application to Revise Technical Specifications to Adopt TSTF-569, Rev. 2, Revise Response Time Testing DefinitionSafe Shutdown
Shutdown Margin
Packing leak
Surveillance Frequency Control Program
Process Control Program
Pressure Boundary Leakage
Unidentified leakage
RA-20-0107, Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position18 January 2022Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated PositionUltimate heat sink
Water Inventory Control
Surveillance Frequency Control Program
Operability Determination
Recently irradiated fuel
Power Uprate
RA-22-0017, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections6 January 2022Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube InspectionsStress corrosion cracking
Eddy Current Testing
RA-21-0282, Submittal of Updated Final Safety Analysis Report (Amendment 64), Technical Specification Bases Revision, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes15 November 2021Submittal of Updated Final Safety Analysis Report (Amendment 64), Technical Specification Bases Revision, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment ChangesSafe Shutdown
Boric Acid
Shutdown Margin
Ultimate heat sink
Fire Barrier
Anticipated operational occurrence
Tornado Missile
Internal Flooding
Hydrostatic
Past operability
Probabilistic Risk Assessment
Fire impairment
Nondestructive Examination
Incorporated by reference
Missed surveillance
Surveillance Frequency Control Program
Stress corrosion cracking
Operability Determination
Maintenance Rule Program
Turbine Missile
Fuel cladding
Pressure Boundary Leakage
Offsite Circuit
Power change
Unidentified leakage
Overspeed trip
Operational leakage
RA-21-0272, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b1 November 2021Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4bHot Short
Safe Shutdown
High winds
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Mission time
Anticipated operational occurrence
Water Inventory Control
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
FLEX
Fukushima Dai-Ichi
Surveillance Frequency Control Program
Scram Discharge Volume
Large early release frequency
Earthquake
Fuel cladding
Offsite Circuit
RA-21-0213, License Amendment Request to Remove Limitation to Perform Certain Surveillance Requirements During Shutdown23 September 2021License Amendment Request to Remove Limitation to Perform Certain Surveillance Requirements During ShutdownSafe Shutdown
Anticipated operational occurrence
Surveillance Frequency Control Program
Offsite Circuit
Overspeed trip
RA-21-0027, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections16 September 2021Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube InspectionsShutdown Margin
Non-Destructive Examination
Nondestructive Examination
Operational leakage
RA-21-0057, Independent Spent Fuel Storage Installation, Submittal of Updated Final Safety Analysis Report (Revision No. 29), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 27), Technical .27 May 2021Independent Spent Fuel Storage Installation, Submittal of Updated Final Safety Analysis Report (Revision No. 29), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 27), Technical .
ML21116A2074 May 2021Correction to Amendment No. 184 Regarding TSTF Traveler TSTF-505, Rev. 2, Provide Risk Informed Extended Completion Times - RITSTF Initiative 4B
RA-18-0183, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b1 April 2021License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4bSafe Shutdown
High winds
Shutdown Margin
Reactor Vessel Water Level
Ultimate heat sink
Stroke time
Anticipated operational occurrence
Tornado Missile
Water Inventory Control
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
FLEX
Tornado Generated Missile
Fukushima Dai-Ichi
Surveillance Frequency Control Program
Scram Discharge Volume
Large early release frequency
Earthquake
Turbine Missile
Fuel cladding
Offsite Circuit
ML20342A3474 March 2021Issuance of Amendment Nos. 303 and 331 Revise Technical Specification to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control EnhancementsWater Inventory Control
Surveillance Frequency Control Program
Fuel cladding
Fire Protection Program
RA-20-0252, License Amendment Request to Remove Extraneous Content and Requirements from the Operating License and Technical Specifications24 February 2021License Amendment Request to Remove Extraneous Content and Requirements from the Operating License and Technical SpecificationsShutdown Margin
High Radiation Area
Anticipated operational occurrence
Probabilistic Risk Assessment
Annual Radioactive Effluent Release Report
Surveillance Frequency Control Program
Annual Radiological Environmental Operating Report
Process Control Program
Unidentified leakage
Operational leakage
RA-20-0207, Duke Energy - Application to Revise the Technical Specification for Engineered Safety Feature Actuation System (ESFAS) Instrumentation3 December 2020Duke Energy - Application to Revise the Technical Specification for Engineered Safety Feature Actuation System (ESFAS) InstrumentationShutdown Margin
Anticipated operational occurrence
Surveillance Frequency Control Program
Loss of condenser vacuum
ML20237F4354 September 2020Issuance of Amendments Regarding the Technical Specification Requirements Pertaining to Mode Change LimitationsSafe Shutdown
Time of Discovery
Post Accident Monitoring
Probabilistic Risk Assessment
Missed surveillance
Significance Determination Process
Surveillance Frequency Control Program
Large early release frequency
Offsite Circuit
Power change
RA-20-0223, Supplement to Application to Revise Harris Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b27 July 2020Supplement to Application to Revise Harris Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4bHot Short
Safe Shutdown
Boric Acid
High winds
Internal Flooding
Probabilistic Risk Assessment
Multiple Spurious Operation
FLEX
Tornado-Generated Missile
Tornado Generated Missile
Large early release frequency
Offsite Circuit
Fire Protection Program
Very Early Warning Fire Detection
RA-20-0148, Supplement to License Amendment Request to Eliminate Certain Technical Specification Requirements in Alignment with Improved Standard Technical Specifications27 May 2020Supplement to License Amendment Request to Eliminate Certain Technical Specification Requirements in Alignment with Improved Standard Technical SpecificationsHigh Radiation Area
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
ML20147A04015 May 2020Amendment 63 to Updated Final Safety Analysis Report, Administrative Procedure Non-Safety Related PLP-106 Technical Specification Equipment List Program, Revision 073 (Redacted)Safe Shutdown
Boric Acid
Fitness for Duty
Grab sample
Offsite Dose Calculation Manual
Stroke time
Commercial Grade Dedication
Coatings
Nondestructive Examination
Emergency Lighting
Functionality Assessment
Incorporated by reference
Condition Adverse to Quality
Aging Management
Annual Radioactive Effluent Release Report
Surveillance Frequency Control Program
Process Control Program
Stress corrosion cracking
Operability Determination
License Renewal
Commercial Grade
Maintenance Rule Program
Power-Operated Valves
Fatigue Rule
Fire Protection Program
Power Uprate
Overspeed trip
ML20147A03315 May 2020Amendment 63 to Update Final Safety Analysis Report, Chapter 16, Preliminary Technical SpecificationIncorporated by reference
RA-19-0359, License Amendment Request to Correct Non-Conservative Technical Specification 3/4.4.9, Pressure/Temperature Limits - Reactor Coolant System12 May 2020License Amendment Request to Correct Non-Conservative Technical Specification 3/4.4.9, Pressure/Temperature Limits - Reactor Coolant SystemHydrostatic
RA-20-0105, Supplement to License Amendment Request to Revise Technical Specifications for the Adoption of 10 CFR 50, Appendix J, Option B for Type B and C Testing and for Permanent Extension of Type a, B and C Leak Rate Test Frequencies16 April 2020Supplement to License Amendment Request to Revise Technical Specifications for the Adoption of 10 CFR 50, Appendix J, Option B for Type B and C Testing and for Permanent Extension of Type a, B and C Leak Rate Test FrequenciesHigh Radiation Area
RA-19-0431, Application to Revise Technical Specifications to Adopt TSTF 564, Safety Limit MCPR9 March 2020Application to Revise Technical Specifications to Adopt TSTF 564, Safety Limit MCPRReactor Vessel Water Level
Safety Limit Minimum Critical Power Ratio
Anticipated operational occurrence
Fuel cladding
Exclusive Use
Affidavit
RA-20-0011, Application for Technical Specifications Change Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process6 February 2020Application for Technical Specifications Change Regarding Mode Change Limitations Using the Consolidated Line Item Improvement ProcessSafe Shutdown
Time of Discovery
Hydrostatic
Past operability
Incorporated by reference
Surveillance Frequency Control Program
Operability Determination
Offsite Circuit
Unidentified leakage
Overspeed trip
RA-19-0440, Supplement to License Amendment Request for Extension of the Essential Services Chilled Water System Allowed Outage Time and Removal of an Expired Note from Technical Specifications21 November 2019Supplement to License Amendment Request for Extension of the Essential Services Chilled Water System Allowed Outage Time and Removal of an Expired Note from Technical SpecificationsSurveillance Frequency Control Program
RA-19-0067, License Amendment Request to Revise Technical Specifications for the Adoption of 10 CFR 50, Appendix J, Option B for Type B and C Testing and for Permanent Extension of Type a, B and C Leak Rate Test Frequencies8 November 2019License Amendment Request to Revise Technical Specifications for the Adoption of 10 CFR 50, Appendix J, Option B for Type B and C Testing and for Permanent Extension of Type a, B and C Leak Rate Test FrequenciesHigh winds
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Coatings
Incorporated by reference
Locked High Radiation Area
FLEX
Aging Management
Surveillance Frequency Control Program
Local Leak Rate Testing
Foreign Material Exclusion
Large early release frequency
Spent Fuel Pool Instrumentation
Moisture barrier
Flooding Focused Evaluation
License Renewal
Fuel cladding
Very Early Warning Fire Detection
Power Uprate
Manual Operator Action
RA-19-0001, License Amendment Request to Revise Technical Specifications to Adopt Risk- Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b7 October 2019License Amendment Request to Revise Technical Specifications to Adopt Risk- Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b
RA-19-0183, License Amendment Request to Add New Feedwater Bypass Valves to Technical Specification 3.7.329 July 2019License Amendment Request to Add New Feedwater Bypass Valves to Technical Specification 3.7.3Unanalyzed Condition
Earthquake
RA-19-0123, License Amendment Request to Eliminate Certain Technical Specification Requirements in Alignment with Improved Standard Technical Specifications25 July 2019License Amendment Request to Eliminate Certain Technical Specification Requirements in Alignment with Improved Standard Technical SpecificationsUnanalyzed Condition
Offsite Dose Calculation Manual
Anticipated operational occurrence
Annual Radioactive Effluent Release Report
Surveillance Frequency Control Program
Annual Radiological Environmental Operating Report
Process Control Program
Offsite Circuit
Overspeed trip
RA-19-0006, License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description8 July 2019License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program DescriptionCoatings
RA-19-0017, License Amendment Request to Modify the Departure from Nucleate Boiling Ratio Safety Limit to Address Transition to New Fuel Type10 April 2019License Amendment Request to Modify the Departure from Nucleate Boiling Ratio Safety Limit to Address Transition to New Fuel TypeShutdown Margin
Anticipated operational occurrence
Hydrostatic
Fuel cladding
Exclusive Use
Affidavit
RA-19-0157, Supplement to Request for License Amendment Technical Specification 3.8.3, Diesel Fuel Oil, One-Time Extension of Main Fuel Oil Storage Tank Completion Time26 March 2019Supplement to Request for License Amendment Technical Specification 3.8.3, Diesel Fuel Oil, One-Time Extension of Main Fuel Oil Storage Tank Completion Time
ML18298A0783 December 20182nd Correction to Issuance of Amendments to Adopt Technical Specifications Task Force 542, Revision 2, Reactor Pressure Vessel Water Inventory ControlWater Inventory Control
Surveillance Frequency Control Program
RA-18-0204, Transmittal of Technical Specification Bases12 November 2018Transmittal of Technical Specification BasesSafe Shutdown
Boric Acid
Shutdown Margin
Ultimate heat sink
Fire Barrier
Anticipated operational occurrence
Tornado Missile
Internal Flooding
Hydrostatic
Past operability
Nondestructive Examination
Incorporated by reference
FLEX
Missed surveillance
Surveillance Frequency Control Program
Stress corrosion cracking
Operability Determination
Turbine Missile
Fuel cladding
Pressure Boundary Leakage
Offsite Circuit
Power change
Unidentified leakage
Overspeed trip
Operational leakage
Negative Flux Rate Trip
RA-18-0079, Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO14 August 2018Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCOSurveillance Frequency Control Program
Offsite Circuit
HNP-18-004, License Amendment Request to Change Shearon Harris Nuclear Power Plant, Unit 1, Emergency Plan Emergency Action Level Scheme13 August 2018License Amendment Request to Change Shearon Harris Nuclear Power Plant, Unit 1, Emergency Plan Emergency Action Level Scheme
RNP-RA/18-0044, Supplement to License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transform11 July 2018Supplement to License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup TransformersQualified Offsite Circuit
Offsite Circuit
RA-18-000, Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications10 May 2018Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical SpecificationsPost Accident Monitoring
Surveillance Frequency Control Program
Stress corrosion cracking
Recently irradiated fuel
ML18130A80710 May 2018Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical SpecificationsPost Accident Monitoring
Surveillance Frequency Control Program
Stress corrosion cracking
Recently irradiated fuel
RA-18-0001, Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - License Amendment Application to Remove Heaters from Ventilation System Technical Specifications10 May 2018Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - License Amendment Application to Remove Heaters from Ventilation System Technical SpecificationsUltimate heat sink
Post Accident Monitoring
Hydrostatic
Surveillance Frequency Control Program
Recently irradiated fuel
BSEP 18-0045, Request for License Amendment: Technical Specification 3.8.3, Diesel Fuel Oil, One-Time Extension of Main Fuel Oil Storage Tank Completion Time25 April 2018Request for License Amendment: Technical Specification 3.8.3, Diesel Fuel Oil, One-Time Extension of Main Fuel Oil Storage Tank Completion TimeProbabilistic Risk Assessment
FLEX
Large early release frequency
Manual Operator Action
HNP-18-039, Supplement to License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses13 April 2018Supplement to License Amendment Request Regarding Spent Fuel Storage Pool Criticality AnalysesTime to boil
Incorporated by reference
FLEX
Fuel cladding
Affidavit
Water rod
BSEP 18-0001, Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements23 January 2018Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance RequirementsSurveillance Frequency Control Program
Recently irradiated fuel
Power Uprate