Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20217K12314 October 1999Revised Positions for DBNPS & Pnpp QA ProgramOffsite Dose Calculation Manual
Coatings
Nondestructive Examination
Local Leak Rate Testing
Process Control Program
Stress corrosion cracking
Commercial Grade
Fire Protection Program
ML20212J20130 September 1999Safety Evaluation Supporting Transfer of Dl Ownership Interest in Pnpp to Ceico
PY-CEI-NRR-2437, Monthly Operating Rept for Sept 1999 for Pnpp,Unit 1.With30 September 1999Monthly Operating Rept for Sept 1999 for Pnpp,Unit 1.With
ML20217H28430 September 1999Monthly Operating Rept for Sept 1999 for Seabrook Station. with
ML20212D14617 September 1999SER Accepting Request to Use Proposed Alternative to Certain Weld Repair Requirements in ASME Boiling & Pressure Vessel CodeHydrostatic
Nondestructive Examination
Incorporated by reference
PY-CEI-NRR-2429, Monthly Operating Rept for Aug 1999 for Pnpp,Unit 1.With31 August 1999Monthly Operating Rept for Aug 1999 for Pnpp,Unit 1.With
ML20216F51431 August 1999Rept on Status of Public Petitions Under 10CFR2.206Unanalyzed Condition
Hydrostatic
ML20212B86731 August 1999Monthly Operating Rept for Aug 1999 for Seabrook Station. with
ML20210Q75811 August 1999SER Approving Proposed Merger of CES & Bec,Which Will Create New Parent Company of Canal
ML20210R9786 August 1999ISI Exam Rept of Seabrook Station, for RFO 6,period 3Boric Acid
Nondestructive Examination
VT-2
Liquid penetrant
Dissimilar Metal Weld
ML20210J8683 August 1999SER Approving License Transfer from Montaup Electric Co to Little Bay Power Corp & Approval of Conforming Amend for Seabrook Station Unit 1
ML20210R60031 July 1999Monthly Operating Rept for July 1999 for Seabrook Station, Unit 1.With
PY-CEI-NRR-2424, Monthly Operating Rept for July 1999 for Perry Npp.With31 July 1999Monthly Operating Rept for July 1999 for Perry Npp.With
ML20210J38528 July 1999Pnpp - Unit 1 ISI Summary Rept Results for Outage 7 (1999) First Period,Second IntervalNon-Destructive Examination
Weld Overlay
Hydrostatic
Coatings
Nondestructive Examination
VT-2
Intergranular Stress Corrosion Cracking
Liquid penetrant
Dissimilar Metal Weld
ML20209H13730 June 1999Monthly Operating Rept for June 1999 for Seabrook Station, Unit 1.With
ML20210H11530 June 1999Naesc Semi-Annual Fitness-for-Duty Rept for 990101-0630Fitness for Duty
PY-CEI-NRR-2416, Monthly Operating Rept for June 1999 for Perry Nuclear Power Plant,Unit 1.With30 June 1999Monthly Operating Rept for June 1999 for Perry Nuclear Power Plant,Unit 1.With
ML20196A19517 June 1999Instrument Drift Analysis
ML20207G2747 June 1999Safety Evaluation Concluding That Firstenergy Flaw Evaluation Meets Rules of ASME Code & That IGSCC & Thermal Fatigue Crack Growth Need Not Be Considered in ApplicationWeld Overlay
Intergranular Stress Corrosion Cracking
Thermal fatigue
PY-CEI-NRR-2409, Monthly Operating Rept for May 1999 for Perry Nuclear Power Plant,Unit 1.With31 May 1999Monthly Operating Rept for May 1999 for Perry Nuclear Power Plant,Unit 1.With
ML20195G53931 May 1999Monthly Operating Rept for May 1999 for Seabrook Station, Unit 1.With
ML20195C04925 May 1999Offshore Intake Seal Deterrent Barrier DesignSafe Shutdown
PY-CEI-NRR-2393, Special Rept Update:On 990327 Refueling Outage 7 Began & Troubleshooting Efforts Began.Troubleshooting of Affected Calbe Confirmed Fault in Drywell Section of Cable.Determined That Installation of Newer Technology Should Be Explored12 May 1999Special Rept Update:On 990327 Refueling Outage 7 Began & Troubleshooting Efforts Began.Troubleshooting of Affected Calbe Confirmed Fault in Drywell Section of Cable.Determined That Installation of Newer Technology Should Be ExploredPost Accident Monitoring
ML20206G6453 May 1999Safety Evaluation Authorizing Requests for Relief IR-032 to IR-035 & IR-037 to IR-040 Re Implementation of Subsections IWE & Iwl of ASME Section XI for Containment InspCoatings
Nondestructive Examination
PY-CEI-NRR-2399, Monthly Operating Rept for Apr 1999 for Perry Nuclear Power Plant,Unit 1.With30 April 1999Monthly Operating Rept for Apr 1999 for Perry Nuclear Power Plant,Unit 1.With
ML20206E47630 April 1999LER 99-S01-00:on 990408,contractor Employee Was Granted Temporary Unescorted Access to Seabrook Station Protected Area.Caused by Failure of Contractor Employee to Provide Accurate Info.Individual Access Revoked.With
ML20206N17530 April 1999Monthly Operating Rept for Apr 1999 for Seabrook Station, Unit 1.With
ML20206E22629 April 1999Safety Evaluation Concluding That Proposed Alternatives Will Result in Acceptable Level of Quality & Safety.Authorizes Use of Code Case N-504 for Weld Overlay Repair of FW Nozzle Weld at Pnpp & Use of Table IWB-3514Non-Destructive Examination
Weld Overlay
Intergranular Stress Corrosion Cracking
Stress corrosion cracking
Dissimilar Metal Weld
ML20206D79123 April 1999Rev 6 to PDB-F0001, COLR for Pnpp Unit 1 Cycle 8,Reload 7
ML20196L20819 April 1999Rev 01-07-00 to RE-21, Cycle 7 ColrShutdown Margin
ML20205P43715 April 1999Safety Evaluation Concluding That Licensee Performed Appropriate Evaluations of Operational Configurations of safety-related power-operated Gate Valves to Identify Valves Susceptible to Pressure Locking or Thermal BindingPower-Operated Valves
Backfit
ML18016A90112 April 1999Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected
ML20206D84631 March 1999Rev 1 to J11-03371SRLR, Supplemental Reload Licensing Rept for Pnpp,Unit 1 Reload 7 Cycle 8Shutdown Margin
Anticipated operational occurrence
PY-CEI-NRR-2389, Monthly Operating Rept for Mar 1999 for Perry Nuclear Power Plant,Unit 1.With31 March 1999Monthly Operating Rept for Mar 1999 for Perry Nuclear Power Plant,Unit 1.With
ML20205G42231 March 1999Safety Evaluation Accepting Second 10-yr Interval IST Program Releif Requests for Plant,Unit 1
ML20205L81431 March 1999Monthly Operating Rept for Mar 1999 for Seabrook Station. with
ML20205K54431 March 1999Decommissioning UpdateLicense Renewal
ML20205S06031 March 1999Rept on Status of Public Petitions Under 10CFR2.206 with Status Change from Previous Update,990331Fuel cladding
ML20205C37626 March 1999Safety Evaluation Supporting Request for Proposed Exemption to 10CFR50,app a GDC 19Exemption Request
ML20205D31026 March 1999Safety Evaluation Supporting Amend 103 to License NPF-58Earthquake
ML20205C19824 March 1999Safety Evaluation Concluding That Proposed Relief Request IR-8,Rev 1,provides Acceptable Alternative to ASME Code Requirements.Recommends Authorization of Proposed Alternative Pursuant to 10CFR50.55a(a)(3)(i)Non-Destructive Examination
Incorporated by reference
PY-CEI-NRR-2369, Special Rept:On 990127,PAMI Was Declared Inoperable.Caused by Low Resistance Reading Existing in Circuit That Goes to Drywell.Troubleshooting of Affected Cable Will Commence During RFO on 9902273 March 1999Special Rept:On 990127,PAMI Was Declared Inoperable.Caused by Low Resistance Reading Existing in Circuit That Goes to Drywell.Troubleshooting of Affected Cable Will Commence During RFO on 990227Post Accident Monitoring
ML20207F49428 February 1999Monthly Operating Rept for Feb 1999 for Seabrook Station. with
PY-CEI-NRR-2372, Monthly Operating Rept for Feb 1999 for Perry Nuclear Power Plant,Unit 1.With28 February 1999Monthly Operating Rept for Feb 1999 for Perry Nuclear Power Plant,Unit 1.With
ML20203A5962 February 1999Safety Evaluation Accepting Licensee Proposed Revs to Responsibilities of Plant Operations Review Committee as Described in Chapter 17.2 of USAR
ML20203A52127 January 1999Safety Evaluation Accepting Licensee Calculations Showing That Adequate NPSH Will Be Available for HPCS PumpsSafe Shutdown
Design basis earthquake
Earthquake
Backfit
ML20198R8927 January 1999SER Accepting Licensee Proposed Amend to TSs to Delete Reference to NRC Policy Re Plant Staff Working Hours & Require Administrative Controls to Limit Working Hours to Be Acceptable
ML20199E67331 December 1998Monthly Operating Rept for Dec 1998 for Seabrook Station, Unit 1.With
ML20204J67531 December 19981998 Annual Rept for Dbnps,Unit 1,PNPP,Unit 1 & BVPS Units 1 & 2
ML20202E82431 December 1998Naesc Semi-Annual Fitness-for-Duty Rept for 980701-981231Fitness for Duty