Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20217P539 | 25 October 1999 | Rev 0,Change 1 to Millstone Unit 1 Northeast Utils QA Program | Safe Shutdown Offsite Dose Calculation Manual Probabilistic Risk Assessment Nondestructive Examination Incorporated by reference Condition Adverse to Quality Process Control Program Fire Protection Program |
ML20217C872 | 6 October 1999 | Rev 21,change 3 to MP-02-OST-BAP01, Nuqap Topical Rept, App F & G Only | Offsite Dose Calculation Manual Process Control Program Fire Protection Program |
B17898, Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 3.With | 30 September 1999 | Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 3.With | |
B17894, Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 2.With | 30 September 1999 | Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 2.With | |
B17896, Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 1.With | 30 September 1999 | Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 1.With | |
ML20217H284 | 30 September 1999 | Monthly Operating Rept for Sept 1999 for Seabrook Station. with | |
ML20216J434 | 24 September 1999 | Mnps Unit 3 ISI Summary Rept,Cycle 6 | Hydrostatic VT-2 Liquid penetrant |
ML20212D146 | 17 September 1999 | SER Accepting Request to Use Proposed Alternative to Certain Weld Repair Requirements in ASME Boiling & Pressure Vessel Code | Hydrostatic Nondestructive Examination Incorporated by reference |
ML20211N840 | 2 September 1999 | Rev 21,change 1 to Northeast Utils QA TR, Including Changes Incorporated Into Rev 20,changes 9 & 10 | Safe Shutdown Boric Acid Offsite Dose Calculation Manual Probabilistic Risk Assessment Nondestructive Examination Incorporated by reference Condition Adverse to Quality Process Control Program Fire Protection Program |
ML20216F514 | 31 August 1999 | Rept on Status of Public Petitions Under 10CFR2.206 | Unanalyzed Condition Hydrostatic |
B17879, Monthly Operating Rept for Aug 1999 for Millstone Nuclear Power Station,Unit 2.With | 31 August 1999 | Monthly Operating Rept for Aug 1999 for Millstone Nuclear Power Station,Unit 2.With | |
B17874, Monthly Operating Rept for Aug 1999 for Millstone Nuclear Power Station,Unit 3.With | 31 August 1999 | Monthly Operating Rept for Aug 1999 for Millstone Nuclear Power Station,Unit 3.With | |
B17878, Monthly Operating Rept for Aug 1999 for Mnps,Unit 1.With | 31 August 1999 | Monthly Operating Rept for Aug 1999 for Mnps,Unit 1.With | |
ML20212B867 | 31 August 1999 | Monthly Operating Rept for Aug 1999 for Seabrook Station. with | |
ML20211G963 | 30 August 1999 | SER Accepting Licensee Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves | Stroke time |
ML20210Q758 | 11 August 1999 | SER Approving Proposed Merger of CES & Bec,Which Will Create New Parent Company of Canal | |
ML20210R978 | 6 August 1999 | ISI Exam Rept of Seabrook Station, for RFO 6,period 3 | Boric Acid Nondestructive Examination VT-2 Liquid penetrant Dissimilar Metal Weld |
ML20210J868 | 3 August 1999 | SER Approving License Transfer from Montaup Electric Co to Little Bay Power Corp & Approval of Conforming Amend for Seabrook Station Unit 1 | |
ML20210R600 | 31 July 1999 | Monthly Operating Rept for July 1999 for Seabrook Station, Unit 1.With | |
ML20211A656 | 31 July 1999 | Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 2 | |
B17856, Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 1.With | 31 July 1999 | Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 1.With | |
B17858, Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 3.With | 31 July 1999 | Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 3.With | |
ML20210J031 | 21 July 1999 | Rev 20,Change 10 to QAP 1.0, Organization | Probabilistic Risk Assessment Incorporated by reference |
ML20210E593 | 19 July 1999 | Revised Page 16 of 21,to App F of Northeast Util QA Program Plan | |
ML20210C591 | 15 July 1999 | Revised Rev 20,change 10 to Northeast Util QA Program TR, Replacing Summary of Changes | |
ML20210A041 | 15 July 1999 | Rev 20,change 10 to Northeast Util QA Program Tr | Safe Shutdown Offsite Dose Calculation Manual Probabilistic Risk Assessment Incorporated by reference Condition Adverse to Quality Process Control Program Fire Protection Program |
B17814, Special Rept:On 990612 B Train EDG Failed to Restart within 5 Minutes Following Completion of 18 Month 24 H Endurance Run Required by TS 4.8.1.1.2.g.7.Caused by Procedural inadequacy.Re-performed Hot Restart Via Manual Start | 12 July 1999 | Special Rept:On 990612 B Train EDG Failed to Restart within 5 Minutes Following Completion of 18 Month 24 H Endurance Run Required by TS 4.8.1.1.2.g.7.Caused by Procedural inadequacy.Re-performed Hot Restart Via Manual Start | |
ML20209D188 | 1 July 1999 | Rev 20,change 9 to Northeast Util QA Program Tr | Offsite Dose Calculation Manual Probabilistic Risk Assessment Process Control Program Fire Protection Program |
ML20196J219 | 30 June 1999 | SER Concluding That Licensee USI A-46 Implementation Program,In General,Met Purpose & Intent of Criteria in GIP-2 & Staff Sser 2 for Resolution of USI A-46 | Safe Shutdown Safe Shutdown Earthquake Operating Basis Earthquake Earthquake |
ML20196K179 | 30 June 1999 | Addendum 6 to Millstone Unit 2 Annual Rept, | |
ML20211A675 | 30 June 1999 | Revised Monthly Operating Rept for June 1999 for Millstone Nuclear Power Station,Unit 2,providing Revised Average Daily Unit Power Level & Operating Data Rept | |
B17830, Monthly Operating Rept for June 1999 for Millstone Nuclear Power Station,Unit 3.With | 30 June 1999 | Monthly Operating Rept for June 1999 for Millstone Nuclear Power Station,Unit 3.With | |
B17833, Monthly Operating Rept for June 1999 for Millstone Power Station,Unit 1.With | 30 June 1999 | Monthly Operating Rept for June 1999 for Millstone Power Station,Unit 1.With | |
ML20209J054 | 30 June 1999 | Monthly Operating Rept for June 1999 for Millstone Unit 2 | |
ML20196A845 | 30 June 1999 | Post Shutdown Decommissioning Activities Rept | Offsite Dose Calculation Manual |
ML20196J182 | 30 June 1999 | Rev 21,Change 0 to Northeast Utilities QAP (Nuqap) Tr | Safe Shutdown Offsite Dose Calculation Manual Probabilistic Risk Assessment Nondestructive Examination Condition Adverse to Quality Process Control Program Fire Protection Program |
ML20209H137 | 30 June 1999 | Monthly Operating Rept for June 1999 for Seabrook Station, Unit 1.With | |
ML20210H115 | 30 June 1999 | Naesc Semi-Annual Fitness-for-Duty Rept for 990101-0630 | Fitness for Duty |
ML20195H101 | 11 June 1999 | Rev 20,change 8 to Northeast Utilities QAP (Nuqap) TR | Probabilistic Risk Assessment |
ML20207G641 | 3 June 1999 | Safety Evaluation Supporting Amends 105,235 & 171 to Licenses DPR-21,DPR-65 & NPF-49,respectively | |
ML20195G539 | 31 May 1999 | Monthly Operating Rept for May 1999 for Seabrook Station, Unit 1.With | |
ML20209J066 | 31 May 1999 | Revised Monthly Operating Rept for May 1999 for Millstone Unit 2 | |
B17804, Monthly Operating Rept for May 1999 for Mnps,Unit 2.With | 31 May 1999 | Monthly Operating Rept for May 1999 for Mnps,Unit 2.With | |
B17807, Monthly Operating Rept for May 1999 for Mnps,Unit 1.With | 31 May 1999 | Monthly Operating Rept for May 1999 for Mnps,Unit 1.With | |
ML20211B735 | 31 May 1999 | Cycle 7 Colr | Shutdown Margin |
B17808, Monthly Operating Rept for May 1999 for Millstone Nuclear Power Station,Unit 3.With | 31 May 1999 | Monthly Operating Rept for May 1999 for Millstone Nuclear Power Station,Unit 3.With | |
ML20211A663 | 31 May 1999 | Revised Monthly Operating Rept for May 1999 for Millstone Nuclear Power Station,Unit 2,providing Revised Average Daily Unit Power Level,Operating Data Rept & Unit Shutdowns & Power Reductions | |
ML20195C049 | 25 May 1999 | Offshore Intake Seal Deterrent Barrier Design | Safe Shutdown |
ML20206M463 | 11 May 1999 | Safety Evaluation Supporting Alternative Proposed by Licensee to Perform Ultrasonic Exam on Inner Surface of Nozzle to safe-end Weld | Incorporated by reference Dissimilar Metal Weld |
ML20206J835 | 7 May 1999 | Rev 20,Change 7 to QAP-1.0, Northeast Utls QA Program (Nuqap) Tr | Probabilistic Risk Assessment |