Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20217G996 | 14 October 1999 | SER Accepting First 10-year Interval Inservice Insp Requests for Relief for Plant,Units 1 & | VT-2 Incorporated by reference |
ML20217E802 | 7 October 1999 | CPSES Unit 1 Cycle 8 Colr | Shutdown Margin |
ML20217H522 | 30 September 1999 | Monthly Operating Repts for Sept 1999 for Byron Station, Units 1 & 2.With | |
BW990066, Monthly Operating Repts for Sept 1999 for Braidwood Station, Units 1 & 2.With | 30 September 1999 | Monthly Operating Repts for Sept 1999 for Braidwood Station, Units 1 & 2.With | |
ML20217G415 | 30 September 1999 | Monthly Operating Repts for Sept 1999 for Cpses,Units 1 & 2 | Coast down |
ML20217P635 | 29 September 1999 | Non-proprietary Rev 6 to HI-982083, Licensing Rept for Spent Fuel Rack Installation at Byron & Braidwood Nuclear Stations | Safe Shutdown Earthquake Operating Basis Earthquake Earthquake |
ML20212F767 | 24 September 1999 | SER Granting Relief Request C-4 Pursuant to 10CFR50.55a(g)(6)(i) for Unit 2,during First 10-year ISI Interval & Relief Requests B-15,B-16 & B-17 Pursuant to 10CFR50.55a(g)(6)(i) | Incorporated by reference |
ML20217A169 | 22 September 1999 | Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers | |
ML20216J570 | 16 September 1999 | Rev 2 to CPSES Unit 2 Cycle 5 Colr | Shutdown Margin |
ML20212A744 | 10 September 1999 | Safety Evaluation Concluding That Alternatives Contained in Relief Request 12R-07 Provide Acceptable Level of Quality & Safety | Hydrostatic VT-2 Incorporated by reference Finite Element Analysis Liquid penetrant |
ML20212B926 | 31 August 1999 | Monthly Operating Repts for Aug 1999 for Byron Station,Units 1 & 2.With | |
BW990056, Monthly Operating Repts for Aug 1999 for Braidwood Station, Units 1 & 2.With | 31 August 1999 | Monthly Operating Repts for Aug 1999 for Braidwood Station, Units 1 & 2.With | |
TXX-9920, Monthly Operating Repts for Aug 1999 for Cpses.With | 31 August 1999 | Monthly Operating Repts for Aug 1999 for Cpses.With | |
ML20210R642 | 13 August 1999 | ISI Outage Rept for A2R07 | Boric Acid Hydrostatic VT-2 Moisture barrier Liquid penetrant |
ML20211M298 | 6 August 1999 | Rev 1 to CPSES Fuel Storage Licensing Rept, CPSES Credit for Soluble Boron & Expansion of Spent Fuel Storage Capacity, Consisting of Revised Title Page and 4-1 | |
ML20210U811 | 4 August 1999 | SER Granting Licensee Relief Requests VR-1,VR-3 & Portion of VR-2 Pursuant to 10CFR50.55a(a)(3)(ii).Relief Request VR-4 Does Not Require Explicit NRC Approval Because Relief Applies to Valves Not Required by 10CFR50.55a | |
ML20210R343 | 31 July 1999 | Monthly Operating Repts for July 1999 for Byron Station, Units 1 & 2.With | |
BW990048, Monthly Operating Repts for Jul 1999 for Braidwood Station, Units 1 & 2.With | 31 July 1999 | Monthly Operating Repts for Jul 1999 for Braidwood Station, Units 1 & 2.With | |
ML20210U408 | 31 July 1999 | Monthly Operating Repts for July 1999 for Cpses,Units 1 & 2 | Downpower |
ML20210K986 | 30 July 1999 | Safety Evaluation Accepting Licensee 60-day Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs | Stroke time |
ML20210D832 | 23 July 1999 | Safety Evaluation Accepting Relief Requests Re Use of 1998 Edition of Subsections IWE & Iwl of ASME Code for Containment Insp | Coatings Moisture barrier |
ML20210E225 | 21 July 1999 | B1R09 ISI Summary Rept Spring 1999 Outage, 980309-990424 | Boric Acid Hydrostatic Nondestructive Examination VT-2 Pressure Boundary Leakage |
ML20209H766 | 15 July 1999 | Safety Evaluation Accepting GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Comanche Peak Steam Electric Station,Units 1 & 2 | Safe Shutdown Power-Operated Valves |
ML20216D384 | 12 July 1999 | Revised NFM9900022, Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function | |
M990002, Revised NFM9900022, Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function | 12 July 1999 | Revised NFM9900022, Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function | |
ML20209H263 | 9 July 1999 | 2RF04 ISI Summary Rept First Interval,Second Period,Second Outage | Hydrostatic Liquid penetrant |
ML20209H272 | 9 July 1999 | 2RF04 Containment ISI Summary Rept First Interval,First Period,First Outage | |
ML20196L019 | 8 July 1999 | Safety Evaluation Granting Request Relief B-6 (Rev 2),B-7 (Rev2),B-12,B-13,B-14 & C-9,pursuant to 10CFR50.55a(g)(6)(i).Technical Ltr Rept Also Encl | Incorporated by reference Liquid penetrant |
ML20209G750 | 8 July 1999 | SER Finding That Licensee Individual Plant Exam of External Events Complete with Regard to Info Requested by Suppl 4 to GL 88-20 & That IPEEE Results Reasonable Given Design, Operation & History of Comanche Peak Steam Electric Station | Safe Shutdown High winds Fire Barrier Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Earthquake |
ML20209G175 | 8 July 1999 | SG Eddy Current Insp Rept,Cycle 9 Refueling Outage (B1R09) | |
ML20209H371 | 30 June 1999 | Monthly Operating Repts for June 1999 for Byron Station, Units 1 & 2.With | |
ML20209G080 | 30 June 1999 | Monthly Operating Repts for June 1999 for Cpses,Units 1 & 2 | |
ML20207H777 | 30 June 1999 | Rev 0 to WCAP-15177, Evaluation of Pressurized Thermal Shock for Byron,Unit 2 | |
ML20207H785 | 30 June 1999 | Rev 0 to WCAP-15183, Commonwealth Edison Co Byron,Unit 1 Surveillance Program Credibility Evaluation | |
ML20207H794 | 30 June 1999 | Rev 0 to WCAP-15180, Commonwealth Edison Co Byron,Unit 2 Surveillance Program Credibility Evaluation | |
ML20207H807 | 30 June 1999 | Rev 0 to WCAP-15178, Byron Unit 2 Heatup & Cooldowm Limit Curves for Normal Operations | Anticipated operational occurrence Hydrostatic |
BW990038, Monthly Operating Repts for June 1999 for Braidwood Station, Units 1 & 2.With | 30 June 1999 | Monthly Operating Repts for June 1999 for Braidwood Station, Units 1 & 2.With | |
ML20210J939 | 30 June 1999 | CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-990630 | Temporary Modification |
ML20196J062 | 29 June 1999 | Safety Evaluation Supporting Proposed Changes to Emergency Plan Re Licenses NPF-87 & NPF-89 Respectively | Severe Accident Management Guideline |
ML20207H756 | 28 June 1999 | Pressure Temp Limits Rept (Ptlr) | Hydrostatic Pressure and Temperature Limits Report |
ML20207H762 | 28 June 1999 | Pressure Temp Limits Rept (Ptlr) | Hydrostatic Pressure and Temperature Limits Report |
ML20209H748 | 31 May 1999 | Revised Monthly Operating Repts for May 1999 for Braidwood Station,Units 1 & 2 | |
BW990029, Monthly Operating Repts for May 1999 for Braidwood Stations, Units 1 & 2.With | 31 May 1999 | Monthly Operating Repts for May 1999 for Braidwood Stations, Units 1 & 2.With | |
ML20195J800 | 31 May 1999 | Monthly Operating Repts for May 1999 for Byron Station,Units 1 & 2.With | |
ML20195G514 | 31 May 1999 | Monthly Operating Repts for May 1999 for Comanche Peak Steam Electric Station,Units 1 & 2.With | |
ML20207B648 | 25 May 1999 | SER Accepting Revised SGTR Analysis for Byron & Braidwood Stations.Revised Analysis Was Submitted to Support SG Replacement at Unit 1 of Each Station | |
ML20216E071 | 21 May 1999 | 1999 Graded Exercise - Comanche Peak Steam Electric Station | Safe Shutdown Grab sample Fire Watch |
ML20195B259 | 19 May 1999 | Rev 66a to CE-1-A,consisting of Proposed Changes to QAP for Dnps,Qcs,Znps,Lcs,Byron & Braidwood Stations | Offsite Dose Calculation Manual Process Control Program |
ML20206Q009 | 14 May 1999 | Safety Evaluation Accepting GL 92-08, Thermo-Lag 330-1 Fire Barriers, Dtd 921217,for Comanche Peak Electric Station,Unit 1 | Fire Barrier |
ML20206H206 | 6 May 1999 | SER Accepting Exemption to App K Re Leading Edge Flowmeter for Plant,Units 1 & 2 | Probabilistic Risk Assessment Exemption Request Power change |