Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20217P539 | 25 October 1999 | Rev 0,Change 1 to Millstone Unit 1 Northeast Utils QA Program | Safe Shutdown Offsite Dose Calculation Manual Probabilistic Risk Assessment Nondestructive Examination Incorporated by reference Condition Adverse to Quality Process Control Program Fire Protection Program |
ML20217L937 | 20 October 1999 | Safety Evaluation Supporting Licensee Proposed Alternative from Certain Requirements of ASME Code,Section XI for First 10-Yr Interval Request for Relief for Containment Inservice Insp Program | |
ML20217J479 | 18 October 1999 | SER Approving Exemption from Certain Requirements of 10CFR73 for Zion Nuclear Power Station,Units 1 & 2.NRC Concluded That Proposed Alternative Measures for Protection Against Radiological Sabotage Meets Requirements of 10CFR73.55 | Exemption Request |
ML20217K944 | 15 October 1999 | SER Accepting Util Alternative Proposed Relief Request RR-ENG-2-4 for Second 10-year ISI Interval at Stp,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(i) | Nondestructive Examination |
ML20217K915 | 15 October 1999 | SER Authorizing Util Relief Request RR-ENG-2-3 for Second 10-year ISI Interval of Stp,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(i) | Nondestructive Examination Incorporated by reference |
ML20217H850 | 14 October 1999 | Safety Evaluation Supporting Amend 197 to License DPR-64 | |
ML20217F150 | 12 October 1999 | Special Rept:On 990929,south Plant Vent (SPV) Range Ng Monitor Was Inoperable.Monitor Was Inoperable for More than 72 H.Caused by Electronic Noise Generated from Noise Suppression Circuit.Replaced Circuit | Grab sample |
ML20217C872 | 6 October 1999 | Rev 21,change 3 to MP-02-OST-BAP01, Nuqap Topical Rept, App F & G Only | Offsite Dose Calculation Manual Process Control Program Fire Protection Program |
ML20212J631 | 1 October 1999 | SER Accepting Request for Relief from ASME Boiler & Pressure Vessel Code,Section Xi,Requirements for Certain Inservice Insp at Plant,Unit 1 | Incorporated by reference |
ML20217D053 | 30 September 1999 | Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr | |
ML20217D048 | 30 September 1999 | Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 Colr | |
ML17355A447 | 30 September 1999 | Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr | |
ML20217G372 | 30 September 1999 | Monthly Operating Repts for Sept 1999 for Sequoyah Nuclear Plant.With | |
NOC-AE-000676, Monthly Operating Repts for Sept 1999 for South Texas Project,Units 1 & 2.With | 30 September 1999 | Monthly Operating Repts for Sept 1999 for South Texas Project,Units 1 & 2.With | |
L-99-154, Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with | 30 September 1999 | Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with | |
B17896, Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 1.With | 30 September 1999 | Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 1.With | |
B17894, Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 2.With | 30 September 1999 | Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 2.With | |
B17898, Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 3.With | 30 September 1999 | Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 3.With | |
A99026, Monthly Operating Repts for Sept 1999 for Zion Nuclear Power Station,Units 1 & 2.With | 30 September 1999 | Monthly Operating Repts for Sept 1999 for Zion Nuclear Power Station,Units 1 & 2.With | |
ML20217A993 | 30 September 1999 | NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data | |
ML20249C849 | 30 September 1999 | 1999 Third Quarter Rept of Completed Changes,Tests & Experiments Evaluated,Per 10CFR50.59(b)(2), for Dresden Nuclear Power Station. with | Temporary Modification |
ML20217N653 | 30 September 1999 | Monthly Operating Rept for Sept 1999 for Hope Creek Generating Station,Unit 1.With | Safe Shutdown Temporary Modification |
ML20216J434 | 24 September 1999 | Mnps Unit 3 ISI Summary Rept,Cycle 6 | Hydrostatic VT-2 Liquid penetrant |
ML20212F083 | 23 September 1999 | Safety Evaluation Granting Relief from Certain Weld Insp at Sequoyah Nuclear Plant,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(ii) for Second 10-year ISI Interval | Safe Shutdown VT-2 Incorporated by reference |
ML20212F476 | 23 September 1999 | Safety Evaluation Supporting Amends 246 & 237 to Licenses DPR-77 & DPR-79,respectively | |
ML20217A169 | 22 September 1999 | Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers | |
ML20217M021 | 20 September 1999 | Part 21 Rept Re Possible Deviation of NLI Dc Power Supply Over Voltage Protection Circuit Actuation.Caused by Electrical Circuit Conditions Unique to Remote Engine Panel. Travelled to Hope Creek to Witness Startup Sequence of DG | |
ML20211P781 | 9 September 1999 | SER Approving Second 10-year Interval Inservice Insp Program Plan Relief Request RR-ENG-2-8 (to Use Code Case N-491-2) for South Texas Project,Units 1 & 2 | Incorporated by reference |
ML20211P841 | 9 September 1999 | Safety Evaluation Supporting Alternative Proposed by Licensee to Surface Exam to Perform Boroscopic VT-1 Visual Exam of Pump Casing Welds within Pump Pits for Welds Covered by Relief Request RR-ENG-24 | Incorporated by reference |
ML20211Q673 | 9 September 1999 | Safety Evaluation Accepting First 10-yr Interval ISI Program Plan Request for Relief from ASME Code Case N-498 | Boric Acid Hydrostatic VT-2 Incorporated by reference |
ML20211N553 | 8 September 1999 | Safety Evaluation Supporting Amend 121 to License NPF-57 | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program |
L-99-139, LER 99-S01-00:on 990813,uncompensated Loss of Ability to Detect within Single Intrusion Security Detection Zone Occurred.Caused by Procedure non-compliance.Involved Personnel Received Counseling Re Event.With | 2 September 1999 | LER 99-S01-00:on 990813,uncompensated Loss of Ability to Detect within Single Intrusion Security Detection Zone Occurred.Caused by Procedure non-compliance.Involved Personnel Received Counseling Re Event.With | |
ML20211N840 | 2 September 1999 | Rev 21,change 1 to Northeast Utils QA TR, Including Changes Incorporated Into Rev 20,changes 9 & 10 | Safe Shutdown Boric Acid Offsite Dose Calculation Manual Probabilistic Risk Assessment Nondestructive Examination Incorporated by reference Condition Adverse to Quality Process Control Program Fire Protection Program |
B17878, Monthly Operating Rept for Aug 1999 for Mnps,Unit 1.With | 31 August 1999 | Monthly Operating Rept for Aug 1999 for Mnps,Unit 1.With | |
B17874, Monthly Operating Rept for Aug 1999 for Millstone Nuclear Power Station,Unit 3.With | 31 August 1999 | Monthly Operating Rept for Aug 1999 for Millstone Nuclear Power Station,Unit 3.With | |
B17879, Monthly Operating Rept for Aug 1999 for Millstone Nuclear Power Station,Unit 2.With | 31 August 1999 | Monthly Operating Rept for Aug 1999 for Millstone Nuclear Power Station,Unit 2.With | |
L-99-140, Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with | 31 August 1999 | Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with | |
ML20216F514 | 31 August 1999 | Rept on Status of Public Petitions Under 10CFR2.206 | Unanalyzed Condition Hydrostatic |
ML20212C476 | 31 August 1999 | Monthly Operating Repts for Aug 1999 for Sequoyah Nuclear Plant.With | |
ML20212E519 | 31 August 1999 | Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment | |
ML17355A412 | 31 August 1999 | Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr | |
NOC-AE-000643, Monthly Operating Repts for Aug 1999 for South Texas Project,Units 1 & 2.With | 31 August 1999 | Monthly Operating Repts for Aug 1999 for South Texas Project,Units 1 & 2.With | |
ML20211K040 | 31 August 1999 | SER Accepting Approval of Defueled Station Emergency Plan & Exemption from Certain Requirements of 10CFR50.47, Emergency Plans for Plants,Units 1 & 2 | Nuclear Accident Reporting System Exemption Request |
A99023, Monthly Operating Repts for Aug 1999 for Zion Nuclear Power Station,Units 1 & 2.With | 31 August 1999 | Monthly Operating Repts for Aug 1999 for Zion Nuclear Power Station,Units 1 & 2.With | |
ML20211G963 | 30 August 1999 | SER Accepting Licensee Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves | Stroke time |
ML20211F453 | 24 August 1999 | Safety Evaluation Supporting Licensee Proposed Alternative to Defer Partial First Period Exams of flange-to-shell Weld to Third Period & Perform Required Ultrasonic Exams,Both Manual & Automated,During Third Period | Non-Destructive Examination Incorporated by reference |
ML20211F511 | 23 August 1999 | Safety Evaluation Supporting Licensee Proposed Alternative Contained in Request for Relief RR-ENG-30 | Nondestructive Examination VT-2 Incorporated by reference |
ML20211B378 | 13 August 1999 | Special Rept 99-002:on 990730,NPV Radiation Monitoring Sys Was Declared Inoperable.Caused by Voltage Induced in Detector Output by Power Cable to Low Range Sample Pump. Separated Cables & Secured in Place to Prevent Recurrence | |
ML20210L436 | 2 August 1999 | Cycle 9 12-Month SG Insp Rept | |
ML20216E378 | 31 July 1999 | Monthly Operating Repts for July 1999 for Sequoyah Nuclear Plant,Units 1 & 2.With |