Issue date | Title | Topic | |
---|---|---|---|
ML20210R213 | 31 May 1997 | Final Safety Evaluation Report Related to the Certification of the System 80+ Design.Docket No. 52-002.(Asea Brown Boveri-Combustion Engineering) | Shutdown Margin Hydrostatic Incorporated by reference Earthquake |
ML20148A821 | 31 January 1997 | Abb System 80+ Design Control Document - Volume 1 | |
ML20078Q431 | 28 February 1995 | Revs to Sys 80+ Design Control Document | Safe Shutdown Boric Acid Shutdown Margin Fire Barrier Anticipated operational occurrence Safe Shutdown Earthquake Probabilistic Risk Assessment Fuel cladding Power change |
ML20080E205 | 5 January 1995 | Rev 2 to Technical Support Document for Amend to 10CFR51 Considering Severe Accidents Under NEPA for Plants of Sys 80+ Design | |
ML20076F330 | 7 October 1994 | Rev 1 of Technical Support Document for Amends to 10CFR51 Considering Severe Accidents Under NEPA for Plants of Sys 80+ Design | Boric Acid Anticipated operational occurrence Safe Shutdown Earthquake Probabilistic Risk Assessment License Renewal |
ML20069N409 | 20 June 1994 | System 80+ Certified Design Material | |
ML20029E199 | 6 May 1994 | Technical Support Document for Amends to 10CFR51 Considering Severe Accidents Under NEPA for Plants of Sys 80+ Design. | |
ML20062L863 | 31 December 1993 | Certified Design Matl | Safe Shutdown Boric Acid Health Physics Network Ultimate heat sink Non-Destructive Examination Stroke time Safe Shutdown Earthquake Post Accident Monitoring Tornado Generated Missile Earthquake Turbine Missile Flow Induced Vibration |
ML20058E997 | 15 November 1993 | Amend T to C-E Std SAR - Design Certification. W/31 Oversize Figures | |
ML20062J355 | 29 October 1993 | C-E Ssar - Design Certification,Amend S. W/15 Oversize Encls | Safe Shutdown Boric Acid Fitness for Duty Shutdown Margin Reactor Vessel Water Level Ultimate heat sink Offsite Dose Calculation Manual Fire Barrier Stroke time Anticipated operational occurrence Tornado Missile Safe Shutdown Earthquake Post Accident Monitoring Hydrostatic Probabilistic Risk Assessment Coatings Anchor Darling Nondestructive Examination Finite Element Analysis Tornado Generated Missile Process Control Program Safeguards Contingency Plan Earthquake Control of Heavy Loads Power-Operated Valves Power Operated Valves Brachytherapy GOTHIC |
ML20058N100 | 23 September 1993 | Rev 2 to Design Alternatives for Sys 80+ Nuclear Power Plant | |
ML20046B362 | 15 July 1993 | Session 3.7;Review of SG Tube Rupture Procedure at Borssele Nuclear Power Station. | |
ML20045C490 | 30 June 1993 | Evaluation of Sys 80+ Std Design to Interfacing Sys LOCA Challenges, Special Rept | |
ML20045D342 | 30 June 1993 | Rev 1 to Design Alternatives for Sys 80+ Nuclear Power Plant. | Boric Acid Probabilistic Risk Assessment |
ML20045C635 | 15 June 1993 | Amend P to Sys 80+ Cessar - Design Certification. | Fire Barrier Probabilistic Risk Assessment |
ML20044G706 | 19 May 1993 | Common Mode Failure Evaluation for Limiting Fault Events. | |
ML20059F475 | 29 March 1993 | Application of Advanced Full Scope Simulators to Severe Accident Precursor Training, Presented at 1993 Simulation Multiconference on 930329-0401 in Washington,Dc | |
ML20044C006 | 17 March 1993 | ABB-C-E Sys 80+ Structural Analysis of Nuclear Island & Nuclear Annex Structures. | Safe Shutdown Ultimate heat sink Fire Barrier Tornado Missile Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Tornado-Generated Missile Design basis earthquake Earthquake Turbine Missile |
ML20044B941 | 23 February 1993 | Rev 0 to Human Factors Evaluation & Allocation of Sys 80+ Functions. | Safe Shutdown |
ML20012G335 | 16 February 1993 | Sys 80+ Advanced LWR PRA-Based Seismic Margin Evaluation. | Earthquake |
ML20127M417 | 15 January 1993 | Control Complex Info Sys Bases for Nuplex 80+ | |
ML20126F677 | 8 December 1992 | Review of CE 80+ FMEA & D&Did Analysis, Technical Ltr Rept | |
ML20126E619 | 30 October 1992 | Amend K to CESSAR - Design Certification. W/50 Oversize Encls | Safe Shutdown Boric Acid Shutdown Margin High Radiation Area Ultimate heat sink Offsite Dose Calculation Manual Fire Barrier Anticipated operational occurrence Tornado Missile Safe Shutdown Earthquake Hydrostatic Coatings Operating Basis Earthquake Emergency Lighting Tornado-Generated Missile Design basis earthquake Process Control Program Excess Flow Check Valve Earthquake Turbine Missile Pressure Boundary Leakage Through-Wall Leakage Fire Protection Program Fire Watch Scaffolding Power change Flow Induced Vibration |
ML20126J052 | 30 October 1992 | Amend K to C-E Std SAR - Design Certification | |
ML20012G336 | 30 September 1992 | Draft Basis for Seismic Provisions of UCRL-15910. | |
ML20114F561 | 30 September 1992 | Evaluation of Defense-in-Depth & Diversity in ABB-C-E Nuplex 80+ Advanced Control Complex for Sys 80+ Std Design | Boric Acid Shutdown Margin |
ML20104A855 | 2 September 1992 | Sys 80+ Design Certification Fire Hazard Risk Assessment | Safe Shutdown Boric Acid Fire Barrier |
ML20104A850 | 2 September 1992 | Sys 80+ Design Certification PRA Flood Protection Assessment | Safe Shutdown |
LD-92-095, Draft Sys 80+ Design Certification Piping Analysis Specification | 31 August 1992 | Draft Sys 80+ Design Certification Piping Analysis Specification | Safe Shutdown Fire Barrier Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Finite Element Analysis Earthquake Pressure Boundary Leakage Scaffolding |
ML20101S728 | 31 July 1992 | Criteria for Design of Main Control Room & Other Operating Stations for Sys 80+ | Post Accident Monitoring |
ML20099D803 | 31 July 1992 | Final Sys 80+ Shutdown Risk Evaluation Rept | |
ML20099D830 | 25 July 1992 | Draft Sys 80+ Design Certification Distribution Sys Design Guide | Safe Shutdown Fire Barrier Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Finite Element Analysis Earthquake Pressure Boundary Leakage Scaffolding |
ML20101G526 | 15 June 1992 | Draft Sys 80+ Shutdown Risk Evaluation Rept | Boric Acid Shutdown Margin Loop seal Fire Barrier Time to boil Internal Flooding Hydrostatic Probabilistic Risk Assessment Control of Heavy Loads Fuel cladding |
ML20097A125 | 31 May 1992 | Human Factors Engineering Stds,Guidelines & Bases for Nuplex 80+ | Post Accident Monitoring Emergency Lighting |
ML20096F727 | 8 May 1992 | Nuplex 80+ Human Factors Design Process Summary | Backfit |
ML20095J232 | 30 April 1992 | Rev 0 to Design Alternatives for Sys 80+ Nuclear Power Plant | Boric Acid Probabilistic Risk Assessment |
ML20095L504 | 30 April 1992 | Draft Sys 80+ Shutdown Risk Evaluation Rept, Part 1 | |
ML20095A960 | 15 April 1992 | Selection of Control Motion for ABB-C-E Sys 80+ Std Design | Earthquake |
ML20090K485 | 12 March 1992 | QA Program Topical Rept | Non-Destructive Examination Hydrostatic Nondestructive Examination |
LD-92-031, Marked-up Copy of QA Program Topical Rept | 12 March 1992 | Marked-up Copy of QA Program Topical Rept | Non-Destructive Examination Hydrostatic Nondestructive Examination |
ML20094E943 | 11 February 1992 | LOCA Aspects of C-E Advanced LWR - Sys 80+ | Boric Acid Mission time Safe Shutdown Earthquake Internal Flooding Earthquake |
ML20079C964 | 13 June 1991 | Description of Nuclear QA Program | Non-Destructive Examination Hydrostatic Nondestructive Examination |
ML20043H220 | 18 May 1990 | Seminar on Use of Unusual Event Repts for Improving Nuclear Power Plant Safety. | Boric Acid Liquid penetrant |
ML20106D734 | 15 January 1990 | Nuplex 80+ Advanced Control Complex Design Bases | Safe Shutdown Fire Barrier Safe Shutdown Earthquake Post Accident Monitoring Fuel cladding |
ML20096F476 | 31 December 1989 | Nuplex 80+ Rev 2 to Verification Analysis Rept | |
ML20247H033 | 30 March 1989 | Chapter 6, Esfs, to CESSAR Sys 80+ Std Design.W/One Oversize Encl | |
ML20248C392 | 30 March 1989 | App 3.11B, Identification & Location of Mechanical & Electrical Safety-Related Sys Components, to CESSAR Sys 80+ Std Design | |
ML20248C380 | 30 March 1989 | App 3.11A, Environ Qualification for Structures & Components, to CESSAR Sys 80+ Std Design | |
ML20248B002 | 30 March 1989 | App 3A, Discussion of Finite Difference Analysis for Analysis of Pipe Whip, to CESSAR Sys 80+ Std Design | Safe Shutdown Boric Acid Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Finite Element Analysis Earthquake Power change Flow Induced Vibration |
ML20247G666 | 30 March 1989 | Chapter 1, Introduction & General Plant Description, to CESSAR Sys 80+ Std Design.W/One Oversize Encl | Safe Shutdown Boric Acid Shutdown Margin High Radiation Area Ultimate heat sink Anticipated operational occurrence Safe Shutdown Earthquake Probabilistic Risk Assessment Coatings Operating Basis Earthquake Nondestructive Examination Incorporated by reference Turbine Missile Pressure Boundary Leakage Power change |