Issue date | Title | Topic | |
---|---|---|---|
ML20138J839 | 10 December 1996 | WPPSS Nuclear Project,Unit 2 TER on IPE Submittal Human Realiability Analysis, Final Rept | Hardened vent |
ML20138J827 | 22 October 1996 | Technical Evaluation Rept on IPE Front End Analysis | Reactor Vessel Water Level Mission time Probabilistic Risk Assessment Backfit |
ML20138J833 | 30 September 1996 | WPPSS Nuclear Project Unit 2 TER on IPE Back End Analysis | Finite Element Analysis Hardened vent |
ML17291B163 | 31 August 1995 | Technical Evaluation Rept on Second 10-yr Interval Inservice Insp Program Plan:Washington Public Power Supply Sys,Nuclear Project,Unit 2 | Fire Barrier Hydrostatic VT-2 Incorporated by reference Liquid penetrant |
ML20071J424 | 31 July 1994 | Technical Evaluation Rept,Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01,WNP-2 | |
ML17291A263 | 15 July 1994 | BNL Technical Ltr Rept On-Site Followup Assessment of Post- Fire Safe Shutdown Startup Issues at WNP-2, Conducted on 940620-24 | Hot Short Safe Shutdown Fire Barrier |
ML20058L759 | 27 March 1993 | TER, 'Bwr Transient Analysis Model' WPPSS-FTS-129,Rev 1, for WPPSS WNP-2 | Feedwater Controller Failure |
ML17289A945 | 11 September 1992 | TER of TR WPPS-FTS-127(Qualification of Core Physics Methods for BWR Design & Analysis) for Wpps 2. | |
ML17286A774 | 28 February 1991 | Technical Evaluation Rept,Pump & Valve Inservice Testing Program Wppss Nuclear Project 2. | Stroke time Scram Discharge Volume Excess Flow Check Valve Power Operated Valves |
ML19332B614 | 31 October 1989 | Conformance to Generic Ltr 83-28,Item 2.2.1--Equipment Classification for All Other Safety-Related Components:Quad Cities 1 & 2, Final Technical Evaluation Rept | Safe Shutdown |
ML20065C663 | 30 September 1989 | Final Technical Evaluation Rept on Response from WPPSS to Generic Ltr 88-01 Pertaining to Washington Nuclear Plant 2 | Weld Overlay |
ML20248E212 | 16 August 1989 | Notification of Contract Execution,Mod 16,to Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Browns Ferry,Sequoyah & Bellefonte Simulators. Contractor:Tva | |
ML20248E219 | 16 August 1989 | Mod 16,reflecting Return of Equipment to Tva,To Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Browns Ferry,Sequoyah & Bellefonte Simulators | |
ML20247R385 | 16 May 1989 | Notification of Contract Execution,Mod 15,to Use of TVA Reactor Simulator Facilities at Chattanooga,Tn,For Training on Browns Ferry,Sequoyah & Bellefonte Simulators. Contractor:Tva | |
ML20247R394 | 16 May 1989 | Mod 15,extending Period of Performance,Providing Addl Work Re Training for NRC Inspectors & Supervisors,Changing NRC Project Officer & Adding TVA Project Manager & Increasing Contract Ceiling & Funding to Use of TVA Reactor.. | |
ML20246B815 | 30 April 1989 | Rev 1 to Conformance to Item 4.5.2 of Generic Ltr 83-28, Duane Arnold,Enrico Fermi-2,Hope Creek,Lasalle County 1 & 2, Limerick 1 & 2,Millstone 1,Monticello,Nine Mile Point 1 & 2 & Oyster Creek, Technical Evaluation Rept | |
ML20246B973 | 31 March 1989 | Conformance to Reg Guide 1.97:Byron 1/2 & Braidwood 1/2, Technical Evaluation Rept | Boric Acid |
ML20236B805 | 13 March 1989 | Monthly Progress Rept for Contract NRC-02-87-004 for Period 890204-890303.Financial Data Available in Central Files | |
ML20205N943 | 31 October 1988 | Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components: Millstone-1 | |
ML20155B739 | 1 June 1988 | Notification of Contract Execution,Mod 1,to Local Telephone Svc for Yankee Rowe,Vermont Yankee,Maine Yankee,Pilgrim & Seabrook Resident Sites. Contractor:New England Telephone Co | |
ML20155B753 | 1 June 1988 | Corrected Mod 1,restoring Funds That Was Deobligated & Providing Final Increment of Funding to Contract,To Local Telephone Svc for Yankee Rowe,Vermont Yankee,Maine Yankee, Pilgrim & Seabrook Resident Sites | |
ML20195E927 | 30 April 1988 | Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components: Washington Nuclear Plant-2 | |
ML20151C234 | 31 March 1988 | Technical Evaluation Rept for Evaluation of Offsite Dose Calculation Manual Through Amend 4 Washington Nuclear Plant Unit 2 | Grab sample Offsite Dose Calculation Manual |
ML20150D909 | 17 March 1988 | Mod 1,deobligating Funds from Total Obligated Amount of Contract & to Correct FIN Number,To Local Telephone Svc for Yankee Rowe,Vermont Yankee,Maine Yankee,Pilgrim & Seabrook Resident Sites | |
ML20150D900 | 17 March 1988 | Notification of Contract Execution,Mod 1,to Local Telephone Svc for Yankee Rowe,Vermont Yankee,Maine Yankee,Pilgrim & Seabrook Resident Sites. Contractor:New England Telephone Co | |
ML20196C164 | 4 February 1988 | Independent Assessment & Analysis, Monthly Progress Rept for Period Ending 880131 | |
ML20205N948 | 31 January 1988 | Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components - Millstone-2 | Safe Shutdown |
ML20205N953 | 31 January 1988 | Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components: Millstone-3 | Safe Shutdown |
ML20149F169 | 11 January 1988 | Contract: Local Telephone Svc for Yankee Rowe,Vermont Yankee,Maine Yankee,Pilgrim & Seabrook Resident Sites, Awarded to New England Bell Telephone Co | |
ML20149F131 | 11 January 1988 | Notification of Contract Execution: Local Telephone Svc for Yankee Rowe,Vermont Yankee,Maine Yankee & Pilgrim & Seabrook Resident Sites, Awarded to New England Bell Telephone Co | |
ML20236T737 | 24 November 1987 | Notification of Contract Execution,Mod 7,to Dresden & Perry Simulator. Contractor:Ge | |
ML20236T746 | 24 November 1987 | Mod 7,extending Period of Performance Through 880930,adding Addl GE Simulator to Contract & Scheduling Four Simulator Courses Through FY88,to Dresden & Perry Simulator | |
ML20235M359 | 31 August 1987 | Preliminary Conformance to Reg Guide 1.97:Byron Units 1 & 2 & Braidwood Units 1 & 2, Technical Evaluation Rept | Boric Acid |
ML18040B189 | 31 August 1987 | Selected Operating Reactors Issues:Stability Calculations for Grand Gulf 1 & Susquehanna 2 Bwrs. | |
ML20235V152 | 31 August 1987 | Technical Evaluation Rept,Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Peach Bottom 2 & 3,Perry 1 & 2,Pilgrim 1,Quad Cities 1 & 2,River Bend 1, Shoreham,Susquehanna 1 & 2,Vermont Yankee & WNP-2 | |
ML20237J062 | 19 August 1987 | Technical Evaluation Rept on Duke Power Co McGuire & Catawba Nuclear Stations Spds | Backfit |
ML20237J141 | 17 August 1987 | Facility Sys Analysis Support, Progress Rept 23 for 870713 -0807 | |
ML20236P205 | 10 August 1987 | Notification of Contract Execution,Mod 1,to Local Telephone Svc for Yankee Rowe,Vermont Yankee,Main Yankee,Pilgrim & Seabrook Resident Sites. Contractor:New England Bell Telephone Co | |
ML20236P218 | 10 August 1987 | Mod 1,increasing Total Amount of Contract,To Local Telephone Svc for Yankee Rowe,Vermont Yankee,Main Yankee, Pilgrim & Seabrook Resident Sites | |
ML17347A593 | 31 July 1987 | Retran Code:Transient Analysis Model Qualification, Technical Evaluation Rept | |
ML20236D918 | 31 July 1987 | Methodology and Application of Surrogate Plant PRA Analysis to the Rancho Seco Power Plant.Task 1 - Analysis of ANO-1 and Oconee PRAs | Probabilistic Risk Assessment Earthquake |
ML20236P640 | 31 July 1987 | Review of Recirculation Pump Trip Design for Brunswick Steam Electric Plants, Informal Rept | |
ML17279A393 | 30 June 1987 | Conformance to Generic Ltr 83-28,Item 2.2.2-Vendor Interface Programs for All Other Safety-Related Components: Washington Nuclear Plant-2, Informal Rept | |
ML18052B193 | 30 June 1987 | Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,Calvert Cliffs-1 & -2, Millstone-2 & Palisades, Final Informal Rept | |
ML20214R148 | 29 May 1987 | Notification of Contract Execution,Mod 12,to Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Browns Ferry,Sequoyah & Bellefonte Simulators. Contractor:Tva | |
ML20214R156 | 29 May 1987 | Mod 12,providing Incremental Funds & Increasing Ceiling,To Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Browns Ferry,Sequoyah & Bellefonte Simulators | |
ML20214Q898 | 30 April 1987 | Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,Hatch-1 & 2,Millstone-1, Final Rept | |
ML20214R068 | 30 April 1987 | Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,Arnold,Brunswick-1 & 2, Informal Rept | |
ML18150A188 | 30 April 1987 | Conformance to Generic Ltr 83-28,Item 2.2.2 - Vendor Interface Programs for All Other Safety-Related Components, North Anna Units 1 & 2 & Surry Units 1 & 2, Informal Rept | |
ML18150A119 | 30 April 1987 | Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,North Anna 1 & 2 & Surry 1 & 2, Final Informal Rept |