IR 05000228/1999201 | 2 September 1999 | Insp Rept 50-228/99-201 on 990816-19.No Violations Noted. Major Areas Inspected:Routine,Announced Insp Was on-site Review of Selected Aspects of Licensee Class II non-power Reactor Operation | |
IR 05000070/1999201 | 1 July 1999 | Insp Repts 50-070/99-201,50-073/99-201 & 50-183/99-201 on 990607-10.No Violations Noted.Major Areas Inspected: Operation Program,Organizational Structure & Functions Program | Safe Shutdown |
IR 05000070/1998001 | 7 January 1999 | Insp Rept 50-070/98-01 on 991116-19.No Violations Noted. Major Areas Inspected:Review of Status of Three Shutdown Reactor Facilities,Getr,Vbwr & Evesr.Safstor Condition of Evesr,Getr & Vbwr Evaluated During Tour of Facilities | |
ML20196F880 | 2 December 1998 | Notice of Violation from Insp on 981102-05.Violation Noted: Several Discrepancies Were Noted on Shipping Papers as Listed | |
IR 05000228/1998201 | 2 December 1998 | Insp Rept 50-228/98-201 on 981102-05.Violations Noted.Major Areas inspected:on-site Review of Selected Aspects of Licensees Class II non-power Reactor Operation Including Organization & Staffing & Review & Audit Functions | Exclusive Use |
ML20217C149 | 18 March 1998 | Insp Repts 50-070/98-201,50-073/98-201 & 50-183/98-201 on 980209-13.Violations Noted.Major Areas Inspected:Review of Safeguards Programs,Security Program,Procedures,Radiation Protection & Matl Control | Safe Shutdown |
ML20217C128 | 18 March 1998 | Notice of Violation from Insp on 980209-13.Violation Noted: Licensee Failed to Comply with Requirements of Section 12 of Physical Security Plan | |
IR 05000018/1997001 | 9 January 1998 | Insp Repts 50-018/97-01,50-070/97-01 & 50-183/97-01 on 971204.No Violations Noted.Major Areas Inspected:Review of Status of Getr,Vbwr & ESADA Vallecitos Experimental Superheat Reactor | |
IR 05000228/1997201 | 11 July 1997 | Insp Rept 50-228/97-201 on 970603-04.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering,Plant Support,Implementation of Emergency Plan & Security & Safeguards | High Radiation Area |
ML20149K064 | 7 July 1997 | NRC Operator Licensing Initial Exam Rept 50-228/OL-97-01 on 970602 & 03.Exam Results:Written & Operating Exams Administered to One Candidate for Senior Operator License. Candidate Passed Exams | Shutdown Margin High Radiation Area B.5.b Power change |
PNO-V-93-015, on 930811,4.7 Magnitude Earthquake Occurred.No Damage Reported at Listed Facilities.Aerotest Reactor Was Operating & Earthquake Scram Not Triggered.Concludes That Since No Motion Detected,Mmi Probably Less than I | 11 August 1993 | PNO-V-93-015:on 930811,4.7 Magnitude Earthquake Occurred.No Damage Reported at Listed Facilities.Aerotest Reactor Was Operating & Earthquake Scram Not Triggered.Concludes That Since No Motion Detected,Mmi Probably Less than I | Earthquake |
ML20127P117 | 23 November 1992 | Exam Rept 50-228/OL-92-01 on 921102-04.Exam Results:All Seven SRO Passed Written & Operating Portion of Exam.Several Operators Demonstrated Weaknesses,Per Standards Set by Facility Requalification Program | Shutdown Margin Earthquake Fuel cladding Power change |
PNO-II-89-066A, updates Status of Hurricane Hugo for Nuclear Facilities in Southeast.Manning of Incident Response Ctr by Region II Continuing | 21 September 1989 | PNO-II-89-066A:updates Status of Hurricane Hugo for Nuclear Facilities in Southeast.Manning of Incident Response Ctr by Region II Continuing | |
PNO-II-89-066, licensees Prepared for Adverse Weather Conditions Due to Hurricane.Briefings Held W/Key Managers on Responsibilities to Check All Trailers,Secure Crane Hooks & Increase Emergency Food Supplies | 21 September 1989 | PNO-II-89-066:licensees Prepared for Adverse Weather Conditions Due to Hurricane.Briefings Held W/Key Managers on Responsibilities to Check All Trailers,Secure Crane Hooks & Increase Emergency Food Supplies | |
ML20247N007 | 11 September 1989 | PNS-I-89-015:revised Notification of Telephone Threat, Correcting Event Date from 890909 to 890911.Call, Originating from Limerick or Peach Bottom,Received at Corporate Ofc.On 890525,threat Received at Peach Bottom | |
ML20246Q128 | 15 August 1989 | Exam Rept 50-228/OL-89-01 on 890726-27.Exam Results:One Senior Reactor Operator Candidate Passed Both Written & Operating Exams & One Senior Reactor Operator Candidate Failed Written & Passed Operating Exam | High Radiation Area Earthquake |
ML20246C400 | 15 August 1989 | Partially Deleted Insp Repts 50-272/89-19,50-311/89-17 & 50-354/89-15 on 890710-14 (Ref 10CFR73.21).Major Areas Inspected:Followup on Actions Taken in Response to Regulatory Effectiveness Review on 890410-14 | |
ML20246Q030 | 10 August 1989 | Insp Repts 50-029/89-14 & 50-271/89-10 on 890717-21.No Violations or Deviations Noted.Major Areas Inspected: Corporate Engineering & Offsite Support for Plants & Implementation of Mods | |
PNO-V-89-047, on 890808,earthquake & Aftershock of 5.1 & 4.2 Magnitudes,Respectively,Occurred Approx 15 Miles Southwest of San Jose,Ca.Reactors Shutdown During Earthquake.Tour of GE Reactor Disclosed No Damage | 8 August 1989 | PNO-V-89-047:on 890808,earthquake & Aftershock of 5.1 & 4.2 Magnitudes,Respectively,Occurred Approx 15 Miles Southwest of San Jose,Ca.Reactors Shutdown During Earthquake.Tour of GE Reactor Disclosed No Damage | Earthquake |
PNO-IV-89-045, on 890703,earthquake Near Tremonton,Ut Occurred.Earthquake Safety Interlocks Did Not Trip & No Damage Occurred | 5 July 1989 | PNO-IV-89-045:on 890703,earthquake Near Tremonton,Ut Occurred.Earthquake Safety Interlocks Did Not Trip & No Damage Occurred | Earthquake |
IR 05000157/1989001 | 11 May 1989 | Insp Rept 50-97/89-01 & 50-157/89-01 on 890425-26.No Violations Noted.Major Areas Inspected:Operation & Records of Triga & Zpr Reactors | |
ML20247B665 | 9 May 1989 | Mgt Meeting Rept on 890307 & 0413.Major Areas Discussed: Status of Plant,Training & Safety Programs & Self Assessment Programs | Ultimate heat sink Temporary Modification Scaffolding |
IR 05000228/1989001 | 11 April 1989 | Insp Rept 50-228/89-01 on 890327-30.No Violations Noted. Major Areas Inspected:Arrr Operation,Including Organization, Review & Audit,Experiments,Reactor Operator Requalification Training,Environ Monitoring Program & Procedures | Siren |
PNO-V-89-022, on 880403,earthquake of Magnitude of 4.5 on Richter Scale Occurred 10 Miles Northeast of San Jose,Ca. Automatic Seismic Protection Did Not Trigger Shutdown. Reactors Manually Shutdown.No Radioactive Release Occurred | 3 April 1989 | PNO-V-89-022:on 880403,earthquake of Magnitude of 4.5 on Richter Scale Occurred 10 Miles Northeast of San Jose,Ca. Automatic Seismic Protection Did Not Trigger Shutdown. Reactors Manually Shutdown.No Radioactive Release Occurred | Earthquake |
PNO-IV-89-020, Region IV Notified of Recent Reactor Trip at Palo Verde Unit 3 That Was Complicated by Inability to Open Steam Generator Atmospheric Dump Valves Mfg by Control Components,Inc.No Sticking Problems Noted at Other Plants | 23 March 1989 | PNO-IV-89-020:Region IV Notified of Recent Reactor Trip at Palo Verde Unit 3 That Was Complicated by Inability to Open Steam Generator Atmospheric Dump Valves Mfg by Control Components,Inc.No Sticking Problems Noted at Other Plants | |
IR 05000321/1988037 | 9 March 1989 | Partially Withheld Insp Repts 50-321/88-37,50-366/88-37 & 50-424/88-53 on 881102-890106 (Ref 10CFR2.790(d) & 73.21). Violations Noted.Major Areas Inspected:Physical Security Operational Activities & Safeguards Matl Handling | |
IR 05000213/1988021 | 15 November 1988 | Physical Security Insp Repts 50-213/88-21,50-245/88-22, 50-336/88-25 & 50-423/88-21 on 881017-21.No Noncompliance Noted.Major Areas Inspected:Safeguards Info Program - Corporate Ofcs | |
PNO-I-88-116, on 881108,voters Voted Down state-wide Referendum to Shutdown Plants in State of Ma If Nuclear Waste Produced in Process | 9 November 1988 | PNO-I-88-116:on 881108,voters Voted Down state-wide Referendum to Shutdown Plants in State of Ma If Nuclear Waste Produced in Process | |
IR 05000280/1988040 | 26 October 1988 | Insp Repts 50-280/88-40,50-281/88-40,50-338/88-28 & 50-339/88-28 on 880926-30.No Violations or Deviations Noted. Major Areas Inspected:Control Room Habitability & Insp Followup Items | Safe Shutdown |
IR 05000369/1988021 | 13 October 1988 | SALP Repts 50-369/88-21 & 50-370/88-21 for Aug 1987 - Jul 1988 | Boric Acid High Radiation Area Hydrostatic Missed surveillance Systematic Assessment of Licensee Performance Operability Determination Fire Watch Backfit Unidentified leak Siren |
IR 05000413/1988024 | 13 October 1988 | SALP Repts 50-413/88-24 & 50-414/88-24 for Aug 1987 - Jul 1988 | Boric Acid Systematic Assessment of Licensee Performance Inattentive Unidentified leakage Unidentified leak |
ML20151U770 | 10 August 1988 | Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $1,250,000.Violations Noted:Control Room Operators Observed Sleeping While on Duty,Reading Matls Not Directly Job Related & Failure to Rept Items to NRC | |
PNO-V-88-044, on 880627,earthquake Occurred 5 Miles East of Santa Cruz,Ca.Seismic Instrumentation Not Triggered at Vallecitos,Aerotest Operations or at Univ of California at Berkeley | 27 June 1988 | PNO-V-88-044:on 880627,earthquake Occurred 5 Miles East of Santa Cruz,Ca.Seismic Instrumentation Not Triggered at Vallecitos,Aerotest Operations or at Univ of California at Berkeley | Earthquake |
PNO-V-88-038, on 880612,earthquake Occurred on Calaveras Fault within 50 Miles of Identified Facilities.All Reactors Shutdown at Time of Earthquake.No Seismic Trips Observed. Insp Revealed No Signs of Damage at Facilities | 13 June 1988 | PNO-V-88-038:on 880612,earthquake Occurred on Calaveras Fault within 50 Miles of Identified Facilities.All Reactors Shutdown at Time of Earthquake.No Seismic Trips Observed. Insp Revealed No Signs of Damage at Facilities | Earthquake |
IR 05000454/1988008 | 27 May 1988 | Insp Repts 50-454/88-08,50-455/88-08 & 50-456/88-16 on 880509-19.No Violations or Deviations Noted.Major Areas Inspected:Review of Action on Previous Insp Items & Followup on SER Items | |
ML20197F502 | 23 May 1988 | Exam Rept 50-228/OL-88-01 on 880413.Exam Results:Of Two Candidates Administered Test,One Passed & Given Senior Reactor Operator License & One Failed Written Exam & Not Granted License.Master Copy of Test Encl | |
PNO-IV-88-040, on 880509,System Energy Resources,Inc to Manage & Operate All Middle South Nuclear Plants.Arkansas Power & Light & Louisiana Power & Light Will Apply for Appropriate License Amends | 9 May 1988 | PNO-IV-88-040:on 880509,System Energy Resources,Inc to Manage & Operate All Middle South Nuclear Plants.Arkansas Power & Light & Louisiana Power & Light Will Apply for Appropriate License Amends | |
IR 05000272/1988006 | 18 March 1988 | Partially Withheld Physical Security Insp Repts 50-272/88-06,50-311/88-06 & 50-354/88-04 on 880201-05 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected: Procedures,Security Organization & Mgt Effectiveness | Inattentive |
ML20151U878 | 4 March 1988 | Partially Withheld Insp Repts 50-259/88-01,50-260/88-01, 50-296/88-01,50-327/88-01 & 50-328/88-01 on 880106,07 & 13. (Ref 10CFR2.790(d) & 73.21).Major Areas Inspected:Corrective Measures in Response to Unresolved Item | |
IR 05000354/1986099 | 4 March 1988 | SALP Rept 50-354/86-99 on 861201-880115 | High Radiation Area Grab sample Temporary Modification Missed surveillance Systematic Assessment of Licensee Performance Safeguards Contingency Plan Scaffolding Unidentified leakage Unidentified leak Siren |
PNO-I-88-020, on 880216,CA Mcneill Named Executive Director - Nuclear W/Responsibility of Directing Nuclear Operations, Including Nuclear Dept Reorganization & Restart Efforts of Peach Bottom | 16 February 1988 | PNO-I-88-020:on 880216,CA Mcneill Named Executive Director - Nuclear W/Responsibility of Directing Nuclear Operations, Including Nuclear Dept Reorganization & Restart Efforts of Peach Bottom | |
IR 05000272/1986099 | 5 February 1988 | SALP Repts 50-272/86-99 & 50-311/86-99 for Oct 1986 - Dec 1987 | Safe Shutdown High Radiation Area Fire Barrier Weld Overlay Locked High Radiation Area Missed surveillance Systematic Assessment of Licensee Performance Safeguards Contingency Plan Fire Protection Program Fire Watch Siren |
PNO-I-88-017, on 880202,util to Announce Change to Corporate Mgt,Per Highly Critical INPO Ltr.Jh Austin Will Retire as of 880301 & Jl Everett Will Assume Duties of President Until Replacement Named | 2 February 1988 | PNO-I-88-017:on 880202,util to Announce Change to Corporate Mgt,Per Highly Critical INPO Ltr.Jh Austin Will Retire as of 880301 & Jl Everett Will Assume Duties of President Until Replacement Named | |
PNO-I-88-001, on 880104,realignment of Nuclear Mgt Updated. Action Provides for Corporate Officer at Each Plant to Elevate Level of Plant in Corporate Mgt Structure | 4 January 1988 | PNO-I-88-001:on 880104,realignment of Nuclear Mgt Updated. Action Provides for Corporate Officer at Each Plant to Elevate Level of Plant in Corporate Mgt Structure | |
PNO-V-87-076, on 871123-24,two Moderate Earthquakes Centered Near Westmoreland,Ca Occurred,Triggering Seismic Alarms at San Onofre.Unusal Event Declared.Plant Sys & Components Not Adversely Affected.Effects on Other Locations Noted | 24 November 1987 | PNO-V-87-076:on 871123-24,two Moderate Earthquakes Centered Near Westmoreland,Ca Occurred,Triggering Seismic Alarms at San Onofre.Unusal Event Declared.Plant Sys & Components Not Adversely Affected.Effects on Other Locations Noted | Earthquake |
PNO-III-87-138, on 871103,reactor Shutdown After Two MSIV Failed to Close.Valves Recycled Resulting in Acceptable Time Responses.Augumented Insp Team Dispatched to Plant Site to Review Possible Causes of MSIV Closure Problems | 3 November 1987 | PNO-III-87-138:on 871103,reactor Shutdown After Two MSIV Failed to Close.Valves Recycled Resulting in Acceptable Time Responses.Augumented Insp Team Dispatched to Plant Site to Review Possible Causes of MSIV Closure Problems | |
ML20236B885 | 20 October 1987 | Performance Appraisal Nrc/State Contracts for Environ Monitoring on 871005-06.State Fulfilled All Requirements W/ Few Exceptions.Major Areas Inspected:Repts,Correspondence, day-to-day Contacts & Promptness in Resolution of Problems | |
PNO-II-87-069, on 871012,Turkey Point Units 3 & 4 Declared NOUE Based on Potential for Hurricane Force Winds & Technical Support Ctr Activated for Mgt of Storm Preparation & Operations.St Lucie Also Made Severe Weather Preparations | 13 October 1987 | PNO-II-87-069:on 871012,Turkey Point Units 3 & 4 Declared NOUE Based on Potential for Hurricane Force Winds & Technical Support Ctr Activated for Mgt of Storm Preparation & Operations.St Lucie Also Made Severe Weather Preparations | |
PNO-I-87-093, on 871009,util Announced Listed Changes to Corporate Nuclear Mgt to Provide for Corporate Officer at Each Plant & to Elevate Plant Level.Changes Will Be Effective on 871101.Nuclear Review Board Reconstituted | 9 October 1987 | PNO-I-87-093:on 871009,util Announced Listed Changes to Corporate Nuclear Mgt to Provide for Corporate Officer at Each Plant & to Elevate Plant Level.Changes Will Be Effective on 871101.Nuclear Review Board Reconstituted | |
ML20235T250 | 24 September 1987 | Notice of Violation from Insp on 870901-03.Violations Noted: None of Three Firemen from Nuclear Test Reactor Bldg Emergency Team Provided w/self-contained Breathing Apparatus Training & Failure to Maintain Records on Training |