Issue date | Title | Topic | |
---|---|---|---|
ML20211B238 | 31 August 1999 | Revised Interjurisdictional Policy for Songs | |
ML20196A998 | 17 June 1999 | Revised Pages to Risk-Informed IST Program for Sce | Boric Acid Stroke time Probabilistic Risk Assessment Large early release frequency |
ML20216D974 | 7 May 1999 | Rev 3 to Abnormal Operating Instruction SO23-13-14, Reactor Coolant Leak | Boric Acid Shutdown Margin Pressure Boundary Leakage Downpower |
ML20198L511 | 23 December 1998 | Rev 0 to SONGS Risk-Informed Inservice Testing Program, Engineering Analysis & Program Description | Safe Shutdown Boric Acid Probabilistic Risk Assessment Design basis earthquake Large early release frequency Exemption Request |
ML20238E814 | 31 August 1998 | Revised Big Rock Point Defueled Emergency Plan | Offsite Dose Calculation Manual Earthquake |
ML20206N538 | 12 August 1998 | Rev 15 to Emergency Operating Instruction S023-12-7, Loss of Forced Circulation/Loss of Offsite Power, Pages 1,3,18, 39 & 122 | Shutdown Margin |
ML20206N523 | 16 March 1998 | Rev 15 to Emergency Operating Instruction S023-12-1, Std Post Trip Actions | |
ML20217P381 | 28 February 1998 | Revised Defueled Emergency Plan | Offsite Dose Calculation Manual |
ML20206E600 | 27 February 1998 | Rev 31 to S023-ODCM, SONGS Units 2 & 3 Odcm | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Power change |
ML20206N502 | 30 January 1998 | Temporary Change Notice 2-1 to Rev 2 to Alarm Response Instruction S023-15-50.A1, Annunciator Panel,50A Pzr/Cea Windows 1-30, Pages 1,3,14,15 & 62-64 | |
ML20197D434 | 31 December 1997 | Rev 1 to Ynps License Termination Plan | Safe Shutdown Grab sample Deep Dose Equivalent Scaffolding |
ML20198P401 | 31 October 1997 | Rev 2 to Document 90022, Susceptibility of RCS Alloy 600 Nozzles to Primary Water Stress Corrosion Cracking & Replacement Program Plan | Boric Acid Pressure Boundary Leakage |
ML20148U011 | 17 June 1997 | Confirmatory Survey of Group E Effluent Discharge Pathway Areas Fsv Nuclear Station Platteville,Co | |
ML20217P998 | 28 May 1997 | Rev 30 to SONGS Unit 2 & 3, Odcm | Safe Shutdown Grab sample Offsite Dose Calculation Manual Anticipated operational occurrence Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Power change |
ML20141F639 | 15 May 1997 | License Termination Plan for Yankee Nuclear Power Station | Safe Shutdown Grab sample Coatings Deep Dose Equivalent Scaffolding |
ML20203E437 | 12 February 1997 | Rev 2 to SO23-XVII-3.1.1, Refueling Outage Interval Exam of Reactor Coolant Pressure Boundary to Detect Leakage from Abb Combustion Engineering to SCE.W/18 Oversize Drawings | Boric Acid Hydrostatic VT-2 |
ML20198G638 | 7 February 1997 | Rev 12 to Ynps Off-Site Dose Calculation Manual | Grab sample Annual Radiological Environmental Operating Report |
ML20249A531 | 7 January 1997 | Rev 4 to PRA-REV-001, PRA Model Rev Procedure | |
ML20216A961 | 1 January 1997 | Rev 13 to Big Rock Point Radiological Effluent T/S Required Documents,Offsite Dose Calculations & Process Control Program | Grab sample Process Control Program Fuel cladding |
ML20203K759 | 5 November 1996 | Rev 1 to Du General Software Design Description | |
ML20138Q530 | 31 October 1996 | Rev 11 to Off-Site Dose Calculation Manual | Grab sample Annual Radiological Environmental Operating Report |
ML20133D766 | 16 September 1996 | Confirmatory Survey Plan for Fsv Nuclear Station Decommissioning Project | |
ML20129A462 | 11 September 1996 | Rev 0 to Fsv Decommissioning Project Final Survey Requirements for Liquid Effluent Pathway | Offsite Dose Calculation Manual Chernobyl |
ML20138H557 | 5 August 1996 | Rev 1 to Ultrasonic Exam of Vessel Welds & Adjacent Base Metal | Nondestructive Examination Scaffolding |
ML20138F012 | 31 July 1996 | Rev 29 to, Offsite Dose Calculation Manual,Nuclear Organization Units 2 & 3 | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Power change |
ML20113C508 | 30 June 1996 | PRA Barrier Control Program | Probabilistic Risk Assessment Design basis earthquake |
ML20203E402 | 27 June 1996 | Rev 0 to SO23-XXVI-20.46, Visual Exam Procedure to Determine Condition of Nuclear Parts,Components or Surfaces. W/Temporary Change Notice 0-1 | Scaffolding |
ML20206N514 | 25 April 1996 | Rev 2 to Abnormal Operating Instruction S023-13-17, Recovery from Inadvertent Safety Injection,Containment Isolation or Containment Spray | Boric Acid Shutdown Margin |
ML20097C260 | 17 January 1996 | Confirmatory Survey Activities Plan for Fsv Nuclear Station PSC Platteville,Co | |
ML20203K802 | 21 November 1995 | Rev 0 to Lpu General Software Design Description | |
ML20203E340 | 19 October 1995 | Rev 1 to SO123-V-8.15, Mode 3 Boric Acid Leak Insp | Boric Acid |
ML20112C182 | 16 October 1995 | Temporary Change Notice 6-36 to Rev 6 to Operating Instruction SO23-5-1.7, Power Operations | Boric Acid Fuel cladding Power change Downpower |
ML20199J741 | 3 October 1995 | Rev 6 to Users Guide for Vectora CL-200 Polyethylene High Integrity Containers | |
ML20101F209 | 18 September 1995 | Issue 7 to DPP 5.4.2, Odcm | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report |
ML20091N340 | 24 August 1995 | Temporary Change Notice to Rev 9 to S023-V-35, IST of Valves Program | Safe Shutdown Boric Acid Stroke time Probabilistic Risk Assessment Power-Operated Valves Scaffolding |
ML20203K737 | 24 July 1995 | Rev 1 to S0123-606-1-15-1, DRMS Software Verification & Validation Plan | |
ML20084B880 | 25 May 1995 | Rev 1 to Fsv Nuclear Station Decommissioning Project Final Survey Plan for Site Release | Coatings Deep Dose Equivalent Scaffolding |
ML20084B688 | 10 May 1995 | Issue 5 to Fire Protection Operability Requirements (Fpor) FPOR-7, Fire Extinguishers | Fire Barrier Emergency Lighting |
ML20082K363 | 14 April 1995 | Rev 3 of San Onofre Unit 3 Nuclear Generating Station Nuclear ISI Program Second Interval from 940401-030817 | |
ML20082T215 | 12 April 1995 | Issue 7 to Fire Protection Operability Requirements (Fpor) FPOR-12, Fire Detectors | Fire Barrier Emergency Lighting Fire Protection Program Fire Watch Hourly Fire Watch |
ML20082K357 | 12 April 1995 | Rev 3 of San Onofre Unit 2 Nuclear Generating Station Nuclear ISI Program Second Interval from 940401-030817 | |
ML20082B941 | 17 March 1995 | Confirmatory Survey Plan for Repower Area,Fort St Vrain, Platteville,Co | |
ML20082C080 | 16 March 1995 | Proposed Confirmatory Survey Plan for Repower Area,Fort St Vrain,Platteville,Co | |
ML20082B982 | 15 March 1995 | Instrumentation Comparison Plan Between Orise & Fort St Vrain | |
ML20204J029 | 17 February 1995 | Rev 0,EC 0-1 to SO23-XXI-3.1.2, Simulator Performance Test Scheduling | |
ML20080L232 | 17 February 1995 | Editorial Correction 0-1 to Rev 0 of Training Procedure S023-XXI-3.1.2, Simulator Performance Test Scheduling | Shutdown Margin |
ML20086S247 | 9 February 1995 | Decommissioning Plan for Fort St Vrain Nuclear Generating Station | High Radiation Area Offsite Dose Calculation Manual Tornado Missile Operating Basis Earthquake Design basis earthquake Earthquake Fire Protection Program Scaffolding |
ML20080F702 | 21 December 1994 | Rev 27 to Odcm | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Power change |
ML20138H566 | 1 December 1994 | Rev 0 to Ultrasonic Exam of Nozzle Inner Radius Areas | Coatings Nondestructive Examination Scaffolding |
ML20077C717 | 30 November 1994 | Issue 9 to FPOR-14, Fire Protection Operability Requirements | Fire Barrier Emergency Lighting Fire Watch Hourly Fire Watch |