ML20135E743 | 11 December 1996 | Test to Determine Ampacity Derating Factor for Electrical Conductors Installed in 600mm X 101mm X 3650mm Long Cable Tray Encapsulated by KM1 Darmatt Three H Replacement Matl | Fire Barrier |
ML20135E739 | 11 December 1996 | Tests to Determine Ampacity Derating Factors for Electrical Conductors Installed in 1 & 4 Diameter Rigid Steel Conduits Encapsulated by KM1 Darmatt Three H Replacement Matl | Fire Barrier |
ML20135E735 | 11 December 1996 | Tests to Determine Ampacity Derating Factors for Electrical Conductors Installed in 1 & 4 Diameter Rigid Steel Conduits Encapsulated by KM1 Darmatt One H Replacement Matl | |
ML20069K056 | 9 June 1994 | Startup Rept for Wolf Creek Generating Station Power Rerate & T Hot Increase | |
ML20067C013 | 18 February 1994 | Startup Rept for Wolf Creek Generating Station Power Rerate & T Hot Reduction | |
ML20094F457 | 17 February 1992 | Reactor Containment Bldg Integrated Leak Rate Test for Wolf Creek Generating Station | |
ML20029A280 | 28 January 1991 | Primary Reactor Bldg Integrated Leakage Rate Test, Final rept.W/910128 Ltr | Exemption Request |
ML20246D971 | 9 August 1989 | Cycle 4 Startup Rept | |
ML20195G390 | 17 June 1988 | Startup Rept for Callaway Plant Uprating | |
ML20246H987 | 30 April 1988 | Environ Qualification of Continental Wire & Cable Corp Instrumentation Cable Installed in Beaver Valley Power Station Unit 1 | |
ML20149D990 | 31 December 1987 | Cycle 3 Startup Rept | Flow Induced Vibration |
ML20153G348 | 25 November 1987 | Rev 1 to Irradiation Study of Boraflex Neutron Absorber Interim Test Data, Interim Technical Rept | |
ML20236L500 | 31 August 1987 | Analysis of Capsule U from Wolf Creek Nuclear Operating Corp Wolf Creek Reactor Vessel Radiation Surveillance Program | |
ML20236J763 | 30 April 1987 | Primary Reactor Containment Integrated Leakage Rate Test, Final Rept for Apr 1987 | |
ML20215E462 | 30 November 1986 | Voltage Study for Split Group Bus Configuration | |
ML20212A307 | 6 June 1986 | Union Electric Co Callaway Plant Cycle 2 Startup Test Rept | |
ML20195C779 | 20 February 1986 | Rev 2 to Triaxial Peak Accelerograph Channel Calibr for D51-R120 (Reactor Recirculation Pump) | |
ML20195C760 | 20 February 1986 | Rev 1 to Seismic Instruments Channel Check | |
ML20210T527 | 19 February 1986 | Rev 2 to Triaxial Peak Accelerograph Channel Calibr for D51-R140 (HPCS Pump Base Mat) | |
ML20195C894 | 18 February 1986 | Rev 2 to Triaxial Response Spectrum Recorder Channel Calibr for D51-R170 (Reactor Recirculation Piping Support) | |
ML20195C768 | 18 February 1986 | Rev 1 to Triaxial Peak Accelerograph Channel Calibr for D51-R120 (Reactor Recirculation Pump) | |
ML20195C852 | 18 February 1986 | Rev 2 to Triaxial Peak Accelerograph Channel Calibr for D51-R130 (HPCS Piping in Reactor Bldg) | |
ML20195C873 | 17 February 1986 | Rev 1 to Triaxial Response Spectrum Recorder Channel Calibr for D51-R190 (RCIC Pump Base Mat). Related Documentation Encl | |
ML20195C867 | 17 February 1986 | Rev 1 to Triaxial Response Spectrum Recorder Channel Calibr for D51-R180 (HPCS Pump Base Mat) | |
ML20195C860 | 14 February 1986 | Rev 1 to Triaxial Response Spectrum Recorder Channel Calibr for D51-R160 (Reactor Bldg Foundation) | |
ML20195C739 | 7 February 1986 | Rev 1 to Triaxial Time-History Accelerograph Channel Calibr | Earthquake |
ML20195C752 | 7 February 1986 | Rev 1 to Triaxial Seismic Switch Channel Calibr for D51-N150 | |
ML20137T603 | 27 November 1985 | Startup Rept for Cycle 1 | Boric Acid Reactor Vessel Water Level High Radiation Area Test box Power change |
ML20213G152 | 26 September 1985 | Sanitized Version of Test Program on Isolation Relays & Analog Signal Isolators for Use in Hope Creek Generating Station. W/Three Oversize Drawings | |
ML20133N021 | 27 August 1985 | Electrical Cable Separation Verification Testing | |
ML20100G097 | 19 March 1985 | Startup Rept | |
ML20100N136 | 28 February 1985 | Phase II Testing at Sites 23CY-20,23CY-352,23CY-359,Union Electric Co,Callaway Nuclear Power Plant, Final Rept | |
ML20099E656 | 18 February 1985 | Rev 1 to Reactor Vessel Cavity Seal Test Results,Catawba Nuclear Station,Units 1 & 2,McGuire Nuclear Station,Units 1 & 2 | Hydrostatic |
ML20112J719 | 4 February 1985 | Rev a to Qualification Rept for Model KDI-1000 High-Range Containment Area Radiation Detector & Mineral-Insulated Cable Sys | |
ML20104A960 | 18 January 1985 | Reactor Vessel Cavity Seal Test Results | Hydrostatic |
ML20198E744 | 10 January 1985 | Test Rept for Full Flow Testing of 16,18 & 20-Inch Main Steam Safety Valve Vent Stacks for Yankee Atomic Electric Co | |
ML20117E004 | 31 December 1984 | Primary Reactor Containment Integrated Leakage Rate Test, Final Rept | |
ML20101D281 | 18 December 1984 | Addendum to Containment Structural Integrity & Integrated Leak Rate Test | |
ML20137Z827 | 30 November 1984 | Nuclear Component Qualification Test Rept Square D 9025-BCW-45 Thermal Switch | Earthquake |
ML20098F544 | 30 September 1984 | Rev 0 to Evaluation of Tests Performed on Energy Absorbing Matl for Pipe Whip Restraints | Finite Element Analysis |
ML20100N109 | 31 August 1984 | Reactor Vessel Irradiation Surveillance Program Analysis of Capsule 8, Final Rept | |
ML20094C151 | 12 July 1984 | Extension of Retainer Lifetime to 4 Cycles | Flow Induced Vibration |
ML20094G745 | 30 April 1984 | Rev 1 to Evaluation of Energy Absorbing Matl for Pipe Whip Restraints | |
ML20138P455 | 19 April 1984 | Elcometer Adhesion Tests Nutec Concrete Coating Repair Sys 11S/1201/11S/1201 11S/1201/11/1201. Related Documentation Encl | Coatings |
ML20100N115 | 31 March 1984 | Reactor Vessel Irradiation Surveillance Program Analysis of Capsule 18, Final Rept | |
ML20090J560 | 23 March 1984 | Reactor Containment Bldg Integrated Leak Rate Test (Preoperational) | |
ML20080B269 | 29 February 1984 | Diesel Generator Rocker Arm Lube Oil Temp Test Rept - SER Confirmatory Item 26 for Callaway & Item B.26 for Wolf Creek | |
ML20088A519 | 31 January 1984 | Primary Reactor Containment Structural Integrity Test & Integrated Leakage Rate Test, Jan 1984 Final Rept | |
ML20080U493 | 31 January 1984 | Evaluation of Natural Circulation Cooldown Test Performed at San Onofre Nuclear Generating Station | |
ML20086P064 | 1 December 1983 | Section 5.0, Startup Addenda, to Monthly Project Status Rept | Hydrostatic |