 Issue dateTitleTopic
ML20211G05031 August 1999Rev 0 to NF-908.03, Brunswick Unit 2,Cycle 14 Neutronics Startup ReptShutdown Margin
ML20204D49631 March 1999Rev 0 to Brunswick Steam Electric Plant,Unit 1 Simulator Certification ReptHydrostatic
Emergency Lighting
ML20204D52431 March 1999Rev 0 to Brunswick Steam Electric Plant,Unit 2 Simulator Certification Quadrennial ReptScram Discharge Volume
Power Uprate
Overspeed trip
Loss of condenser vacuum
ML20249C01311 June 1998Rev 0 to TR-ECCS-GEN-011, ECCS Suction Strainer Hydrodynamic Test Summary Rept
ML20198T29624 November 1997Rev 0 to B2C13, Brunswick Unit 2,Cycle 13 Neutronics Startup ReptShutdown Margin
ML20198T3137 November 1997BSEP Unit 2 Power Uprate Startup Test Rept for Cycle 13Shutdown Margin
Power Uprate
ML20249C00430 September 1997Rev 2 to TR-ECCS-GEN-01-NP, Hydrodynamic Inertial Mass Testing of ECCS Suction Strainers
ML20249C00930 September 1997Rev 1 to TR-ECCS-GEN-05-NP, Hydrodynamic Inertial Mass Testing of ECCS Suction Strainers Suppl 1 - Free Vibration Data Analysis
ML20217E27917 September 1997Tensil Testing & Charpy Impact Testing of Reactor Archive Matl
ML20148E94429 May 1997Power Update Startup Test Rept for Cycle 11Shutdown Margin
Power Uprate
ML20134J32829 January 1997Rev 2 to NF-908.02, Brunswick Unit 1,Cycle 11 Neutronics Startup ReptShutdown Margin
ML20117N43330 April 1996Rev 0 to NF-908.03, Brunswick Unit 2,Cycle 12 Startup ReptShutdown Margin
ML20072F26124 May 1994RPV Surveillance Matls Testing
ML20210U75530 April 1994Rev 0 to GE-NE-523-48-0494, Structural Assessment of Brunswick 1 RPV for Scram Event
ML20056C9968 July 1993Re 2 to Test Rept for Analysis of EMI Main Control Room Mapping Data & GE Numac Ldm (Part 1) for Carolina Power & Light Co One Hanover Square Bldg - 5B5 Raleigh,Nc
ML20056C93430 June 1993Rev 1 to Test Rept for Point of Installation Electromagnetic Interference (EMI) Mapping of Control Rooms, Brunswick Plant,Units 1 & 2
ML20044G25726 April 1993Final Reactor Containment Bldg Integrated Leak Rate Test Rept.
ML20094K0591 December 1991Reactor Containment Bldg Integrated Leakage Rate Test Rept
ML20073J0644 February 1991Project Unit I,Reactor Containment Bldg Integrated Leakage Rate Test ReptPacking leak
ML20042G59028 February 1990Reactor Containment Bldg Integrated Leak Rate Test. W/900508 LtrReactor Vessel Water Level
Packing leak
ML20246H98730 April 1988Environ Qualification of Continental Wire & Cable Corp Instrumentation Cable Installed in Beaver Valley Power Station Unit 1
ML20196A28031 March 1988Reactor Containment Bldg Integrated Leak Rate TestReactor Vessel Water Level
Packing leak
Hydrostatic
ML20153G34825 November 1987Rev 1 to Irradiation Study of Boraflex Neutron Absorber Interim Test Data, Interim Technical Rept
ML20236H73331 May 1987Reactor Containment Bldg Integrated Leak Rate TestReactor Vessel Water Level
ML20215E46230 November 1986Voltage Study for Split Group Bus Configuration
ML20207J48631 May 1986Reactor Containment Bldg Integrated Leak Rate TestReactor Vessel Water Level
Packing leak
Local Leak Rate Testing
ML20195C76020 February 1986Rev 1 to Seismic Instruments Channel Check
ML20195C77920 February 1986Rev 2 to Triaxial Peak Accelerograph Channel Calibr for D51-R120 (Reactor Recirculation Pump)
ML20210T52719 February 1986Rev 2 to Triaxial Peak Accelerograph Channel Calibr for D51-R140 (HPCS Pump Base Mat)
ML20195C76818 February 1986Rev 1 to Triaxial Peak Accelerograph Channel Calibr for D51-R120 (Reactor Recirculation Pump)
ML20195C85218 February 1986Rev 2 to Triaxial Peak Accelerograph Channel Calibr for D51-R130 (HPCS Piping in Reactor Bldg)
ML20195C89418 February 1986Rev 2 to Triaxial Response Spectrum Recorder Channel Calibr for D51-R170 (Reactor Recirculation Piping Support)
ML20195C86717 February 1986Rev 1 to Triaxial Response Spectrum Recorder Channel Calibr for D51-R180 (HPCS Pump Base Mat)
ML20195C87317 February 1986Rev 1 to Triaxial Response Spectrum Recorder Channel Calibr for D51-R190 (RCIC Pump Base Mat). Related Documentation Encl
ML20195C86014 February 1986Rev 1 to Triaxial Response Spectrum Recorder Channel Calibr for D51-R160 (Reactor Bldg Foundation)
ML20195C7527 February 1986Rev 1 to Triaxial Seismic Switch Channel Calibr for D51-N150
ML20195C7397 February 1986Rev 1 to Triaxial Time-History Accelerograph Channel CalibrEarthquake
ML20138R04830 September 1985Reactor Containment Bldg Integrated Leak Rate Test Brunswick Steam Electric Plant Unit 1Reactor Vessel Water Level
Packing leak
ML20213G15226 September 1985Sanitized Version of Test Program on Isolation Relays & Analog Signal Isolators for Use in Hope Creek Generating Station. W/Three Oversize Drawings
ML20133N02127 August 1985Electrical Cable Separation Verification Testing
ML20099E65618 February 1985Rev 1 to Reactor Vessel Cavity Seal Test Results,Catawba Nuclear Station,Units 1 & 2,McGuire Nuclear Station,Units 1 & 2Hydrostatic
ML20112J7194 February 1985Rev a to Qualification Rept for Model KDI-1000 High-Range Containment Area Radiation Detector & Mineral-Insulated Cable Sys
ML20104A96018 January 1985Reactor Vessel Cavity Seal Test ResultsHydrostatic
ML20198E74410 January 1985Test Rept for Full Flow Testing of 16,18 & 20-Inch Main Steam Safety Valve Vent Stacks for Yankee Atomic Electric Co
ML20137Z82730 November 1984Nuclear Component Qualification Test Rept Square D 9025-BCW-45 Thermal SwitchEarthquake
ML20101K33330 September 1984Reactor Containment Bldg Integrated Leak Rate Test, Sept 1984Reactor Vessel Water Level
Packing leak
Local Leak Rate Testing
ML20098F54430 September 1984Rev 0 to Evaluation of Tests Performed on Energy Absorbing Matl for Pipe Whip RestraintsFinite Element Analysis
ML20100N10931 August 1984Reactor Vessel Irradiation Surveillance Program Analysis of Capsule 8, Final Rept
ML20107M36124 August 1984Environ Qualification of Raychem-Flamtrom TM-1,000 Volt Control 7/C 12AWG 1975 CG12-400 Cable for CP&L Brunswick Steam Electric Plants 1 & 2
ML20094C15112 July 1984Extension of Retainer Lifetime to 4 CyclesFlow Induced Vibration