Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20210R35813 August 1999Proposed Tech Specs Allowing Performance of CRDM & Ni Instrumentation Replacement to Not Be Considered Core Alterations During Operational Condition 5,Refueling,while Fuel Is in Reactor VesselShutdown Margin
ML20210Q4106 August 1999Proposed Tech Specs Section 3/4.6.4, Vacuum Relief, Removing Specific Operability Requirements Related to Position Indication for Suppression chamber-drywell Vacuum Breakers & Revising Action Statements & Srs,Per NUREG-1433
ML20210J17530 July 1999Marked-up TS Pages for Proposed Changes Re Upper Temp Limit for UHSUltimate heat sink
Anticipated operational occurrence
ML20209G35814 July 1999Proposed Tech Specs Pages Re Amend to Licenses NPF-11 & NPF-18,revising TS Allowing LCS Units 1 & 2 to Operate at Uprated Power Level of 3489 MwtProcess Control Program
ML20209D3937 July 1999Proposed Tech Specs,Changing Proposed Degraded Voltage Low Limit Setpoint & Adding High Limit Setpoint & Allowable Value
ML20209D3237 July 1999Proposed Tech Specs,Revising MCPR Safety Limits & Adding Approved Siemens Power Corp Methodology List of TRs for COLRAnticipated operational occurrence
Fuel cladding
ML20209B74130 June 1999Proposed Tech Specs Section 3.8.5, DC Sources - Shutdown, Correcting LCO & Braidwood TS Section 3.8, Electrical Power Systems, Deleting Various References to At&T BatteriesSafe Shutdown
Battery sizing
ML20206T14019 May 1999Proposed Tech Specs Section 3/4.4.4, Chemistry, Relocating to UFSARPressure Boundary Leakage
ML20204H97823 March 1999Proposed Tech Specs,Revising Sections 3.7.15,3.7.16,4.3.1 & 4.3.3 to Support Installation of New Boral high-density SFP Storage Racks at Byron & Braidwood StationsNondestructive Examination
Earthquake
ML20204H42922 March 1999Proposed Tech Specs 3.9.3,allowing Use of Gamma-Metrics post-accident Neutron Monitors to Provide Neutron Flux Info During Operational Mode 6Anticipated operational occurrence
ML20198N34729 December 1998Proposed ITS Tables 3.3.1-1 & 3.3.2-1,revising Twelve Allowable ValuesSafe Shutdown
ML20198N20429 December 1998Revised Tech Specs Change,Page 3/4 3-54,providing Early Implementation of Containment Floor Drain Sump Water Level Instrumentation RequirementsReactor Vessel Water Level
ML20198K58423 December 1998Revised Tech Spec Pages 3/4 3-53,3/4 3-53a,6-27 & 6-27a,for Rv LI SysReactor Vessel Water Level
Offsite Dose Calculation Manual
ML20198A08114 December 1998Proposed Rev T to Improved Tech Specs Section 3.4, Reactor Coolant SysGrab sample
Power Operated Valves
ML20196G66130 November 1998Proposed Rev to Improved Tech Specs Section 3.1
ML20196B41025 November 1998Proposed Tech Specs Facilitating Replacement of 125 Vdc At&T Batteries with New 125 Vdc C&D Batteries While in Mode 1-4Safe Shutdown
ML20195E0109 November 1998Proposed Tech Specs Re Application for Amends to Licenses NPF-11 & NPF-18,adding Automatic Primary Containment Isolation on Ambient & Differential Temperature to High for RWCU Sys Pump,Pump Valve,Holdup Pipe & Filter/Demineralizer
ML20195E0549 November 1998Proposed Tech Specs Pages Re Application for Amends to Licenses NPF-11 & NPF-18,to Modify Degraded Voltage Second Level Undervoltage Relay Setpoint & Allowable Value to TS 3/4.3.3 & TS Table 3.3.3-2Safe Shutdown
ML20155J2055 November 1998Proposed TS Converting to Its,Rev R
ML20155J00430 October 1998Proposed Tech Specs Section 5.6.2, Fuel Storage Drainage, to Identify Sf Pool Level Sufficient to Ensure SRP Acceptance Criteria
ML20154S50118 October 1998Proposed Rev N to Improved TS Section 3.7Safe Shutdown
Ultimate heat sink
Anticipated operational occurrence
Power Operated Valves
Power change
ML20154M46416 October 1998Proposed Tech Specs,Lowering Power Level Below Which TCV & TSV Closure Scram Signals & EOC-RPT Signal Are Not in EffectShutdown Margin
Reactor Vessel Water Level
Scram Discharge Volume
Feedwater Controller Failure
ML20154M52815 October 1998Revisions K,O & P of 961213 ITS Submittal
ML20154A8882 October 1998Proposed Rev L to Improved Tech Specs Section 3.8 Closeout
ML20153G43325 September 1998Revs J & M to Tech Specs Sections 3.6 & 5.0,converting to Improved Tech Specs (Its),Final Closeout Package
ML20236W58531 July 1998Proposed Rev G to Sections 3.1 & 3.2 of Improved Tech Specs
ML20237B63930 July 1998Proposed Rev H to Section 3.5 of Improved Tech Specs
ML20237E99721 July 1998Rev I to Proposed Improved Tss,Section 3.9 Re Final Closeout
ML20237B7029 July 1998Proposed Improved TS (ITS) Section 3.3 Issued as Result of Removing Generic Change Traveler TSTF-135,Rev E from ITS Submittal
ML20236H6532 July 1998Rev F to 961213 Improved TS Submittal,Containing Final Package Closeout for Improved TS Sections 1.0,2.0 & 3.0
ML20248M1491 June 1998Proposed Tech Specs Bases Page B 3.8-58b,converting to Improved Tech Specs
ML20248C55129 May 1998Proposed Tech Specs Bases Section 3/4.4.4, Relief Valves, Specifically Crediting Automatic Function of PORVs to Provide Mitigation for Inadvertent Operation of ECCS at Power AccidentMaintenance Rule Program
Pressure Boundary Leakage
Backfit
ML20217M6671 May 1998Proposed Tech Specs Adding Ventilation Filter Testing ProgramUltimate heat sink
ML20216D9439 April 1998Modified Proposed TS Pages Re 980324 Request for Amends to Licenses NPF-37 & NPF-66
ML20216E3227 April 1998Proposed Tech Specs Pages Re Addition of Ventilation Filter Testing Program
ML20217J29824 March 1998Proposed Tech Specs Deleting Unit 1 License Condition 2.C.(30)(a) in Entirety
ML20217E18924 March 1998Proposed Tech Specs Surveillance Sections & Bases Allowing Util to Defer 10CFR50,App J,Type a Testing of Byron Unit 2 Containment Until Next Refuel Outage in 1999
ML20217B26814 February 1998Proposed Rev D to ITSHigh Radiation Area
Annual Radiological Environmental Operating Report
Process Control Program
ML20202C8972 February 1998Proposed Tech Specs Re Changes to Relocate Fire Protection RequirementsSafe Shutdown
Fire Barrier
Hydrostatic
Fire Protection Program
ML20198L81314 January 1998Proposed Tech Specs Pages Revising TS 3.4.8, Specific Activity, Figure 3.4-1,Table 4.4-4 & TS Bases 3.4.8Power change
ML20198L88114 January 1998Proposed Tech Specs Pages,Revising TS Section 3/4.8.2 & Bases,To Allow Replacement of 125 Volt Dc At&T Batteries W/New Charter Power Sys,Inc (C&D) Batteries
ML20198C31830 December 1997Proposed Tech Specs 3.7.1.3 Re Condensate Storage TankUltimate heat sink
ML20203M59217 December 1997Proposed Tech Specs,Rev C Changes Improved TSs 3.0,3.3,3.7, 3.8 & 5.0 as Result of Removing Generic Change Traveler TSTF-115 from Improved TS SubmittalSafe Shutdown
Anticipated operational occurrence
Battery sizing
Offsite Circuit
ML20203G50512 December 1997Proposed Tech Specs,Modifying Bypass Logic for Msli Valve Isolation Acuation Instrumentation on Condenser Low VacuumReactor Vessel Water Level
ML20203D0369 December 1997Proposed Tech Specs Pages Correcting Errors Discovered in Current TS W/Regards to Total RCS Volume & Correction to Increase in RCS Volume Associated W/Unit 1 Replacement SGs Accounting for Hot ConditionsLoop seal
ML20199K54824 November 1997Proposed Ts,Adding Automatic Primary Containment Isolation on Ambient & Differential Temp High for Rwcs Pump,Pump Valve,Holdup Pipe & F/D Valve Rooms & Eliminating RHR Sys Steam Condensing Mode Isolation Actuation InstrumentationReactor Vessel Water Level
ML20199A4757 November 1997Proposed Tech Specs Pages Revising TS Surveillance Sections 4.6.1.1.c,4.6.1.2.a,4.6.1.2.c & Bases to Allow Performance of 10CFR50 App J,Type a Testing
ML20217K44621 October 1997Proposed Tech Specs Re Boron Credit in SFPHigh Radiation Area
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
ML20211P93315 October 1997Proposed Tech Specs Eliminating Unnecessary Detail from Accident Monitoring Instrumentation Surveillance Requirements
ML20202F45610 October 1997Proposed Tech Specs,Deleting Lower Flow Rate Requirement Associated W/Nonaccessible Area Exhaust Filter Plenum & Fuel Handling Bldg Ventilation SysShutdown Margin
Process Control Program