Issue date | Title | Topic | |
---|---|---|---|
ML20211K841 | 2 September 1999 | Proposed Tech Specs Deleting Inequality Signs from Trip Setpoints in SR 3.3.5.3 & Reflecting Info on Calibr Tolerance Band | |
ML20210H290 | 30 July 1999 | Proposed Tech Specs Pages,Extending Operation of RBS from Current Licensed Power Level of 2894 Mwt to Uprated Power Level 3039 Mwt | Reactor Vessel Water Level Hydrostatic Abnormal operational transient Overtravel Fuel cladding |
ML20210J143 | 29 July 1999 | Proposed Tech Specs Changes to ITSs | Post Accident Monitoring Hydrostatic Pressure and Temperature Limits Report |
ML20209D365 | 8 July 1999 | Proposed Tech Specs Pages Re Amend to License NPF-42, Revising Allowable Value for CTS Table 3.3-4,functional Unit 8.a.,4 Kv Undervoltage - Loss of Voltage & Functional Unit 8.b.,4 Kv Undervoltage - Grid Degraded Voltage | |
ML20209C208 | 30 June 1999 | Proposed Tech Specs Re Temporary Change to CTS Without Action to Reduce Power | Ultimate heat sink |
ML20195G033 | 11 June 1999 | Proposed Tech Specs Pages,Revising TS 3.7.1.6 & Bases by Modifying LCO to Require Four ARVs to Be Operable, Eliminating Use of Required in Action Statements & Adding New Action for Three or More ARVs Inoperable | Safe Shutdown |
ML20195F796 | 10 June 1999 | Proposed Tech Specs,Revising Z,S & Allowable Value Terms for Current TS Table 3.3-4,functional Unit 7.b,automatic Switchover to Containment Sump (RWST Level - Low-Low) | |
ML20206Q904 | 11 May 1999 | Proposed Tech Specs 3/4.7.5, Ultimate Heat Sink, Proposing Addl Required Zcaion for Restoring Ultimate Heat Sink to Operable Status within Completion Time of 8 H | Ultimate heat sink |
ML20205P870 | 15 April 1999 | Proposed Tech Specs,Implementing Bwrog/Ge Enhanced Option I-A (EI-A) Reactor Stability long-term Solution | Anticipated operational occurrence |
ML20205L732 | 8 April 1999 | Proposed Tech Specs,Removing Notes That Refer to Specific Cycles,Per LAR 1998-15 Re Change to TS 2.1.1.2, Reactor Core Safety Limits | Reactor Vessel Water Level |
ML20196K732 | 26 March 1999 | Proposed Tech Specs Converting to Improved Tech Specs | Safe Shutdown Unanalyzed Condition Boric Acid Time of Discovery Shutdown Margin Reactor Vessel Water Level High Radiation Area Ultimate heat sink Offsite Dose Calculation Manual Stroke time Anticipated operational occurrence Post Accident Monitoring Hydrostatic Pressure and Temperature Limits Report Annual Radiological Environmental Operating Report Process Control Program Earthquake Deep Dose Equivalent Fuel cladding Pressure Boundary Leakage Offsite Circuit Fire Protection Program Power change Unidentified leakage |
ML20205A211 | 25 March 1999 | Markups of Current & Improved TS Re TS Conversion Application | |
ML20207J202 | 5 March 1999 | Proposed Tech Specs Re Conversion to ITS Section 1,0,3.1, 3.2,3.3,3.4,3.6,3.7,3.8,3.9,4.0 & 5.0 | Safe Shutdown Shutdown Margin Reactor Vessel Water Level High Radiation Area Post Accident Monitoring Offsite Circuit Grace period Power change Unidentified leakage |
ML20199G728 | 15 January 1999 | Proposed Tech Specs SR 4.7.3b Deleting During SD Requirement & Reflect Appropriate Plant Conditions in Associated 3/4.7.3 Bases | Ultimate heat sink |
ML20199F451 | 12 January 1999 | Proposed Tech Specs Pages Re Amend to License NPF-42, Revising TS 3/4.7.5 by Adding New Action Statement Requiring Verification of Operability of Two RHR Trains,Or Initiation of Power Reduction with Only One RHR Train Operable | Ultimate heat sink Anticipated operational occurrence |
ML20206R935 | 12 January 1999 | Proposed Tech Specs Re Refueling Equipment Interlocks Required Actions | |
ML20199C188 | 8 January 1999 | Revised Page 7 to Rev 13 of RBS Security Training & Qualification Plan | |
ML20198P121 | 29 December 1998 | Proposed Tech Specs to Incorporate Revised Heatup & Cooldown Limit Curves & Revised Cold Overpressure Mitigation Sys (COMS) PORV | Stroke time Hydrostatic Exemption Request |
ML20207J962 | 18 December 1998 | Rev 1 to TRM for Wolf Creek Generating Station,Unit 1 | Boric Acid Shutdown Margin High Radiation Area Grab sample Annual Radioactive Effluent Release Report Earthquake |
ML20198E809 | 16 December 1998 | Proposed Tech Specs Pages Re Change to TS Safety Limit 2.1.1.2,changing Two Recirculation Loop MCPR Limit from 1.13 to 1.12 & Single Recirculation Loop MCPR Limit from 1.14 to 1.13 | Reactor Vessel Water Level |
ML20197H670 | 8 December 1998 | Proposed Corrected Tech Spec Page 4.0-2 Increasing Spent Fuel Storage Capacity | |
ML20196G616 | 2 December 1998 | Proposed Tech Specs Section 3.3, Instrumentation | |
ML20196B490 | 24 November 1998 | Proposed Tech Specs Pages & follow-up Items Re Proposed Conversion to TS Section 1.0,3.4,3.5 & 3.6,per 980828 RAI | Shutdown Margin Pressure and Temperature Limits Report Pressure Boundary Leakage |
ML20196A140 | 20 November 1998 | Proposed Tech Specs Adding 3.10.9, Control Rod Pattern - Cycle 8, to Support Startup from Outage Planned for Early Dec 1998 | |
ML20195E767 | 10 November 1998 | Rev 0 to EPP 01-2.4, Core Damage Assessment Guidance | |
ML20155H612 | 6 November 1998 | Proposed Tech Specs Bases 3/4.7.1.2 Re Afws | |
ML20155H684 | 6 November 1998 | Proposed Tech Specs Pages,Revising TS Bases Section 3/4.4.4, Relief Valves | |
ML20154S591 | 23 October 1998 | Proposed Tech Specs Sections 3.1, Reactivity Control Sys, 3.2, Power Distribution Sys, 3.4, RCS, 3.5, ECCS & 5.0, Administrative Controls | |
ML20154S572 | 23 October 1998 | Proposed Tech Specs Section 3.5.1,increasing AOT in Action B. to 24 Hours in Lieu of Current AOT of One Hour | |
ML20154R932 | 20 October 1998 | Proposed Tech Specs 3/4.3,changing ESFAS Functional Units 6.f,8.a & 8.b | Offsite Circuit |
ML20154H369 | 8 October 1998 | Proposed Tech Specs Implementing BWROG Enhanced Option I-A Reactor Stability Long Term Solution as Documented in NEDO-32339,Rev 1, Reactor Stability Long-Term Solution, Enhanced Option I-A | Anticipated operational occurrence Abnormal operational transient Annual Radiological Environmental Operating Report Process Control Program Fuel cladding |
ML20153H043 | 24 September 1998 | Proposed Tech Specs Pages Re RAI on Application for Amend to License NPF-42,incorporating Changes to TS Sections 3.4 & 5.0 | |
ML20153H031 | 23 September 1998 | Proposed Tech Specs Changing Specific Gravity Acceptance Criteria for Div III Battery | |
ML20153E811 | 22 September 1998 | Proposed Tech Specs Deleting License Conditions Associated with Transamerica Delaval,Inc EDGs | Ultimate heat sink |
ML20236Y277 | 5 August 1998 | Proposed Tech Specs Sections 3.1,3.2,3.5,3.9 & 4.0 Converting to Improved Std Tech Specs | |
ML20236R478 | 17 July 1998 | Proposed Tech Specs 3/4.7.5 Revising UHS by Adding Temporary New Action Statement | Ultimate heat sink |
ML20236G832 | 30 June 1998 | Proposed Tech Specs Re Section 3.6, Containment Sys | |
ML20247F861 | 8 May 1998 | Proposed Tech Specs 3/4.3.2,Table 3.3-3,revising Functional Unit 7.b.,RWST Level low-low Coincident W/Safety Injection, by Adding New Action Statement | |
ML20217J095 | 21 April 1998 | Proposed Tech Specs Bases Update Package for Revs Implemented Since Last Submittal Through Refuel Outage 7 | Safe Shutdown Shutdown Margin High Radiation Area Ultimate heat sink Stroke time Anticipated operational occurrence Post Accident Monitoring Hydrostatic Abnormal operational transient Scram Discharge Volume Fuel cladding Offsite Circuit |
ML20216F194 | 9 April 1998 | Proposed Tech Specs License Condition 2.C(13) Re Partial Feedwater Heating & Final Feedwater Temp Reduction | |
ML20216J829 | 20 March 1998 | Proposed Tech Specs,Increasing Spent Fuel Storage Capacity & Increasing Max Nominal Fuel Enrichment to 5.0 W/O (Nominal Weight Percent) U-235 | High Radiation Area Time to boil Nondestructive Examination Finite Element Analysis Fuel cladding |
ML20202C456 | 4 February 1998 | Proposed Tech Specs 3/4.3 Re Changes to ESFAS Functional Units 6.f,8.a & 8.b | Offsite Circuit |
ML20202D125 | 4 February 1998 | Proposed Tech Specs 3/4.2.4 Re Quadrant Power Tilt Ratio | |
ML20199H355 | 28 January 1998 | Proposed Tech Specs 6.3 & 6.12,reflecting Position Change within Organization | High Radiation Area |
RBG-44355, Cycle 8 Startup Physics Test Summary | 19 January 1998 | Cycle 8 Startup Physics Test Summary | Shutdown Margin Stroke time |
ML20198P500 | 15 January 1998 | Proposed Tech Specs Replacement Pages Clarifying Bases in 970-902 LAR Re Auxiliary Feedwater Sys | |
ML20202F036 | 26 November 1997 | Rev 0 to IST Plan for Pumps & Valves Second Ten-Yr Interval | Safe Shutdown Ultimate heat sink Stroke time Hydrostatic Scram Discharge Volume Cold shutdown justification Power-Operated Valves Power Operated Valves Scaffolding |
ML20198Q941 | 6 November 1997 | Proposed Tech Specs Bases Section 3/4.8.1,3/4.8.2 & 3/4.8.3 for Installation of Spare Battery Chargers | |
ML20217K218 | 17 October 1997 | Proposed Tech Specs 4.5.2b,revising Surveillance Requirement to Vent ECCS Pump Casings | Stroke time |
ML20217B616 | 19 September 1997 | Proposed Tech Specs Bases Section B3/4.9.2,adding Info Re Role of Source of Power Supplied to One Source Range Neutron Flux Monitor in Determining Operability of Monitor in Mode 6 |