Issue date | Title | Topic | |
---|---|---|---|
ML20211N553 | 8 September 1999 | Safety Evaluation Supporting Amend 121 to License NPF-57 | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program |
ML20216D833 | 26 July 1999 | Safety Evaluation Concluding That Licensee IPEEE Complete Re Info Requested by Suppl 4 to GL 88-20 & That IPEEE Results Reasonable Given HCGS Design,Operation & History | Safe Shutdown High winds Tornado Missile Safe Shutdown Earthquake Earthquake |
ML20210F333 | 22 July 1999 | Safety Evaluation Granting Relief Requests RR-B1,RR-C1,RR-D1 & RR-B3.Finds That Proposed Alternative for RR-B3 Provides Acceptable Level of Quality & Safety & Authorizes Alternative Pursuant to 10CFR50.55a(a)(3)(i) | Fire Barrier Incorporated by reference Pressure Boundary Leakage |
ML20206Q473 | 14 May 1999 | SER Accepting Response to GL 97-05, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Plant | Power-Operated Valves Backfit |
ML20206C848 | 22 April 1999 | SER Authorizing Pse&G Proposed Relief Requests Associated with Changes Made to Repair Plan for Core Spray Nozzle Weld N5B Pursuant to 10CFR50.55a(a)(3)(i) | Weld Overlay Hydrostatic Nondestructive Examination Dissimilar Metal Weld |
ML20205G605 | 19 March 1999 | SER Accepting Relief Request Re Acme Code Case N-567, Alternate Requirements for Class 1,2 & 3 Replacement Components,Section Xi,Div 1 | Non-Destructive Examination Hydrostatic Incorporated by reference |
ML20205F891 | 18 March 1999 | Safety Evaluation Authorizing Licensee Requests for Second 10-year Interval for Pumps & Valves IST Program | Stroke time Incorporated by reference Scram Discharge Volume Power-Operated Valves Power Operated Valves |
ML20198H812 | 18 December 1997 | Corrected Safety Evaluation Supporting Amend 63 to License NPF-57,correcting Error Re Description of Min Core Thermal Power & Flow Conditions to Avoid Thermal Stratification | |
ML20199C144 | 6 November 1997 | Safety Evaluation Supporting Amend 108 to License NPF-57 | Ultimate heat sink Offsite Dose Calculation Manual |
ML20198P386 | 31 October 1997 | Safety Evaluation Authorizing Licensee & Suppls & 1001,requesting Alternative to Perform RPV Circumferential Sheld Weld Exam Requirements of ASME Boiler & Pressure Vessel Code,Section XI,1993 Edition | Incorporated by reference |
ML20199B202 | 31 October 1997 | Safety Evaluation Concluding That Insufficient Info Was Available for Staff to Perform Any Detailed Evaluation of Adequacy of Licensee New Strainer Design | Coatings Foreign Material Exclusion |
ML20212C448 | 17 October 1997 | SER Accepting Alternative to ASME Section XI Code Requirements to Use Code N-432 & N-504-1 for Weld Overlay Repair for Hope Creek Generating Station | Weld Overlay |
ML20217D834 | 25 September 1997 | Safety Evaluation Authorizing Licensee Request for Relief RR-C2 for Plant,First 10-yr Interval Insp Program Plan | Hydrostatic VT-2 Incorporated by reference |
ML20198F998 | 4 August 1997 | Safety Evaluation Accepting Proposed Changes to Rev 8 of HCGS Qap,Submitted on 970516 & 970606 by PSEG | |
ML20133N649 | 24 December 1996 | Safety Evaluation Denying Amend Request Re Plant Svc Water Sys & Ultimate Heat Sink | Ultimate heat sink Safe Shutdown Earthquake |
ML20134L718 | 12 November 1996 | Safety Evaluation Accepting Relief Request V-20 | Stroke time Incorporated by reference |
ML20128G276 | 26 September 1996 | SER Accepting Continuation of 18-month Test Schedule for Drywell to Suppression Chamber Vacuum Breakers | |
ML20058G517 | 29 November 1993 | Safety Evaluation Supporting Amend 60 to License NPF-57 | |
ML20058N831 | 13 August 1990 | Safety Evaluation Granting Relief Until Next Scheduled Outage Exceeding 30 Days & No Later than Next Scheduled Refueling Outage | |
ML20055D336 | 27 June 1990 | Safety Evaluation Re Util 881128,900308 & 0417 Responses to Generic Ltr 88-11.Proposed Pressure/Temp Limits for RCS for Heatup,Cooldown,Leak Test & Criticality Acceptable & May Be Incorporated Into Plant Tech Specs,Per Reg Guide 1.99 | Hydrostatic |
ML20195H675 | 22 November 1988 | Safety Evaluation Re Part 2 of Item 2.1 to Generic Ltr 83-28, Vendor Interface Programs - Reactor Trip Sys Components | |
ML20151E275 | 11 April 1988 | SER Supporting Util Responses to Part 1,Item 2.1 of Generic Ltr 83-28, Required Actions Based on Generic Implications of Salem ATWS Events | |
ML20148P634 | 19 January 1988 | Safety Evaluation Supporting Amend 14 to License NPF-57 | Spiral reload |
ML20237B461 | 11 December 1987 | Safety Evaluation Granting Relief from Exams & Testing Requirements & Alternate Methods from First 10-yr Interval Inservice Insp Program | Incorporated by reference |
ML20236V815 | 1 December 1987 | Safety Evaluation Supporting Program Existing for Identifying,Classifying & Treating Components Required for Performance of Reactor Trip Function as Safety Related. B&W Owners Group 870403 Internal Memo Also Encl | |
ML20236U615 | 24 November 1987 | Safety Evaluation Supporting Amend 12 to License NPF-57 | |
ML20236A889 | 14 October 1987 | Safety Evaluation Supporting Description of How Plant Alternate Rod Injection Sys,Atws Reactor Coolant Recirculation Pump Trip & Standby Liquid Control Sys Meet Requirements of ATWS Rule 10CFR50.62 | Anticipated operational occurrence |
ML20206G720 | 9 April 1987 | Safety Evaluation Supporting Util 861125 Rev 1 to Process Control Program | Process Control Program |
ML20206G400 | 7 April 1987 | Safety Evaluation Supporting Amend 3 to License NPF-57 | Fuel cladding |
ML20206R069 | 25 June 1986 | Safety Evaluation Supporting Util 841217 Response to Generic Ltr 83-28,Items 3.1.1,3.2.1,3.2.2 & 4.5.1 Re Required Actions Based on Generic Implications of Salem ATWS Events | Safe Shutdown |
ML20203N222 | 12 June 1986 | Safety Evaluation Accepting Util Responses to Generic Ltr 83-28,Items 3.1.1,3.1.2,3.2.1,3.2.2 & 4.5.1 | Safe Shutdown |
ML20154S208 | 27 March 1986 | SER Supporting Util 860127 Request to Use Later ASME Code Editions for Design & Fabrication of Components & Supports. Proposed FSAR Changes in ASME Code Section III Requirements Acceptable | Hydrostatic |
ML20137R919 | 4 February 1986 | Safety Evaluation Accepting Applicant 850821,1004 & 17,1106 & 1209 Proposed Mods to Tests 24,28E,25,28D,3,11,16,1 & 32 of Power Ascension Test Program | Minimum Critical Power Ratio |
ML20151Z108 | 3 February 1986 | SER Supporting Util Response to Generic Ltr 83-28,Item 1.2 Re post-trip Review (Data & Info Capability) | |
ML20151R251 | 22 January 1986 | Sser Supporting Power Ascension Test Program Acceleration. SALP Input Encl | |
ML20137L740 | 22 January 1986 | SER Supporting Util 840330 Response to Generic Ltr 83-28, Items 1.1,3.1.3 & 3.2.3 Re post-trip Review (Program Description Procedure) & post-maint Testing | |
ML20137M400 | 22 January 1986 | Safety Evaluation Accepting Power Ascension Program Proposed Test Mods | Abnormal operational transient |
ML20138M242 | 16 December 1985 | Sser Re Power Ascension Test Program Acceleration.Change Acceptable Except for Elimination of Testing at Test Condition 4.Justification for Deleting Testing at Test Condition 4 Insufficient | Abnormal operational transient |
ML20132A448 | 30 September 1985 | Safety Evaluation Supporting Elimination of Arbitrary Intermediate Pipe Breaks | Earthquake |