 Issue dateTitleTopic
L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-065428 November 2023Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654,Health Physics Network
High Radiation Area
Offsite Dose Calculation Manual
Met Tower
Incorporated by reference
FLEX
Severe Accident Management Guideline
Earthquake
Deep Dose Equivalent
Minimum staff
Fire Protection Program
Grace period
Overexposure
L-2023-162, Response to 50.69 2nd Round of Rals21 November 2023Response to 50.69 2nd Round of RalsProbabilistic Risk Assessment
Incorporated by reference
Fukushima Dai-Ichi
L-2023-118, Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors11 September 2023Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power ReactorsSafe Shutdown
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Multiple Spurious Operation
FLEX
B.5.b
L-2023-110, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project25 August 2023Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement ProjectHydrostatic
Probabilistic Risk Assessment
Large early release frequency
Time Critical Operator Action
Fire Protection Program
Coast down
Exclusive Use
Affidavit
L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 27 August 2023and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2Health Physics Network
Cyber Security
FLEX
B.5.b
Severe Accident Management Guideline
Minimum staff
Siren
L-2023-094, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project27 July 2023Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement ProjectInternal Flooding
Hydrostatic
Probabilistic Risk Assessment
Large early release frequency
Earthquake
Fire Protection Program
L-2023-069, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project31 May 2023Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement ProjectMission time
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Large early release frequency
Continuous fire watch
Fire Protection Program
ML23151A43624 May 2023License Amendment Request Revision 3 for the Technical Specifications Conversion to NUREG - 1431 Revision 5Safe Shutdown
Reactor Vessel Water Level
Offsite Dose Calculation Manual
Anticipated operational occurrence
Post Accident Monitoring
Incorporated by reference
Surveillance Frequency Control Program
Recently irradiated fuel
Offsite Circuit
Power Uprate
ML23151A43724 May 2023Attachment 3: Turkey Point Nuclear Plant, Units 3 and 4, Improved Technical Specifications Conversion License Amendment Request NRC Request for Additional Information and FPL Responses DatabaseSafe Shutdown
Reactor Vessel Water Level
Offsite Dose Calculation Manual
Anticipated operational occurrence
Post Accident Monitoring
Incorporated by reference
Surveillance Frequency Control Program
Recently irradiated fuel
Offsite Circuit
Power Uprate
L-2023-059, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response21 April 2023Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental ResponseCoatings
Aging Management
License Renewal
Subsequent License Renewal
ML23095A0084 April 2023Attachment 2 - Improved Technical Specifications Conversion License Amendment Request NRC Request for Additional Information and FPL Responses DatabaseSafe Shutdown
Time of Discovery
Shutdown Margin
High Radiation Area
Ultimate heat sink
Anticipated operational occurrence
Post Accident Monitoring
Internal Flooding
Nondestructive Examination
Emergency Lighting
Missed surveillance
Pressure and Temperature Limits Report
Surveillance Frequency Control Program
Battery sizing
Fuel cladding
Recently irradiated fuel
Offsite Circuit
Power change
L-2023-026, Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 427 March 2023Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 4Coatings
Aging Management
License Renewal
Subsequent License Renewal
L-2023-040, Response to Requests for Additional Information (Rals) and Requests for Confirmation of Information (Rc Ls) Following Regulatory Audit of Subsequent License Renewal Application3 March 2023Response to Requests for Additional Information (Rals) and Requests for Confirmation of Information (Rc Ls) Following Regulatory Audit of Subsequent License Renewal ApplicationAnnual Radioactive Effluent Release Report
License Renewal
Subsequent License Renewal
Environmental Justice
ML23013A20313 January 2023RAI Set 4 Draft ResponseAging Management
L-2022-181, Response to Request for Additional Information Regarding License Amendment Request for the Technical Specifications Conversion to NUREG-1431, Revision 51 December 2022Response to Request for Additional Information Regarding License Amendment Request for the Technical Specifications Conversion to NUREG-1431, Revision 5
L-2022-165, Subsequent License Renewal Application - Aging Management Request for Additional Information (RAI) 4.3.1-1a(second Round) - Class 1 Fatigue Response26 October 2022Subsequent License Renewal Application - Aging Management Request for Additional Information (RAI) 4.3.1-1a(second Round) - Class 1 Fatigue ResponseOperating Basis Earthquake
Aging Management
License Renewal
Earthquake
L-2022-166, Response to Request for Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement5 October 2022Response to Request for Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System ReplacementCommercial Grade Dedication
L-2022-156, Correction to Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 1a Response19 September 2022Correction to Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 1a ResponseAging Management
L-2022-143, Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 1A Response8 September 2022Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 1A ResponseBoric Acid
Coatings
Aging Management
L-2022-136, Response to Request for Additional Information Regarding Turkey Point Unit 3 Cycle 32 Steam Generator Tube Inspection Report12 August 2022Response to Request for Additional Information Regarding Turkey Point Unit 3 Cycle 32 Steam Generator Tube Inspection Report
L-2022-115, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 3 Response and Submittal of Superseded Response for One Set 2 RAI and One Supplement 1 Attachment9 August 2022Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 3 Response and Submittal of Superseded Response for One Set 2 RAI and One Supplement 1 AttachmentBoric Acid
Ultimate heat sink
Nondestructive Examination
Aging Management
Foreign Material Exclusion
License Renewal
Subsequent License Renewal
Power Uprate
Measurement Uncertainty Recapture
L-2022-108, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 2 Response11 July 2022Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 2 ResponseBoric Acid
Ultimate heat sink
Fire Barrier
Weld Overlay
Coatings
Finite Element Analysis
Aging Management
Foreign Material Exclusion
Moisture barrier
License Renewal
Subsequent License Renewal
EVT-1
Through-Wall Leakage
Fire Protection Program
Dissimilar Metal Weld
Power Uprate
L-2022-075, Subsequent License Renewal Application-Aging Management Requests for Additional Information (RAI) Set 1A Response and Request for Confirmation of Information (RCI) Set 1 Response13 June 2022Subsequent License Renewal Application-Aging Management Requests for Additional Information (RAI) Set 1A Response and Request for Confirmation of Information (RCI) Set 1 ResponseWeld Overlay
Aging Management
Subsequent License Renewal
L-2022-051, Fifth Ten-Year Inservice Inspection Interval Relief Request No. 10 Part-II, Supplement Information and Response to Request for Additional Information29 March 2022Fifth Ten-Year Inservice Inspection Interval Relief Request No. 10 Part-II, Supplement Information and Response to Request for Additional InformationHydrostatic
VT-2
Through Wall Leak
L-2022-000, License Amendment Request for the Technical Specifications Conversion to NUREG- 1432 Revision 5 - Request for Supplemental Information (Rsi) Response19 January 2022License Amendment Request for the Technical Specifications Conversion to NUREG- 1432 Revision 5 - Request for Supplemental Information (Rsi) ResponseShutdown Margin
Anticipated operational occurrence
Probabilistic Risk Assessment
Qualified Offsite Circuit
Surveillance Frequency Control Program
Recently irradiated fuel
Offsite Circuit
Power change
Power Uprate
L-2021-213, Response to Request for Additional Information Regarding License Amendment Request 273, Update Listing of Approved LOCA Methodologies to Adopt Full Spectrum LOCA Methodology19 November 2021Response to Request for Additional Information Regarding License Amendment Request 273, Update Listing of Approved LOCA Methodologies to Adopt Full Spectrum LOCA MethodologyFuel cladding
L-2021-207, Response to Request for Additional Information for ISI Relief Request No. 1025 October 2021Response to Request for Additional Information for ISI Relief Request No. 10Time to boil
Through-Wall Leak
Through Wall Leak
L-2021-197, Response to Request for Additional Information for ISI Relief Request No. 1015 October 2021Response to Request for Additional Information for ISI Relief Request No. 10
ML21258A37914 September 2021Response to Request for Additional Information, Relief Requests 8 and 9 Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1), Extension of Inspection Interval for Turkey Point Unit 3 and Unit 4 Reactor.
L-2021-105, Response to Request for Additional Information for St. Lucie License Amendment Request to Allow Risk Informed Completion Times (RICT) for the 120-Volt AC Instrument Bus Requirements12 May 2021Response to Request for Additional Information for St. Lucie License Amendment Request to Allow Risk Informed Completion Times (RICT) for the 120-Volt AC Instrument Bus Requirements
L-2021-065, Response to Request for Additional Information. Relief Request Number RR 15, Extension of St. Lucie Unit 2 RPV Welds from 10 to 20 Years1 April 2021Response to Request for Additional Information. Relief Request Number RR 15, Extension of St. Lucie Unit 2 RPV Welds from 10 to 20 Years
L-2020-165, Supplement to Updated Final Response to NRC Generic Letter 2004-024 December 2020Supplement to Updated Final Response to NRC Generic Letter 2004-02
L-2020-094, Supplemental Response to Request for Additional Information Regarding License Amendment Request to Modify the Reactor Coolant Pump (RCP) Flywheel Inspection Program Requirements26 June 2020Supplemental Response to Request for Additional Information Regarding License Amendment Request to Modify the Reactor Coolant Pump (RCP) Flywheel Inspection Program Requirements
L-2020-111, Response to Request for Additional Information Regarding Steam Generator Tube Inspection Report24 June 2020Response to Request for Additional Information Regarding Steam Generator Tube Inspection Report
L-2020-081, Response to Request for Additional Information Regarding License Amendment Request 264, Adopt Emergency Action Level Scheme Described in NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactor8 June 2020Response to Request for Additional Information Regarding License Amendment Request 264, Adopt Emergency Action Level Scheme Described in NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive ReactorSafe Shutdown
Time of Discovery
High winds
Shutdown Margin
Ultimate heat sink
Offsite Dose Calculation Manual
Fire Barrier
Safe Shutdown Earthquake
Internal Flooding
Operating Basis Earthquake
Operator Manual Action
FLEX
Annual Radioactive Effluent Release Report
Earthquake
Fuel cladding
Pressure Boundary Leakage
Grace period
L-2020-083, Supplemental Response to Request for Additional Information Regarding License Amendment Request 270, Modify Containment Atmosphere Radioactivity Monitoring, Containment Ventilation Isolation and RCS Leakage Detection System Re21 May 2020Supplemental Response to Request for Additional Information Regarding License Amendment Request 270, Modify Containment Atmosphere Radioactivity Monitoring, Containment Ventilation Isolation and RCS Leakage Detection System ReSurveillance Frequency Control Program
L-2020-061, Response to Request for Additional Information Regarding License Amendment Request to Modify the Reactor Coolant Pump (RCP) Flywheel Inspection Program Requirements30 April 2020Response to Request for Additional Information Regarding License Amendment Request to Modify the Reactor Coolant Pump (RCP) Flywheel Inspection Program Requirements
L-2020-071, Response to Request for Additional Information Regarding License Amendment Request 270, Modify Containment Atmosphere Radioactivity Monitoring, Containment Ventilation Isolation and RCS Leakage Detection System Requirements16 April 2020Response to Request for Additional Information Regarding License Amendment Request 270, Modify Containment Atmosphere Radioactivity Monitoring, Containment Ventilation Isolation and RCS Leakage Detection System RequirementsGrab sample
Offsite Dose Calculation Manual
Unidentified leakage
L-2020-064, Exigent License Amendment Request 272, One-Time Extension of TS 6.8.4 Steam Generator Inspection Program - Response to Request for Additional Information9 April 2020Exigent License Amendment Request 272, One-Time Extension of TS 6.8.4 Steam Generator Inspection Program - Response to Request for Additional Information
ML20098F3417 April 2020Exigent License Amendment Request 272, One-Time Extension of TS 6.8.4 Steam Generator Inspection Program - Response to Request for Additional InformationDownpower
ML20015A02814 January 2020NMFS to NRC, Concurrence with Interim Response to Requests for Additional Information for St. Lucie Endangered Species Act Section 7 Consultation
L-2019-164, Response to Request for Additional Information Regarding License Amendment Request to Relocate the MOV Thermal Overload Protection Bypass Devices Requirements to Licensee Control11 September 2019Response to Request for Additional Information Regarding License Amendment Request to Relocate the MOV Thermal Overload Protection Bypass Devices Requirements to Licensee Control
L-2019-166, Refueling Outage SL2-24 Steam Generator Tube Inspection Report RAI Response21 August 2019Refueling Outage SL2-24 Steam Generator Tube Inspection Report RAI Response
L-2019-153, Exigent Technical Specification Amendment Request Supplemental RAI Reply One-Time Allowed Outage Time Extension for Inoperable EDG25 July 2019Exigent Technical Specification Amendment Request Supplemental RAI Reply One-Time Allowed Outage Time Extension for Inoperable EDGSafe Shutdown
Hydrostatic
Multiple Spurious Operation
FLEX
Offsite Circuit
Continuous fire watch
Early Warning Fire Detection
L-2019-149, Exigent Technical Specification Amendment Request RAI Reply One-Time Allowed Outage Time Extension for Inoperable EDG24 July 2019Exigent Technical Specification Amendment Request RAI Reply One-Time Allowed Outage Time Extension for Inoperable EDGSafe Shutdown
Hydrostatic
Multiple Spurious Operation
FLEX
Surveillance Frequency Control Program
Offsite Circuit
Continuous fire watch
Early Warning Fire Detection
L-2019-135, Response to Request for Additional Information Regarding License Amendment Request 266, Clarify Requirements When One Unit Is Outside the Applicability of Certain Technical Specifications22 July 2019Response to Request for Additional Information Regarding License Amendment Request 266, Clarify Requirements When One Unit Is Outside the Applicability of Certain Technical Specifications
L-2019-118, Response to Request for Additional Information Regarding License Amendment Request to Allow Performance of Selected Emergency Diesel Generator (EDG) Surveillance Requirements (Srs) During Power Operation28 June 2019Response to Request for Additional Information Regarding License Amendment Request to Allow Performance of Selected Emergency Diesel Generator (EDG) Surveillance Requirements (Srs) During Power OperationSafe Shutdown
Anticipated operational occurrence
Surveillance Frequency Control Program
ML19158A5037 June 2019NRC to NMFS, NRC Responses to NMFS Requests for Additional Information for Turkey Point ESA Section 7 ConsultationGrab sample
License Renewal
Subsequent License Renewal
Accidental discharge
L-2019-114, Subsequent License Renewal Application Safety Review Requests for Additional Information (RAI) Set 10, RAI No. B.2.3.28-1b Updated Response4 June 2019Subsequent License Renewal Application Safety Review Requests for Additional Information (RAI) Set 10, RAI No. B.2.3.28-1b Updated ResponseCoatings
Aging Management
L-2019-107, License Amendment Request - Iodine Removal System Elimination17 May 2019License Amendment Request - Iodine Removal System EliminationBoric Acid