L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654 | 28 November 2023 | Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, | Health Physics Network High Radiation Area Offsite Dose Calculation Manual Met Tower Incorporated by reference FLEX Severe Accident Management Guideline Earthquake Deep Dose Equivalent Minimum staff Fire Protection Program Grace period Overexposure |
L-2023-162, Response to 50.69 2nd Round of Rals | 21 November 2023 | Response to 50.69 2nd Round of Rals | Probabilistic Risk Assessment Incorporated by reference Fukushima Dai-Ichi |
L-2023-118, Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors | 11 September 2023 | Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors | Safe Shutdown Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Multiple Spurious Operation FLEX B.5.b |
L-2023-110, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project | 25 August 2023 | Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project | Hydrostatic Probabilistic Risk Assessment Large early release frequency Time Critical Operator Action Fire Protection Program Coast down Exclusive Use Affidavit |
L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 | 7 August 2023 | and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 | Health Physics Network Cyber Security FLEX B.5.b Severe Accident Management Guideline Minimum staff Siren |
L-2023-094, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project | 27 July 2023 | Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project | Internal Flooding Hydrostatic Probabilistic Risk Assessment Large early release frequency Earthquake Fire Protection Program |
L-2023-069, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project | 31 May 2023 | Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project | Mission time Internal Flooding Hydrostatic Probabilistic Risk Assessment Large early release frequency Continuous fire watch Fire Protection Program |
ML23151A436 | 24 May 2023 | License Amendment Request Revision 3 for the Technical Specifications Conversion to NUREG - 1431 Revision 5 | Safe Shutdown Reactor Vessel Water Level Offsite Dose Calculation Manual Anticipated operational occurrence Post Accident Monitoring Incorporated by reference Surveillance Frequency Control Program Recently irradiated fuel Offsite Circuit Power Uprate |
ML23151A437 | 24 May 2023 | Attachment 3: Turkey Point Nuclear Plant, Units 3 and 4, Improved Technical Specifications Conversion License Amendment Request NRC Request for Additional Information and FPL Responses Database | Safe Shutdown Reactor Vessel Water Level Offsite Dose Calculation Manual Anticipated operational occurrence Post Accident Monitoring Incorporated by reference Surveillance Frequency Control Program Recently irradiated fuel Offsite Circuit Power Uprate |
L-2023-059, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response | 21 April 2023 | Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response | Coatings Aging Management License Renewal Subsequent License Renewal |
ML23095A008 | 4 April 2023 | Attachment 2 - Improved Technical Specifications Conversion License Amendment Request NRC Request for Additional Information and FPL Responses Database | Safe Shutdown Time of Discovery Shutdown Margin High Radiation Area Ultimate heat sink Anticipated operational occurrence Post Accident Monitoring Internal Flooding Nondestructive Examination Emergency Lighting Missed surveillance Pressure and Temperature Limits Report Surveillance Frequency Control Program Battery sizing Fuel cladding Recently irradiated fuel Offsite Circuit Power change |
L-2023-026, Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 4 | 27 March 2023 | Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 4 | Coatings Aging Management License Renewal Subsequent License Renewal |
L-2023-040, Response to Requests for Additional Information (Rals) and Requests for Confirmation of Information (Rc Ls) Following Regulatory Audit of Subsequent License Renewal Application | 3 March 2023 | Response to Requests for Additional Information (Rals) and Requests for Confirmation of Information (Rc Ls) Following Regulatory Audit of Subsequent License Renewal Application | Annual Radioactive Effluent Release Report License Renewal Subsequent License Renewal Environmental Justice |
ML23013A203 | 13 January 2023 | RAI Set 4 Draft Response | Aging Management |
L-2022-181, Response to Request for Additional Information Regarding License Amendment Request for the Technical Specifications Conversion to NUREG-1431, Revision 5 | 1 December 2022 | Response to Request for Additional Information Regarding License Amendment Request for the Technical Specifications Conversion to NUREG-1431, Revision 5 | |
L-2022-165, Subsequent License Renewal Application - Aging Management Request for Additional Information (RAI) 4.3.1-1a(second Round) - Class 1 Fatigue Response | 26 October 2022 | Subsequent License Renewal Application - Aging Management Request for Additional Information (RAI) 4.3.1-1a(second Round) - Class 1 Fatigue Response | Operating Basis Earthquake Aging Management License Renewal Earthquake |
L-2022-166, Response to Request for Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement | 5 October 2022 | Response to Request for Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement | Commercial Grade Dedication |
L-2022-156, Correction to Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 1a Response | 19 September 2022 | Correction to Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 1a Response | Aging Management |
L-2022-143, Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 1A Response | 8 September 2022 | Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 1A Response | Boric Acid Coatings Aging Management |
L-2022-136, Response to Request for Additional Information Regarding Turkey Point Unit 3 Cycle 32 Steam Generator Tube Inspection Report | 12 August 2022 | Response to Request for Additional Information Regarding Turkey Point Unit 3 Cycle 32 Steam Generator Tube Inspection Report | |
L-2022-115, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 3 Response and Submittal of Superseded Response for One Set 2 RAI and One Supplement 1 Attachment | 9 August 2022 | Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 3 Response and Submittal of Superseded Response for One Set 2 RAI and One Supplement 1 Attachment | Boric Acid Ultimate heat sink Nondestructive Examination Aging Management Foreign Material Exclusion License Renewal Subsequent License Renewal Power Uprate Measurement Uncertainty Recapture |
L-2022-108, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 2 Response | 11 July 2022 | Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 2 Response | Boric Acid Ultimate heat sink Fire Barrier Weld Overlay Coatings Finite Element Analysis Aging Management Foreign Material Exclusion Moisture barrier License Renewal Subsequent License Renewal EVT-1 Through-Wall Leakage Fire Protection Program Dissimilar Metal Weld Power Uprate |
L-2022-075, Subsequent License Renewal Application-Aging Management Requests for Additional Information (RAI) Set 1A Response and Request for Confirmation of Information (RCI) Set 1 Response | 13 June 2022 | Subsequent License Renewal Application-Aging Management Requests for Additional Information (RAI) Set 1A Response and Request for Confirmation of Information (RCI) Set 1 Response | Weld Overlay Aging Management Subsequent License Renewal |
L-2022-051, Fifth Ten-Year Inservice Inspection Interval Relief Request No. 10 Part-II, Supplement Information and Response to Request for Additional Information | 29 March 2022 | Fifth Ten-Year Inservice Inspection Interval Relief Request No. 10 Part-II, Supplement Information and Response to Request for Additional Information | Hydrostatic VT-2 Through Wall Leak |
L-2022-000, License Amendment Request for the Technical Specifications Conversion to NUREG- 1432 Revision 5 - Request for Supplemental Information (Rsi) Response | 19 January 2022 | License Amendment Request for the Technical Specifications Conversion to NUREG- 1432 Revision 5 - Request for Supplemental Information (Rsi) Response | Shutdown Margin Anticipated operational occurrence Probabilistic Risk Assessment Qualified Offsite Circuit Surveillance Frequency Control Program Recently irradiated fuel Offsite Circuit Power change Power Uprate |
L-2021-213, Response to Request for Additional Information Regarding License Amendment Request 273, Update Listing of Approved LOCA Methodologies to Adopt Full Spectrum LOCA Methodology | 19 November 2021 | Response to Request for Additional Information Regarding License Amendment Request 273, Update Listing of Approved LOCA Methodologies to Adopt Full Spectrum LOCA Methodology | Fuel cladding |
L-2021-207, Response to Request for Additional Information for ISI Relief Request No. 10 | 25 October 2021 | Response to Request for Additional Information for ISI Relief Request No. 10 | Time to boil Through-Wall Leak Through Wall Leak |
L-2021-197, Response to Request for Additional Information for ISI Relief Request No. 10 | 15 October 2021 | Response to Request for Additional Information for ISI Relief Request No. 10 | |
ML21258A379 | 14 September 2021 | Response to Request for Additional Information, Relief Requests 8 and 9 Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1), Extension of Inspection Interval for Turkey Point Unit 3 and Unit 4 Reactor. | |
L-2021-105, Response to Request for Additional Information for St. Lucie License Amendment Request to Allow Risk Informed Completion Times (RICT) for the 120-Volt AC Instrument Bus Requirements | 12 May 2021 | Response to Request for Additional Information for St. Lucie License Amendment Request to Allow Risk Informed Completion Times (RICT) for the 120-Volt AC Instrument Bus Requirements | |
L-2021-065, Response to Request for Additional Information. Relief Request Number RR 15, Extension of St. Lucie Unit 2 RPV Welds from 10 to 20 Years | 1 April 2021 | Response to Request for Additional Information. Relief Request Number RR 15, Extension of St. Lucie Unit 2 RPV Welds from 10 to 20 Years | |
L-2020-165, Supplement to Updated Final Response to NRC Generic Letter 2004-02 | 4 December 2020 | Supplement to Updated Final Response to NRC Generic Letter 2004-02 | |
L-2020-094, Supplemental Response to Request for Additional Information Regarding License Amendment Request to Modify the Reactor Coolant Pump (RCP) Flywheel Inspection Program Requirements | 26 June 2020 | Supplemental Response to Request for Additional Information Regarding License Amendment Request to Modify the Reactor Coolant Pump (RCP) Flywheel Inspection Program Requirements | |
L-2020-111, Response to Request for Additional Information Regarding Steam Generator Tube Inspection Report | 24 June 2020 | Response to Request for Additional Information Regarding Steam Generator Tube Inspection Report | |
L-2020-081, Response to Request for Additional Information Regarding License Amendment Request 264, Adopt Emergency Action Level Scheme Described in NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactor | 8 June 2020 | Response to Request for Additional Information Regarding License Amendment Request 264, Adopt Emergency Action Level Scheme Described in NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactor | Safe Shutdown Time of Discovery High winds Shutdown Margin Ultimate heat sink Offsite Dose Calculation Manual Fire Barrier Safe Shutdown Earthquake Internal Flooding Operating Basis Earthquake Operator Manual Action FLEX Annual Radioactive Effluent Release Report Earthquake Fuel cladding Pressure Boundary Leakage Grace period |
L-2020-083, Supplemental Response to Request for Additional Information Regarding License Amendment Request 270, Modify Containment Atmosphere Radioactivity Monitoring, Containment Ventilation Isolation and RCS Leakage Detection System Re | 21 May 2020 | Supplemental Response to Request for Additional Information Regarding License Amendment Request 270, Modify Containment Atmosphere Radioactivity Monitoring, Containment Ventilation Isolation and RCS Leakage Detection System Re | Surveillance Frequency Control Program |
L-2020-061, Response to Request for Additional Information Regarding License Amendment Request to Modify the Reactor Coolant Pump (RCP) Flywheel Inspection Program Requirements | 30 April 2020 | Response to Request for Additional Information Regarding License Amendment Request to Modify the Reactor Coolant Pump (RCP) Flywheel Inspection Program Requirements | |
L-2020-071, Response to Request for Additional Information Regarding License Amendment Request 270, Modify Containment Atmosphere Radioactivity Monitoring, Containment Ventilation Isolation and RCS Leakage Detection System Requirements | 16 April 2020 | Response to Request for Additional Information Regarding License Amendment Request 270, Modify Containment Atmosphere Radioactivity Monitoring, Containment Ventilation Isolation and RCS Leakage Detection System Requirements | Grab sample Offsite Dose Calculation Manual Unidentified leakage |
L-2020-064, Exigent License Amendment Request 272, One-Time Extension of TS 6.8.4 Steam Generator Inspection Program - Response to Request for Additional Information | 9 April 2020 | Exigent License Amendment Request 272, One-Time Extension of TS 6.8.4 Steam Generator Inspection Program - Response to Request for Additional Information | |
ML20098F341 | 7 April 2020 | Exigent License Amendment Request 272, One-Time Extension of TS 6.8.4 Steam Generator Inspection Program - Response to Request for Additional Information | Downpower |
ML20015A028 | 14 January 2020 | NMFS to NRC, Concurrence with Interim Response to Requests for Additional Information for St. Lucie Endangered Species Act Section 7 Consultation | |
L-2019-164, Response to Request for Additional Information Regarding License Amendment Request to Relocate the MOV Thermal Overload Protection Bypass Devices Requirements to Licensee Control | 11 September 2019 | Response to Request for Additional Information Regarding License Amendment Request to Relocate the MOV Thermal Overload Protection Bypass Devices Requirements to Licensee Control | |
L-2019-166, Refueling Outage SL2-24 Steam Generator Tube Inspection Report RAI Response | 21 August 2019 | Refueling Outage SL2-24 Steam Generator Tube Inspection Report RAI Response | |
L-2019-153, Exigent Technical Specification Amendment Request Supplemental RAI Reply One-Time Allowed Outage Time Extension for Inoperable EDG | 25 July 2019 | Exigent Technical Specification Amendment Request Supplemental RAI Reply One-Time Allowed Outage Time Extension for Inoperable EDG | Safe Shutdown Hydrostatic Multiple Spurious Operation FLEX Offsite Circuit Continuous fire watch Early Warning Fire Detection |
L-2019-149, Exigent Technical Specification Amendment Request RAI Reply One-Time Allowed Outage Time Extension for Inoperable EDG | 24 July 2019 | Exigent Technical Specification Amendment Request RAI Reply One-Time Allowed Outage Time Extension for Inoperable EDG | Safe Shutdown Hydrostatic Multiple Spurious Operation FLEX Surveillance Frequency Control Program Offsite Circuit Continuous fire watch Early Warning Fire Detection |
L-2019-135, Response to Request for Additional Information Regarding License Amendment Request 266, Clarify Requirements When One Unit Is Outside the Applicability of Certain Technical Specifications | 22 July 2019 | Response to Request for Additional Information Regarding License Amendment Request 266, Clarify Requirements When One Unit Is Outside the Applicability of Certain Technical Specifications | |
L-2019-118, Response to Request for Additional Information Regarding License Amendment Request to Allow Performance of Selected Emergency Diesel Generator (EDG) Surveillance Requirements (Srs) During Power Operation | 28 June 2019 | Response to Request for Additional Information Regarding License Amendment Request to Allow Performance of Selected Emergency Diesel Generator (EDG) Surveillance Requirements (Srs) During Power Operation | Safe Shutdown Anticipated operational occurrence Surveillance Frequency Control Program |
ML19158A503 | 7 June 2019 | NRC to NMFS, NRC Responses to NMFS Requests for Additional Information for Turkey Point ESA Section 7 Consultation | Grab sample License Renewal Subsequent License Renewal Accidental discharge |
L-2019-114, Subsequent License Renewal Application Safety Review Requests for Additional Information (RAI) Set 10, RAI No. B.2.3.28-1b Updated Response | 4 June 2019 | Subsequent License Renewal Application Safety Review Requests for Additional Information (RAI) Set 10, RAI No. B.2.3.28-1b Updated Response | Coatings Aging Management |
L-2019-107, License Amendment Request - Iodine Removal System Elimination | 17 May 2019 | License Amendment Request - Iodine Removal System Elimination | Boric Acid |