Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML23318A095 | 14 November 2023 | Request for Additional Information (E-mail Dated 11/14/2023) LAR to Revise TSs Related to Framatome Gaia Fuel | Anticipated operational occurrence Fuel cladding |
ML23318A117 | 13 November 2023 | NRR E-mail Capture - Formal Issuance of RAIs for North Anna Technical Support Center (TSC) License Amendment Request (LAR) (L-2023-LLA-0006) | High winds Earthquake |
ML23257A209 | 14 September 2023 | NRR E-mail Capture - Formal Issuance of 2nd Round RAIs for Surry Units 1&2 and North Anna Units 1&2 Emergency Plans LAR | FLEX |
ML23243A986 | 31 August 2023 | NRR E-mail Capture - Draft RAIs for EP Staff Augmentation Times LAR (L-2022-LLA-0166) | FLEX |
ML23219A160 | 7 August 2023 | 003 Radiation Safety Baseline Inspection Information Request | Process Control Program |
ML23199A283 | 18 July 2023 | Request for Additional Information (E-mail Dated 7/18/2023) LAR to Revise the Pressure-Temperature Limits | |
ML23187A112 | 6 July 2023 | TSC Relocation LAR RAIs | High winds Earthquake |
ML23171B052 | 20 June 2023 | NRR E-mail Capture - RAI for Review of Appendix F to DOM-NAF-2-P (Redacted) | |
ML23081A528 | 26 April 2023 | Request for Additional Information - North Anna Subsequent License Renewal Application Environmental Review | Environmental Justice |
ML23089A188 | 29 March 2023 | Request for Additional Information (E-mail Dated 3/29/2023) Spring 2022 Steam Generator Tube Inspection Report | |
ML23075A023 | 15 March 2023 | NRR E-mail Capture - RAI - License Amend Req (LAR) to Revise Tech Spec (Ts) 3.6.8 Limiting Condition for Operation to Remove Refueling Water Chemical Addition Tank and Replace the Containment Sump Buffer North Anna, 1 and 2 (L-2022-LLA-0162 | Earthquake |
ML23073A180 | 14 March 2023 | Notification of Commercial Grade Dedication Inspection (05000336/2023010 and 05000423/2023010) and Request for Information | Commercial Grade Dedication |
ML23068A024 | 8 March 2023 | RAI Issuance Fuel Handling Trolley LAR | Probabilistic Risk Assessment Aging Management Large early release frequency Earthquake Fuel cladding Fatality |
ML23060A093 | 1 March 2023 | NRR E-mail Capture - Formal Issuance of RAIs for Surry/North Anna Emergency Plans LAR | |
ML23059A228 | 28 February 2023 | NRR E-mail Capture - Draft RAIs for Containment Buffer Change to Natb (L-2022-LLA-0162) | Earthquake |
ML23054A241 | 23 February 2023 | NRR E-mail Capture - Formal Issuance of RAIs for Surry Turbine Building Tornado Reclassification | Earthquake |
ML23046A117 | 2 February 2023 | 002 Radiation Safety Baseline Inspection Information Request | Process Control Program Coronavirus |
ML23018A164 | 17 January 2023 | Formal Issuance of RAIs for Surry ISI Alternative for SG Welds, 30 Day Calendar Response Period (Email) | Incorporated by reference |
ML22349A210 | 15 December 2022 | Formal 43-day Request for Additional Information Issuance for Surry Turbine Building License Amendment Request | Earthquake |
ML22339A158 | 30 November 2022 | Requalification Inspection Notification Letter | Job Performance Measure |
ML22258A220 | 13 September 2022 | FFD RFI | |
ML22251A129 | 9 September 2022 | Request for Additional Information Related to Response to Generic Letter 2004-04 | |
ML22242A045 | 23 August 2022 | NRR E-mail Capture - Dominion GL 04-02 Response Draft RAIs (L-2017-LRC-0000) | |
ML22223A119 | 14 August 2022 | RP Inspection Document Request Letter Final | High Radiation Area Locked High Radiation Area |
ML22110A205 | 19 April 2022 | Formal Issuance of RAIs for Post LOCA Buffer Change LAR | |
ML22083A210 | 24 March 2022 | NRR E-mail Capture - Draft RAI - Relief Request N2-14-LMT-003 Fourth Ten Year Inservice Inspection Interval | |
ML22067A162 | 9 March 2022 | Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection | Probabilistic Risk Assessment Operator Manual Action Maintenance Rule Program |
ML22012A057 | 11 January 2022 | Issuance of RAIs for Surry Unit 1, Spring 2021 Steam Generator Tube Inspection | |
ML21327A365 | 23 November 2021 | NRR E-mail Capture - Draft RAI for TSTF-577 LAR | |
ML21322A096 | 18 November 2021 | Final Request for Additional Information Set 5 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email | |
ML21322A099 | 18 November 2021 | Final Request for Additional Information Set 5 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Enclosure | Nondestructive Examination Aging Management License Renewal Subsequent License Renewal |
ML21256A067 | 13 September 2021 | Final Request for Confirmation of Information Set 2 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email | |
ML21256A069 | 13 September 2021 | Final Request for Confirmation of Information Set 2 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Request for Confirmation of Information | |
ML21238A094 | 25 August 2021 | Draft Request for Additional Information Set Z - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email | |
ML21238A098 | 25 August 2021 | Draft Request for Additional Information Set Z - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Enclosure | Subsequent License Renewal |
ML21225A502 | 13 August 2021 | Request for Additional Information for North Anna Power Station, Units 1 and 2, Surry Power Station, Units 1 and 2, and Millstone Power Station, Units 2 and 3, Appendix E of Fleet Report Com-Naf-2 (EPID:L02021-LLT-0000) Public Version | |
ML21196A101 | 15 July 2021 | Notification of an NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000280/2021011 and 05000281/2021011) and Request for Information (RFI) | Safe Shutdown Fitness for Duty Exemption Request Fire Protection Program |
ML21195A244 | 13 July 2021 | NRR E-mail Capture - Draft RAI Appendix E to Topical Report DOM-NAF-2 Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code | |
ML21188A163 | 7 July 2021 | Final Request for Additional Information Set 4 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email | |
ML21188A165 | 7 July 2021 | Final Request for Additional Information Set 4 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Enclosure | Aging Management |
ML21182A290 | 1 July 2021 | 7/1/2021 E-mail - Request for Additional Information Alternative Frequency to Supplemental Valve Position Verification Testing Requirements | Incorporated by reference |
ML21174A195 | 23 June 2021 | Safety RAIs - Set Y - Draft - Enclosure | Aging Management Pressure Boundary Leakage |
ML21166A351 | 15 June 2021 | Safety RAIs - Set 4 - Draft | Aging Management |
ML21123A297 | 3 May 2021 | Final Request for Additional Information Set 3 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - E-mail | |
ML21123A298 | 3 May 2021 | Final Request for Additional Information Set 3 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Enclosure | Coatings |
ML21112A308 | 22 April 2021 | Request for Additional Information (E-mail Dated 4/22/2021) License Amendment Request for Measurement Uncertainty Recapture Power Uprate | Anticipated operational occurrence Flow Induced Vibration |
ML21105A115 | 15 April 2021 | Request for Additional Information (e-mail Dated 4/15/2021) Proposed LAR for Addition of Analytical Methodology to the Core Operating Limits Report for a LBLOCA | |
ML21102A312 | 12 April 2021 | NRR E-mail Capture - Surry, Units 1 & 2 - Final RAI for the LOCA AST LAR | Safe Shutdown |
ML21091A003 | 1 April 2021 | Final Request for Additional Information Set 2 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Enclosure 1 - RAIs | Safe Shutdown Aging Management License Renewal Subsequent License Renewal |
ML21091A004 | 1 April 2021 | SLRA Safety Review - Withdrawn Requests for Information (EPID No. L-2020-SLR-0000) - Enclosure 2 | Safe Shutdown Fire Barrier Coatings Aging Management License Renewal Subsequent License Renewal |