ML23333A01427 November 2023Attachment F - Groundwater Tek Inc - Peer Review Study Final-1Power Uprate
ML23333A01727 November 2023Attachment I - Chin - the Cooling Canal System at the FPL-Turkey-Point Power Station
ML24012A04216 November 2023FAQ 23-03 Turkey Point IE01 Proposed NRC ResponsePower change
L-2023-131, Subsequent License Renewal Application - Second Annual Update28 September 2023Subsequent License Renewal Application - Second Annual UpdateBoric Acid
Aging Management
License Renewal
ML23265A55122 September 2023Enclosure 3: WCAP-18830-NP, Turkey Point Fuel Storage Criticality Analysis for 24 Month CyclesAging Management
Fuel cladding
Coast down
Power Uprate
L-2023-115, Inservice Inspection Program Owner'S Activity Report (OAR-1)21 August 2023Inservice Inspection Program Owner'S Activity Report (OAR-1)Boric Acid
L-2023-089, Refueling Outage Owner'S Activity Report (OAR-1) Unit 2 for Inservice Inspections24 July 2023Refueling Outage Owner'S Activity Report (OAR-1) Unit 2 for Inservice Inspections
L-2023-076, In-Service Inspection Program Owner'S Activity Report (OAR-1)11 July 2023In-Service Inspection Program Owner'S Activity Report (OAR-1)
L-2023-049, Correction to U4R33 Steam Generator Tube Inspection Report30 March 2023Correction to U4R33 Steam Generator Tube Inspection Report
L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications27 March 2023and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or ApplicationsFuel cladding
L-2023-010, Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of RPS / ESFAS / Nis10 February 2023Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of RPS / ESFAS / NisCyber Security
Surveillance Frequency Control Program
Time Critical Operator Action
L-2023-009, Owner'S Activity Report31 January 2023Owner'S Activity Report
L-2022-168, and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report26 October 2022and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report
L-2020-159, 10 CFR 50.59 Evaluation and Commitment Change Summary Report4 October 202210 CFR 50.59 Evaluation and Commitment Change Summary ReportShutdown Margin
L-2022-110, License Amendment Request 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project (Non-Proprietary)26 August 2022License Amendment Request 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project (Non-Proprietary)Probabilistic Risk Assessment
Fire Protection Program
L-2022-142, Revised Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-00419 August 2022Revised Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-004Safe Shutdown
Boric Acid
Shutdown Margin
Loop seal
Anticipated operational occurrence
Fuel cladding
ML22227A05315 August 2022Biological Opinion for the Continued Operation of St. Lucie Nuclear Power PlantBiofouling
L-2022-121, Exemption Request, License Amendment Request and Revised Response in Support of a Risk-informed Resolution of Generic Letter 2004-0229 July 2022Exemption Request, License Amendment Request and Revised Response in Support of a Risk-informed Resolution of Generic Letter 2004-02Safe Shutdown
Boric Acid
High winds
Reactor Vessel Water Level
Mission time
Safe Shutdown Earthquake
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Coatings
Operating Basis Earthquake
FLEX
Foreign Material Exclusion
Large early release frequency
Severe Accident Management Guideline
Exemption Request
Earthquake
Maintenance Rule Program
Turbine Missile
Fuel cladding
Scaffolding
ML22140A13920 May 2022Attachment 4 - Cross-Reference of TSTF-505, Revision 2, and Point Beach Proposed Changes
ML22140A13320 May 2022Attachment 1 - Evaluation of the Proposed ChangesProbabilistic Risk Assessment
Large early release frequency
ML22140A13520 May 2022RPS InstrumentationHigh Radiation Area
Hydrostatic
Surveillance Frequency Control Program
ML22140A13620 May 2022Containment Isolation ValvesHigh Radiation Area
Surveillance Frequency Control Program
ML22140A13820 May 2022Containment Isolation ValvesSafe Shutdown
Offsite Circuit
ML22140A14020 May 2022Attachment 5 - Evaluation of Plant-Specific VariationsSafe Shutdown
Emergency Lighting
Earthquake
Offsite Circuit
ML22140A14220 May 2022Enclosure 1 - List of Revised Required Actions to Corresponding PRA Functions and Additional Supporting InformationInternal Flooding
Probabilistic Risk Assessment
ML22140A14120 May 2022Attachment 6 - Point Beach RICT Program Pre-Implementation Items
ML22140A14320 May 2022Enclosure 4 - Information Supporting Justification of Excluding Sources of Risk Not Addressed by PRA ModelsSafe Shutdown
High winds
Ultimate heat sink
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
FLEX
Fukushima Dai-Ichi
Turbine Missile
ML22140A14420 May 2022Enclosure 8 - Attributes of the Configuration Risk Management ModelInternal Flooding
Probabilistic Risk Assessment
Large early release frequency
NRC 2022-0007, Enclosure 11 - Monitoring Program20 May 2022Enclosure 11 - Monitoring ProgramFire Barrier
Probabilistic Risk Assessment
Large early release frequency
L-2022-038, Emergency Response Data System (Eros) Changes17 May 2022Emergency Response Data System (Eros) Changes
L-2022-073, Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-0043 May 2022Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-004Anticipated operational occurrence
ML22124A01130 April 2022Scoping Summary Report - FinalLicense Renewal
Subsequent License Renewal
L-2022-046, Subsequent License Renewal Application Revision - Documents WCAP-18623-P/NP Revision 1 Submittal13 April 2022Subsequent License Renewal Application Revision - Documents WCAP-18623-P/NP Revision 1 SubmittalAging Management
L-2022-022, Updated Conditions of Certification Report14 February 2022Updated Conditions of Certification ReportEnforcement Discretion
Incorporated by reference
Annual Radiological Environmental Operating Report
L-2022-015, Relief Request Number 20 - Request for an Alternative to the Requirements of the ASME Code for Examination of Reactor Vessel Closure Head Control Element Drive Mechanism (CEDM) Housing 27 Canopy Seal Weld - RAI14 January 2022Relief Request Number 20 - Request for an Alternative to the Requirements of the ASME Code for Examination of Reactor Vessel Closure Head Control Element Drive Mechanism (CEDM) Housing 27 Canopy Seal Weld - RAIBoric Acid
Weld Overlay
VT-2
Liquid penetrant
L-2022-011, Relief Request Number 20 - Request for an Alternative to the Requirements of the ASME Code for Examination of Reactor Vessel Closure Head Control Element Drive Mechanism (CEDM) Housing 27 Canopy Seal Weld12 January 2022Relief Request Number 20 - Request for an Alternative to the Requirements of the ASME Code for Examination of Reactor Vessel Closure Head Control Element Drive Mechanism (CEDM) Housing 27 Canopy Seal WeldBoric Acid
Weld Overlay
VT-2
Liquid penetrant
ML22010A0944 January 2022Trp 29 St. Lucie SLRA - Tank Breakout
L-2021-178, Report of 10 CFR 50.59 Plant Changes8 November 2021Report of 10 CFR 50.59 Plant Changes
SBK-L-21106, Transmittal of WCAP-18607-NP, Analysis of Capsule X from the NextEra Energy Seabrook Unit 1 Reactor Vessel Radiation Surveillance Program30 September 2021Transmittal of WCAP-18607-NP, Analysis of Capsule X from the NextEra Energy Seabrook Unit 1 Reactor Vessel Radiation Surveillance Program
L-2021-182, Summary of Commitment Revisions, Emergency Diesel Generator Fuel Oil Storage Tank Cleaning Inspection Commitment Revisions16 September 2021Summary of Commitment Revisions, Emergency Diesel Generator Fuel Oil Storage Tank Cleaning Inspection Commitment RevisionsSafe Shutdown
FLEX
L-2021-142, Westinghouse Report LTR-REA-21-1-NP, Revision 1, St. Lucie Nuclear Plant, Units 1 and 2, Subsequent License Renewal: Unit 1 Reactor Vessel, Vessel Support, and Bioshield Concrete Exposure Data, May 26, 20213 August 2021Westinghouse Report LTR-REA-21-1-NP, Revision 1, St. Lucie Nuclear Plant, Units 1 and 2, Subsequent License Renewal: Unit 1 Reactor Vessel, Vessel Support, and Bioshield Concrete Exposure Data, May 26, 2021
ML21214A0432 August 2021SLRA June 30, 2021, Public Meeting Discussion Questions
L-2021-069, Commitment Revision Summary Report for Reactor Vessel Head Leakage Detection System (Rvhlds)24 June 2021Commitment Revision Summary Report for Reactor Vessel Head Leakage Detection System (Rvhlds)Boric Acid
Aging Management
License Renewal
Subsequent License Renewal
Unidentified leakage
ML21126A2396 May 2021Subsequent License Renewal Application, Aging Management Supplement 2Boric Acid
Fire Barrier
Coatings
Aging Management
Foreign Material Exclusion
Subsequent License Renewal
Biofouling
Through-Wall Leak
Fire Protection Program
ML21062A14621 April 2021Memo to File: Final Ea/Fonsi of 2012 and 2015 Decommissioning Funding Plans for Seabrook Station Unit 1 Independent Spent Fuel Storage Installation (2012 and 2015)Decommissioning Funding Plan
ML21040A4859 February 2021Fws to NRC, Verification Letter for Point Beach SLR Under Programmatic Biological Opinion for Northern Long-eared Bat
ML21040A4849 February 2021Fws to NRC, Point Beach Subsequent License Renewal Updated List of Threatened and Endangered Species That May Occur in Your Proposed Project Location And/Or May Be Affected by Your Project
NRC 2021-0003, Refueling 39 (U1 R39) Reactor Coolant Pump Analytical Evaluation Report21 January 2021Refueling 39 (U1 R39) Reactor Coolant Pump Analytical Evaluation ReportFinite Element Analysis
Aging Management
Liquid penetrant
ML21008A01725 October 2020Revised ANS Design Report
IR 05000250/202001123 July 2020NRC Inspection Report 05000250-2020011 and 05000251-2020011 and Investigation Report 2-2019-011; and Apparent Violation FinalSignificance Determination Process