ML22013A70613 January 2022Investigation Report of LLRW Shipment Pursuant to 10 CFR 20, Appendix G
L-21-078, Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G6 July 2021Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G
ML21056A0787 April 2021Final Environmental Assessment and Finding of No Significant Impact for Initial and Updated Decommissioning Funding Plans for Indian Point ISFSI (Docket: 72-51)Decommissioning Funding Plan
Authorized possession limits
ML21075A17715 March 2021Response to Vermont Yankee on the State of Vermont Comments on the Review of the Draft Final SER and EA for 20.2002 Alternate Disposal Request
NL-21-006, Relief Request IP3-ISI-RR-16, Proposed Alternative to American Society of Mechanical Engineers Code Case N-513-4 Inspection Requirement10 February 2021Relief Request IP3-ISI-RR-16, Proposed Alternative to American Society of Mechanical Engineers Code Case N-513-4 Inspection RequirementTime of Discovery
Coatings
Nondestructive Examination
VT-2
Finite Element Analysis
Through Wall Leak
Through-Wall Leakage
RS-21-001, Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping4 January 2021Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel PipingNondestructive Examination
ML20303A17523 October 2020Proposed Relief Request from Section XI Repair/Replacement Documentation for Bolting Replacement of Pressure Retaining Bolting
BVY 20-026, Defueled Safety Analysis Report, Revision 223 September 2020Defueled Safety Analysis Report, Revision 2Safe Shutdown
Fitness for Duty
Shutdown Margin
Loop seal
High Radiation Area
Grab sample
Offsite Dose Calculation Manual
Fire Barrier
Tornado Missile
Hydrostatic
Met Tower
Abnormal operational transient
Design basis earthquake
Annual Radiological Environmental Operating Report
Earthquake
Maintenance Rule Program
Control of Heavy Loads
Fuel cladding
Fire Protection Program
ML20259A21714 September 2020Commitment Change Summary ReportSafe Shutdown
Boric Acid
Fire Barrier
Hydrostatic
Probabilistic Risk Assessment
Nondestructive Examination
Emergency Lighting
Incorporated by reference
Operability Determination
Liquid penetrant
Fire Protection Program
ML20260H07218 June 2020IP-RPT-14-00013, Revision 3, Indian Point Nuclear Generating Units 2 and 3, Consequences of a Postulated Fire and Explosion Following the Release of Natural Gas from the New Aim 42 Pipeline Near IpecTornado Missile
Hydrostatic
Coatings
Met Tower
FLEX
Earthquake
ML20122A10527 May 2020Letter from Margaret M. Doane to John B. Rhodes, Chair and Executive Officer, Ny State Public Service Commission: Response to Ny State Public Service Commission Regarding Natural Gas Transmission Pipelines Near Indian Point Nuclear Power PlSafe Shutdown
FLEX
Tornado Generated Missile
Fukushima Dai-Ichi
Earthquake
ML20100F6358 April 2020Expert Team Final ReportSafe Shutdown
Unanalyzed Condition
Non-Destructive Examination
Mission time
Tornado Missile
Hydrostatic
Probabilistic Risk Assessment
Coatings
FLEX
Fukushima Dai-Ichi
Significance Determination Process
License Renewal
Earthquake
Fatality
NL-19-073, Request for Relaxation of Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)22 October 2019Request for Relaxation of Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)Ultimate heat sink
Spent Fuel Pool Instrumentation
ML19252A3189 September 2019Entergy to NRC, IPEC Weekly Sturgeon Monitoring Report for Week of Sept 2, 2019
ML19301A50513 August 2019JAF-CALC-NBI-00205 Setpoint Calculation for Vessel Lo-Lo Lvl Primary Containment Isolation Function (02-3LT-57A,B and 02-3STU-258A,B)Safe Shutdown
Reactor Vessel Water Level
Earthquake
BVY 19-020, 72.48 Summary Report for the Reporting Period March 2, 2017 Through March 2, 201920 June 201972.48 Summary Report for the Reporting Period March 2, 2017 Through March 2, 2019Fuel cladding
ML19198A25220 June 2019Alternate Disposal Request - Rail Shipments (License DPR-28, Docket No. 50-271)
NL-19-061, Form OAR-1 Owners Activity Report for Inservice Inspection and Repairs and Replacements13 June 2019Form OAR-1 Owners Activity Report for Inservice Inspection and Repairs and Replacements
ML19114A07422 April 2019Entergy to NRC, IPEC Weekly Sturgeon Monitoring Report for Week of April 15, 2019
NL-19-012, Request for Approval of a Certified Fuel Handler Training and Retraining Program15 April 2019Request for Approval of a Certified Fuel Handler Training and Retraining ProgramJob Performance Measure
ML18158A1336 June 2018Extent of Condition Review in Response to Findings Associated with Inspection 95003: Evaluation of NRC Assessment and Inspection Processes at Pilgrim Nuclear Power StationHot Short
Safe Shutdown
Unanalyzed Condition
Enforcement Discretion
Missed surveillance
Tornado Missile Protection
Pressure Boundary Leakage
Offsite Circuit
ML18098A0886 April 2018Fracture Mechanics Assessment of Embedded Flaw Repair AcceptabilityVT-2
Finite Element Analysis
Earthquake
Liquid penetrant
NL-18-021, Indian Point, Unit 2, Fracture Mechanics Assessment of Embedded Flaw Repair Acceptability6 April 2018Indian Point, Unit 2, Fracture Mechanics Assessment of Embedded Flaw Repair AcceptabilityVT-2
Finite Element Analysis
Earthquake
Liquid penetrant
ML18019A26912 February 2018Flood Hazard Mitigation Strategies AssessmentUltimate heat sink
Hydrostatic
FLEX
Fukushima Dai-Ichi
Flood Hazard Mitigation Strategies Assessment
NL-20-066, Engineering Report IP-RPT-11-00032, Revision 5, Licensing Report on the Inter-Unit Transfer of Spent Nuclear Fuel at the Indian Point Energy Center19 December 2017Engineering Report IP-RPT-11-00032, Revision 5, Licensing Report on the Inter-Unit Transfer of Spent Nuclear Fuel at the Indian Point Energy CenterBoric Acid
High winds
High Radiation Area
Tornado Missile
Water Inventory Control
Time to boil
Weld Overlay
Hydrostatic
Probabilistic Risk Assessment
Coatings
Nondestructive Examination
Incorporated by reference
Design basis earthquake
License Renewal
Earthquake
Control of Heavy Loads
Fuel cladding
Fire Watch
ML17349A1568 December 2017Risk Impact of One-Time Extending the ILRT Interval Associated with the Proposed Technical Specification ChangesHot Short
High winds
Probabilistic Risk Assessment
Seismically rugged
Large early release frequency
ML17279A2476 October 20172017 Annual Assessment Meeting Written Comments CompilationEarthquake
Chernobyl
ML17222A2394 October 2017NRC Response to Request for Deferral of Actions Related to Beyond-Design-Basis Seismic and Flooding Hazard ReevaluationsSafe Shutdown
Ultimate heat sink
Safe Shutdown Earthquake
Probabilistic Risk Assessment
FLEX
Fukushima Dai-Ichi
Design basis earthquake
Spent Fuel Pool Instrumentation
Exemption Request
Earthquake
Backfit
ML17289A6552 October 2017Attachment 6 to NL-17-115, Revised HI-2094289, Licensing Report on the Inter-Unit Transfer of Spent Fuel at the Energy Center, Revision 9Boric Acid
High winds
High Radiation Area
Tornado Missile
Water Inventory Control
Time to boil
Weld Overlay
Hydrostatic
Probabilistic Risk Assessment
Coatings
Nondestructive Examination
Incorporated by reference
Design basis earthquake
License Renewal
Earthquake
Control of Heavy Loads
Fuel cladding
Fire Watch
NL-17-122, Transmittal of 10 CFR 50.59(d)(2) Summary Report, March 26, 2015 to May 18,201728 September 2017Transmittal of 10 CFR 50.59(d)(2) Summary Report, March 26, 2015 to May 18,2017Temporary Modification
JAFP-17-0085, High Frequency Confirmation Report for March 12, 2012, Information Request Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1, Seismic30 August 2017High Frequency Confirmation Report for March 12, 2012, Information Request Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1, SeismicProbabilistic Risk Assessment
Emergency Lighting
Fukushima Dai-Ichi
Earthquake
JAFP-17-0084, Report of Full Compliance with March 12, 2012, Commission Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)29 August 2017Report of Full Compliance with March 12, 2012, Commission Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)Spent Fuel Pool Instrumentation
ML19056A19317 August 2017Attachment 2 Design Input Record
ML17212A57128 July 2017Recovery PlanFunctionality Assessment
Condition Adverse to Quality
Maintenance Rule Program
Grace period
JAFP-17-0078, Focused Evaluation Summary Pursuant to 10 CFR 50.54(f) Request for Information Regarding Recommendation 2.1: Flooding of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident27 July 2017Focused Evaluation Summary Pursuant to 10 CFR 50.54(f) Request for Information Regarding Recommendation 2.1: Flooding of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi AccidentHydrostatic
Fukushima Dai-Ichi
Flooding Focused Evaluation
JAFP-17-0054, James a FitzPatrick - Submittal of Stress Analysis Summary for the 24-10-130 Weld Overlay25 May 2017James a FitzPatrick - Submittal of Stress Analysis Summary for the 24-10-130 Weld OverlayWeld Overlay
Nondestructive Examination
Dissimilar Metal Weld
ML17110A27420 April 2017Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI Division 1Through-Wall Leak
ML17096A21223 March 2017Entergy Engineering Report No. IP-RPT-16-00078, Indian Point RAI CLI-16-07 SAMA Cost-Benefit Sensitivities Rev. 1 (March 23, 2017)High winds
NL-17-020, License Renewal Application - Revisions to Reactor Vessel Internals Aging Management Program and Inspection Plan6 February 2017License Renewal Application - Revisions to Reactor Vessel Internals Aging Management Program and Inspection PlanUnanalyzed Condition
Nondestructive Examination
Functionality Assessment
Condition Adverse to Quality
Aging Management
EVT-1
ML17096A2114 January 2017Entergy Engineering Report No. IP-RPT-16-00077, Indian Point RAI CLI-16-07 MACCS2 Sensitivities, Rev. 0 (Jan 4, 2017)
ML16176A33928 October 2016Decommissioning Lessons Learned Report and Transmittal MemorandumSafe Shutdown
Fitness for Duty
Anticipated operational occurrence
Cyber Security
Aging Management
Fukushima Dai-Ichi
Containment Hardened Vent
Exemption Request
Fire Protection Program
ML16280A22819 September 2016Indian Point 2 Technical Requirements ManualSafe Shutdown
Unanalyzed Condition
Boric Acid
Shutdown Margin
Ultimate heat sink
Grab sample
Offsite Dose Calculation Manual
Tornado Missile
Post Accident Monitoring
Hydrostatic
Emergency Lighting
FLEX
Missed surveillance
Spent Fuel Pool Instrumentation
Recently irradiated fuel
NL-16-109, HI-2094289, Licensing Report on the Inter-Unit Transfer of Spent Fuel at the Indian Point Energy Center.19 September 2016HI-2094289, Licensing Report on the Inter-Unit Transfer of Spent Fuel at the Indian Point Energy Center.Boric Acid
High winds
High Radiation Area
Tornado Missile
Water Inventory Control
Time to boil
Weld Overlay
Hydrostatic
Probabilistic Risk Assessment
Coatings
Nondestructive Examination
Incorporated by reference
Design basis earthquake
License Renewal
Earthquake
Control of Heavy Loads
Fuel cladding
Fire Watch
NL-16-109, Indian Point 2 Technical Requirements Manual19 September 2016Indian Point 2 Technical Requirements ManualSafe Shutdown
Unanalyzed Condition
Boric Acid
Shutdown Margin
Ultimate heat sink
Grab sample
Offsite Dose Calculation Manual
Tornado Missile
Post Accident Monitoring
Hydrostatic
Emergency Lighting
FLEX
Missed surveillance
Spent Fuel Pool Instrumentation
Recently irradiated fuel
ML16250A27613 September 2016Evaluation of Impacts to Proposed Critical Habitat for the Atlantic Sturgeon for Indian Point Nuclear Generating Units 2 and 3 Proposed License Renewal
NL-16-083, Post Accident Monitoring (PAM) Report for an Inoperable Containment Area Radiation Monitor (R-26) High Range, Indian Point Unit Number 31 August 2016Post Accident Monitoring (PAM) Report for an Inoperable Containment Area Radiation Monitor (R-26) High Range, Indian Point Unit Number 3Post Accident Monitoring
ML18115A05928 June 2016After Action Report/Improvement Plan, Drill Date June 28, 2016Fuel cladding
ML16153A37220 June 2016Final ASP Analysis Pilgrim (LER 293-15-001)
ML16043A41118 February 2016Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50 Section 50.54(f) Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force ReviewSafe Shutdown Earthquake
Probabilistic Risk Assessment
Fukushima Dai-Ichi
Spent Fuel Pool Instrumentation
Earthquake
JAFP-15-0129, Submittal of 10 CFR 71.95 Report Involving 8-120B Cask6 November 2015Submittal of 10 CFR 71.95 Report Involving 8-120B Cask